RESEARCH AND DEVELOPMENT REPORT
ANNISTON PLANT
Report No.
1
Job No. 446-514
.
Data _ January 15, 1971
OTHER LOCATIONS
GENERAL OFFICE
ANNISTON PLANT
P. B. Hodges F. J. Holzapfel W. B. Papageorge W. R, Richard J. R. Savage
^
J. T. Bell J. L.- Ether edge
R. Haupt ` J. C. Landwehr
G. W. Miller W. F. Taffee E. G. Wright
Personnel: Problem:
Aroclor Pollution Study I. Ransaw & A. Nelson (J. L. Brown) Removal of Aroclor from the waste water by filtration-adsorption.
Justification:
Pollution Control
Summary:
Aroclor was removed from the plant effluent by filtration of the neutraliza-. tion pit solids on which Aroclor was adsorbed and by adsorption on the filtration media. Aroclor concentrations (100-8,000) in the plant effluent were consistently reduced to 10 ppb upon passing through a four (4) inch diameter tube (packed to a bed depth of 5.5 inch with activated carbon) at flow rates up to 350 cc/min. In the sand filtration study conducted under ' similar operating conditions, the Aroclor levels in the effluent were not consistently reduced to the target level (< 10 ppb).
The presence of 200-1000 ppm of solid particles (size range 1.5-25QH) tended to blind the filter, thus setting a maximum limit on the pressure and flow at which the unit had to be operated.
ish Ransaw PR&D Chemist
jw
DSW 345511
STLCOPCB4084139
Aroclor Pollution Study PR&D Report
...
Page 2
BACKGROUND:
Initial Research efforts for removing Aroclor from the waste stream were
centered primarily around three conventional approaches: multiple distillation,
adsorption and extraction. After considering the economic and technical
factors involved in each approach, it was felt the approaches should be
evaluated in sequence listed above. The following paragraphs are presented
to up-date previously research efforts and to show the basis for the work
being reported.
'
Cost evaluations were made by Dr. Wise, CED, for both a distillation and extraction system for removing Aroclor from the waste water. Dr. Wise concluded that the cost for either of these systems was likely to be considerable greater than that for an adsorption system. A decision was made at this point to abandon these approaches and pursue the adsorption approach in depth.
Initial screening of various adsorbents (i.e, carbon types, porocel, attapulgus clay, powdered polyethylene) by adsorption isotherm tests was very inconclusive. The Aroclor levels were reduced to < 10 ppb in all the isotherm tests regardless of the adsorbent or the amount of adsorbent used. The reason for the erroneous results was later found to lie in the fact that Aroclor was being adsorbed on the reactor walls, particulates in the solution, as well as the adsorbent being tested. From the isotherm studies, the following conclusions were drawn: a) Aroclor levels in plant effluent can be reduced to an acceptable level (< 10 ppb) by adsorption, b) Further evaluation should be done on an adsorption column utilizing a feed of constant Aroclor concentration.
/.
The studies reported herein were conducted at the original neutralization pit
(hereafter designated as pit #1) and newly constructed neutralization (hereafter
designated pit #2). Pit #1 was distinguished from pit #2, during the course of
study, by both its consistently higher suspended solids and Aroclor concentrations.
Pit #1 has been operational since 1961 while pit #2 has been operational since
October, 1970.
.
In a 13 day pilot run at pit #1, initial concentrations of 1,000-8,000 ppb Aroclor in the waste were reduced to a range of 0-15 ppb upon passing through a series of packed carbon beds at a average flow of 25 cc/min. Over 99% of Aroclor removal occurred in the prefilter. This unusual reduction was found to be due, in part, to the filtration of solids on which Aroclor was adsorbed. Since the average flow per square foot was quite low for this particular study, it was felt that the prefilter observation should be evaluated at higher flow rates. This report contains the result of the studies carried out using both carbon and sand filtering media for treating waste water from pit #1 and #2.
1. The adsorber consisted of a prefilter (3.5 inch diameter packed to a 5.5 inch bed depth and a series of one (1) inch diameter columns packed to a total bed depth of 13.5 ft.
DSW 345512
STLCOPCB4084140
Aroclor Pollution Study *FR&D Report
EXPERIMENTAL
.. .
Page 3
pit.
2. Sampl ing
A 24 hour composite sample (300 ml) was taken by catching a 100 ml.sample every 8 hours. : Occasionally, smaller samples were caught at shorter intervals and composited.
3. Flow Rate
Flow to the filter was controlled by adjusting two needle valves (diagram above). A calibrated rotameter was used to measure flow. A given flow rate was difficult to maintain due to the back pressure created by the 'build up of fine solids in the filter. The unit was back washed when necessary to maintain a relative constant flow. In the studies conducted at pit #1, flows were started at the lowest rate (100 cc/min.) and then increased to maximum 350 cc/min. This approach was reversed in the sand study at the pit #2. The maximum flow (350 cc/min.) could not be maintained over an eight (8) hour period due to the high back pressure.
4. Analytical Analysis
The Aroclor was extracted from the aqueous sample into a hexane solvent.
The hexane solution was then dried and analyzed on a EC/GC. The concentration
of Aroclor 1221, 1242, 1254 was determined by comparing the main peak height
of the unknown with height of the same peak in the chromatograms of known
Aroclor solutions of 122t, 1242, and 1254.
.
DSW 345513
STLCOPCB4084141
Aroclor Pollution Study PR&D Report
Page 4
DISCUSSION OF RESULTS
For clarity of the following discussion, it is necessary here to explain the difference in the quality of the effluent from pits #1 and #2.
During the course of this study, the effluent from pit #1 generally contained about 1,000 ppm of solids and Aroclor concentrations in the range <1000-80000 ppb) Table 1 & 2. A prolonged study of the effluent quality (i.e. solids and Aroclor levels) indicates that high Aroclor concentrations generally correspond to high solids. Presently, the solids level in pit #2 is kept at minimum. The effluent from pit #2 normally contains about 200 ppb of solids and 50-100 ppb Aroclor except during periods in which large quanities of acid (HCl) are being 6ewered. This accounts for the higher values seen in Tables 3 & 4.
Carbon consistently reduced the solid and Aroclor concentrations in the effluents from pits #1 & 2 to an acceptable level (< 10 ppb) at flow rates up to 350 cc/min. (Table 1 & 3). The mechanism by which Aroclor is being removed cannot totally be explained. Existing evidence indicates adsorption on the pit solids. However, attempts to determine the adsorptive capacity of the solids were unsuccessful. The lower quantify of solids (200 ppm) in the effluent from the pit #2 had seemingly little effect on the quality of effluent produced.
As it can be seen from Tables 2 & 4, the quality of effluent realized in the sand filtration was not as dramatic as in the carbon study. Aroclor levels in pit #1 effluent (Table 2) were significantly and rather consistently reduced without producing an acceptable effluent (< 10 ppb) quality. Comparatively, the effluent quality produced at the pit #2 was very inconsistent (Table 4). The effluent quality varied between high and low values without drastic changes in influent Aroclor levels or operating conditions.
.
The following factors may explain the results obtained:
a. The solids level of influent varied considerably during the test period. b. Silica type adsorbent requires a considerably longer contact time to
adsorb Aroclor than carbon.
The test data for both the sand and carbon studies suggest that the Aroclor removal is taking place by filtration of pit solids on which Aroclor has been adsorbed and by adsorption on the filtering media itself. Further, it also suggests that the adsorption zone with carbon is quite short and quite long with sand. '
-'
The solids in the waste stream caused considerable operational difficulties.
These solids, of which 42% of its particles were in the 1.5 - 2.3JU. size, tended
to blend the filter, especially at flow rates > 200 cc/rain. Backwashing the
filter did not adequately remove the finer particles. Hence^these Aroclor con-'
taining particles were eventually washed through the filter. This point was
considered a breakthrough.
j
j f { !
OS***14
< ?<.
STLCOPCB4084142
Aroclor Pollution Study PR&D Report
Page 5
CONCLUSION .
.
1. Aroclor is removed from the plant effluent by the filtration of the solids on which Aroclor was adsorbed.
2. Aroclor is adsorbed on activated carbon within a very short adsorption
zone.
'
3. The effectiveness of sand in removing Aroclor is not sufficient at the experimental bed depth.
4. Solids removal is a primary concern in any final clean up method.
FUTURE WORK
.
1. A pilot adsorption study has been conducted in a series c-f 5 inch diameter columns. These result are being compiled for an evaluation and recommendation. A report will be issued by 1/28/71.
2. A pilot clarification (flocculation) unit is scheduled to be put in operation by 1/29/71. This unit will also be used to carry out semicontinuous adsorption studies with other finely divided solids.
jw Attachments
Ishmeal Ransaw
DSW 345515 STLCOPCB4084143
Volume Treated (Gal.X
38 99 160 *175 198 236
Page~6
CARBON FILTRATION STUDY AT OLD PIT TABLE 1
Aroclor Conicentration
of Influent
(PP b) 1221 1242 1254
84 106 NBA
1750 188 NDA
NBA 618 NBA
6051 2638 NDA
559 147 NBA
2106 441 NDA ,
Average Daily Flow
(GPM)
0.0263 0.042
0.042
0.0263
0.0263
0.0263
'
Aroc Lor Concen tration
o E Effluent *
(ppb)
1221
1242
1254
NDA NDA NDA 21 14 NDA NDA NDA NDA
7 5 NDA NDA NDA NDA 4.0 1.2 NDA
Unit plugged. Solids were lorced thr >ugh as the pressu :e on filter i icreased.
Volume Treated
38 76 114 152 190 228
SAND FILTRATION STUDY AT OLD NEUTRALIZATION PIT
TABLE 2
Aroclor Concentration
of Influent
(ppb) 1221 1242 1254
Average Daily Flow (GPM)
Aroclor Concentration
of Effluent .
1221
1242 *
1254
4100 4000 NDA
0.0263
---
8000 2750 NDA
0.0263
138 5
NDA
0.0263
48000 3650C NDA
0.0263
- -
-'
2594 844 NDA
0.0263
157 12
NDA
1800 400 NDA
178 12
NDA
DSW 345516
STLCOPCB4084144
Volume Treated (Gal.)
38 76 114 152
CARBON FILTRATION STUDY AT NEW PIT
Page 7
TABLE 3
Aroc! Lor Coiicentiration
of
Inflilent (p >b)
1221 1242 1254
Average Daily Flow (GPM)
.
Aroclor Concentration
of Sffluent
1221
>PPb) 1242
1254
31 109 NDA . 4 40 NDA
0.0263 0.0263
NDA 2 NDA
NDA
NDA '
NDA
210 32 NDA
0.0263
NDA NDA NDA
340 4 NDA
0.0263
NDA 4 NDA
Volume Treated (Gal.)
38 76 163 277 364 446 516
SAND FILTRATION STUDY AT NEW PIT
TABLE 4
Arocl .or Con centiation
oi
Inflilent (pt>b)
1221 1242 1254
Average Daily Flow (GPM)
Aroclor Concent]ration
of 1 !ffluent
1221
1242
1254
110 72 NDA-
0.0263
48 3 NDA
0.0263 ,
- - . -'
1200 820 NDA
0.0605
NDA NDA NDA
260 60 NDA
0.079
NDA NDA NDA
840 150 NDA
0.0605
7 NDA NDA
610 180 NDA
0.057
60 NDA NDA '
NDA 560 NDA
0.0482
55 NDA NDA