Occupational Safety and Health Sprayed-on Asbestos in Company-owned and Leased Buildings
St. SR 80-06-010
data: distribution lisa:
d:
fika no. roUttd Isttars: othsr:
Strong Recommendation June 3, 1980 STF 108, HHD 020, HRD 057, ST? 102 SR 80-06-010
AT&T
America"' Te<?c-c-e inc
Teieg^ao* 222 Mi A.ry =*oac
Basking ^'^5? \ J 0 T92C Pnon* i20U 221-20C0
<o;
from:
AVP - Support Services Copies to Medical Directors, Safety, and Environmental Coordinators-
AVP - Support Services
*\
o
!o
doicnptian:
Provides guidelines required for OSHA compliance in company-owned and leased buildings with sprayed-on asbescos.
***
Section 29 CFR 1910.1001 of standards issued by the Occupational Health and Safety Administration (OSHA) requires all employers to establish and maintain an effective program for protecting their employees against asbestos exposures which are above acceptable levels. The major areas of concern for the Bell System in this matter are in automotive operations (brakes and clutches) and in buildings (sprayed-on fire protection and insulation).
The attached document considers sprayed-on asbestos in company-owned and leased buildings, and is one of a series of 3ell System guidelines intended to satisfy the requirements of the standards. Previous documents include:
. SR 79-05-398 "Occupational Safety and Health - Exposure to Airborne Asbestos Fibers - Request for Survey" - surveys all System-owned and leased buildings to determine if sprayed-on asbestos was used.
. RL 79-07-254 "Asbescos Hazards in Leased Buildings" - recommends thac facilities under consideration for lease, containing sprayed-on asbescos, be reviewed before final decision.
. GL 73-08-054 "MoCor Vehicle Maintenance - Protection Against Exposure to Asbestos Fibers" - provides general procedures for protecting employees against asbestos exposure in garages.
. GL 77-07-024 "Motor Vehicle Maintenance - Brakes and Clutches provides specific recommendations for protecting employees againsc asbestos exposure while performing maintenance operations on brakes and clutches-
LLA 000081
In addition, an SR will be issued shortly entitled "Occupational Safety and Health - Exposure to Airborne Asbestos Fibers" which will provide basic information Co establish an overall asbestos control program.
The results of Che survey of approximately 29,000 owned and leased Sell System buildings (SR 79-05-398) indicates chac there are less Chan LI or 216 (108 owned and 108 Leased) buildings which are suspected to have sprayed-on asbestos. However, bulk sample tests necessary to determine if a substance is asbestos were not performed in all cases during the survey.
Concurrent with Che building survey, Bell Laboratories was requested to perform tests Co determine the possible levels of exposure where asbescos was presenc. The resulcs of these tests may be summarized as follows;
. If sprayed-on asbestos is undisturbed, airborne levels of asbestos are well below OSHA standards (typical office or work space environment).
. During typical work operations which do not require the removal or displacement of the sprayed-on material, exposure levels are below OSHA standards.
. During any work operations where there is significant disruption of Che sprayed-on aacerial, there may be exposures above Che OSHA standard (for example, work in crawl spaces or ceilings or removing ceiling panels).
. During renovations, ripouts and remodeling activities, airborne asbescos levels are generally above OSHA standards.
As a result of the above it is recommended chat:
1. Bulk sample CesCs be performed to confirm the presence or absence of asbescos in each of the 216 buildings identified in the survey, and any other building which may have asbestos.
2. Warning signs, labels, or ocher means of control must be provided for employees who must perform work in an area where sprayed-on material may be disturbed.
3. Methods must be developed to minimize or eliminate the possibility of excessive exposure during renovations or removal activities in the affected buildings. The Environmental Protection Agency (EPA) has specific requirements on these activities.
4. A disposal procedure must be established for any collected asbestoscontaminaced materials. The EPA also has requirements on this accivity.
i
LLA 000082
I
i- J
J I
o
I
We recommend che primary responsibility for implementation of the required program as detailed in Che attached instruction will reside with che Building Engineering Group at BOC Headquarters. As such, a coordin ator in this organization must be identified. In addition, Building Engineering must work closely with appropriate Medical, Safety, Environ mental ind Building Operations Force representatives. The Building Operations Force supervisor responsible for effected buildings will ultimately be responsible for the day-to-day procedures that are re quired. It is strongly recommended that implementation of Chese guidelines be initiated immediately.
The resource impact of this lecter on the Bell SysCera is estimated as follows:
Capital
. Signage . Air Sample Test Kit . Respirators
Total Capital
$10,000 10,000 ($500 per kit) 10,000 ($ 10 per cartridge
530,000
type)
Expense
. Bulk Sample Analysis by Outside Laboratories
. Air Sample Analysis by Outside Laboratories Total Expense
SlO.OOO (S25 co $50 per sample)
50,000 ($300 co $500 per sample) $60,000
Revenue Change
No revenue impact
Force Changes
No additional manpower required, however, certain Building Engineering, Building Operations, Medical and Safety pe -nel must include this activity with their ocher responsibilities.
In addition Co the above impact, there may be situations where the sprayed-on asbestos must be removed, contained or encapsulated. Ic is anticipated that this will occur only in areas which are to be renovated or remodeled. The cost for chese activities (based on current prices) per square foot of floor area renovated is estimated as follows:
Removal Encapsula tion Containment
56 per sq. ft. S4 per sq. ft. S3 per sq. ft. (for paincing) S6 per sc- ft. (for structural enclosing)
LLA 000083
Attachment
Guidelines for Sprayed-On Asbescos In Comoany-ouned and Leased Buildings
Genera L
The following guidelines are Co be used in conjunction with Che general program ouclined in an SR co be issued shorcly, "Occupacional Health and Safety - Exposure to Airborne Asbescos Fibers," in complying with OSHA standards pertaining to Bell System-owned and leased buildings which have sprayed-on asbescos used for fire protection and/or heat insulacion.
OHSA Asbescos Standard 1910.1001 (July l, 1976)
The eighc hour time weighted average (TWA) airborne concentrations of asbescos fibers Co which any employee may be exposed shaLL noc exceed cwo fibers, longer than 5 micrometers, per cubic centimeter of air. In addition, no employee shall be exposed at any cime to airborne concentrations of asbescos fibers in excess of 10 fibers, longer chan 5 micromecers, per cubic centimeter of air. Medical surveillance is required if employees are exposed to .1 fibers per cubic centimeter (3 hours TWA) or greater.
Confirmation of Asbescos
SR-79-05-398 requested chat the BOCs perform a comprehensive survey co idencify all owned and Leased buildings which apparently contain sprayed-on asbescos. A summary of the System resuLts is shown as Appendix A. Ic was noc necessary co confirm Che asbescos wich a buLk sample cast as part of the survey, however, a number of companies have performed this testing.
As pare of the seeps required for compliance with the asbestos standard, it will be necessary (in each facilicy identified as apparently having sprayed-on asbescos) to perform a bulk sample test for confirmation chat che material is or is noc asbescos. If the test indicates asbescos, Chen an ambienc air test must aLso be performed. Such ambienc air cescs will determine Che level of airborne asbescos in the area on an 8-hr TWA basis. The ambienc air cescs should be made in areas where che asbestos exists and is in an undisturbed state, i.e., no one is working on che asbescos. If che material exists throughout the building, several typicaL locations should be identified and anarabienc air test made in each Location. It is extremely important chat che ambienc samples as well as che bulk be analyzed by qualified laboratories approved by NIOSH See SR to be issued shortly, "Occupational Health and Safety Exposure to Airborne Asbestos Fibers," for a discussion of bulk sample and ambienc air sample cescing.
The objectives of the bulk sample and ambient air tests are two-cold.
1. To establish s permanent record which indicates chac each company nas identified che existence of che material and recorded che normal airborne exposure levels. The bulk and air sample results should also be forwarded to ATST, Real estate ana Property Management Grout2:: Mount Airy Read, tasking Ridge, New Jersey 27920-
LLA 000084
2. To confirm char ambient levels are not above che OSHA standard. Numerous BTL tests have indicated that this will be the normaL case. If, however, a situation occurs where ambient levels in an undisturbed environment are above OSHA standards, and this is corroborated with additional testing, then it is necessary to implement some type of engineering controls. These controls may be one of che following:
Enclosure of che material - Chis may be achieved wich a dropped ceiling.
. Sealing of che material - chis can be achieved by spraying an additional material over Che sprayed-on asbestos. Presently, chere are a number of different types of sealants available for this purpose including latex paints, vinyl or butyl polymers, plaster emulsions, epoxy materials and inorganic silicates.
. Removal of the material - chis activity should be avoided, if at all possible, due co the disturbance of work accivity as a resulc of che excremely high levels of airborne asbestos chat are generated in che removal, and che need co replace Che material with ocher building products co achieve the original objective of the asbestos. If it is noc possible to avoid removal Chen the appropriate procedures outlined below muse be followed.
Before any of che above engineering controls are implemented, a case by case feasibility study must be made and individual situations discussed wich the Real Estate Management Group at AT&T.
Follow-up Measurements
It is recommended that follow-up ambient air tests be performed every five years co assure chat asbestos deterioration has noc occurred to che point where levels are above OSHA standards.
Labeling/Identification of Areas with Sprayed-on Asbestos
Compliance wich Che OSHA standard also requires that either Caution labels be employed co identify che sprayed-on asbestos material or engineering controls be employed as described above under Objective 2. The label should be approximately 6" x 3" with red lettering and shall scate
uautLon This Area Contains Asbescos Materials
Avoid Creating Dust Breaching Asbescos May Cause
Serious 3odily Harm
LLA 000085
AC lease one Label shall be prominently located in each area -here exposed sprayed-on asbestos exists so chac anyone working in the srea will be alerced to the potential hazard. For unexposed areas, such as hung ceilings, the label should be Locaced in a central control point so that the people who would have the need to enter these areas would be made aware of the asbescos and its location. This area may be the building maintenance office or a similar location. It may also be desirable to provide a wall-mounted drawing in the building manager's office illustrating asbescos covered areas in the building.
Work Procedures
In all buildings identified as having sprayed-on asbescos every effort should be made to avoid work procedures which resulc in disruption of the asbescos macerial and the resultant reLease of fibers into the air. Pre liminary data has indicated chac for routine work operations which do no: require che removal or displacement of any sprayed-on asbescos, exposure levels are well below those permitted by che currenc OSHA standard. In chose cases where some handling of che material is necessary che sorayed-on asbestos should oe worked in a moistened state, if possible.
If it is noc possible to avoid work procedures which result in a significant disruption of che sprayed-on materiaL then proceccive eloching and respiracors must be employed during che work procedures. See SR to be issued shortly "Occupational HeaLch and Safecy - Exposure to Airborne Asbescos Fibers" for a discussion of protective eloching and che OSHA requirements for respirator protection- Of particular concern are exposures to employees who work within hung ceilings, doing such work operations as installing or removing telephone cables and electrical wiring, or working on building equipment.
The above work procedure modification must be achieved through meeemgs with employees in che building and by poscing such a policy in appropriate central work locations in the building. 3efore engaging in any work procedures which may disturb sprayed-on asbestos, employees must concacc che Building Operations Control Center (30CC), if implemented in that Company, or the incividual in that buildi- ho is responsible tor implementing these guidelines.
In addition to empLoyee accivicy, it is also important chac any concraccor engaged in work activities which might disrupt che asbescos material be informed that they must comply with these procedures.
Remodeling or Renovation Activites
Remodeling or renovation work in areas with sprayed-on asbestos poses tne graacesc asbescos hazard in Bell System buildings and may require .the removal, sealing or enclosure of the asbestos. As such it will be necessary to fully procett all employees by isolating the work area : r on the rest of the facility, and monitoring both inside and outside the wo rk
Ilk 000086
areas. Workers should wear appropriate protective cloching and respirators, and the area should be cleaned after the renovations with wet methods. Remeasurement of ambient levels should be performed co ascertain that they are below OSHA standards. In contracting remodeling and renovation work, specific guidelines must be established and included in the specification for bidding by outside contractors. It is extremely important to recognize that asbestos removal activities are complex and not routine to most building contractors. As such the BOCs must be assured that any contractor who will perform this work has experience in asbestos removal. Section 61.22(d) "Demolition and Renovation" of the EPA's National Emission Standard for Asbestos details federal requirements for these activities and is attached as Appendix B. Waste Disposal All asbestos scrap and debris must be collected and disposed of in accordance with EPA requirements. Section 61.22Cj) of the EPA's NationaL Emission Standard for Asbestos details the federal requirements for asbestos waste disposal and is attached as Appendix C. However, some states may have their own laws regarding disposal and Companies are advised, to check with the EPA State Waste Management Agencies for compliance with local disposal regulations.
LLA
PNB Wisconsin NJ NY Southern Ohio NVB SNET Michigan Mountain. Southwestern New England C& P Pacific Illinois SouCh Central* Cincinnati Bell of Pa. Indiana Long Lines BTL 195 Broadway BSCTE
TOTALS
APPENDIX A
RESULTS OF AS3ESTOS SURVEY
Owned
Total W/Ashes tos
696 320 388 1001 1302 404 2469 200 483 1868 4458 312 839 1020 240 1284
70 674 298 4300
26 19
0
4 8 13 15 3 0 6 l 3 4 4 3 3 9 3 l 0 6 0 2 3 12 _0
23,199
108
Leased
Total W/Asbes t
254 72
223 357 622 231 303
54 317
438 568 347 363 649 195 561
19 325
64 100
2 41
2
l 0 6 26 5 4 0 4 0
5 1 8 8 9 0 0 0 30 7 1
19 _1
6108
108
* Not including Louisiana
LLA 000088
APPENDIX 3
ENVIRONMENTAL PROTECTION AGENCIES REQUIREMENTS NATIONAL EMISSION STANDARD FOR AS3ESTOS 61.22(d) - "Demoli Cion and Renovacion"
The requirements of this paragraph shall apply co any owner or operator of a demolition or renovation operation who intends to demolish any institutional, coiranercial, or industrial building (including apartment buildings having more than four dwelLing unics), structure, facility, installation, or portion thereof which contains any pipe, duct, boiler, tank, reactor, turbine, furnace, or structural member that is covered or coated with friable asbestos materials, except as provided in paragraph (d)(1) of this section; or who intends to renovate any institutional, commercial, or industrial building, structure, facility, installation, or portion thereof where more than 80 mecers (ca. 260 feet) of pipe covered or coated with friable asbestos materials are stripped or removed, or more than 15 square meters, (ca. 160 square feet) of friable asbestos materials used to cover or coat any duct, boiler, tank, reactor, turbine, furnace, oc structural member are stripped or removed.
(1) (i'l
The owner or operacor of a demolition operation is exempted from the requirements of this paragraph: Provided, (A) The amount of friable asbestos materials in the building or porcion thereof co be demolished is less than 80 mecers (ca. 260 feet) used on pipes, and less chan 15 square mecers (ca. 160 square feet) used on any duct, boiler, cank, reactor, turbine, furnace, or structural member, and (B) che notification requirements o: paragraph (d)(l)(ii) are met.
(ii)
Wriccen notification shall be postmarked or delivered Co Che Administrator at lease 20 days prior to commencement of demolition and shall include Che information required by paragraphs (d)(2) of this section, with Che exception of Che information required by paragraphs (d)(2) (iii)-, (vi), (vii), (viii), and (i:<) of this section, and shall scate che measured or estimated amount of friable asbestos materials which is present. Techniques of estimation shall be explained.
43 FR 26372, June 19, 1978
(2) Written notice of intention co demolish or renovate shall be provided to- che Administrator by the owner or operacor of che demolition or renovation operation. Such notice shall be postmarked or delivered to Che Administrator at least 10 days prior co commencement of demolition, or as early as possible prior to commencement of emergency demolition subject to paragraph (d)(6) of this section, and as early as possible prior to commencement of renovacion. Such notice shall include Che following information:
U_A 000089
(i) Name of owner or operator,
(ii) Address of owner or operator.
C i Li)
Description of the building, structure, facility, or installation to be demolished or renovated, including the size, age, and prior use of the structure, and the approximate amount of friable asbestos materials present.
43 FR 26372, June 19, 1978
(iv) Address or location of the building, structure, facility, or installation
(v) Scheduled starting and completion dates of demolit ion or renovation.
(vi) Nature of planned demolition or renovation and method(s) to be employed.
(vii) Procedures co be employed to meet the requirements of this paragraph and paragraph (j) of chis section.
(viii) The name and address or location of the waste disposal site where the friable asbestos waste will be deposited.
(ix)
Name, title, and authority of the State or local governmental representative who has ordered a demolition which is subject to paragraph (d)(6) of this section.
(3) (i)
For purposes of determining whether a planned renovating operation constitutes a renovation within the meaning of this paragraph, the amount of friable asbestos material to be removed or stripped shall be:
(A) For planned renovating operations involving individually non-scheduled operations, the additive amount of friable asbestos material that can be predicted will be removed or stripped at a source over the maximum period of time for which a prediction can be made. The period shall be not less chan 30 days and noc longer Chan one year.
(B) For each planned renovating operation not covered by paragraph (d)(3)(i)(A), the total amount of friable asbestos material chat can be predicted will be removed or stripped at a source.
(ii)
For purposes of determining whether an emergency renovating operation constitutes a renovation within the meaning of this paragraph, the amount of friable asbestos material co be removed or stripped shall be the total amount of friable asbestos material that will be removed or scripped as a result of the sudden, unexpected event chat necessitated the renovation.
.rr*" 1
LLA 000090
(4) The following procedures shall be used Co prevenc emissions of particulate asbestos material to outside air:
(i) Friable asbestos materials, used on any pipe, duct, boiler, tank, reactor, turbine, furnace, or structural member, shall be removed from any building, structure, facility or installation subject to this paragraph. Such removal shall occur before wrecking or dismantling of any portion of such building, structure, facility, or installation that would break up the friable asbestos materials and before wrecking or dismantling of any ocher portion of such building, structure ,, fac i l icy, or in stallation, thac would preclude access to such materials for subsequent removal. Removal of friable asbescos materials used on any pipe, duct, or structural member which are encased in concrete or ocher similar structural material is not required prior to demolition, but such materials shall be adequately wetted whenever exposed during demolition.
(ii)
Friable asbescos materials used on pipes, ducts, boilers, canks , reactors, turbines, furnaces, or structural members shall be adequately wetted during stripping except as provided in paragraphs (d)(4)(iv), (d)(4)(vi), or (d)(vii) of chis section.
(iii) Pipes, ducts, boilers, canks, reactors, turbines, furnaces, or structural members chat are covered or coaced with friable asbescos materials may be caken out of any building, structure, facilicy, or installation subject to chis paragraph as units or in seccions provided the friable asbestos materials exposed during cucting or disjoining are adequately wetted during the cutting or disjoining operation. Such units shall not be dropped or thrown to the ground, but shall be carefully lowered to ground level .
(iv)
The scripping of friable asbescos materials used on any pipe, duct, boiler, tank, reactor, turbine, furnace, or structural member that has been removed as a unic or in seccions as provided in paragraph (d)(4)(iii) of Chis section shall be performed in accordance with paragraph (d)(4)(ii) of chis section. Rather chan comply with the wetting requirement, a local exhausc ventilacion and collection system may be used to prevenc emissions to the outside air. Such local exhaust ventilacion systems shall be designed and operated to capture the asbescos particulate matter produced by Che stripping of friable asbescos materials. There shall be no visible emissions to Che outside air from such local exhausc ventilacion and collection systems except as provided in paragraph (f) of chis sec cion.
43FR 26372, June 19, 1973
LLA
(v) All friable asbescos maceriaLs Chat have been removed or stripped shall be adequately vetted to ensure that such materials remain wet during all remaining stages of demolition or renovation and related handling operations. Such materials shall not be dropped or thrown to the ground or a lower floor. Such materials that have been removed or stripped more than 50 feet above ground level, except those materials removed as units or in sections, shall be transported to the ground via dust-tight chutes or containers.
(vi) Excepc as specified below, Che wetting requirements of this paragraph are suspended when che temperature at the point of wetting is below 0C (32F). When friable asbestos materials are not wetted due to freezing temperatures, such materials on pipes, ducts, boilers, tanks, reactors, turbines, furnaces, or structural members shall, co che maximum extent possible, be removed as units or in sections prior to wrecking. In no case shall che requirements of paragraphs (d)(4)(iv) or (d)(4)(v) be suspended due Co freezing temperatures.
(vii) For renovacion operations, local exhaust ventilacion and collection systems may be used instead of weccing as specified in paragraph (d)(4)(ii), co prevent emissions of particulace asbestos material to outside air when damage to equipment resulting from che weccing would be unavoidable. Upon request and supply of adequate information, Che Administrator will determine whether damage to equipment resulting from wetting to comply with Che provisions of this paragraph would be unavoidable. Such local exhaust ventilation systems shall be designed and operated co capcure che asbestos parciculace matter produced by che stripping and removal of friable asbescos material- There shall be no visible emissions to che outside air from such local ex'nausc ventilation and collection syscems, except as provided in paragraph (f) of chis section.
Sources subject to tms paragraph are exempt from che requirements of 6L.05(a), 61.07, and 61.09.
The demolition of a building, structure, facility, or installation, pursuanc co an order of an authorized representative of a Scace or local governmental agency, issued because chat building is structurally unsound and in danger of imminenc collapse is exempt from all but che following requirements of paragraph (d) of this seccion:
(i) The notification requirements specified by paragraph (d)(2) of chis seccion;
(ii)
The requirements on stripping of friable asbestos materials from previously removed units or seccions as specified m paragraph (d)(4)( iv ) of this section;
ILfl 000092
(iii) The wetting, as specified by paragraph (d)(4)(v) of this section, of friable asbestos materials that have been removed or stripped;
(iv) The portion of the structure being demolished chat concains friable asbestos materials shall be adequately wetted during the wrecking operation. 39 FR 15936, May 3, 1974; 40 FR 45292, October 14, 1975
LLA 000093
APPENDIX C
ENVIRONMENTAL PROTECTION AGENCY REQUIREMENTS NATIONAL EMISSIONS STANDARD FOR ASBESTOS 61.22(j) WASTE DISPOSAL
Waste disposal for manufatcuring, fabricating, demolition, renovation and spraying operations: The owner or operator of any source covered under che provisions of paragraphs (c), (d), (e), or (h) of Chis seccion shall meec Che following standards: (1) There shall be no visible emissions to the outside air except as
provided in paragraph (j)(3) of chis seccion, during Che collection; processing, including incineration; packaging; transporting; or deposition of any asbescos-containing vasce material which is generated by such source. (2) Ail asbestos-containing waste material shall be deposited at waste disposal sites which are operated in accordance with che provisions of 61.25. (3) Rather chan meec che requirement of paragraph (j)(i) of chis section, an owner or operator may elect co use either of che disposal methods specified under (j)(3)(i) and (ii) of Chis seccion, or an alternative disposal mechod which has received prior approval by che Administrator: (i) Treatment of abestos-containing waste material with water: (A) Control device asbestos waste shall be thoroughly mixed with
water inco a slurry and ocher asbestos-concaining waste material shall be adequately wetted. There shall be no visible emissions to the outside air from che collection, mixing and wetting operations, except as provided in paragraph (f) of chis section. (B) After weccing, all asbestos-containing wasce material shall be sealed inco leak-tight containers while wet, and such containers shall be deposited ac waste disposal sices which are operated in accordance with Che provisions of 61.25.
LLA 000094
(C) The containers specified under paragraph (j)(3)(i)(B) of this section shall be labeled with a warning label that states: Caution Contains Asbestos Avoid Opening or Breaking Container Breaching Asbestos is Hazardous to Your Health Alternatively, warning labels specified by Occupational Safety and Health Standards of Che Department of Labor, Occupational Safety and Health Administration (OSHA) under 29 CFR 1910-93a(g)(2)(ii) may be used.
(ii) Processing of asbestos-containing waste material into non-friable forms: (A) All asbestos-containing waste material shall be formed into non-friable pellets or ocher shapes and deposited at wasce disposal sices which are operated in accordance with che provisions of 61.25. (3) There shall be no visible emissions to Che outside air from che collection and processing of asbestos-containing waste material, except as specified in paragraph (f) of this section.
(4) For the purpose of this paragraph (j), the term all asbestos-containing waste material as applied co demolition and renovation operations covered by paragraph (d) of chis section includes only friable asbestos waste and control device asbestos waste.
LLA 000095