UNITED STATES ENVIRONMENTAL PROTECTION AGENCY Region III
841 Chestnut Building Philadelphia, Pennsylvania 19107
6NV1R6NMENTAI
owes
In Reply Refer To; (3HW52)
CERTIFIED MAIL
RETUEILJRECEIPT REQUESTED
8EP 3 0 1991
PIAMT nig COPY l0 NOT RIMOVt
W. M. stewart E.I du Font de Nemours and Company,
P.O. Box 1217 Parkersburg, WV 26102
Inc.
Res Washington Works WVD 04 587 5291
^.z^
Dear Mr, stewart: The Environmental Protection Agency (EPA) has completed the
review of the second draft of the RCRA Verification Investigation (VI) Work Plan submitted December 14, 1990 by Du Font for their Washington Works Plant. The VI Work Plan hasi substanttvely met the VI Work Plan requirementsi of the RCRA permit issued to Du Font on December 13, 198S and EPA conditionally approves the Work Plan subject to the following requirements:
I. Unit A-l, Du Pont Road Landfill
The leaehate sampling program is accepted as proposed. The groundwater sampling program ie accepted as proposed. in addition, Du Font must conduct surficial soil sampling (o-
2 feet) as called for in permit condition II.B.l.b.(1)(a)(i).
These saaples muat be tested for the parameters listed in Table 18 of the RCRA permit. Use the appropriate soil sampling plan developed for other solid waste management units; such plan may be modified as necessary tor this unit.
For figure 2 of the Work Plan; Currently the scale of this map is l"=300. The map scale must be changed to express the scale
PriHtf M Rie-fcttil Pisptr
CF033537 EID482263
either as a fraction, be included.
ex.
1;24,000,
or the units for the
300 must
II. unit A-2, River Bank Landfill
Soil, groundwater, and leachate sampling plans are accepted
as proposed.
III. Unit B-4, Anaerobic Digestion Ponds
the
Ths plan for soil and groundwater ponds is acceptable as proposed.
samples to be taken outside For the cores taken inside
the ponds; samples must be taken every 5 feet (starting 0"2 feet
below the level of backfill), where soil characteristics change,
and taken until groundwater is encountered. Groundwater samples
must be taken in Table 18.
from
each
boring
and
tested
for
the
parameters
listed
IV. Unit c-6, Polyacetal Product Incinerator
For this unite, it is sufficient to sample one upwind and one
downwind soil sample at the specified locations. In addition the
sampling parameter list for this unit must include the metals
burned in this unit, specifically, cadmium, chroiaimtt, lead, and
selenium.
V. Unit F-ll, Injection Wells
This Bubmigsion and plan are accepted as proposed.
VI. unit H-13, Burning Grounds
The number and location of the soil borings are approved but soil samples must be taken every 5 feet, where soil characteri sties change, and until groundwater is encountered.
VII. Trigger levels for a RCR& Facility Investigation
if
a
The Permittee must conduct a RCRA facility Investigation (RFI)
release of a hazardous waste or hazardous constituents from
a SWMU to groundwater, surface water, soil or sediment exceeds;
I. The Practical Quantitatlon Limit (PQL) where the PQL is at
or below the health-based the lowest concentrations
level (available upon of analytes that can
request). PQLs are
be reliably deter-
CB-033538
EID482264
mined within specified limits o precision and accuracy by SW-846 fTest Methods for Evaluation Solid Wastes; Physical/Chemical Methods) methods under routine laboratory operating conditions. Should the PQL not be practical, the Permittee must justify the use of a higher number. This justification must be in the Verification Investigation Report.
2. The method detection limit where the PQL is greater than the health-based limit,
VIII. QA/QC
E.J. review of
Clugston of EPA's the second draft
Annapolis Laboratory has of Du Font's QA/QC plan.
completed the The plan is
approved subject to the reviewer's comments which are enclosed and
the following comments;
If groundwater monitoring wells are pumped dry during the well
evacuation, sampling must be performed within two hours, not the 24 hours specified in Appendix B of the VI Work Plan? and
Where groundwater samples tor metal analyses are taken, both
filtered and unfiltered samples shall be taken and analyzed.
IX. Effect of public Water Supply Wells
From investigations already performed, it is obvious that the
public supply wells have a significant impact on the groundwater
flow at the site. Therefore, provide available data on the those wells such as size, depth, screened interval, pumping rates, etc*
X. Data Management and Models
All raw data must be kept in an easily retrievable form for the duration of the HSWA permit and provided to EPA upon request.
it EPA recognizes the legitimacy of using computer models to
determine the extent o or risk associated with contamination.
However, approval of any conclusions of this study which are based
on computer models necessitates that EPA have access to the same
models. Du Font must provide the name and distributor for any
commercially available package and make the necessary arrangements
for EPA access
a custom designed package is used.
CT033539 EID482265
XI. Schedule Within 180 days of receipt o this approval of this VI work
Plan or by April 6, 1S92, Du Font shall execute the Plan and submit the VI Report to EPA for approval. Du Font shall also submit the VI Report to WVDMR.
Acceptance of the above conditions may be addressed by submitting revised pages and/or a supplement to the VI Work Plan
within 30 calendar days of receipt of this letter. Should exception be taken to all or part of the above conditions, a written statement of the grounds tor the exception shall be submitted within 15 days from receipt of this letter.
XII. other comments
The supplement to the VI Work Plan must include a proposed
schedule for field and sampling activities* WVDHR and EPA Bust be notified of any changes in this schedule at least 14 calendar days
in advance,
you should have any questions, please do not hesitate to
if in contact John J. Humphries
at (215) 597-0320 or Mary F. Beck at
(2155 597-7239.
enclosure cci <3*S. Atwal
(WVDMR)
' /' ^/ 7b^e^^r^t^L/.<A'-<li(e^n, chief RCKA Programs Branch
CF033S40 EID482266