1'*-iL jf.it *00 * A 1*1 vJ Buffalo, 1N.T. 14313 (
November 9> 1972
Georgia-Pacific Corporation 900 f>.0. th Avenue Portland, Oregon - 9720U
Attention* Mr. Ariel Sanchez
Gentlemen i
Wo have thoroughly analyzed your problem on the Bag Packer at your Akron, Now York KLant. We have also made preliminary drawings and reviewed them with Mr. Bill Hammer regarding equipment location, selection and overall design.
It is our opinion that this system iroiBt be a separate and complete unit.
< Wo propose to furnish and install the necessary hooding, ductwork and collecting equipment to eliminate the dusting problem and also prevent the loss of any product.
The existing vibratory conveyor and crocs feed belt conveyor would bo removed.
Two sots of three hoppers each would receive-the material dropping doxm thiu the conveyor and thru the floor below tho fill spouts.
This material then would be picked up by the ductwork at tho floor level. These three ducts would also have floor sweeps facing the center of tho building with adjustable covor3. A protective grille would prevent any foroign objects from entering the syctem. Complete hooding of the upper area would include tiiroe (3) doors to give access to the power curve conveyor for spring repair.
Additional pickup hoods would be installed at the three fill spouts and above tho fill spouts in front of tho operator*
These lines would all join and lead to a 32" diameter high efficiency cyclone mounted on a platform ll'-O" off the floor and behind tho bag packer Jit the outside wall. This unit would be a Duotcx ^23-1003 Model 32.
From the cyclone, the dust collector ic to be filtered thru a Flex-Xloen Collector with 11 os. Dacron. Bags mounted adjacent to the cyclone on tho
cono platform. A Hew York Blower ,-''192 iw.nd.iing 3000 Cfm, with 1$ HP motor and drive, r.onr.ted on the platform would exhaust out the side of the building.
COAT'D ON PAGE (2)
PLAINTIFF'S EXHIBIT CP-1041
SGP 0006546
II. *>'> OTA\iN GO., INC.
Buffalo. N. T. 14215
Georgia-Pacific Corp.
November 9$ 1972
Att'ni Mr. A. Sanchez
The discharge of both the cyclone and collector hoppers would be equipped with Dustex Vacuum valves as shown on the enclosed literature.
These in turn would discharge into the leg of the buoket elevator for
complete salvage of all the product.
-^
Ductwork to be primarily 18 gauge galvanized with heavier gauges used on hooding, hoppers and doors as required.
All steel to have shop coat of primer.
We include the cost of final drawings with P.E. Seal affixed for submitting for approval.
Price t Thirteen Thousand right Hundred Ninety Seven ($13,897.00) Dollars.
No applicable taxes are included.
Wc thank you for this inquiry and tract wo may bo of further servico.
Yours very truly.
H. J. OTTEN CO., INC.
JHP./p3
cc: Mr. Bill Hammer Enel. 2 copies Flo Diagram
BY "John H. hussell, Sr.
/