Specifications for Asbestos Removal -
Case 46102-1
Pol Laboratories
if August 24, 1981
iw h. M. Crawford MH 78691 3A-213 n2250
Hr. S. Eichinger:
This memorandum is in response to your request for a description of procedures required of contractors removing asbestos. OSHA 1910.1001 specifies the following:
. (c)(2)(1) - Insofar as practicable, asbestos shall be., removed... or otherwise worked in a wet state sufficient to prevent the emission of airborne fibers... . [For example, workers should continually mist or spray the layers of insulation with water as they are being removed.]
. (c)(2)(1ii) - Employees engaged in... the removal or demolition of asbestos insulation or coverings shall be provided with respiratory equipment... and with protective clothing. [Generally the workers will wear disposable coveralls including a hood. Respirators will be NIOSH/ HSHA approved and be marked accordingly. The contractor supplies protective equipment.]
(9)0)(i) - Caution signs shall be provided and displayed at each location where airborne concentrations of fibers may be in excess of exposure limits... . Signs shall be posted at such a distance from such a location so that an employee may read the sign and take necessary protective steps. [Work areas should be roped off and signs posted to prevent BTL personnel from entering the work area.]
(s)(2j(i) - Caution labels shall be affixed to... scrap, waste, deons, and other products containing asbestos fibers.... [A sample of
this type of label is attached.]
(h)(1) All places nf employment shall be maintained free of accumulations of asbestos fibers... . [Work areas should be enclosed within plastic drapes. Floors should also be covered. All enclosure materials should be removed by the contractor. Contractors should vacuum all wort areas clean. Only a vacutan cleaner with a HEPA filter, which will remove 99.971 of particles with a diameter 0.3un or greater is acceptable.]
PLAINTIFF'S EXHIBIT ATT-403
LLA 001894
Mr. S. Eichinger - 2
. (h)(2) Asbestos waste, debris, bags and asbestos-contaminated clothing consigned for disposal... shall be collected and disposed of in sealed, impermeable bags or other closed impermeable containers.
In addition to OSHA requirements, the contractor is responsible as generator of the asbestos waste to manifest the waste and insure that it is taken to an approved landfill. The contractor should supply the name of the disposal facilit) to BTl. BTL should investigate to insure that the facility is EPA registered and that the contractor manifests the waste material as a hazardous waste under RCRA, mmiber U-01 3.
The contractor should be certified in asbestos removal by the New Jersey Oivision of Building and Construction.
Finally, the Environmental Health and Safety Department is available to assess contractor work practices to insure compliance with OSHA regu lations and monitor BTL employees potentially exposed to airborne asbestos.
MH-78691-WWC-air 1
Copy to M. H. Brown L. K. Jurskis D. Rainer w. J. Schreibeis G. M. Uilkening P. E. Myszkowski
W. W. Crawford