Document Lo8Y0r1NjvX6eJaJZX4XRL2nq
Monsanto
PROM (NAME ft LOCATION DATE SUBJECT REFERENCE
TO
COMPANY CONFIDENTIAL
E. E. Stewart, W. G Krummrich Plant
August 1, I972
STATUS Y>PCB POLLUTION, controt; PROGRAM
Mr. J. R. Savage General Offices B2SL
cc G. L. Bratsch C. P. Buckley W. C. Engman P. E. Heisler G. A. Hippe P. B. Hodges - G.O. (E1SP) A. E. Leisy/R. M. McCutchan W. R. Richard - G.O. (T3A)
This is the August 1, 1972 status of PCB pollution control program.
I,. PCB LEVEL IN SEWERS '
"Knowing PCB losses" measured from the department
and the Incinerator area at 0.95 #/day average are within expected guideline from the EPA. July PCB losses measured at the Waste Treatment Plant Effluent continue at record low of 2 #/day average. Losses measured to the Treatment Plant continue down ward trend, and at 11 #/day approaches record low to be reached in near future.
Aroclor sewer loss control data are attached.
A. Aroclor Department - Continuous samples taken
from main department effluent stream average
O.67 #/day. Chlorinators down about J>0% of the
time during periods when the C/S department could
not take off-gas. Operated entire month without
air blowing. Department sewers in good condition.
Amendment will be included as permanent part of
the process.
.
B. Incinerator area - Measured losses averaged 0.28 #/day. The unit was down all month for repairs. During the month returned drums from customers are being emptied into storage for subsequent incineration.
C. Total Plant - The average daily loss measured at the influent was 11 #/day. This value reflects background losses from the entire plant and village sewer system in addition to the knowing losses from the manufacturing department and the Incinerator area. Expect to go below record low of 10 #/day
established in early January.
DSW 330208
STLCOPCB4076852
Mr. J. R. Savage STATUS - PCB POLLUTION CONTROL PROGRAM
Page 2 . 8/1/72
WGK
I. PCB LEVEL IN SEVERS (Cont'd)
D. Treatment Plant Effluent - The average daily loss measured at the effluent continues at record low of 2 #/day. Do not expect to see much lower values in near future. Record low concentrations of 20 ppb have been attained on several occasions during the month.
II. PROJECT STATUS
Estimate No. 3972 - "Modify Aroclor Sewer Facilities to Permit Sampling all Sewer Streams" - Design package prepared.
III. PROGRAM STATUS Re Engman/Bratsch 4/24/72
` 1.
HC1 Off-Gas
-
A. Aroclor - c/S production being coordinated such that
minimum 246 off-gas is sewered. Chlorinators were down 30$ during July when C/S department could not accept gas.
B. PR & D completed additional laboratory off-gas ' scrubbing experiments to confirm a lower liquid/gas
. . ratio possible in the scrubber design, and tests . were made to confirm calculated effect of recycle
of scrubber liquor on scrubber efficiency.
- 2. Blow Tank Off-Gas
The amendment to the process to eliminate the aeration process step will be included as a portion of the process. The criteria for acceptance was satisfied. Reduced PCB's to the department sewer stream will be
realized.
3. Rip Track Washes
*
Washed about 4 tank cars and 4 tank trailers during month. Estimate losses about 1-2 # per wash. No action taken to effect better separation in settling basin or . to provide some type of filtration to get to 0.01 #/wash desired. Future work to be done.
DSW 330209
STLCOPCB4076853
Mr. J. R. Savage STATUS - PCB POLLUTION CONTROL PROGRAM
WGK
PROGRAM STATUS (Cont'd)
.
Prepared chronological history of actions taken at WGK to reduce PCB entrances into the environment. Information to be made available to federal authorities if requested.
Two each of four species of fish were taken from the
Mississippi River about 15 miles south of the WGK plant.
The PCB content in the edible portion ranged from 3 to
ppm.
Although some were above the 5 ppm used as a guideline by the
PDA they are not unlike fish taken throughout the United
States where some have been found with lower and some with
higher PCB content, especially those taken from rivers at
large metropolitan cities. Comparative data obtained from
the Interdepartmental Task Force on PCB's report "Poly
chlorinated Biphenyls and the Environment".
Four fish of one species taken from the Mississippi river about 100 miles north of the WGK plant analyzed -cl ppm PCB.
Edward E. Stewart
'
Technical Services Department
/tm att
STLCOPCB4076854
STLCOPCB4076855