Document MGMEjp1y32O4pLqJqYGRmKokV

PLAINTIFF'S EXHIBIT I \ MON-716 i PLANT MANAGER'S SAFETY BOARD MINUTES OF MEETING (SYNOPSIS) MAY 18, 1983 were: A.H. Conrad G.A. Danner G.W. Daues R.M. Fritz (Guest) R.T. Hammann R.L. Hammond D.E. Kaldenberg E.T. Kirk for J.G B.C. Lancaster D.W. Metten S.G. Pappas G.L. Tromblee G.L. Wofford Trafton I. REVIEW OF STATISTICS--R.T. Hammann A. Texas City Plant Safety Performance Summary - April (A) INJURIES WITHOUT LOST WORKDAYS (medical treatment only) (B) LOST WORKDAYS CASES **Bj RESTRICTED ACTIVITY **b2 DAYS AWAY FROM WORK CASES (C) FATALITIES *TOTAL RECORDABLE CASES 1982 APR YTD 16 12 00 12 00 28 1983 APR YTD 02 00 00 00 00 02 1983 TARGETS 11 2 -- -- -- 13 INJURY RATES PER 200,000 MANHOURS 1982 APR YTD 1983 APR YTD 1983 1983 MFI TARGETS TARGET YTD TOTAL INJURY-TIR TOTAL RECORDABLE-TRR TOTAL LOST WORKDAY-TLWR DAYS-AWAY-FROM-WORK-DAWR 11.49 1.44 0.72 0.72 9.19 10.72 1.39 0.00 0.35 0.00 0.35 0.00 10.44 0.41 0.00 0.00 -- 0.87 0.13 -- --------- -------------------- 1.02 0.91 ----- 0.26 ----- 0.18 B. Comments on Statistics--R. T. Hammann There were no Recordable Injuries in April. As noted in the bulletin board announcement, we have gone 2,000,000 hours (8 months) without a sc 13945 STs 2430751 LAM015734 PMSB Meeting Minutes--May 18, 1983 Page 2 Lost Workday Injury. Minor injuries have increased In May (10 so far in the month), so we must Increase our awareness to maintain our safety record at the present high level. Areas having a high cumulative monthly rate are: Dept. 53 Insulators Truckers--Laborers Electricians Analysts Areas having a high cumulative monthly injury rate, but showing improvement in recent months are: Painters Dept. 50 Areas having excellent safety records are: Dept. 513 - 8 months without an injury Stores - 15 months without an Injury Dept. 33 - 16 months without an injury C. Contractor Safety--R.L. Hammond No report. II. REPORT OF THE SAFETY ADVISORY COMMITTEE (SAC)--G. A. Danner A. Practice of Removing Manways from Equipment SAC recommended to PMSB that manways on equipment can be safely opened without blinding provided that: 1. The equipment is blocked, locked, and depressured. 2. The equipment is decontaminated (assured by vapor test for contaminants and adequate oxygen for breathing). 3. Manways are attended while open. It was noted that if a person inserts his head inside the manway it is considered vessel entry and would require an entry permit (P-0117). This practice was approved by PMSB with the following additions: a. The procedure applies to inspection only. 13946 b. Manways must be replaced immediately after the inspection is completed and equipment must be inerted. c. This work requires a Special Permit. A SHAC Alert will be issued stating this policy. STG 2430752 LAM015735 PMSB Meeting Minutes--May 18, 1983 Page 3 B. Removal of bolts from manways before blocking, locking, decon taminating, and blinding PMSB agreed with SAC's recommendation against this practice. HI. REPORT OF THE PLANT SAFETY AND HOUSEKEEPING ACTION COMMITTEE (SHAC) -- A. H. Conrad A. Hourly Safety Committee There was 100% attendance at the April meeting at which Greg Daues discussed the plans for expanding S-T-O-P to all hourly employees. A status report was given on the following items: 1. Cooling tower fan brakes - A design is being completed and this will be reported through normal maintenance channels. 2. Vessel opening without blinding - SAC reviewing for plant policy (see SAC report). 3. Use of barricade tape - Reminders have been issued to supervision and individuals were asked to report misuse of the tape to appropriate supervision. 4. Radio Calls - Problem explained to maintenance supervision. 5. Plectron checks - Plant testing of the plectrons in units will commence 5/16/83. New Concerns: 1. Responsibilities of holeman - SHAC will review and make a recom mendation to SAC and PMSB. 2. Other items discussed were referred back to the unit or craft where the problem originated. B. Quarterly Safety & Housekeeping Inspection This will be scheduled for the last two weeks in June. An Expanded Staff meeting will be held May 25 at 14:00 hours to discuss plans for the Second Quarterly Inspection and review the results and rating system from the First Quarterly Inspection. C. Annual Inspection It is assumed that this year's inspection will be similar to last year's with no formal outside team unless some reciprocal agreement is reached with Chocolate Bayou. More Information on this is expected after a meeting between Tromblee and Brasfleld on 5/20/83. D. Bicycle Safety SHAC will work on this from a safety rules aspect only. Procurement, maintenance, and security of bicycles will be addressed by other disciplines. SC 13947 STG 2430753 LAM015736 PMSB Meeting Minutes--May 18, 1983 Page 4 E. S&PP Survey 1. Nitrogen back-up of instrument air - A memo was written requesting that a change from instrument air to nitrogen be noted on the protective devices bypass status board in addition to the present control procedures. 2. Portable buildings and trailers - Those portable buildings in unacceptable locations have been removed. Several in questionable areas are not being moved as the risk is considered to be accept able . IV. REVIEW OF INCIDENTS Monsanto Incidents Date Incident No. Description 03/31/83 83-05 (not issued) Recordable Injury--Dept. 51 NH3 bullets; operator fell, same level, struck chin and neck required 3 stitches to close. (Fiesinger) 03/30/83 83-06 (not Issued) First Aid Case--PA storage tanks; pipefitter and contract insulator struck by PA while working on 56P703. (Coleman) Contractor Incidents 04/07/83 C-83-02 (not issued) Days-Away-From-Work Case--Dept. 35 Dismantling; contract wrecking crew member; right abdominal strain; 4-7 days off. (Vornkahl) It is felt that investigation and reporting of Incidents is taking too long. Steps should be taken to complete the investigation in a timely fashion so that effective corrective action can be taken. V. STATUS OF S-T-O-P PROGRAM--G. W. Daues The card tally has picked up. This apparently reflects that goals have been established in this area. STOP III is in progress for the Chiefs/ Leadmen and instructors have been selected for the final two sessions for this group. A new class for supervisors has been considered since there are approximately 10 people who have transferred to the plant from other Monsanto locations since the training was completed. VI. MISCELLANEOUS--R. T. Hammann A. Fire, Entry, and Special Permit Procedure--P-0117 SC 13948 The first session for reviewing the revised Fire, Entry, and Special Permit Procedure (P-0117) was held Tuesday, May 17. A second session for supervisory personnel will be held Thursday, May 19, at 13:00 in STG 2430754 LAM015737 PMSB Meeting Minutes--May 18, 1983 Page 5 the Research Conference Room. These meetings are being held to ensure consistent implementation of this procedure throughout the plant. Plans are to implement the new procedure and permits on June 1, 1983. B. Eyebath/Safety Shower Retrofit It was a consensus feeling in the plant that the cost involved in retrofitting all safety showers and eyebaths for freeze protection and installing dual eyebaths is not justified. It will be left up to the units to determine whether or not it is necessary to retrofit any or all of the safety showers and eyebaths in their area. C. Emergency Procedure Manual This manual is out of date and needs a general revision. Bob Hammann will review with each superintendent what revisions need to be done in their section. The goal for completing these revisions is Sept. 1. At the June PMSB it will be determined whether or not this goal is realistic. D. Distribution of Safety Binders Loose-leaf safety notebooks for supervisors and for holding the Safety Procedure Bulletins have been received and are presently being distributed. E. Quarterly Safety & Housekeeping Inspection Responses to the comments made in the Quarterly Safety & Housekeeping Inspection were slow in being received. Several phone calls were required in some cases in order to get the appropriate response. Since these responses are now being sent to the appropriate General Superintendent, in the future SHAC will not contact the individual, but will contact the General Superintendent concerning areas which are late in reporting. VII. PLANT MANAGER'S COMMENTS Recently we have seen an increase in the number of minor injuries and incidents occurring in the plant. This could well be a sign of a let down in our safety awareness. It's up to all of us to take the extra steps to ensure that our safety performance remains at a good level. RTH/es R. T. Hammann SC 13949 ST6 2430755 LAM015738