Document M4DdvKj6RKz6mQk7Y11MXwBdk

ES-0O-SS-I3 APPENDIX 1 HONS 022329 Monsanto MMIIMI CofltfMV OP N. Nlrrk St. iMit, Uimfi 63IM niOTi: (314) OM-IOCO September 19, 1980 Mr. William A. Hueppauff Rosalia Investment Company 1962 Clayton Road Ballwin, Milsour1 63011 Daar Mr. Hueppauff: This will confirm our agreement to undertake analytical teating of six composite samples of chemical wastes which you will deliver to Monsanto. We will conduct our analysis using our ordinary pro cedures for the detection of polychlorinated biphenyls (PCBs) only. Our analysis will not undertake the identification of any other materials present in your samples. We will target to achieve a detection limit in the sample as analyzed (the composite) of five parts per million. This could vary depending on the nature and complexity of the sample matrix. If the saiqpis contains inter fering materials such as chlorinated pesticides or other chlori nated industrial wastes, the FCB analysis will be significantly more difficult and could result in achieving a higher detection limit. Prior to conducting our analysis we shall extend an invitation to the Missouri Department of Natural Resources and the Onited States Environmental Protection Agency to have observers present during the procedure if they so desire. Results of our analysis will be provided to you and will be made available to state and federal authorities as appropriate and nay, in Monsanto's discretion, be made available publicly. It is expressly agreed that Monsanto is not undertaking any obliga tion or liability except as expressly set forth herein and that Monsanto is providing this technical assistance in the public interest and at your specific request. If this letter accurately sets forth our understanding and agree ment, please sign one copy in the space indicated and return to me. Accep ' MONSANTO COMPANY Date By -- '' | `-`-`-i ^r-i <=! P-iC- HONS 022330 Monsanto MOHMMTO MBUSTHUU. CN8MICMJ Ctt tOO N. UA<krM lonlivird St. tovil. WfiiMri 83186 014) 684*1000 September 19, 1980 This letter documents trsnefer of six (6) composite samples of wastes removed by the Missouri Department of Natural Resources from the site near Caulk's Creek on property owned by Rosalie Investment Company. A description of the samples is included on the ettached receipt from Gary B. Snodgrass OSEPA, Region VII, and Keith Schodien, Missouri Department of Natural Resources. Hilliam A. Hueppauff hereby states that the samples are in the same condition as received from the Missouri Department of Natural Resources. Hilliam A. Hueppauff " c) -- v Orville Hicks hereby acknowledges receipt of the six (6) samples. / Wfllt ( MfffSBAtB C0*D*V HONS 022331 Inventory of Soaplao Reaoved Proa Roonllo Inreotaont Co. Property. Saptoafcer 1T| I960 - Drum sit* la Dralaaevay SK99O0 - Coapoolto Drua Saaple 3X9909 - Coapoolto Drua Soaplo 3X9910 - Coapoolto Drw Soaplo Septeafeer IS, I960 - Dn olta along Caulk' o Croak SX9911 - Co^oolto Dm Soaplo 3X9912 - Coapoolto Droa Soaplo Soptoakor 18, 1980 - Du^ olta along Coulk'o Crook containing Plro (?) gallon eaa* aid bockota. SK991h - Coapoolto Soil Staple MONS 022332 ES-60-SS-I8 APPENDIX II HONS 022333 ES-80-SS-18 Page 1 POLYCHLORINATED BIPHENYLS IN SAMPLES FROM CAULK'S CREEK SITE INTRODUCTION On September 19, 1980, five composited drum samples and one composited soil smnple were received from a representative of Rosalie Investment Company. The samples were split samples which had been removed from sites near Caulk's Creek In West St. Louis County by representatives of the USEPA and the Missouri Department of Natural Resources (DNR). The sites were on land owned by Rosalie Investment Com pany. The samples were submitted for analysis for polychlorinated biphenyls, In response to an offer made by Monsanto Company to Rosalie Investment Company. The documents In Appendix I are records of the Monsanto offer and the transfer of the samples. SUMMARY The six samples from the Caulk's Creek site were analyzed for polychlorinated biphenyls by our laboratory. Five of the samples (four composite drum samples and one soil sample) did not contain polychlorinated biphenyls above our exper imental detection limit of five parts per million (ppm). These samples were subjected to standard cleanup techniques and the polychlorinated biphenyls were measured by gas chromatography/mass spectrometry (GC/MS). One composite drum sample was not amenable to GC/MS analysis because of the nature of the material In the sample. After the sample was cleaned up, the polychlorinated biphenyls were measured by electron capture gas chromatography (EC-GC). This sample con tained 4 ppm polychlorinated biphenyls. (The lower detection limit for this technique resulted from reduced background contamination for this chroamtographic detector for this sample.) Each of the samples was "spiked" with S ppm poly chlorinated biphenyls to demonstrate our ability to measure the polychlorinated biphenyls at the stated detection limit. These spiked samples were analyzed Identically to the unspiked samples. Our recovery of the polychlorinated bi phenyls averaged 94t at the 5 ppm level. DETAILS SamplInq The six composite samples (five drun composites and one soil composite) were collected by USEPA and Missouri DNR personnel at the Caulk's Creek site. The samples were split at the site and one set was transmitted to our laboratory as documented in Appendix I. Upon receipt, the samples were entered into our sample log. In our laboratory, the samples were aliquoted for analysis. The drum samples, which were not homogeneous, were stirred to mix as completely as possible. Ten gram aliquots were weighed Into 100 mL volumetric flasks and diluted to volune with pesticide grade hexanes. The soil sample was handled in accordance with Standard Operating Procedure (SOP) EAN-30-S0P-006, SOP for Homogenizing, Subdi viding and Preserving Sediment Samples. However, the sample was not sieved so that the integrity of the sample would not be affected by the sampling procedure. HONS 022324 ES-30-SS-18 Page 2 Sample Cleanup (Drum Campsites) The diluted composite drum samples were cleened up using standard procedures described In the ASTM Standard Methad for Analysis of Environmental Materials for Polychlorinated Biphenyls. aSYh D3304-M. Five mL aliquots of the heeane solutions were subjected to alumina column cleanup, described In Section 9.2 of 03304. The cleaned up samples were concentrated to 5ml for subsequent deter mination of polychlorinated biphenyls. Two of the samples (SK 9910 and SK 9911) had excessive background Interferences after column cleanup. These two samples were reallquoted and subjected to the sulfuric acid cleanup described in Section 9.1.9-9.1.2 of D3304. The acid washed fractions were then cleaned up with an alumina column as described above and concentrated for analysis. The homogenized soil sample was extracted with Isooctane In accordance with EAN-80-SOP-20 (Draft) Standard Operating Procedure for the Extraction of Semivolatile Organic Chemicals from Sediment. The composite sod sample contalned less than Sx moisture, by weight. Determination of Polychlorinated Biphenyls The cleanup samples and extracts were analyzed for polychlorinated biphenyl by Selected Ion Monitoring gas chromatography/mass spectrometry (SIM 6C/M5). The analysis conditions have been described previously In Environmental Sciences method ES-80-M-11, Determination of ... Polychlorinated Biphenyls ... In Low Bolling Organic Matrices. Sections 9 and 10.4. These are included in AppoSTIx TT these were two deviations from the method as written. In Section 10.4.2, the column temperature was programmed from 120* to 280* at 16*/m1n. Secondly, the SIM groups and start times were changed to determine heptachlorobiphenyl Instead of monochioroblphenyl. The Ions monitored for heptachlorobiphenyl were mil 392 and 322. A revised Table II has been Included In the Appendix to reflect this change. One sample (SK9910) was not amenable to determination of polychlorinated bi phenyls by SIM SC/MS because of mass spectral interferences at the selected ions. The acid wash did not remove these Interferences. This sample was ana lyzed by gas chromatography with an electron capture detector (EC-GC), which did not respond to the materials which Interfered with SIM GC/MS. This pro cedure was similar to that described in Section 10, D3304. The specific con ditions used are tabulated below. Instrument: Varlan 3700 Gas Chromatograph with Linear Electron Capture Detector Column: 1 m by 2 on i.d. glass column packed with 3% OV 101 on 100/120 mesh Gas Chrom Q Column temperature: 220 C Isothermal Oetector temperature: 350C Injection port temperature: 250 MOMS 022325 Carrier Gas: Nitrogen, 30 mL/min Injection volume: 3 jL ES-80-SS-18 Pag* 3 The EC-6C M$ calibrated with duplicate reference standards over the operating concentration range, similar to the procedure used for SIM SC/MS. Calculation of Results The results for the SIM SC/MS determinations were calculated using an average response factor (RF) for each chloroblphenyl homolog. Mixed standards contain ing equal weights of Aroclor* 1242 and Aroclor* 1254 were injected at least in duplicate on a dally basis to calibrate the Instrumental response and determine the RF. The concentration of each homolog. Cl, was calculated using the follow ing equation: C, * (RF|j(A|)(t) where C( * concentration of the homolog (ppm) RF{ response factor (ppm/area count) Ai * peak area for homolog (area counts) Vi volume of sample concentrate (ml) Hi sample weight (g) (0.5 g for drum composites 10 g for soil) The total concentration of polychlorinated biphenyls in each sample was cal culated by summing the Ci for all the homologs. The results for the EC-GC measurements were calculated using a calibration curve of sunned chloroblphenyl peak area vs concentration, prepared by summing three Aroclor* 1254 standards In duplicate at each concentration. The concentration In the sample concentrate was read directly from the calibration curve. The concentration in the original sample was calculated using the equation: C where C concentration in original sample (ppm) Cc concentration from the calibration curve (ppm) V volume of the sample concentrate (ml) W sample weight (0.5 g) (For both SIM GC/MS and EC-GC, equal injection volumes were used in all cases, so that the Injection volume does not enter into the calculation; l.e., the methods were calibrated In concentration units, not mass units.) HONS 022326 ES-80-SS-18 Page 4 QUALITY ASSURANCE In order to assess the validity of the results for this study, each sample was spiked with 5 ppm of Aroclor* 1254. The recovery of the polychlorinated biphenyls at this level Insured that if polychlorinated biphenyls were present In the samples at this level (our stated detection limit) we would have been able to measure them. The average recovery for all samples was 941. An attempt was made to measure the precision of the analyses by analyzing two saavles (SK 9912 and SK 9914) in replicate. However, since no polychlorinated biphenyls were measured In those samples, the precision could not be calculated for the samples. However, based on replicate Injections of the standards, the precision for the determinations can be estimated to be between 101 and 201 relative standard deviation for the SIM GC/MS measurements. RESULTS The results for this study are tabulated below. ______________________ DATA SUH4ARY CAULK'S CREEK SITE SAMPLES Sample # Total Polychlorinated Biphenyls (ppm) Cleanup Analysis * Recovery 5 ppm Spike SK 9908 NO <5 Column, GC/MS 102* SK 9909 NO <5 Col urn, GC/MS 831 SK 9910 4 Acid,Column, EC-GC 87* SK 9911 NO <5 Column, GC/MS 96* SK 9912 NO <5 Column, GC/MS 92* SK 9914 NO <5 Extract, GC/MS 111* As can be seen, only saaple SK 9910 contained measureable levels of polychlori nated biphenyls. This was the sample analyzed by EC-GC. (The lower detection limit for this technique resulted from the reduced background contamination from this sample for the EC detector.) The results are indicative that polychlorinated biphenyl contamination at the Caulk's Creek site is not as widespread as feared. Even for the sample which did contain measureable levels. If we assume the composite represents seven drums, the most any one drum could contain Is still less than 30 ppm. This level Is below the 50 ppm US EPA action level. MONS 022327 ES-80-SS-18 Page 5 Submitted by: Prepared by: Approved by: Monsanto Industrial Chemicals Company Environmental Sciences Section - N1E 800 North Lindbergh Blvd. St. Louis, Missouri 63166 fciUiti 3T Robert G. Kaley, ll r/ Research Group Leader Richard L. Hasson Director, Technology Support Environmental Operations 6 Technology Planning HONS 022328