Document M4kXRge7exmywzeokDJKkbOJy

June 13, 1972 NC Startup J. R. Savage - St. Louis - B2SL E. D. Malone 1760 <3- Due to sales requirements for fydraul 90-E and 115-E, we will have to continue with the previous plans of starting up June 1$ on NC Phosphate. We only need about a week's production of NC and we want to avoid unnecessary ohangeovers so we will have to begin NgC production on June 26, also as previously planned. It is likely that we will not have completed our technical program so that we can Implement a low-cost operation which achieves low phenol content and a pass on the emulsion test. Therefore, N2C operations commencing on June 26 should be segregrated for C Series Pydrauls only and we should piake this a run for minimum cost at rated capacity. Hopefully, within a week or two, we will have the technology in hand to modify our operations and produce N2C that is satisfactory for all appli cations. However, no process modification requiring a sub stantial departure from rated capacity is to be adopted without my specific agreement. J, R. 'Savage M 0065694