Safety Audit - South Plainfield Plant - June 16, 1970
June 26, I970
SUMMAET
The industrial hygiene exposure presented by the Spray-Ebn operation is severe. Both Celite and Asbestos dust and spills are widespread. This is the worst toxic dust hazard I have seen In the company.
Three out of forty-nine exposed employees that were recently xrayed, have questionable x-ray plates and need re-testing.
The heavy production schedule certainly magiifies a problem that should have been corrected at the time of initial construction, Installation of the approved duet collection eys-tem should be expedited.
A rigidly enforced respirator program is needed. A 100$ safety eye protection program should be considered.
Between dust problems from Spray-Don and those created by the accelerated market for felt, an uncontrollable housekeeping problem exists. Present building and equipment arrangements aggravate the problem, causing considerable haulage of otherwise re-usable waste.
CSEK:bp