SUBJECT! Comments on Specifications for Dead Creek Interceptor Sewer
Dear Mr. Ooldenbergi
Cur Engineering Dept, has reviewed the drawings and specifications of the subject sewer and pieraping station as prepared by Homer and Shifrin. The design looks good generally. Them are several small items, however, which m believe should be re-examined. They are:
(1) Corrosion at Junction Chamber - The concrete and steel bar screen may suffer severe attack if exposed to aailie wastes for a considerable period. Ve suggest that the concrete be coated with asphalt or other protective naterial and that the bar screens either be made of #316 stainless steel or be mounted (as in a channel in the concrete) so as to be eanily replaced
(&) Hydraulics at Junction Chamber - rainiraras head loss when wastes are flowing south into Deed Creek is desirable.
. As designed the charaber will force the water to turn 90* to flow out through the bar screens. Will head loss be appreciable and, if eo, can it be reduced by placing the bar screen at the south end of the structure so that the turn is avoided T
(3) Stability of Junction Charaber - will the Junction chamber be subject to frost heave? Also - in event of settlement, will the weight of the charaber be supported by the pipes? The sans concern exists in relation te attachment of the pipes to the puoplng station - it appears that the pipes can be easily broken tey settleraent f toe pump station.
(t) 21" Overflew Line - This line is 'laid flat and at such an elevation that test liquids trill tend to be trapped. We suggest that consideration be given to raising this line
PAUL HODGES DEPOSITION May 31 - June 1, 1994
EXHIBIT NO. 15
C-0003 2 renum 004046
HARTOLDMONOOQ7121
Mr. J. V. Goldenberg
-3-
December 6, 1965
(4) slightly and giving It a llttla pitch so that It will
normally be dry.
'
(5) Two small typographical points -
(a) On page 11-17 of the spec*, "20-inoh" VCP is referred to - should read "21-lnoh".
(b) On page 1-13, last sentence shows head range as "6 feet minimum to 16 feet maximum". We believe minimum level should be about 9 feet.
We assume that Cerro is examining the project to assure that it will relieve all of their flooding problems.