Document M4r6N4kxaxYY0veY9q870724z
ABJ^Q1366Z(L
ABERDEEN CHEMICAL PLANT ROUTINE CHEMICAL DOSIMETRY SUMMARY
MONTH OF: January, 1983
DATE OF REPORT: February 9, 1983
c: JF, CRM, PEM, PJK, RDJ, WFH,CRS, RAF, RAM, AHS T. G. Grumbles - Houston, L. A. Legendre- Ponca City
ALL SAMPLE RESULTS:
Chemical
VCM Lead
PEL No.
%
98 92.6 4 100
> PEL OVEREXPOSURES No. %
8 7.5 00
Total Particulates OVEREXPOSURES: Job Class Vinyl Shift Supervisor
Chief Operator
Vinyl Shift Supervisor Reactor Operator
Reactor Operator
00 0 0
Exposure 1.0* ppm, VCM 1,2* ppm, VCM
1.2* ppm. VCM 1.4* ppm, VCM 3.3* ppm, VCM
Source
Employee unplugged the blowdown tank transfer line from the old unit to the new unit.
Employee worked near a leaking VCM pump discharge valve in the old unit - same source as that for the Reactor Operator exposureof 1.4 ppm (see below).
Employee checked VCM leaks in old * unit.
Employee checked for VCM leak in old unit, finding the west VCM charge pump discharge valve stuck.
Employee manually drained the K.O. tanks and the blowdown tank in the new unit.
ABDOO136671
OVEREXPOSURES - (Continued)
Job Class Reactor Operator
Expsoure 3.5* ppm, VCM
Chief Operator Reactor Operator
5.7* ppm, VCM 20.1* ppm, VCM
*Respiratory protection worn.
Source
Employee dumped two coarse batches (741 & 742 reactors) and sampled 743 and 745 reac tors for coarseness.
Employee isolated a vacuum pump having a blown seal.
Employee changed VCM filters in the new unit filter packs.
'Jerald Uptain rah