Document M2GYZgn039N4NqbqdZDLeEaz
to Jon L. Koazen, MD * Toledo 11 object BP.RLtH PLANT
intra-company correspondence
from data
G E* Devltt - Toledo 11 February 1?/ 1971
R. S. Grant - Toledo 25 T. J. Moyer - Toledo 1L D. S* Naot* - Toledo 11 P, Scheuarla - Berlin
On January 26 and 27, 1971, a aeriaa of sample* were taken inside tha plant
by tha writer* These were to act as a check on engineering work already
done, and to aid In further planning, as requested by the plant. They will
be compared, where possible, with the results of the previous aurvy made
by Clayton 6 Associates in June of 1970. A copy of the results of ch*
.
January, 1971 study is attached,
*
Since the June 1970 survey, a number of engineering and process charges have been Bade in the finishing end of the plant, while essentially nothing has bsen done on the #1 and /2 pouring lines. In addition, the filter press operation has been brought as least partially on line since the June 1970 etudy.
These samples were checked for two things. The first was the dust concentration,
which is reported In mllllgrams/cublc meter (tag/M^), and would Include fibrous
material, as well as particulate dust. The sample was also checked for asbestos
fibers, with Che counts reported lo flbers/allllllter of lengths greater than
5 microns, greater than 10 microns, and total. The health threshold of 5
fibers/ml greater than 5 oicrone is based on the prevention of asbestosls, but
no actual limit has been set for the prevention of lung cancer. There Is some
United evidence that shorter fibers may be a factor, and this should be kept
In mind. Also, no actual exposure rate and dose response has been determined
for thie feel health hazard,
' '`
....
The finishing end of the plant, vhlle the equipment, and especially the T3 sew Is operating correctly, as was the case during these sampling periods, 'appears to have levels which ere saelsfectory with one exception. The F-l unloader (ln-feeder) still Is getting excessive exposures, but corrective work is to be soon completed, with a conveyor extension and a local exhaust rework.
The filter press operation appears veil controlled, although under process -- conditions during the sampling periods, excessive amounts of water are being . used, which stay have been elding In control. However, the batch mixer for 4- thla area requires better process control ventilation, as Veil as hood redesign
for more efficient operation.
Jon L. Konzen, MD - Toledo 11
RERUN PLANT Pafe 2 February 17, 1971
I
The operations of the #1 and #2 lines are a definite source oj a real health exposure to all who work on then. Ventilation controls are -.badly needed, and the exposures are serious enough to require- personal 'respiratory protection on an lnterla basis until these controls can be -installed* These pouring lines are ooe of the few areas of this plant 'where comparable results between the June 1970 study and the January 1971 study can be noted* In both studies, the results are almost Identical and show levels well above the recoessended threshold values* These results ere listed below for comparison purposes}
June 1970 Study
January 1971 Study
Operations
ag/M3
Fib^rs/^l
ag/n3
Fiberi/al
#1 Line Service
7.* 34.2
1.59 15.1
34.4
17.1
#1 Line Poorer
8.9 2.18
2.0 0.31
#2 Line Stripper
24.2 39.1
14.1 11.5
21.1
8.62
#2 Line Pourer
14.2
1.54
19.2
1.66
Recommendations
1* The stroog need for local eontrol of asbestos and dust on the pouring lines has bean racoaflraed*
2* Until such positive engineering controls are installed, a personal protection program for all pouring line- esployees is required, as wall as batch nix oparators*
3* The filter press batch aixiog ventilation system needs redesign for battar control*
If thare are any questions or consents, please do not hesitate to contact ae*
. E. Devltt Chief Industrial Hygienist
eve
Attachment
-
Plant
DR CE D. CLAYTON & ASSOCI* -S, INC. INDUSTRIAL HYCIENE FIELD SAMPLING RECORD
$*JL,
Date
//J7/AL
Process Material (s)
/L
By Sampling Method
rfA
Remarks (Ventilation, etc.)
Sample 1 Rot amcter No. Reading
Description of Sample
Start Stop
ntt
/V
-to
11
n
V
n
ir
%
<n
n . ` f!
f!%s?
AM
3/1
3SJ7
an 7 1* An *31 fs /r in A io t`ir ti io nr r* *r J '< f( /; j.ji
j ! iL&d
fI - CajL
)
oils' /'LO OfQ 1-11
j *>/**'V f/lt [if-#- #3
t'r xo V'ff (A.A
!6'3l 0 41.
if Ji If JU
' d'fc^jL-v ert^v
A1FL II'-if
/k/ \ 10-31, h'.xi
% I -*' J*s -
ofybt*' '
' 10.3') 1/3)
/O'ti#9 -Ac,
US?
Ut. P~
_c-A
FP * l
/-
FP it j
FP M *
WjT
' /- 30J1" t*
^
fl n
___ PL
03/ OJ 01
---
Pi / 9 JV pi tj J.JP fs J }.rf
P4tf 3 /I
A-OF^J
/"' /-
/**
A./v
ft jIl
S"*-' (
)
Lva
-ti
9* J~
i
c a
fex n n e
or o c rt
!S
CEORCE D . CLAYTON & A S S O C IA TE S , IN C
O
* 9
ft
O 0
1 w
!
$w0
r*
3S
Z tn
cn
w n