Document M4eN540XNgEKqEXvepGj0aNLy

A. E. BSANSEORD LABORATORY TO: PLANT LETTER LISTS "A", ,?E", Si "C2" NOV 3 1972 SEADRIH HL/utf-v BLDG. $2 /T / l'^qraiory, .- i7 c"/ PROCEDURE FOR REMOVA L OF/ASBESTOfvINSULATION 1.0. ICO''- The fallowing procedures, requirements and comTirUtrations sru necessary v/ben and where asbestos Insulation removal is required. TLiTTufcrmatlon7"properly used, will allow us-to perform this task well viNun the limits as prescribed by OSHA Article 1910. 93a asbestos, date.: October 18, iv (*i</>. 2.0 PROCEDURE Allsersonnel involved in the removal of asbestos insrJsHcn -must be aware of the health hazard. It is mandatory that protective equipment as de^ 7>oribed in 2.1 and 2.2 be worn as situation warrant. 2.1 MINIMUM REQUIREMENTS All- personnel involved in the removal of asbestos insulation must wear Comfo Type ,!Hrl respirator equipped wich an 0.3 micron fiiterT A. Insulation is thoroughly wet, conditions are dust free. E. Where test results indicate wc are within the limits as described by OSHA. 2.2 MAXIMUM REQUIREMENTS (Where test results indicate the asbestos fiber concentration is over the li mits as established by OSHA. A. Type "C" respirator equipment (supplied air) B. Protective Clothing C. Area of work barricaded | [AD.. AOSllHsAcraapppraosvbeedstaossbeinsstouslahtiaoznamrdussitgbnes pplarocpederliyn dpilsapsltaicyeodr plastic lined bags and securely closed. 2.3 HANDLING AND DISPOSAL B. OSHA approved asbestos hazard labels must be attached to each bag. C. Bags should be removed from the area to our regular trash containers. PLAINTIFF'S EXHIBIT UC-4602 UCCTXC 05999 Page 2. 2.4 GENERAL CONSIDERATIONS IN ALL CASES A. Concentration of people in the immediate area B. Large amount or small amount to be removed C. Condition of insulation, wet or dry D. Inclosed area or in the open E. Wind direction /lr UCCTXC 06000