Document LpRmjvJq4Xqo3oDD9KZaZBNqw
fel'ulitO
tr.OU ((JAMf * tOtAtlON)
February 12, 1976
PLAINTIFF'S EXHIBIT
K' SHAC Committee
KHFJNCt
TO
* Plant Manager's Safety Board
>
lieS)e
In order to maintain the plant in a high-level of Housekeeping and Safety
awareness the year round, the SHA^C Committee is planning on conducting
a Guest Inspection of the plant quarterly. The first inspection for 1976
is scheduled for the week of March 15; Attached is a list of the inspection
guides and their areas. The ii^pection teams should contact the department
supervisor and set up an inspection time. After the inspection, the comments
both Housekeeping and Safero wise, should be forwarded to the appropriate
supervisor.
/
V
Enc.
SHAC Committee
SC 13439
LAM014660
Y 4 A
ZONE A Styrene Barge & Ship Docks
Insp. - Ryan, Maute
ZONE B
Department 10 Salt Water Pump Primary Treatment
ZONE C
Personnel Building Locker Safety Supply Fire Station
Insp. - Trafton, Bolton
ZONE D
Stores Shops Building Inst. Shop
*-
Power 2 Water Treatment Depts. 19-25-27
Insp, - Brubaker, Rosenberg Insp. - Marsh, Schwab
ZONE F
Research #1 Research #2 Applications Lab Control Lab
Insp. - Fuller, Ra smusser.
ZONE G
AN Loading Rack Warehouse A-B-C Methanol
Insp. - Daues, Maute
ZONE H
Department 50 Department 33
ZONE I Department 48-56 Department 24
Insp. - Lane, Bolton
ZONE J
Department 53 Soutli 22 AN-5
Insp. - Hamby, Rosenberg
Department 35 Poly Offices West Gate
Insp. - McCullough,
SC 13440
. ZONE L
Main Offices Office Annex Cafeteria - Disp.
Insp. - Danner, Rasmusse
2/12/76
LAM014661