0. Mc*endry Project Analysis Highland park Dirseter-?lart Ssgiresring Corporation Efg, Staff Russell Street Office Detacher 18, 1956 /sirm. asfbcts or project klues? res bkakt using fabricatim? at ciCLgs^ri Ve elsh to advise tbet oe have shacked into the safety aspects of the subject Project Request, and have discussed the industrial hygiene probleas with Dos Foeler. In our opinion, this Request provides for the aeehanleal features, such as ventilation, sprinkler protection, and carbon dioxide systaas that are required to sake a safa operation. The Industrial hygiene Depart ment lnforss us that they have no objections to tbe installation. In general, tbe operations that will be perforaed in tbe proposed brake lining aet-np are vary slsilar to existing operations and hazards in the Cycleveld ceaent production. Jv&tab e: 1. A. Cburgay D. G. Fowlar CHRYSLER *0*423 PLANT ANALYSIS POP /) S/5er-S-rPZ 0-7 DATE g-afr.jZA! TAKEN BY Z & SAMPLE NO. Ce 230 COUNT JL L JL L TIME PUMP FLOW RATE CC AIR SAMPLED CALCULATIONS TOTAL RESULT IN FIBERS/CC > 5 MICRONS: ) tel C- TOTAL 0 * 0 Zl RESULT IN FIBERS/CC > 5 MICRONS: Q TOTAL RESULT IN FIBERS/CC > 5 MICRONS: TOTAL RESULT IN FIBERS/CC > 5 MICRONS: chryslb* ee****