INTER-OFFICE MEMORANDUM See Distribution date from COPIES TO AT SUBJECT JO? NO. Kaiser Sngincara3 Weekly Field Activity Report October 31? 196? 0. A, ?insand Middletown Construction 7100 Transmitted herewith is the subject report for the week ending October 31? 1967* OAF/aec Distribution Aimco D. C. Osborne C. G. Kramer F. VJ. Barnes T. R. Foley P* R. Smith D. Cox <J* S. Lots a. L. Brannaman Kaiser R? J. Wolf (Oakland) U. P. Bort (Oakland) D. A. Daly F. X. Kaat J. V/. Irvin V. L. Franksoa A. L. Gordon H. C, Boucher cc: Central File Kaiser Beading File Armco Beading File *T-- KEN 003864 KAT5KR ENGINEIRS WEEKLY FIELD ACTIVITY HEPOBT Week Ending October 31, 1967 WEATHER: Gsnerally fair and cool in early part of period with rain the last two days. TH-IPSIATUHE: Kudram - 70 degrees t^w^innw -- 27 degrees Client: Armco Steel Corporation Location: Middl^own^Oh-io Job Kumber: &ZL JOB VISITORS Be J. Wolf, W. E* Burger, C. B. Blnanenthal, J. F. Cbajnowski, N. R. Garder, S. Ilontell, Barbara Stengel, D. H. Wheeler, J* Iledadea, J. Zorexsa, T. Zygmuntowirai_____ gtJimig FORCE HEPOBT Management General Supervision Field Ssgineering Warehs. & Mtl. Control Survey Office Srv. & Repro. Clerical Craft * TOTAL Kaiser Engineers 53 16 3 47 23 47 2 19 17 -- 75 1,576 Subcontractors 23 11 4 17 33& 1,264 Foothill l 6 16 1 19 S 698 Total 9 48 97 12 25 8 36 3^378 3,613 7%' - SSfe"; * Average fbr week of nen on payroll. Average for week of Crafts is as follows: Kaiser Engineers Subcontractors Foothill Electric 1,415 1,159 623, Total Crafts Working 3,197 KEN 003865 ' "i i fUJiJ.BW J! ggpggliSBPjgpw!^ . 3- WEEKT.T FIELD ACTIVE? REPOST Meek Siding October 31, 1967 *te PROJECT PROGRESS 1. 71A6 - HOT STRIP MTT.T. 1.1 Excavation and Backfill: 1, 806 cubic yards of backfill waa cdeleted during the period for a total to date of 894,762 cubic yards. 12 Concrete: 27 cubic yards of concrete waa placed during the period for a total to data of 209,856 cubic yards. Period concrete consisted mainly of: grouting for the slab reject transfer car and a few iso lated pours throughout the Hot Strip Hill. Structural and Miaceilaneoua Steel: A work force of 70 men continued during the period on installation of miscellaneous steel in the Hot Strip Hill. At column line 1, the slab reject car rails were completely grouted in place and the slab reject car installed an the rails. The slab reject car Is scheduled to couplets and be ready for operation cn November 15 Test operations were in progress during the period an slab transfer car 2 before placing it in operation. Modification to the cable reel has been accomplished cn this transfer car and the cable guide will be installed when delivered next period. Operation of transfer car #1 and 2 is still dependent cn final electrical work which is presently in progress. In the furnace area, the temporary platforms far conveying brick were re moved at furnace #1 and 2 and the grating was installed at furnace #1. The furnace #2 stile between pushers 1 and 2 waa also installed. In the domcoiler area, installation of grating and handrail continued during the period. This work is 95% complete. At the call conveyor trenches between the Hot Strip Mill and the Green Coil Storage Building, the handrail Installation is complete. In the Roll Shop Area, installation of floor plate and grating continued in the #2 roll grinder area. In the pump house and clarification building, miscellaneous work related to safety requirements continued throughout the period. Progress was also continued during the period cn handrail and platform installation at Seale Pit 3. The miscellaneous steel installation at this scale pit will complete next period. At column line 1, progress continued on cover plate installation over the steam trench. An estimated 80 tons of miscellaneous iron remains to be installed in the Hot Strip Mill excluding extra work orders*, This miscellaneous iron is scheduled to be installed by November 15th*- Progress will continue cn authorised extra work orders in the Hot Strip! Hill as required. 1<>4 Roofing sod Siding: 5,000 square feet of siding was installed in the Waste Heat Boiler Area of the Hot Strip Mill during the period for an overall total to date of 658,693 square feet. 1.5 Heating and Ventilating: At the Hot Strip Mill bag houses, power wiring and lighting for bag houses1 througx 5 and bag house 15 in tbs slab storage area was essentially completed during the period. Piping con- 1{I| i t \ KEN 003866 ljl-jmluu jum . iJBanyp1 t.rm ~ ~ --" s3tt I'JEEKLT FIELD ACTI7ITI REPORT Week Ending October 31, 19&7 timed in four of these six bag houses throughout the period and this piping is scheduled to complete by November 15* Bag houses 3, 8 and 9 are complete and ready for operation. Electrical progress was continued during the period on bag houses 6, 7 and 14. No period progress was evident on the rennining bag houses. Norm Woolley (Contractor for Heating and Ventilating Units at Director Rooms and Offices throughout the Hot Strip Mill) maintained an average work force of 10 men during the period. Installation of diflhsers at the scheduling office air conditioning system was accomplished during the period. This system is now in operation and ready for final balancing. Instrument work was accomplished for the computer room heating and ventilating system. This system is also in operation. At the finishing mill office complex, steam was connected to the heating and ventilating unit this period, but instrument air is required for automatic operation. At the pump house air conditioning unit, steam was connected to the unit this period. Progress was also evident at the clarification building air conditioning unit on electrical work and instrumentation. The gas fired heaters in the clarification building are installed and the piping complete. Some electrical disconnections are needed to complete these units before they are ready for operation. In the boiler house control room, the heating and ventilating fan unit was delivered to the job site. This fan isscheduled for installation next period and the system is scheduled to complete by November 6. The heating unit for the grease house is sche duled to be installed between November 7 and 14* Mechanical: During the period, Eichleay Corporation maintained an average work force of 75 man on mechanical installation in the Hot Strip Mill. In the furnace area, the Installation of all mechanical equipment is complete with the exception of operating the rams and setting the fore and aft limit switches and completing the bridge tables to the furnace skids at furnace #2 and 3* Installation of the dry scale removal system continued during the period. Erection of the dry scale hopper structure at coluwn line 3 east of E-line is in progress. Some modifications will be necessary on the Sanoraan drag bucket on the delivery side before it can be completed. In the rougher area, remedial work continued on the rougher #4 edgers for United Engineering. Remedial work for edgers 2 and 3 were successfully completed. In the finisher area, rework of the finishing mill main drive motors continued during the period under the direction of Westinghoase. The Westinghouse schedule has been established for <Uintl ing and returning all seven finishing mill main motor stators to the Pittsburg: factory by truck for examination and check out and re turning thee to the job site for re-installation. This schedule arranges for the following order: F2 motor to be shipped first and returned by November 6, F4 to be returned to the job site November 7, FI to he re turned to the job site by November 10, F6 to be returned to the job site by November 15, P3 to be returned to the job site by Novaafeer 19, F$ to be returned to the job site by November 23 and F? to be returned to the job site by November 27. Progress continued during the period on KEN 003867 WESCEX PHD ACTIVIST BEPOHT Week Ending October 31, 1967 of the quids roll change rams for the finishers at the Armco Machine . Shop* In the domcodler and runout area* rework was continued during this period on the runout table motor bases and motor installa tion continued as bases became available. The mechanical installation of the aigiode coil bander is essentially complete. This unit can be energized and supplied with plant air for testing before grouting can be accomplished. Progress continued during the period cn the chain and drive installation for the coil conveyors in the Green Coil Storage Building. Delivery of the necessary material for completing the revi sion to the radial turn conveyor #6 has not arrived at the job site. Mechanical installation of this conveyor will be completed as soon a3 the link-belt delivery is received. Percentage completion for mechanical items in the Hot Strip Mill are as follows: the Slab loading and charging tables, 100$$ pusher and skids, 97$$ delivery tables, 100$$ extractors, 100$$ slab reject car, 75$$ vertical scalebreaker, 100$; roughing mill 1, 97$$ roughing mills 2 through 6, 100$; crop shear, 95$5 scalebreaker, 100$$ finishing mills, 97$$ tot runout tables, 90$j downcodlera, 97$$ coil conveyors, 75$ and roll grinders 50$. Assembly of roll grinder 3 continued throughout the period. At Seals Pit 3, mechanical installation of the Link-belt wet scale removal system is in progress and is scheduled to complete late in November. Coupled tests were completed for pusher 1 and finishing mill main motor 5 Uncoupled tests were accomplished fbr finishing mill motor 3 and crop shear. 1.7 Pining: During the period, 7,209 feet of piping was installed for a total to date of 311,767 linear feet. 26,907 linear feet remains to be installed by Kaiser forces in the Hot Strip Mill. Major piping systems worlnd on during the period were: grease, lube oil 10, hydraulic system 17, hydraulic system 18, hydraulic system 16, higi pressure descaling water, mill water, furnace cooling water,clarifier sludge piping, clarifier drains, mill high pressure water, plant air, steam and instru mentation. Pickling of lube oil 10 was completed this period and Hush ing of the system is in progress. Flushing is also in progress cn hydrau lic system 15. Hydro testing of hydraulic system 16 is underway and preparations are being mads to hydro hydraulic system 18 next period. At pomp pit 4, installation of three expansion joints on the suction side of the poops has been completed. One eogwision joint has been sant-fasck to the factory for rework and tbs fifth eapanaton joint has not hiok delivered to the job site. It is anticipated that three of thss#$fr* pumpa will bo in operation in two weeks. Two punps at Scale Pltawsnd 2 are now operable. On tbs high presaura descaling eystem, elermrnew welds on 2* and larger piping was completed during the period with 27 remaining. Seven welds were reworked during the period. 171 1-1/2" Barksdale welds ware accomplished this period with 236 remaining. AH lube oil systems except ten have been released for insulation. A piping tagging crew is scheduled to start tagging and identification of lube oil systems aom. The #1 air compressor has been grouted in place in the puop house. This unit is scheduled to complete by November 23, 1967. Air compressor #2 was delivered to the job site during the period. The coolers for this unit are scheduled to arrive next period. KEN 003868 Y^i'JSUZ YIELD ACTITirr REPOST Weak Ending October 31,1967 1.3 Electrical: Foothill Electric Corporation installed 26,000 lbs. of socpoeod conduit during the period for a total to date of 1,407,000 lbs. 64.000 feet of low voltage cable was installed for a total to date of 1.541.000 feet or S8& cccplete. 1,800 lew voltage cable terminations -were acccnpliahed for a total to date of 26,000 or 84# complete, 46,000 feet of control cable was installed for a total to date of 1,626,000 or 88% complete. 1,600 control cable terminations were accomplished for a total to date of 47?000 or 81# complete. 17,000 feot of ecmpiter cable was installed for a total to date of 732,000 or 78% complete. 600 com puter cable terminations were accomplished for a total to date of 25,800 or 85$ complete. 4,100 lbs. of conduit lighting and 5*000 feet of of wiring for Ught-fag was installed during the period. 1,000 lbs. of structural grounding was installed for a total to date of 132,000 lbs, 425 feet of communication conductor cable was installed and 20 termina tions accomplished. Foothill maintained an average work force cf 480 man in the Hot Strip Mill during the period. 1.9 HlscsHaneous Subcontracts* Bilbrsy Masonry^ contract for block work in the Hot Strip Hill is now complete. Moeschl-Edwarda received delivery of the remaining roll-up doors for :< the Hot Strip Mill. Three of these doors were erected during the i period. Five doors remain to be erected. The Slone Glass Company glased the pedestrian tunnel enclosures and the boiler house control roam enclosure during the period. Owens-Corning Fiberglae continued with insulation of the 165.1b. steam system and lube oil systems in the oil cellar, 300 feet of steam 1W was insulated during the period for & total to date of 13,900 linear feet. 1,100 feet cf Morgoil system 9l was insulated and 590 feet of lube ail system #4 was insulated this period. Insulation was continued diving the period on steam systems in the waste heat boiler area. It is estimated that 65? of the steam lines in this area are complete. Delta Pipeline Contxmetors installed 2,198 linear feet of pipeline and 16 sendee drops in the Hot Strip mil during the period. The total pipe installed to date is 30,219 linear feet. 90 service drops have led to date with 207 remaining. 6,668 linear feet of 2" and piping retains to be installed in the Hot Strip Mill. Pro ^during the period consisted mainly of plant air and coygen Ohio MUf Riggers have completed installation of all flocculators in the clarification building. Progress continued during the period by Delta Pipeline Contractors on Installation of the fuel oil linee Aram the fuel oil storage tanks to the ptmg> house. This laderground piping is empeeted to caapiete in two weeks. KEN 003869 WEEKLI PIEU3 ACriVITZ REPOST Week hiding October 31, 1967 The FBS Builders continued with installation of refractory at the emer gency coll stoxage area near column line 60 during the period. Thin will complete his work for the Hot Strip Mill. Stuart Painting Company is continuing with the painting of structural steel, miscellaneous steel, piping systems, mechanical equipment, elec trical equipment and architectural structures throughout the Hot Strip Mill aa required and as released fcy the area engineers. Salem-Brosius continued with refractory work and slab reheat furnace #2 . up-take area and floor. In furnace #3, refractory installation was con tinued on the side walls and Detrick roof. Piping was also in progress at furnace #2 and 3 cn oil, steam and ispulse piping. Electrical power wiring and terminations were also in progress throughout the period on furnace #2 and 3. Painting of furnace #1 is 50# complete and insulation 76$ complete. Furnace 1 la in the clean-up stage mid preparations are being made for dry-out to begin cn November 20th. Furnace #1 is 97% complete, fUxnace 2 is 85% complete and furnace #3 is 71# complete. Babcock and Wilcox continued with insulation aid lagging of the forced draft and induced draft fans and related ducts at all units. Progress was also evident cn the installation of the #3 induced draft fan rotor and fsn housing. Progress on the fan and duct installation is 92% complete. Forced draft fan 11 is scheduled for test and check-cut the week of November 13th. The Mo Piping (Contractor for the Waste Heat Boiler 2-1/2 and over piping) is now 97% complete. Pressure testing of the boiler feed piping was acccmpliehed also the desuperheater line testing was completed this period. Progress continued throughout the period on changes and addi tional hangers as required on the revised Dravo design drawings. Nona WooTUqr (Contractor for the Waste Heat Boiler 2 and under piping) is_96 eosplete. During the period, pressure testing of the instrument air piping and desuperheater piping was caqaleted* Work continued during the period cn additions and changes required ty recent revised drawing requirements. ITJLi iS^jftHs-Bcneywsil (Contractor for the Waste Heat Boiler Instrumentation) is 67jf ocnplete. Progress during the period consisted mainly of instrument fAHWwffim tad tubing terminations at the main control panels and the soot blower panels* 2. 71V?-SIA9FP1 2.1 Sxcavatlofl 3,743 cubic yards of backfill was caqplsfaed during the period for a total to date of 209,393 cubic yards. KEN 003870 aEBKT.T ?ZEED ACTIVirr BEPOHT Week Ending October 31, 1967 2.2 Caicretes 670 cubic yards of concrete was placed during the period far a total to date of 45*537 cubic yards* During the period* the concrete pour* consisted mainly of a crop pit.slab near column line 8* skip hoist tower walls* the top lift of the west scale pit wall from 8a to 9.5a, portion of the pump room slab and roll tilter foundation walls. The scale pit #4 main structure concrete was canpleted this period. 2.3 Structural and Miscellaneous Steal: The main mill pulpit arrived during the period and was set in place. Support steel for the scarfer pulpit is not expected until early December. The transfer car track rails are 95 complete. Progress was continued during the period cn erection of bag houses. 2.6 Mechanicals Eichleay Corporation continued throughout the period with an average work force of 52 men on mechanical installation in the Slab Mill. Progress was continued in all areas of tbs Slab Mill throughout the period. An estimated 2*880 tons of mechanical equipment has been installed in the Slab Mill to date. 93& of the Slab Mill equipment has been delivered to the job site. Progress to date in the Slab Mill cn mechanical installation is as follows: the ingot buggy and drive* 25$$ tables* 6Q5$j double manipulator* 15$} the vertical mill* 25$; the horizontal mill* 40ff; scarfer, 5%i the slab shear pusher and transfer* care* each* crop conveyor* 20jf; slab, scale* 80j slab pitters* 2006} stationary end stops* 80; the MG sets and main mill drives* 35$. Eichleay plans to increase their work force in this area in the near future as the work load in the Hot Strip Mill decreases. 2.7 Pining: Raster (Piping Contractor for the Slab Mill) continued with an average work force of 61 men on installation of Slab Mill piping systems. 2h the Slab Mill oil cellar* installation of lube oil 3* 6* 7 and 11 continued during the period. Piping installation for hydraulic systems 1 and 2 is also in progress. In tbs main mill aisle along column line D* header piping was continued for plant air* grease* cagrgen and natural gas pipelines. This header piping between 1 and 18 is 95 com plete. Progress was also continued along odium line E on natural gas and oxygen headers between odium 1 and 18. The natural gas piping is being tested and natural gas is scheduled in the lines for start-up of the motor room beater ty November 6. Hunter has been installed 12*045 Unemrfeet- of piping to date. 2.8 EliiuflpmU . 4*700 Ibe. of exposed conduit was installed during the pemSgpsP * total to date of 15,000 or 125$ complete. 10*300 lbs. of embeddelrif oonduit was installed for a total to date of 602*600 lbe. or 94$ complete. 300 feet of cade tray was installed for a total to date of 16,700 feet. 5,400 feet of lighting wiring was installed during the period. 1*300 lbs. of structural grounding was installed for a total to date of 15*000 lbs. or 3Q complete. An average wok force of 90 elec trician* was maintained in this area during the period. KEN 003871 WEEK!! FIELD ACTIVITY REPORT Weak Ending October 31, 1967 3. 71 Aft a^abAKEKG PITS 3.1 Excavation end Backfills 210 cubic yards of excavation was completed at the Soaking Pits for a total to date of 73,340 cubic yards. 74 cubic yards of backfill was made far a total to date of 113>065 cubic yards. 3.2 Concrete: 155 cubic yards of concrete was placed for a total to date of 28,086 cubic yards. During the period, concrete work consisted mainly oft foundations for the east side cable house trench slab, acme D-line footer cdlumna and the 2-line loaking dock wall between column 5*5 and 6.5. 3*3 Structural and Miscellaneous. Steel: 12 tons of structural steed was erected for a total to date of 4,207 tens. Ohio Valley completed boltup of stair towers at column 12.5 and 5.5 during the period. The ingot buggy support steel bolt-up was also completed during the period. The structural steel for the 107 elevation floor deck sooth of X-line arrived cn the job site this period. Erection to start next period. Mechanical: Loftua Engineering continued with good progress in all S phases of battery erection during the period. BrlekNork was in pro- 1 grass at battery 4 through 1 cn archways, collecting Hue walls and floors. Refractory work on pits for batteries 5 sod 6 is 70$ complete. Remaining refractory work will be completed later when heat for dry out in the pits is available. Progress continued during the period on steel erection of pits for batteries 1, 2 and 3. Most of the structural floor framing is installed and bolt-up for the remaining pita is expected to complete in two weeks. Conduit installation for electrical power and lighting in the #4 through 6 battery area continued during the period. Most of the conduit work for battery 6 . is completed. The coke oven and natural gas manifolds at batteries 5 and 6 are complete and 35$ complete at battery 4* Cooling water for batteriee 5 and 6 is 90$ complete. Progress was continued throughout the period on all piping systems in the #4 through 6 battery area. Structural erection of the semi-gantry crane 366 was completed by KE foreea during the period. 3.7 Piplnre&Durlngthe period. Delta Pipeline Contractors installed 80 feet of 1* gfrjfr&imiiTl piping near the east ingot buggy drive houses. Service pjpinjggfethie area was net in progress during the period since Delta was resisted to use their men for priority requirements in other areas. They afrit scheduled to resume process piping in the Soaking Pit on November 6. 3.8 Electrical: Focthill Electric installed 9,000 lbe. of exposed conduit during the period for a total to date of 51,500 lbs. or 67$ ceeplefce* 4. 712ft - BASIC OXYGEN SH)P Excavation and Backfill: 4,244 cubic yards of excavation was completed during the period for a total to date of 197,343 cubic yaxds. 7,910 cubic yaxds of backfill was made for a total to date of 236,914 cubic yaxds. Excavation during the period included the conveyor support foundations and period backfill was confined mainly to the area west of column line 17. KEN 003872 UEBKLY FIELD ACSZVm REPORT Week adding October 31, 196? 4.2 Coocreset. 122 cubic yards of concrete was placed for a total to date of l?,o4? cubic yards. Concrete pours for the period consisted of . grade beams on C-line, stack #2 foundation and the base slab for fan 1. Grouting was completed on the hot metal pit rails as well as sane base plates on piers which are supported by piles. I 4*3 Structural and Miscellaneous Steel* 368 tons of structural stool was erected at the B.O.F. Building for an overall total of 2,458 tens. Seven columns were erected this period along column line 19, 20 and 21. Girders and floor beams were also erected for one bay in the operating floor level between cdum line 20 and 21. 4.4 Roofing and Siding: 2,500 square feet of aiding was installed at the I-Iold Preparation Building for a total to date of 39,920 square feet. 5. 7145 - STRIPPER BUILDUP 5*3 Structural and Miscellaneous Steel: 41 tons of structural steel was m erected for a total to date of 870 tens. m_ 5.6 Mechanical: Erection of the Stripper Building overhead crane continued during the period and all najor components were erected in place. 6. 7150. 7156.and 7159 - PICES AREA 6.1 Excavation and Backfill: Pile driving for the 2 catenary pit on pickle line 4 was completed this, period. Backfill continued during the period for the pickle coil storage building from east to west. Tide backfill between J and H-line is now 4C complete and is proceeding in advance of structural steel erection of the building. 6.2 Concrete: 261. eubie yards of concrete was placed in the piddle line building for a total to date of 6,588 cable sards. 172 cutle yards of concrete was placeiis die pdckLe coil storage building fora total to date of 4^84 eubie yards. AH concrete work in the pid&eceil, storage building is complete except for the west aids piers end Concrete work in the pidele line building consisted for tiie #4 pickle line tank and the #5 piddle 30. 6.3 _____ * 12 tons of structural steel was erected in the Green Coll Storage Building for a total to data of 2,861 tons. Closure of the south aisle was in progress after final erection of major components for crane 404. At the Pickle Coil Storage Srllding, aigxt reef trusses have been erected to date. All eodnms on B-lins are in place and eight odums along J-llns are erected. KEN 003873 WEEKLY FIELD ACTIVITY SEPOHT Week Ending October 31 1967 * 6*4 ________ 4,400 square feet of adding was installed at the Stosage Building for a total to date of 30,586 square feet* Progress was continued on installation of roof ventilators at the Green Coil Storage Building* 6.6 Meehanicali The cab and hook for crane 404 at the Green Coil Storage Building arrived this period and erection is in progress. This cca pletes all major equipment for the four Green Ccdl Storage overhead cranes. 6,7 Piping* Progress continued during the period by McGraw Construction Company on installation of die roof drains for the Green Coil Storage Building. These drains are 80# daoplete. All major columns for this building are grouted. 6.S Electricals In tbs Green Coil Stonge Building, installation of cable tray along B-line is ccaplebe to column 7, High bay lighting feeder conduit in the Pickle Line Building is 40$f complete. Electrical pro gress was continued during the period by Lake Erie Electric on overhead cranes. Crane 405 in the Pickle Line Area is 99$ casplete electrically. 7. UTILITIES 1 7109 - Pipelines Delta Pipeline Contractors are presently en^ged in the final testing of the coke ovan gas line system. During the period, they also installed soute additional concrete supports at various valve stations as required,. 7110 - Poser Distribution* B. H. BouHgny saintalned progress on power distribution work in the Halt Area and the cold finish station. In the Melt Area switching station, eeheddcd ocndult was completed this period and the lighting standards erected. Stringing of conductors to the Melt Area station was continued during the period and is presently 60 com plete* The underground electrical duet work between the Melt Area sub station and tbe Basic Orygen fhroaee control room was completed this period*- Concrete week for manhole 3 was also completed. At the cold flirt sk eehetatjon^idre terminations were completed during the period ^apcifvisacy circuits. The station ground mat was staggered this period. jig s^te PevlcTfMfc 13,625 cubic yards of excavation for a total to date of 677,360 cubic yards, 12,690 cubic yards of backfill was accomplished for a total to date of 914,122 cubic yards, 6 coble yards of concrete was placed during the period far a total to date of 919 cubic yards, 1,598 linear feet of 8* corrugated metal pipe and 280 linear feet of 10" corrugated metal pipe was Installed in the Stoelmaking Area by Delta Pipeline Contractors during the period. Progress was also continued on forming and rebar for the manhole tops in the south area parking lot. KEN 003874 SWESKLX FIELD ACTIVITI HEPOET Week Brtding October 31, 1967 - 7113 - Trackwork: During the period, DHS Corporation laid 692 feet of flange way in the south area and 182 feet of flange way along the pig machine track. Two turnouts were installed to provide a detour east of the V/sighing-In-Motion Scale Area. Construction of this scale pit is in progress. 711A. - Locksr Rooms* At the south area locker room, progress continued by David L. Smith Construction Company on the overhead heating and venti lating system. The asbestos panel liners at the exterior vails and soffit angle supports are almost complete. Water piping, plumbing and lighting installation continued during the period. Suspended ceiling installation is scheduled for next period, lit the Steelmaking Area, the sculptured paneling and Stcelox wall panels were completed during the period. The building generally is dosed in from the weather. No inter ior masonry work is evident yet. 7186 - Waste Disposal fear the Pickle Line Facility; Progress continued during the period on farming and rebar setting for the base slab and walls in the tank farm area. Forming of walls and Installation of rebar was also evident on the east half of the Waste Disposal Bhilding fouade- tions. M OAF/sec KEN 003875