Document M463E7KNjzmQQo16my6mkOw3y
Monsanto
ATI
W4CT
TO
W. C. Engman, Krummrlch
May 5, 1972
PCB POLLUTION REDUCTION EFFORTS AT WOK
Mr. W. B. papageorge Oeneral Offices B2NK
confidential
" P. B. Hodges - E1SF 'A. E. Lelsy
Paul Hodges asked that I gather together pertinent detailed Information concerning plant PCB pollution reduction effort. Please let me know If you need anything in addition to the following.
Protect Work
The following projects were conpleted in the last two years at a cost of about $200,000.
1. Catch basins were installed at the Aroclor department and Rip Track ($50,000).
2. 15 Therminol units were changed out to non-PCB fluids
($80,000).
3. Paving and curbing was installed at truck and tank car loading areas and around storage tanks. ($40,000)
4. A Brink demister was installed to reduce entrainment losses from the blow tanks ($22,500).
5. Four miscellaneous piping modifications were made to reduce losses or the potential for losses in the Aroclor department ($10,000).
6. An electron capture chromatograph was purchased for our laboratory ($8,000).
Sampling
Our first effort was to balance the PCB losses at the two main plant exit sewers with the losses measured at the Waste Treatment Plant Influent. Figure 1 attached illustrates the discrepancy.
moms 099456
Nr. V. B. Papageorge PCB POLLUTION REDUCTION EFFORTS AT WOK
Page 2
5/5/72 WOK
Sampling (cont'd)
Traverse of the cross sectional area of a sewer line gave the
follow*
' * " -----
Profiles along length of sewer runs gave the following results also In lbs PCB/day:
24" sewer 81-98-5-86 30" sewer 6 - 6-6-33
Filtering samples gave a 70 to 90# reduction In PCB level when compered to the corresponding unflltered sample.
Samplers
As part of the sampling program, we have gone through an evolu tion of sampling devices to try to obtain the most representative sample we could.
The first sampler used was the old slow speed sampler that has ' been used for the phenol and mercury reduction programs. This
is a continuous composite sampler which will take about 1 qt. sample in a shift. Hits is Inadequate In trying to sample for aolldB as the settling velocity of the solids Is greater than the velocity of the liquid rising In the sample tube.
We tried a continuous high speed sampler. This seemed to work well for Bhort periods of time. Results indicated PCB levels about 6 times higher than with the slow speed sampler. We gave WP on this sampler when we found the tubing would wear out after 2 to 3 days service.
The barrel sampler is the type being used at the Waste Treatment Plant for control measurements of solids, phenollcs, mercury, etc. We have also used this sampler for PCB's up to this month. Briefly) this sampler consists of a 55 gallon drum housed in a
MONS 09945 7
Mr. W. B. Papageorge PCB POLLUTION REDUCTION EFFORTS AT WOK____________
Page 3 5/3/72 WOK
Samplers (cont'd)
heated shed. A timer Is used to periodically activate a peristaltic "high speed" pump. The total sample Is drawn
Into the barrel. Once, each morning, the WTP operator agi tates the drum with a small propeller type agitator (no baffles). He shuts off the agitator and allows a portion of the material to drain and then obtains a gallon sample In a glass jug. He shakes this bottle and pours about 1/4 into a second glass gallon Jug. This Jug Is filled over 3 to 4 days.
Someone from the pollution control group comes twice a week and. after shaking, pours a sample from the gallon Jug into a 16 oz. sample bottle for PCB analysis. Not only are there Inherent problems in obtaining the Bample but also subsequent sample handling leaves much to be desired.
The flip-flop sampler Is our latest development. We have
adopted this as our permanent PCB sampler both at the Waste Treatment Plant and at the ln-plant sewers. This sampler also
utilizes a timer to periodically activate a high speed peris taltic pump. The sampler Is pointed up stream and is sized so that the velocity of the sample entering the tube matches the velocity In the sewer line itself. This we call "Isokinetic"
sampling. The sample flow is first diverted back to the sewer. After 15 or so seconds, a second timer activates a solenoid which flips the sample tube over a 2-1/2 liter plastic sample bottle. After a second or two the solenoid Is deactivated and flops the sample tube back to the sewer. The first timer then cuts off the pump. A 16 oz. sample Is drawn after shaking from the 2-1/2 liter bottle twice a week for PCB analysis.
Comparative results from the two types of samples at the WTP effluent are:
Date
Flip-Flop
Barrel
3/?3/72 3/24/72 3/25/7? 3/26/72
3/29/72
226 ppb
193 169 181 170 lOd 168
1076 ppb
63
37 22 26 78 211
hQNS 099458
Mr. W. B. Papageorge PCB POLLUTION REDUCTION
efforts at wok
WOK
Samplers (cont'd)
Va ran the following additional tests to get a better feel for our sampling accuracy:
1. 8-1/P liter bottle was shaken and the entire amount poured Into 16 of. sample bottles. The first, middle and last
bottle were analyzed.
First Middle Last
120 ppb 168 ppb 211 ppb
8. Two flip-flop samplers were installed at the WTP effluent at exactly the same location In the sewer line. 16 oz.
samples were drawn.
Sampler #1 198 ppb Sampler #2 128 ppb
3. Sample points were moved about 1' vertically and 1' hori zontally apart for the two samplers.
Sampler #1 (higher) 130 ppb Sampler #2 (lower) 117 ppb
Our conclusion for this work wsb that the flip-flop sampler was superior to the barrel sampler both theoretically and in consls-
' tency of results. The sampler is not perfect, but seems to give reproducible results within the accuracy of the PCB analytical method. Results starting In May will be from the flip flop sampler* These results will tend to be higher than those in the
past.
Current Reduction Program
Our current In-plant reduction program is outlined in my memo to 0. L. Bratsch dated 4/84/72. A copy is attached.
Pi Department Control
Attached la our Aroclor Department Pollution Control Data Sheet for the month of March. The catch basins and demisters are monitored daily.
HONS 099459
Mr. W. B. Papageorge
PCB POLLUTION REDUCTION EFFORTS AT WOK
5/f/72
WGK
Present Knowing Losses
Present knowing losses are listed In the above mentioned memo. They run from 0.7 to 2.3 lbs/day when HC1 Is not sewered. I can get you the raw data and/or loss calculations If you need
them.
Stated In this memo. Is that losses at the Chlorosulfonlc Acid Department (from the HC1) were unknown. We have since deter mined from sewer sampling at that department that losses from
this source are essentially zero (at least less than 0.05 lbs/day).
Unknowing Losses
Our best measure of unknowing losses is the monthly averages from the Waste Treatment Plant. Figure 2 attached shows these losses over the past 12 months.
Some additional measurements made are these:
1 River Ranney well water
4-33 ppb
2 Ground water adjacent to Dept. 246 83 - 290 ppb
3 Streams from neighboring industries
6-56 ppb
4 Plant cooling tower water
None detectable
5 City water
None detectable
/S . ,/
W, C. Engman Technical Services Department
/tm attachments
MQNS 099460