Document Lp93RLxGLDmgoMeZ57Drjdb87

CMiza CHEMICAL MANUFACTURERS ASSOCIATION August 3, 1988 Dear Vinyl Chloride Panel Members and Research Coordinators: A draft report from Environmental Health Associates and the scope of work for the report are enclosed. Please call me with your comments and instructions I should be providing the contractor for the future course of action. Please call me at 202/887-1192 with your comments. S' Hasmukh C. Shah, Ph.D. Manager Vinyl Chloride Program 2501 M Street, NW. Washington, DC 20037 202-387-1100 Telex 89617 ,CMA WSH) SL 066994 Environmental Health Associates, Inc. April 3, 1987 Hasmukh Shah, Ph.D. Program Manager Biomedical and Environmental Special Programs Chemical Manufacturers Association 2501 M street, NW Washington, DC 20037 Dear Has: We are pleased to learn that CMA has decided to further investigate the problem of liver cancer and angiosarcoma in the vinyl chloride study. We agree that the first step should b a pathology review of all deaths coded as liver and biliary cancer in the study. Dr. Ishak at the Armed Forces Institute of Pathology is certainly well known for his expertise in hepatic pathology, and will contribute significantly to this stage of the investigation. As you indicated during our recent phone discussion, CMA is interested in receiving a proposal from EHA for retrieving pathologic materials for Dr. Ishak. There were 37 liver and biliary cancer deaths in the study. It is my understanding that CMA is interested in reviewing the pathologic materials for all 37 cases. In addition to these liver and biliary cancer deaths, I am aware of at least two angiosarcomas which are not specifically identified as occurring in the liver, and were therefore coded as connective tissue tumors. It is likely that they were angiosarcomas of the liver. We suggest that these two cases be reviewed as well, bringing the total to 39 cases. There are 29 different hospitals at which the deaths of the 39 cases occurred. These hospitals are likely to have pathology materials from autopsies. However, only 17 cases are known to have had autopsies conducted. The remaining 22 cases will most likely require additional investigation to identify the location of biopsy specimens. We will contact the appropriate hospital or physician for each case, and request all the pertinent pathology materials. Since the pathology materials are confidential, we will need the approval from the Institutional Review Board. It will be necessary for us to prepare a brief protocol for IRB's review, we feel that an IRB approval will facilitate our request. Dr. Telephone (415) 451-1388 520 Third Street Suite 208 Oakland. CA 94607 Mailing Address: P.O. Box 23050 Oakland, CA 94623*2305 Toil Free: In Cahf. S00-EHA-INFO 80Q-922-INFO SI* 066995 Lowengart, a physician on ur staff, will writs a 1 ttsr to tha appr priata hospitals or physicians. Sha will briafly explain tha purposa of tha request as wall as provide raa surance for pr tacting confidentiality. Wa estimate that wa will obtain approximately 20% of tha pathology materials requested in response to our first raquast. We will follow-up our original requests in order to obtain the remaining 80%. I anticipate that repeated requests will be needed in some cases. Once we receive the materials, wa will put appropriate identifiers on them and ship them to Dr. Ishak at the Armed Forces Institute of Pathology. Dr. Lowengart, Dr. Whorton and I will be responsible for this project. In addition, other EHA support staff will also be involved. The following is our budget estimate: Otto Wong, ScD 2 hours $155 Donald Whorton, MD 2 hours @ $155 Ruth Lowengart, MD 20 hours @ $115 Research Analyst 35 hours @ $45 Administrative Asst 8 hours @ $38 IRB fee Telephone Copying (200 pages @ 15 cents) Postage and express mail $310 $310 $2300 $1575 $304 $250 $500 $30 $50 TOTAL ESTIMATED BUDGET - $5,629 Since it is difficult to anticipate exactly how much time it will take to retrieve all the necessary materials, the above budget is only an estimate. Furthermore, most hospitals or physicians will require reimbursement for shipping and handling the materials. Therefore, we propose to conduct the project on a time and material basis. We will bill CMA for the actual labor and direct expenses on a monthly basis. We estimate the entire project will taka approximately 3 months. If you have any questions regarding this proposal, please give me a call. I look forward to working with you again in this proj ect. Sincerely yours, Otto Wong, Sc.D.,F.A.C.E. President, Scientific Affairs SL 066996 i