Job Procedure: ASBESTOS HANDLING AND ABATEMENT PROCEDURES
Scope; This job procedure covers safeworking procedures for handling asbestos materials.
Asbestos materials found in pipeline operations are:
Asbestos gaskets, typically Garlock No. 7022; 150, 300, 600, 900 series Flexatallic, style CG; 15, 30, 60 series
Asbestos packing, typically Pump and valve glands Rod, braided coil, square teflon impregnated Garlock 5860 or equal
Transits Building covering on older structures
This job procedure is divided into 4 subparts depending on the degree of exposure and type of job. These are listed below.
Certain jobs are not to be done by Dow Pipeline person nel. These jobs are listed in Procedure 41C and require special equipment and personnel training.
/
INDEX TO PROCEDURES
4lA - Procedure for Asbestos handling and abatement on jobs with very small exposure
4IB - Procedure for Asbestos handling and abatement on smallscale, short-duration projects with limited exposure
41C - Procedure for asbestos handling jobs not to be done.
4ID - Procedure for asbestos handling and abatement by vacuuming
ST06U6753
PLAINTIFF'S EXHIBIT DOW-926
Di : | Reviewed | ASBESTOS HANDLING AND ABATEMENT ______ j _____________j PROCEDURE
vised j ______ ______j
Dow Pipeline
Angleton Operations Procedure No. 41 Page 1 of 1r
Job Procedure No. 41A
Job Procedure: SAFE* WORK PROCEDURE FOR ASBESTOS HANDLING AND ABATE MENT ON JOBS WITH VERY SMALL EXPOSURE
Scope: This procedure covers jobs where limited data has shown asbestos exposure is very low (<0.1 fibers/cc)
Jobs covered by Procedure: Receiving new gaskets into warehouse Storing gaskets in warehouses Moving new gaskets to job site Installing new gaskets on pre-cleaned flanges Removing old gaskets that do not require scraping Disposing of old gaskets Asbestos packing installation, handling, and removal
Minimum Safety Requirments: Same as now applicable to the above listed jobs.
Procedure:
1. Asbestos material shall be stored in Angleton Building DPL 108 a. All asbestos material shall be stored in polyethylene bags. Bags shall be marked "Asbestos Storage Bag" and mounted on wall hooks.
b. Asbestos storage area shall be vacuumed one time per week per "Asbestos Vacuum Abatement Procedure #4ID.
2. Remove asbestos material from storage bag and reseal top.
3. Except for disposal of asbestos material, covered herein, all further work for jobs covered by this procedure shall be done as they have been done in the past.
NOTE: Asbestos material for covered jobs is not considered friable and exposure is considered to be within acceptable limits.
4. Asbestos material disposal. Asbestos disposal shall be made into the following polyethylene bag.
30" x 48" size, 6 mil thickness asbestos disposal bags. Each will be labeled:
"DANGER - CONTAINS ASBESTOS FIBERS. AVOID CREATING DUST. CANCER AND LUNG DISEASE HAZARD"
Seal top of bag with tape and return to disposal container in Angleton Building DPL 108.
ST06U675U
Date ______
______
I Reviewed | ASBESTOSHANDLING ANDABATEMENT | I ON JOBSWITH VERY SMALLEXPOSUREj
j______ ______ I
|_ _ _ _ _ _ _ _ _ _ _
j
| Dow Pipeline Angleton Operations
I Procedure No. 4 1A
j Page 1 of 1