* 10 - . * CC tNflO Monsanto no* imam i location W. R. Furley, 0A4 oan August 29, 1984 MMCI hhoki Close Outs; Safety Shut-Off Valve, AR 7379. 01-511665 TO T. W. Triplett I cc* Sylvia Rodriquez Ella Woodley Paul Vanderhoven Central Files I All capital work on the subject job was completed by February 9, 1984, and a project close-out notice written. The attached PAFE was approved to accept expense charges incorrectly charged to this job following February 9, 1984. These charges were: Materials $ 2,030 Owens-Corning Invoice $ 7,610 Opel Invoices $ 2.460 Total expense charges $12,100 Please transfer these charges to Job #03-536191 and close both accounts 01-511665 and 03-536191. ew LAM026222 SC 18559 C Monsanto Company PROJECT AUTHORITY FOR EXPENDITURE V PLANT and/or RETIREMENT <mrt roa to c giro ro Mrntowntt mauimm ccwmti mmwi *no lowtii um. or rrov BUDGET ITEM NO. DEPT. NO. DATE ENG. JOB NO. 19 910.2U 641 1 7/9/84 03-536191 DESCRIPTION. REASON AND JUSTIFICATION FOR WORK: UNBUDGETED AUTHORITY NONE Repair/Revise Acetic Acid Loading Line (Dock 1). Safety Shutoff Valve' Expenditures for repair of Insulation and revisions to steam tracing were Incorrectly charged to Capital*511665, AR 7379. This PAFE is written to provide an account .for expense related work performed. L/MSA026223 Scope: Replace a block valve with a cylinder operated block valve using existing (AN) controls. (Note: Revisions to tracing and insulation involving approximately 5 ft. of pipe were omitted from the engineering estimate.) ^Execution: 1. Install nev valve, pneumatic controls and insulate - completed and closed 2/9/84. 2a. Bleed lines were not piped and new valve was not functional. Insulation removed, valve sent to valve shop for correction, bleed lines sketched and fabricated. b. Bleed lines fabricated opposite-hand; refabricated. *3. Valve and bleed lines reinstalled and insulated. 4. Drain lines leaked. Remove insulation, fix leaks and reinsulate. 5. No steam flow in tracing lines. Remove insulation, repair crimp and reinsulate. 6. Part of the loading hose and one flange joint were insulated by mistake. Remove and reflnish insulation. *(Steam tracing was reported to have been omitted on initial installation, which would have added a "strip insulation, install tracing and relnsulate" step.) iNotes from Tom Hartnett & Pete Payne G W. R. Furley 7/9/84 LAM026224 SC 18561