Document Lp0BER8vM3E6ZR7EOr446kJX3
September II, 1962 PROGRESS SEPC8T E33SA Band Toot a, Insulating Pina brick Corundite Super Ploflto Bond
These tests were run in the sane manner as the teats previously reported on In the report dated May 21, 1962.
Test # and Sample #
Total Load
Modulus Samaria
TROWEL JOINT, MATERIAL TAKEN DIRECTLY FROM .;AH, NO THINIZNG
1C1 1C2 1C3 1C4 ICS Average
5-10#
348#
600# sea#
480#
499.2# *axx#
l?2.8psl 111. 3pal 192psi 170pal
153.6pal 160 pal
BrMce Bzl.ek Broke Brick Broke Both sides nf brick Broke both sides of brick Part bond, part brick
M.1T&RIAL THINNED TO BUTTER JOINT CQ.'SISTLNCT
2C1 2C2
2C3 2C4 2C5 Aver: ge
>
624# 564#
468# 064# 528# 549.6#
200pal 180.5psl lSOpsl 180.5psl 170pel 176.2psl
Broke brick both aides bond
it it
n m*
n 1t
* <v
90* Brick failure 10* bool Broke brick
material thinned to dipper CLaY CONSISTENCY, DRY BRICK DIPPED BOTH SIDES
3Cal 3Ca2 3Ca3
3Ca4 3Ca5 Average
684# 624# 660# 564# 624# 631.2#
219pa& 200pal
2ll.2pal lao.spai 200pal 202.1pal
Broke Brick bondbrlck r.roJcs Brick 2/3 brick, 1/3 bond broke brick
MATERIAL THINNED TO DIFFER CLAT CONSISTENCY, 'JEM BRICK DIPPED BOTH SIDES ( See report of 5/21/62 for full details on this test)
3Cbl 3Cb8 3Cb3 3Cb4 3Cb3 Avoruge
96# 96#
72# 72# 72# 81.6#
3.7pal SO.fpsl 23 pal 23pal 23psl 26psl
broke bond f
it m
m#
it
M.H, Detrick Co. RfieD LABORATORY
R. B. Abell
PLAINTIFFS
I ^exhibit* MHD- 36 ' .