Document M4YooN0GBmrn4MGdkQK8pav6k
Monsanto
S4' 4
3M iv. * . t " '
May 14 , 1987 ' PCB - Free Status Memo DBR to EJJ, et.al. - 4/30/87
,,
D. B. Redington - C2SB
TO
J. L. Brown D. K. Denner M. R. Foresman - G4WT
.
Per your above referenced request, attached herewith is the plan to achieve a PCB - Free status at the Anniston Plant. This is being forwarded to you in as much as the Ag Company is handling the "Anniston reserve account," a part of which is this effort.
If you have any questions or need addition information,
please give me a call.
-
RLC5/sag Attachment
Robert L. Cheever
OSw 1208L2
Safety Interest Yields Injury Free Dividends
HARTOLDMON0015108
PCB FREE PLAN ANNISTON, ALABAMA PLANT
I. RESPONSIBILITY
The responsibility for all PCB activities at the Anniston
Plant has been assigned to R. L. Cheever, Senior
Environmental Specialist. The responsibilities include,
but are not limited to: recordkeeping, inspections, report
preparation; inventory control; and PCB-Free plan
'
execution.
II. INVENTORY
The inventory of PCB and PCB-contaminated equipment in the Anniston Plant'is as follows:
Device
Transformer Transformer Transformer Transformer
Serial No.
7027013 E-690331 C-857658 7024135
Quantity of Fluid" Contamination
240 gallons 1230 gallons _ 380 gallons
261 gallons
142,000 ppm 170 ppm 460 ppm 80 ppm
III. PCB REMOVAL/DISPOSAL PLAN
The Anniston Plant has four (4) in use electrical transformers which are either PCB-contaminated or PCB filled as shown in the inventory above. These units will become surplus equipment during the on-going site consolidation effort. Two of the four units are associated with the idle facility being dismantled. The other two units will be replaced with two non-PCB units which become
available through this same dismantling effort.
In late 1987 or early 1988, these four transformers will be available for disposal. The units will be handled as a "package" and will be dismantled and disposed of by an approved Monsanto outside processor, in a "turn-key" approach. It is the plant's intention to have the disposal contractor "take title" to the units, in place, and to dismantle, transport off-site and dispose of fluids and casings. The estimate cost of accomplishing the plan goal is $50k, although, no formal proposals from potential contractors have been requested. These monies have already been set aside as a portion of the Anniston reserve account.
RLCS/sag
CSw 120813
HARTOLDMON0015109