Document LoeKXDbyj17dbXD9VpgdpXq85
FILE NAME: Garlock (GAR) DATE: 1976 Feb 11 DOC#: GAR060 DOCUMENT DESCRIPTION: Field Visit Report with Cover Memo
Coumunity Health Division
Occupational Health Pr tlon Br.
15 Overlea Blvd., 5th
r
Toronto H4H 1A9
Tel: 416/965-4066
February 13, 1976
Hr. W.J. Woods Manager of Engineering Garlocfc of Canada Ltd. 66 Jutland Road Toronto, Ontario Dear Mr. Woods:
Enclosed Is a copy of the Field Visit Report prepared by S.J. Bell, P. Eng. following a visit to your company on November 7, 1975.
Tours truly
MF:dk
H. Fitch, M.D. Acting Director Occupational Health Protection Br
Ontario
Ministry of Health
c o" "
OCCUPATIONAL HEALTH PROTECTION BRANCH
FIELD VISIT REPORT
.3? 5- 00002- ? 001 6H-671'
Plant: Address:
Garlock of Canada Ltd.
66 Jutland Road Toronto, Ontario
Contacts:
Mr. W.J. Woods Manager of Engineering
` Hazard: Asbestos and Jute
416/965-4066
Date: February 11, 1976
From:
,,
_ _
S.J. Bell, F. Eng.
Requested by:
_ ,, _ itdtDi
Accompanied by: ^ ^ polny _ 0>H>p>B> Mr. A. Cotgreave - l.S.B.
Date of Visit:
November 7, 1975
Copies to:
Dr. M. Fitch (1) Mr. R.K. Cleverdon (3) Mr. W.J. Woods (1)
Abstract:
A visit was made to this plant to assess asbestos and jute exposures. The braiding departments were on a reduced production schedule, however, a modified braider enclosure was observed during this visit. The modi fications appear to have provided a more complete enclosure which should eliminate the need to leave the enclosure doors open during operation.
Four recommendations are made; no directions are suggested.
*
*
*
*
*
The brading operations, at the time of this visit, were on a reduced
production schedule due mainly to the pulp and paper industry strike.
Several braiders were put into operation in both the asbestos braid and
jute braid operations. However, the complete department was not fully
operational during the air sampling hence the results reported in
report AQA #49 represent production conditions which are less than full
production.
.
DIRECTOR O CCU PATIO N .^
FEB 1 6 197
PROTECTION BKAM 2 /
r
r
The front enclosure on braider #6 (black braid department) had been modified to provide a more complete cover of the front section of the braider. The enclosure panels have been enlarged such that they ex tend to the bed of the braider mechanism at the front and about 2 inches from the braider bed at the sides. This arrangement provides a much improved view of the braider mechanism and the final braid which exists at the top of the unit. It would appear, therefore, that the need to keep the enclosure open while the braider is operational has been eli minated.
There are openings or slots at each side of the enclosure. The measured face velocity at these slots was about 950 feet per minute (fpm) which is higher than the velocity figures listed in Mr. G. Rajhan's report (#6B-71) of April 1975. However, it should be noted that the dampers on the exhaust ducts of some of the braiders were closed hence the pre ceding may be somewhat h i g h e r .than conditions during a fully operational department.
The two jute braiders in the white braid department do not have enclosures or local exhaust. It was stated that attempts will likely be made to equip these machines with exhaust enclosures, however, attention would be directed toward the modified enclosure design for the remaining white and black braid units before the jute braiders.
COMMENTS
1. The modified braider enclosure which has been installed on braider #6 appears to be a considerable improvement over the original design. The braider mechanism is, in effect, enclosed and it is quite visible with the enclosure doors closed. There should be no reason, there fore, to keep the enclosure open while the braiders are operational.
2. The face velocity of the enclosure side ports was measured with only #6 braider operational. Some of the dampers in the other braider exhaust ducts were closed hence the measured velocity is likely not representative of a fully operational department. There was also an opening of about 5" x 10" at the back of braider #6; the face velocity was measured at 950 fpm. This rear opening combined with the two side ports results in a calculated flow of about 1900 cfm per square foot of opening. It is suggested that a flow of at least 200 cfm per square foot of opening would suffice hence the available exhaust at braider #6 should be adequate.3
3. The opening at the rear of braider #6 appears to serve no meaning ful purpose. The other braiders in the black braid department had similar openings, however, most of these openings were sealed with a face plate. Elimination of this rear opening would increase the face velocity at each of the enclosure side ports.
3/
(
r
- 3-
As mentioned previously, a number of exhaust dampers were closed at the time of this visit hence the preceding flow per square foot of opening is likely higher than would be encountered with the department fully operational. However, if all the braiders are converted to the modified enclosure design, it is likely that in excess of 200 cfm per square foot of opening would be available at each braider.
4.' It was noted at the time of this visit, that the method of handling a double braid could create problems. This procedure involved the normal braiding operation, however, a braided core was fed through the opened face o f 'the enclosure and a second or outer shell braided onto this center core. The enclosure, therefore, was opened several inches to allow the core braid to be fed into the braid mechanism. This would reduce the effective velocity con siderably (see Mr. G. Rajhan's report #6B-71) and the resultant exhaust capacity could be reduced to below 200 cfm per square foot of opening.
This double braid requirement could perhaps be handled by the instalation of a small port at the front of the enclosure. A hinged flap or quick release cap could be used to seal the port when only single braid is run. The port should be large enough to allow free entry of the braid core, however, small enough to ensure the exhaust capacity does not drop below the required 200 cfm per square foot of opening.
5. Air sampling in both the white and black braid departments (Air Quality Assessment Report #49) showed asbestos levels well below the current threshold limit value; 2_fibers greater than 5 / t i n length per cubic centimeter of air. This sampling was done, how ever, during a production slow-down hence they should not be con sidered as representative of full production^
6. It was stated by the company that blue asbestos (crocidolite) is no
longer in use at this plant. The operation involving the blue asbestos has apparently been transferred to a D.S. plant.
7. The mixer'in the Sheeter Room is equipped with a side exhaust at the charge table. At the time of this visit, the exhaust had not been turned on hence a possible explanation for the high air sampling result (#8) in the AQA report #49. The exhaust slot is about 16" x 8" and when turned on, the face velocity was measured at about 1300 fpm or about 1150 cfm.
The placement of this exhaust port appears to be of questionable value for the initial charging operation (ie: - bag slitting & dumping) as the bales of material tend to block-off the port. It is possible that this exhaust port was designed to handle the mixer back flow during the material charge, however, it is likely that a downdraft arrangement would be more effective.
4/