Document M4yp7V4DB2yRzgVjv6pYKxogy
Anniston
J. T. Bell J. L. Corder A. G. Hill G. L. Jessee L. C. Lahman J. C. Landwehr H. E. Schulte W. F. Taffee
General Offices
H. C. Carder D. Danna (5)
M. w. Farrar
p. B. Hodges F. J. Holzapfel D. B. Hosmer R. E. Howard
w. K. Johnson
C. F. Luecke
w. R. Richard
W. R. Robirds C. W. Roos J. R. Savage J. E. Smith J. A. Stephens
South Second St.
P. 0. DeGarmo
Other Locations
A. H. Forsten Alvin, Texas
D. W. Jackson W.G.K.
COMPANY CONFIDENTIAL
Anniston Plant
TECHNICAL SERVICES DEPARTMENT
MONTHLY REPORT
Summary
OCTOBER 1970
Month YTD
COST IMPROVEMENT RESULTS
Est. Act.Target
% of Target
$74,570
$78,975
94.5%
$709,703
$621,755
114%
Organic Division
Initial results of the Polyphenyl Tubular Unit test indicates capacity of 92 mm lbs./year of polyphenyls at 50/50 - biphenyl/ Santowax C split. Testing is continuing in order to verify/ increase capacity of unit.
Redesigned chlorine spargers installed in one Solid Aroclor chlorinator has decreased free chlorine in HC1 off-gas. Ten tative Amendment "D" to use aluminum and/or AlCl3 catalyst in Aroclor 5460 process was verbally approved and use of aluminum has further decreased the free chlorine. Test continues.
Progress report on the production of low color Aroclor 5460 in Sep 70 was issued.
Evolutionary Operation was begun in Aroclor 5460 to optimize chlorinator-still bottoms. Early results indicate a 30% re duction in still bottoms, with a potential yield savings of $70,000.
HCl - Project 3512 CHC1 Catch Tank) was transmitted to Main tenance 10/15/70, catch tank arrived 10/21/70. Shop fabrication of pipe and supports started week of 10/26.
DSW 014920
.
...
CONFIDENTIAL INFORMATION
This document contains confidential information which it tha property of Monsanto Company. Only thosa portions of ttia document relevant to a
duly authorixad individual's neod to know may be escarptad for him. Tha raport must not be sent outside the Company without written approval and
the euthorixed recipient is accountable for its safe keeping, excerpting or otherwise disclosing of Ht contents and for its propar disposal. Tha docu*
mant remains tha proparty of Monsanto Company and shall ba retyrnad within two months to its author, axcapt upon special authorisation to hold for a longar period."
STLCOPCB4003296
2.
Project 3690 (HC1 Fume Collection and Scrubbing Systems) - AFE issued 10/26/70 for $35M NFC, $7M expense and $3M dismantling. Project for warded for approval. Detail design now in progress. The project includes two separate systems for collecting and scrubbing fumes. One system will handle the loading operations and the other will handle storage tank vents, process tank vents and tails tower vent. Carbon adsorption studies of the Aroclor sump effluent are continuing. After over 4 weeks of continuous operation, the effluent PCB level is still low ( 10 ppb).
The promoter scanning study and mid-point injection phase of the Polyphenvl Pilot Studies is approximately 95% complete. The target date for issuing the report covering work to date is 11-16-70. PR&D studies directed toward solving handling problems of methyl and ethyl intermediate residue were initiated 10-15-70. A progress report was issued on the plant demonstrations of Tentative Process Amendments: 1) Chlorination in the Presence of Acetone, and 2) Diesel Fuel as a Diluent for Still Residue. As a result of failure of these amendments because of sulfur and residue handling problems, a program was begun in PR&D to determine alternate means, other than a straight take-over distillation, for separating the intermediate product in chlorinated thio acid from sulfur and residue. A work plan was prepared for returning parathion condensation yields to the standard once operations resume in early 1971.
Drafting was begun on an experimental project to increase the efficiency of the cone tank for removing Parathion from waste water.
Quality Control The Plant Quality Score was 73.8, down 3.1 from September, with a YTD score of 84.4 against a target of 95.0. Pollution components were placed under the routine surveillance program.
Pollution Control J. T. Bell, J. C. Landwehr and E. G. Wright met with Mr. J. L. Crockett (Technical Staff Director, A.W.I.C.) to discuss Anniston plant progress and plans on the PCB problem. Aroclor losses during October averaged 3.1 #/day. Planning is active and a project is being prepared for renova tion of the old limestone pit. The entire Anniston plant program was reviewed with Messrs. Mason and Papageorge on October 16.
DSW 014921
STLCOPCB4003297
)
PLANT LABORATORIES ANALYTICAL AND QUALITY CONTROL - S. . Kemp
Complaint Report
Quality
Number
Material
Customer
ATL-30-P Muriatic Acid Olin Corporation
YTD Quality Complaints/100 Shipments 0.29 Target 0.20
Reason High Iron
DSW 014922 STLCOPCB4003298
COMMUNITY RELATIONS, PERSONNEL, RECRUITING AND DEVELOPMENT
4.
Community Relations
1. J. L. Brown, Ish Ransaw, W. F. Taffee, and J. L. Etheredge visited Reichold Chemical, October 6, to view the Biodize pilot waste treat ment equipment.
2. Ish Ransaw attended "Industrial Waste Treatment & Water Pollution Seminar" at Bessemer branch University of Alabama, October 13-16.
3. J. T. Bell attended organizational meeting of Central Alabama AIChE Air & Water Pollution Committee in Birmingham, October 15.
4. J. T. Bell, E. G. Wright, and J. C. Landwehr met with Alabama Water Improvement Commission Technical Staff Director in Montgomery, October 23.
Visitors
1. J. C. Mahaney and J. V. Castelli, Pfaudler Corporation, presented technical seminar on "Wiped Film Distillation," October 1. The seminar was attended by TSD Engineers and PRfiD Chemists.
2. w. B. Papageorge and John Mason visited the Anniston Plant for a review of PCB pollution abatement program, October 16.
3. Dr. Gerald Gunning (Tulane University) presented an analysis and proposal for study of Choccolocco Creek aquatic environment and its relationship to PCB.
DSW 014923 STLCOPCB4003299
)
1970 DISTRIBUTION CF TINE BY TECHNICAL SERVICE
EXISTING PRODUCT TECHNOLOGY IMPROVEMENT
NEW PRODUCT EVALUATIONS
MAJOR PROJECT SUPPORT
PROCESS CONTROL IMPROVEMENT
70 60 50 40
PROJECT DESIGN
PROCESS MAINTENANCE
TECHNOLOGY AND TECHNICAL SUPPORT
30 20 10 10
0
15 5
TECHNICAL MANPOWER
FLANT IMPROVEMENT PROGRAM
REAL ESTATE MANAGEMENT
15 5
10
0
c03
n<u
Cl.
su<0
<aL,
>1 203
*c3~3
3"3 <3O'
cC<nuU 4o0J
z0>
0 a
DSW 014924
STLCOPCB4003300
) ORGANIC DIVISION' 1970 T5D COST IMPROVEMENT
FUNCTIONAL FLUIDS
TAR ' EST
ACT
Disposal of Liquid Montar
TAR EST ACT
#3 Aroclor Still New Burners
TAR EST ACT
#2 Still Entrainment Separator
TAR EST ACT
1242 Distillatio t Productivity
TAR EST ACT
TAR
EST
ACT TAR
PLASTICIZERS
EST ACT
Flaking & Drum ming Facilities Headcount
Solid Aroclor Instrumentation
TAR EST ACT TAR EST ACT
TAR
Sandvik Belt
EST ACT
Add Tray Strip ping Sections to Santowax
TAR EST ACT
TAR
Cl2 Bulk Handling
Facilit
L. es
EST ACT
Solid Aroclor Expansion
Chlorinator Back Pressure
TAR EST ACT TAR EST ACT
TAR
EST
ACT
TAR
EST
ACT
TAR
EST ACT
___ TAR
EST
ACT
JAN FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DEC 1
1500 600 600
1080 C C
1080
,0 c
1500
1080 0
0
1080 1080 1080 1080
0
u -------0"
0
000 0
1080
1080
500
500
3000
3000
00
150C 1500 1500 1500 1500 1500 150C 1500 1500 C 100 1O00 1520 '2555 ZUOU 1210 660 C 100 1000 1520 2565 2000 1210
1030 1500
3000 3000 3000
3000 2000 1000 3000 2000 1000 3000 2000 1000
3750 0
1000 1000 1000
3750 3750 3750 3750 3750 3750
O 0
0 0
U
0
0 0
0Q
2250 2250 2250 2250
3750 2250
0 00
00 0 4580 4580 4580 4580 4580 4580 4580
0 00 0 00
c 0 0 00 0
4580
2000. 2000 2000 2000
3500 3550 1950 344C
3500 3550 3050 344C 30000 5000C
30000
4950C 5000C 1000C 36000 24000 20000 17900 4300C 72000
5190C 5590C 1050C 38500 23500 24700 27600 4500C
360 360
360
0
0
3750
2250}
j
4530j
1
1I
I
1
360
------
----
DSW 014925
STLCOPCB4003301
> organic division
1970 TSD COST IMPROVEMENT
FUNCTIONAL FLUIDS & PLASTICIZERS Aroclor Ware house Reduced Headcount
Improved Santowax Yield
HB-40 deduce Nickel Catalyst Usage Substitution of Santowax C for Santowax R
GENERAL CHEMICALS Biphenyl Cool ing Water Treatment PNP Modify Acidifies Dump Valve Svste m Install Entrain ment Separator . Production
Variables-PNP
Re-use Well Water
Untargeted PNCB Heel Credits
HCl HCT Catch Tank & Coalescer 150 M Gallon Storage Tank
HCl Instrumentation
TAR
JAN FEB' MAP. APR MAY JUN JUL AUG SEP OCT NOV DEC
EST ACT.
(AFF ECTIN 3 BOT l BUS I NESS GROUP S)
TAR --long. 1000 EST 1000 1000
ACT 1000 1000
1000
10Q0 1000
-
TAR EST ACT TAR EST ACT TAR EST
1160
4000 400'Q 4000 400Q 5900 2800 5800 4000
4450 2800 5800 4000
700
1330 1335
700 700 525 1230
525 2080
700 425
565
4000 4000
4QQQ
97C 663C 6280 1910
97C 6630 628C
700 C (
700 C 0
700 540
45C
20Q0C
4Q0Q 2QQQC
ACT
TAR
EST
ACT
TAR
EST ACT
03TP HENYL PNP, HCl 1
TAR EST ACT TAR EST
ACT TAR EST ACT TAR EST ACT TAR EST
600 670 670
3150 520 520
6Q.Q 680 580 680 580
3150 3150 1277 2164 3016 2164
600 600 600
600 600 67C 440
675 440
600 290 29C
625 625 625 625
625 625
625 625 625 625
625 625
625 625
625 625
5500 5500 5500 5500
0 00
00 0
463C 4630 4630 4630 4670 4670 4670
12: 1604
0 1525 1780 2365
12- 1 1605
0 1525 1780 2366
5Q0
1 625 625 5500 5500 4670 4670 : 500 600 1
ACT
TAR
EST ACT TAR EST ACT TAR
2275 563 3078 1650 920
2275 563 3078 1650 920
5700 5700 5700 5700 5700 2500 7560 9000 1030C 6545 2500 7560 9000 1030C 6545 4300 "53UCT TTOO 4300 "4300 430Q
410 410
550 550
753 753
EST ACT TP R EST ACT TAR
4300 4300
4300 4300 4300 4300 4300 4300
1875
4000 1230C 4000 1230C
4300 4300
4300 4300
1875 1875 1875 1875 1875 1875 1875 3440 6500 3940 8160 129QC 0 3440 6500 3940 8160 1040C
-1375.
EST
ACT
TAR - -- - .. -- -- EST
11
1
ACT
DSW 014-926
STLCOPCB4003302
) ORGANIC DIVI5ICM 1970 TSD COST IMPROVEMENT
PLANT WIDE Improve Plant Power Factor Central Air Compressor
Chlorine Plant Shutdown RTN Cooling Water to Tower Cooling Con veyor - P2s5
Total Organic Month - M $ Total Organic YTD - M $
JAN TAR
FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DEC
EST
ACT
TAR
EST
ACT
TAR EST ACT
950
900 940
950 950 950 950 950 9TS 790 8W 8^x5
914 840 790 810 845
TAR
1000 1000[ 1000
EST ACT
TAR 19900 EST 19900 ACT 19900
TAR EST ACT
19900 19900 19900 19900 19900 19900
19900 19900 19900
9950 9950
9950
25 25 25 25 25 25 0 0 0-
TAR
EST
ACT
TAR
EST
ACT
TAR EST ACT
40.6 72.1 96.88 58.07 44.62 27.97 34.12 30.52 30.88 64.68 51.68 [51.63 36.29 94.54 103.6 70.39 74.61 43I5H" JO. J J 37 .65 67.68 74.57 36.33 99.86 109.1 70.89 77.98 42.22 35.03 47.35 67.09
TAR 40.6 112.7 209.6 267.6 312.3 340.2 374.3 404.9 435.7 500.4 552.1 603.8
EST 36.29 130.9 239.8 315.7 390.8 437.7 467.7 510.0 587.6 661.4 ACT 36.33 136.2 245.3 316.2 394.1 437.3 472.4 519.7 586.8
r
1
i-
l \
\
r
,
^
r
DSW 014927 STLCOPCB4003303
)
AG DIVISION 1970 TSD COST IMPROVEMENT
JAN FEB MAR APR TAR
MAY JUN JUL AUG
SEP OCT
NOV
PARATHIONS
EST
ACT
Replace #3 Chlorinator
TAR EST ACT
3500 3500 3500 4860 2T5D" 0 0 4860 2340 0 0
3500 0
Improve C1-Still Yields
TAR EST ACT
3000 3000
00 00
3000 0
0
3000 0
0
3000 0
0
3000 -
Increase Chlor- TAR inator Coolings EST
- 8500 3500 8500 'cr --------a- -
ACT
00
Acetone Recovery
TAR 2800
EST 1957 ACT 1957
2800 1069
1069
2800 1225
1225
2800 1935 1935
2800
130 130
2800
715 715
2800
0 q
2300 0 0
2800 0
0
2800 2800
Chlorine Unloading
TAR 2250 EST 3634 ACT 3634
2250 4237
4237
2250 3350
3350
3200
1406 1406
3200 3200 3431, 2430
3431 2430
3200 1750 1750
3200
2710 2710
Optimize Methyl TAR
3000 3000 3000 1500
PNP/PCT Ratio
EST ACT
00 00
00 00
Optimize Ethyl PNP/PCT Ratio
TAR EST ACT
500 750 0 2641 0 2641
750 0
0
500
Change Cooling TAR 200 200 200
H-0 - Item 737 EST 310 230 270 ACT 310 230 270
Untargeted: Plant Test -
TAR EST ACT
2430 5270 2430 5270
TAR
EST
ACT
Total AG Month M $
TAR EST ACT
5.75
5.90 5.90
6.0 6.0
6.0
8.17 '' 4.35 10.63
8.17 4.85 10.62
15.5 11.2 11.2
15.5 3.15
3.15
15.5 1.75
1.75
22.5 l . /I 2.71
14.3 0 0
14.3 -
3.3
Total AG YTD M $
TAR EST ACT
5.75 11.75 17.75 23.75 5.90 14.03 18.92 29.55 5.90 14.08 18.92 29.55
39.25 54.75 40. /J 43.87 40.73 43.87
70.25 92.75 107.1 121.4 45.62 48.33 48.33 48.33
45.62 48.33 48.33
124.7
TAR
EST
ACT
Total Plant Month M $
TAR 46.35 78.1 102.9 64.07 60.12 43.47 49.62 53.02 45.18 78.98 54.98
EST 42.19 102.8 108.5 81.02
46.72 "TZTH'Sj 40.36 67.68 74.57
ACT 42.23 108.0 113.9 81.52 89.15 45.36 36.78 50.06 67.09
Total Plant YTD M $
TAR 46.35 124.5 227.3 291.4 EST 42.19 145.0 258.3 345.3 ACT 42.23 150.3 264.2 345.8
351.5 395.0 444.6 431.5 481.6 513.3
434.9 481.2 518.0
497.6 542.8 621.8 558.3 635.7 709.7 568.0 635.1
676.7
DEC
C,
125. 52.: 728.
DSW 014928
STLCOPCB4003304