Document M4GVDDbBk4gwBndm1O9wQByxj

MEMORANDUM SUBJECT: CLEAN AIR ACT INSPECTION REPORT Holsum of Fort Wayne, Inc., La Porte, Indiana FROM: Dakota Prentice, Environmental Engineer AECAB (IL/IN) THRU: Nathan Frank, Section Supervisor AECAB (IL/IN) TO: File BASIC INFORMATION Facility Name: Holsum of Fort Wayne, Inc. (dba Lewis Bakeries, Inc.) Facility Location: 800 Boyd Boulevard, La Porte, Indiana Date of Inspection: May 2, 2024 EPA Inspector(s): 1. Dakota Prentice, Environmental Engineer 2. Veronica Fischer, Environmental Engineer Other Attendees: 1. Alejandro Abdo, Lewis Bakeries - Plant Manager 2. Nelson Boyd, Lewis Bakeries - VP, Environmental & Safety 3. Buddy Lau, Lewis Bakeries - Maintenance Engineer Contact Email Address: Alejandro Abdo - aabdo@lewisbakeries.com and Nelson Boyd - nboyd@lewisbakeries.com Purpose of Inspection: to determine compliance with the Part 70 Operating Permit issued by the Indiana Department of Environmental Management (IDEM) Facility Type: Commercial Bakery Facility Name: Holsum of Fort Wayne, Inc. Facility Location: 800 Boyd Boulevard, La Porte, Indiana Date of Inspection: May 2, 2024 Regulations Central to Inspection: conditions of the Part 70 Operating Permit, issued by IDEM on April 11, 2022 Arrival Time: 1:10 PM Departure Time: 2:20 PM Inspection Type: Unannounced Inspection Announced Inspection OPENING CONFERENCE Presented Credentials Stated authority and purpose of inspection Provided Small Business Resource Information Sheet Provided CBI warning to facility The following information was obtained verbally from Holsum representatives unless otherwise noted. Process Description: The facility produces bread and buns using two dedicated production lines. Production begins with the delivery of raw material including flour, yeast, and liquid sucrose. Ingredients for specific recipes are weighed in the scale area. The ingredients for the recipe are then taken to one of three mixers where they are mixed with yeast and material from the brew process. After mixing, the dough is conveyed to one of three dividers to cut the dough into appropriate sizes. The dough is then placed into pans and conveyed to one of two proofers. From the proofers, the dough goes to one of two ovens for baking, then through a cooling system prior to final packaging. The facility also has a brew process to pre-ferment a portion of the dough prior to the mixing stage of production. Additional fermentation then occurs once the pre-ferment is mixed with the other ingredients and continues through the proofers. There is one brew process for both the bread line and the bun line. Staff Interview: The facility has a dedicated proofer and oven for both bread and bun production. Emissions from both ovens are uncontrolled. TOUR INFORMATION EPA Toured the Facility: Yes Facility Name: Holsum of Fort Wayne, Inc. Facility Location: 800 Boyd Boulevard, La Porte, Indiana Date of Inspection: May 2, 2024 Data Collected and Observations: EPA walked through the entire production line from the scaling of raw materials through to baked bread exiting the ovens. EPA also observed the two brew processes, which are located in open areas of the plant. During the tour EPA recorded six videos using an optical gas imaging camera, see Appendix A. Photos and/or Videos: were taken during the inspection and are listed in Appendix A. Field Measurements: were not taken during this inspection. CLOSING CONFERENCE Provided U.S. EPA point of contact to the facility Requested documents: Annual emission calculations for the last three years with associated spreadsheets; Potential to emit calculations and actual emissions for the last three years from the two brew processes at the facility; and The application for renewal of the Part 70 Operating Permit issued on August 7, 2020, and the application for the current Part 70 Operating Permit issued on April 11, 2022. DIGITAL SIGNATURES DAKOTA Digitally signed by DAKOTA PRENTICE Report Author: ______P_R__E_N__T_I_C_E____15_:1_0:_19_-0_5'_00_' _______ Date: 2024.05.23 Section Supervisor: NATHAN Digitally signed by NATHAN FRANK _F_R_A__N_K_______1_0:_53_:1_9 -_05_'0_0'______________ Date: 2024.05.28 APPENDICES 1. Appendix A: Digital Video Log APPENDIX A: DIGITAL VIDEO LOG Facility Name: Holsum of Fort Wayne, Inc. Facility Location: 800 Boyd Boulevard, La Porte, Indiana Date of Inspection: May 2, 2024 Inspector Name: V. Fischer Archival Record Location: R5 Electronic Record Center - ECAD > AECAB Library > Enf_Holsum La Porte_IN_24 > Inspection > FLIR Videos Image Number 1 File Name FLIR0178.mp4 Date 5/2/2024 Latitude and Longitude Not Available Description of Image Entry to Bun Line Proofer 2 FLIR0179.mp4 5/2/2024 Not Available Exit from Bun Line Proofer 3 FLIR0180.mp4 5/2/2024 Not Available Bun Oven 4 FLIR0181.mp4 5/2/2024 Not Available Bread Proofer 5 FLIR0182.mp4 5/2/2024 Not Available 6 FLIR0183.mp4 5/2/2024 Not Available Bread Oven Bread Oven