SOLV/EPC & CMP PLANT NOTIFICATION OF PROCESS CHANGE CHECKLIST
Type: LEVEL 1 (minor)
^ Originator:
'x&PJh
Q LEVEL 2 (moderate) -0 LEVEL 3 (major)
Date of Origination: Li-1~^ -9 7
Plant: Solvents/EDC
Actual Date of Change:
Area:
_____________ Equipment:
o^jF'akTOi
Permanent^) Yes Temporary Yes From: ____________
To:
Description and Location of Change (Scope):
-fco___ > \Oo ^yvw ;
f w. V )0o y fwx W>^
Cq I&j--I, S w^.iudn -Vhi. -"TWa**------------
Technical Basis for Change: -rk\S uJ'\V ~iv>Suml
uAl\ vstA be
-jo *%- ?o
u>K-w ^Kc, CQ VeU
i& > l6Qfyw>,
TOc
ttuyAi
-Vo
it%- fc-Ouirt^i scA*. V*. O- 3ooo ffV'n. A"t WsJ. JcLte., 0.
wovli <*ue
Impact om Safety QLoss Prevention ^Environment Health QOuality nProduction QOther: __________
r*
.
Type of Change:
Alarm >0Shutdown Point
instrument
^0Process Computer Control nAddition/Removal of Equip. DPiping Modification
Equip./Material Modification Chemical Djob Procedure No.
QProcess Set Point Change DPiping Spec. DOther
Pre-modification Checklist: Applicable
Follow
Applicable Applicable Applicable Applicable Applicable Applicable ^Applicable Applicable Applicable Applicable Applicable Applicable Applicable Applicable Applicable Applicable Applicable 3 Applicable ^Applicable (^Applicable 0 Applicable E Applicable Applicable Applicable Applicable Applicable Applicable Applicable Applicable Applicable
Written job scope and sketch of proposed change; POD#
Yes
Project economics; attached.
Yes
Consult piping and equipment specifications; Spec. #
Yes
Comply with Engineering Practices.
Yes
Consult Technology Center or comply with Tech. Ctr. guidelines.
Yes
Equipment access/congestion considered. Consult Environmental function
Yes
Yes /fa
Environmental project checklist complete.
Yes
Chemicals listed in the (TSCA) inventory before use.
Yes
Perform Reactive Chemicals testing or review.
Yes
Consult Safety function for compliance with S&LP and Block requirements Yes
Consult Process Safety for impact on PHA(F&EI, CEI, & Fire protection). Yes
State Fire Marshall notified.
Yes
Consult Industrial Hygiene function
Yes
Consult maintenance/Beliability Eng.
Yes
Consult Instrument function.
Yes
Consult Electrical function.
Yes
Consult Analyzer function.
0i s
Consult/Inform Computer/Programming Support.
Yes
Consult Area Engineer.
Ye$
Consult Operations.
--
____
-- Q-Yes
Consult Area Technologist
O^Yes
Consult Inventory Management Consult Process Engineering.
Yes f Yes L
Evaluate and modify relief system.
Yes
Work Order written. (List them)
Yes
Consult Constmction/Small Projects
Yes
Consult Site Logistics
Yes
Consult Quality (Customer Notification ?)
Yes
Other (Name them)
Yes
Date 4-'i-r
Page l of 4 RR 4/96
DOW CONFIDENTIAL INFORMA TION
Rs-1030.doc
DO A 026508 CONFIDENTIAL
APPROVALS: Originator: First Reviewer: Preliminary Reviewer(Lvl 2 & 3):
Date: H~ 1*7 *^7
Date:
Date: $A/g.
| Poat-modlflcatlon Checklist: (BEFORE START-UP)
Applicable
Applicable
Applicable Applicable Applicable
Applicable Applicable 3Applicable Applicable Applicable Applicable Applicable Applicable Applicable Applicable Applicable Applicable Applicable Applicable
Perform prestartup audit: major equipment addition/mod, Lvl 3;attach. PSM files updated(such as piping circuits).
Project list updated. Documented in Operating Discipline Library
Completed Job Procedures reviewed by: Operations Safety. _____________ _ Envir._ Emergency Procedures Training Aids (IPT, etc.) Controlled copies of Critical Oper. Procedures updated Safety/Environmental (cleaning, vessel entry, red tag) Update plant Roundsheets, forms
Plant equipment files updated. P&ID's, process flow sheets, and plot plans updated. personnel trained on the change. Method: ww /aA:
Critical instrument checklist updated. Updated HAZCOM Manual & equip. List. Pressure vessels, PVRVs, & PRD registered. Instrument loops checked and documented. Field switches, equipment, & MCC starters checked & labeled.
Log sheets/controlled forms updated. QPI flow diagram & history/EDAS updated. QEMTS, PPM, & MSMS updated. Mod V program change checklist completed. Equipment RTO Checklist completed. Follow-up action plan completed prior to Final Approvalttffached).
Follow-up Signature
Yes _
Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes
Date
APPROVAL: Final Approver:
trill/
Date:
\
Page 2 of 4 RR 4/96
DOW CONFIDENTIAL INFORMATION
Rs-1030.doc
DO A 026509 CONFIDENTIAL
* MOC TITLE:
Methanes MOC Training Signoff She*;
f>fv~
Fj V,j
DATE:
I Mark the box next to the appropriate individual that the communication/training is intended to reach.
Engineering Staff Master#
Signature
Date
SOS
Master# A . Signature
Taylor, D. Haney, J. Kelley, K. Storm, C. Hunt, L.C. Rolke, R.W. im Stallcup, J.S. White, W.S. Young, Barry.
434501 091506 239424 249497 088600 097946 240558 434499 433620
jJLy^ y/niiL
w/A
Breaux, R. Beieler, B. Bickham, C.J. Cook, F. Cavalier, N. Grant, W.C. Gravouilla, D.C. Jackson, R. Metrejean, D.J.
433793 281334 432411 431977 241889 432637 434255 433457 241773
Harrison, . 0.
096480
Day Personnel Master #
Signature
Date
Michel, A,
X Cook, J. Dugas, D.
x Brown, M.S.
/ Rizzo, G.
Johnson, J.
Donatto, B.
Carrier, B.P.
Witt, J.
432203 433658
432407^ 'fit A
433928^ 432580 432541 434031 085908 241996
WA*&r-Ani
OS Bishop, C.E. Bourg, J. Davis, C. Ekey, J. Jack, O.J. Looney, R. Wolfe, D. Millender, R.
Master # . Signature
432026 094487^ 433015 202669 094373 276854 246186
432751 item
L1 Vavasseur, T. Landry, C.P.
434160 434292
f7 Date
Site Logistics Clebert, J. Mathis, J. Simonson, F. Armond, N.L. Doucet, K
Master# 432385 432997 432477 098664 432056
Signature
Date
\
Page 4 of 4 RR 4/96