Document M418jdRe5Ozvqa7gkoXrMaV4M
E. J. Kerfoot Page 3
Special Surveys
Survey Dates Areas
Results
Comments
- Toluene Diisocyanate
- October .10 and 30, 1975 - Main laboratory and the hazardous chemical storage building be
hind the main lab - Main laboratory - .0003 ppm
Chemical storage building - less than .0001 ppm
The TLV of TDI is .02 ppm TWA. - This survey was requested by laboratory operational personnel
because some laboratory technicians thought a problem might exist. Other analysis work will be performed in the future to
determine contaminants and their sources.
OSHA Inspection
bates'
Areas Reason .for Inspection Action Summary
September 30 and October 1, 1975' - G-l, G-3 and Cell Renewal
- Employee complaint
.-
- Two OSHA Industrial Hygienist/Compliance Officers visited the
Geismar Works in response to an employee complaint involving .
asbestos handling procedures in the G-1 chlorine plant cell room.
The OSHA personnel investigated asbestos handling and took air
borne dust samples in every location where asbestos ..was handled
or stored. S. Herron took identical simultaneous dust samples
for obvious reasons. The OSHA personnel also conducted a general
safety inspection in the vicinity of the cell renewal building
and the G-l and G-3 cell rooms. A citation is anticipated im- .
manently including some of the following alleged violations al
though corrective action has been initiated:
'no warning signs in asbestos storage areas (questionable violation)
improper.disposal of waste asbestos bags;
inadequate medical surveillance records;
.
inadequate asbestos dust area monitoring (questionable violation);
National Electrical Code violation;
no self-closing valve on a combustible liquid drum;
fan guarding;
and chain sling inspection and marking.
Plant Visit Reports
Plant Dates Action
- South Kearny, New Jersey - October 13 thru 16, 1975 - Became oriented with Works facilities and operational personnel.
Helped design and perform extensive air contaminant sampling in the Basacryl and Dispersions Plants.