inter office memo TENNECO CHEMICALS, INC.
To J. T. Sweeney
FromW. R. Smickle
Subject VCM Control Report Period: 9/6/82 - 9/12/82
At Flemington At Flemington
DATESeptember 15, 1982
Copy toR.
J. W. F. H. R. W. S. M. G. D.
A, Donovan E. Durant R. Fogelsanger W. Kanzler R. Horton A. Lojewski Miringoff P. Robbins K. Rosen I. Rozand I. Scofield
Area
VCM Average Level
% *^1 PPM
Number ^7100 PPM
Reactor Building
0.2
3.0
1
Recovery Comp. Room
2.1
32.3
0
General Area
<0.1
0.03
0
Pilot Plant
1.7
1.9
17
Parshall Flume
2.5
1.1
2
Pilot Plant level of 1.7 ppm was the result of a defective valve and leaking header which were subsequently repaired. There was no personnel exposure.
WRSrms
W. R. Smickle
012]56
90-2184
nter office memo TENNECO C H E fV3! C A L S, INC.
To w. R. Smickle
from j. E. Durant
Subject VCM Control Report Period: 9/6/82 to 9/12/82
At Flemington At Flemington
DATESeptember 15, 1982 Copy Top, R. Bisson
Attached is a summary of the Flemington Plant VCM levels as determined by the Computerized Area Monitoring System for the week of September 6, 1982 to September 12, 1982.
JED:ms
J
J. E. Durant
012357
TABLE I AREA MONITORING SYSTEM - FLEMINGTON
Weekly Summary
Area .
AVERAGE PPM.VCM
Reactor Building
0.2
Recovery Comp. Room 2.1
General Area
<0.1
Pilot Plant
1.7
Parshall Flume
2.5
Period: 9/6/82 - 9/12/82 Number of Readings & Percentages
Total
71
Samples N
%
>5 NX
725 N%
7100 N%
11,736 356 3.0 97 0.8 5 0.04 1 0.01
1,304 421 32.3 132 10.1 5 0.4 0 0
6,520
2 0.03
00
00
00
5,216
98 1.9
54 1.0 28
0.5 17
0.3
652 7 1.1 5 0.8 2 0.3 2 0.3
JED:ms
J. E. Durant
012158