Document M4npNpVgboqzprqpqbXnDrvk9

UNITED STATESUNITED STATES ENVIRONMENTAL PROTECTION AGENCY *REGION 1 ENVIRONMENTAL AGENCY5 POST OFFICEB OSSTQOUN,A RMAE ,0 21S0U9-I3T9E12 100 PROTECTION Date:Dated as shown on electronic signature(s) Subj:Inspection Report Clean Water Act - National Pollutant Discharge Elimination System (" NPDES ") Blackstone Rail Trail Construction From:Andrew Spejewski, Inspector ANDREWDigitally signed by ANDREW SPEJEWSKI SPEJEWSKIDate: 2024.04.29 15:44:20 -04'00 ' Thru:Sterphanie Tougas, Inspector To:File I. Facility Information A. Facility Name:Blackstone Rail Trail Construction B. Facility Location:St Paul St. to RI State line Blackstone, MA 01504 C. Facility Contacts:Kurt Cormier, Northern Construction 1520 Park St Palmer, MA 01069 781-364-7325 kcormier@northernconstruction.com D. NPDES ID No (s).: MAR1004HL II. Background Information A. Date(s) of inspection: April 4, 2024 B. Weather Conditions: Light rain, possibly heavier rain earlier in the day C. US EPA Representative(s): Andrew Spejewski D. State / Local Representative(s): None ED_019088A_00019952-00001 E. Federally Enforceable Requirements Covered During the Inspection: EPA general permit for construction stormwater discharge F. Previous Enforcement Actions: None known III. Type and Purpose of Inspection Unannounced evaluation of compliance with the EPA general permit for construction stormwater discharge IV. Facility Description The facility is the construction of a rail trail. The current phase runs from St Paul St. running east about 1/3 mile to the Blackstone River then south another 150 yards to the Massachusetts / Rhode Island state line (where it links to an existing trail in Rhode Island). It includes significant fill / cut / regrading of the old rail line and a new bridge over Farnum St. The trail is on a high embankment at the bridge, slopes down to the river and is at the level of the surrounding terrain at the south end of the project. At the time of the inspection, the work west of the bridge was complete, the new bridge was essentially complete, with earthmoving underway east of the bridge. V. Inspection Mr. Spejewski arrived unannounced at the site around 10:45 AM, and parked at a construction trailer office at the site entrance just east of the new bridge. A. Opening Conference Entering the trailer, Mr. Spejewski found Daniel Boyer, of Mass. Department of Conservation and Recreation, who was overseeing the project for DCR. Mr. Spejewski explained the purpose of the inspection; Mr. Boyer explained there was a contractor, Northern Construction, doing the actual site work, who oversaw erosion controls, but Sean Dermott, the superintendent for Northern Construction, was not on site at the moment. Mr. Boyer called Mr. Dermott, who offered to have Nate Kology (a foreman for Northern Construction) lead a tour. Mr. Spejewski confirmed with Mr. Dermott that Mr. Cormier (listed on the NOI for the permit) was an appropriate contact for follow - up. Mr. Kology then arrived. Mr. Spejewski presented his credentials and they left on a facility tour. 2 ED_019088A_00019952-00002 B. Facility Tour Mr. Spejewski and Mr. Kology then toured the site. South of the trail embankment, and west of the south - running portion, is a large staging / stockpile area with various stockpiles, material and equipment. This area, aside from stockpiles, was very flat with several large areas of shallow standing water (apparently due to the rain). It appeared to be slightly below the terrain to the south and west; it did not appear to drain in any direction. Mr. Kology said only one stockpile nearest the embankment is from the rail trail; the area is a town site used for DPW work. Along the north - south section, the site ran along the top of the riverbank. The site was excavated a couple inches below the existing top of the bank and there was no sign of flow over the top of the bank. Mulch tubes were in place along the top of the bank, though they had rotted away in several places. At the northeast corner of the work, a slight slope led down to the north from the project and down to the east to the river. A small area drained down a steep slope toward the river; there was mulch tube in place but it appeared the tube could be easily overwhelmed. The north side of the project was a steep slope down to a flat grassed park / athletic field. The western part of the slope was established woods, the eastern part was being excavated / graded. There was no sign of concentrated flow or sediment being carried across the fields. C. Records Review No records were reviewed as part of this inspection. D. Closing Conference Mr. Spejewski departed at approximately 11:15 AM Note on timestamps: The camera's clock for this inspection was erroneously set to Eastern Standard Time, when the inspection took place during Eastern Daylight Time; therefore all timestamps are one hour earlier than the actual (EDT) time. Picture List: IMG 2094.JPGSite plan (south) IMG 2095.JPGSite plan (north) IMG 2096.JPGFacing south to end of project (at RI state line) IMG 2097.JPGFacing north along eastern boundary of site IMG 2098.JPGDetail of eastern boundary IMG 2099.JPGFacing north along eastern boundary, about mid point IMG 2100.JPGNorthern section of eastern boundary IMG 2101.JPGDetail of eastern boundary, northern section IMG 2102.JPGDetail along eastern boundary IMG 2103.JPGNorth end of eastern boundary 3 ED_019088A_00019952-00003 IMG 2104.JPGDetail, drainage at northeast corner IMG 2105.JPGFacing west along north edge of site IMG 2106.JPGFacing west to bridge * Unless otherwise noted, this report describes conditions at the facility / property as observed by EPA inspector(s), and / or through records provided to and / or information reported to EPA inspector(s) by facility representatives and as understood by the inspector(s). This report may not capture all operations or activities ongoing at the time of the inspection. This report does not make final determinations on potential areas of concern. Nothing in this report affects EPA's authorities under federal statutes and regulations to pursue further investigation or action. 4 ED_019088A_00019952-00004