Document M4Gq1Y42m59vXdGozzDDNVpry
Monsanto
bcc: W.B. Papageorge
MONSANTO INDUSTRIAL CHEMICALS CO. Sautfal, Illinois 02201 Phono: (618) 271-5635
January 20, 1975
Mr. Richard Rollins Jard Company Inc. P. 0. Box 650 Bennington, Vermont
05201
Dear Mr. Rollins:
Re: "AD HOC PCB Committee"
Tabulated below are the PCB analyses of various samples taken on 12/10 and 12/11/74.
All PCB concentrations are expressed in micrograms per liter. Same as parts per billion (ppb).
1. Composite sample taken 12/10/74 (Sample taken during wash period
10:30 PM to 11:40 PM in water dis charge to deep well. Estimate flow at 5-10 GPM.)
PCB* s 61,750 ppb
II. Plant water sample taken 12/11/74
(Grab sample taken from faucet at laboratory sink.)
63.6 ppb
III.
Cooling water sample taken 12/10/74 (Composite sample taken 3 PM-10PM from cooling water discharge pipe In impreg nation area.)
260.2 ppb
IV. Sanitary sewer sample 12/11/74 (Grab sample taken from manhole out side building.)
161.8 ppb
a unli el Monaanto Company
HONS 093587
Mr. Richard Rollins Jard Company Inc.
Page 2 1/20/75
V. Roaring Branch River 12A1/74 (Grab sample taken upstream of plant along river bank.)
PCB1s 4 ppb
-
VI. Roaring Branch River 12/11/74 (Grab sample taken downstream of plant along river bank.)
4 ppb
The above information, plus flow data from your plant, should permit you to complete the E1A questionnaires. Tom Paquin is familiar with how and where samples were taken.
I discuesed results by telephone with Tom Paquin on 1/20/75. The plant water and cooling water analyses are higher than one would expect. If you send additional samples we will analyze. Call me (618) 271-5835 if you have any questions.
Very truly yours.
EES:tro
Edvard E. Stewart
MQNS 0935aa