COMPLIANCE PLANS SCHEDULE
VISTA
Attached is the final schedule, according to Conoco, for Compliance Plan action items and steps.
' CTVn-------------
Thomas G. Grumbles
ajo/9
Attachment
Distribution:
R. A. Conrad G. E. Hopkins H. G. Garrison S. H. Christiansen J. Friend R. A. Frohreich D. E. Michaels D. Hansen W. L. McClain M. G. Hayes
VVV 000017026
H. Jack Neeld Director, Environmental Programs Environmental Conservation
May 30, 1986
(conoco)
Conoco Inc. Marland Building P.0. Box 2197 Houston, TX 77252 (713) 293-3641
Mr. Thomas Grumbles Vista Chemical Company 15990 North Barkers Landing Road Houston, Texas 77079
Dear Tom:
The attached is the final schedule concerning Consent Decree or Compliance Plan items which Conoco and Vista are needing to watch. Garvin has incorporated the Vista review comments from the draft schedule.
If you have questions, please give me a call.
B. Raffle T. Thoem
VVV 000017027
conoco
Interoffice Communication
To H. J. Neeld
From
G. J. Fryar
Date
May 27, 1986
Subject
Compliance Plan Schedules - VCM Consent Decrees
Draft schedules were issued to you on April 30 for review purposes. Your comments and those of Vista, as received from you on May 22, have been incorporated into the attached tables entitled "Overall Schedules" and "Action Step Checklist". The revisions basically reflect redefinition of the date of filing of the compliance plans with district court to be day nl" rather than day "O'* in the calendar sequence.
Extra copies of this letter are provided for transmittal to Vista should you consider that appropriate.
Special Projects Section Process Engineering Division
Ik att cc:
H. J. Neeld (5) Paulette Wilson (Legal Department - Houston) W. R. Finch V. H. Melquist W. A. Kitchen H. R. Couch
File A-130.80
VVv 000017028
TABLE I OVERALL SCHEDULES VCM CONSENT DECREES (Revised 5/23/86)
Action
COMPLETION DATE, ACTUAL(REGULATED)
Aberdeen
Okla. City
VCM Plant
I. Consent Decree Approval
8/19/85
8/21/85
8/19/85
II. "114" Letter
(9/18/85)
- (9/18/85)
III.
Compliance Plan A. First Draft Submittal B. Final Draft Approval
I. Definitive Process Designs 2. Administrative Steps 3. Place Contracts/P.O.'s 4. Start Construction 5. Complete Construction 6. Activate Projects
10/18/85 4/3/86
(6/1/86) (12/28/86)
(9/29/86) (10/29/86)
(1/27/87) (2/26/87)
10/21/85 3/26/86
(4/24/86) (12/20/86)
-
-
(11/20/86) -
10/18/85 2/7/86
(8/6/86) (8/6/86)
-
-
(4/6/87)
--
IV. Consent Decree Termination
(4/27/87)
(2/20/87)
(7/6/87)
V. Reports Copied To EPA
A. State Semi Annual Reports B. Relief Valve Discharge Reports
(1)
C. National Response Center Reports D. EPA Quarterly Progress Reports'^^(10/15/86)
(1/15/87)
(4/15/87)
VI. Proiect Cost Audit (By Conoco) (4)
4/15/89
(1) (As Applicable) (As Applicable)
(7/15/86) (10/15/86)
(1/15/87)
(1)
4/15/86*" (7/15/86) (10/15/86) (1/15/87) (4/15/87) (7/15/87)
1/15/89
9/15/89
Notes:
(1) Semi annual reports are submitted by September 15 and March 15 of each year.
(2) Quarterly progress reports are to be submitted "within fifteen days of the end of such quarter" commencing with the first full quarter following approval of the individual compliance plan.
(3) This report was issued one quarter earlier than mandated. The first official report is due by 7/15/86.
(4) All audits must be completed by the times indicated.
VVV 000017029
TABLE II ACTION STEP CHECKLIST
COMPLIANCE PLANS VCM CONSENT DECREES
(Revised 5/23/86)
ACTION STEP
Action Type
I. ABERDEEN PVC PLANT
A. Class "A" Process Designs
1. New Valve Positioners (70) Project
2. PR and TR for BWS
Project
3. LI on Blowdown Tank
Project
B. Award Contracts or P.O.'s
Project
For Items I.A.1-3
C. Initiate On-Site Construction
Project
For Items I.A.1-3 D. Initial Retraining on Steam
Admin.
Stripping and Reactor
Slurry Sampling E. Initial Retraining on Power
Admin.
Failure Procedures, Emergency
Kill, Rx Emptying Procedures,
Emergency Air System Procedures,
and Emergency Generator System
Procedures
F. Initial Retraining on Rupture
Admin.
Disc. Handling & Installation
(Mtce. Personnel) G. Initial Retraining on VCM
Admin.
Unloading Procedures
H. Initial Retraining on Equip.
Admin.
Opening Procedures
J. Initial Retraining on Leak
Admin.
Detection and Elimination
Plan
K. Initial Retraining on Waste
Admin.
Water Stripping
L. Complete Construction of
Project
Items I.A.1-3
M. Commence Operation of
Project
Items I.A.1-3
Plan Ref. Page
Elapsed Time.Days(Mo)
Compliance Date
25-27 28-29
14 14,27,29
14,27,29
8,47
15,47
60 60 60 180
210
270
270
6/1/86 6/1/86 6/1/86 9/29/86
10/29/86
12/28/86
12/28/86
15,47
16,47 22,47 25,47
30,47 14,27,29 14,27,29
270
270 270 270
270 300 330
12/28/86
12/28/86 12/28/86 12/28/86
12/28/86 1/27/87 2/26/87
VVV 000017030
Table VI Page 2
ACTION STEP
Action Type
II. OKLAHOMA CITY PLANT
A. Class "A" Process Design PR & TR for BWS
B. Detailed Description of Method For Determining Batch Size
C. Installation Item II.A. D. Revision of Plant RCRA Manual
and Std. Operating and Mtce. Procedures Manual E. Upgrading of Refresher (Operations) Training Procedures F. Revisions to Operating Manuals
Project Admin. Project Admin.
Admin.
Admin.
III. VCM PLANT
A. Review and Update Plant Wide
Admin.
Routine Preventative Mtce.
Program
B. Review and Update Operating
Admin.
Procedures for Minimizing
Bypasses, Etc.
C. Formalize Training Program to
Admin.
Prevent Incinerator Bypasses
D. Conduct Four Hours Annual
Admin.
Review Training on
Environmental Matters for
Operating & Maintenance Staffs
E. Review and Update Operating
Admin.
Procedures (For HC1 Tower)
To Be Taken In Emergency Situations To Minimize
Emissions
F. Class "A" Process Designs
Project
1. In-Situ Oxygen Analyzers
2. Incinerator Combustion
Air Controls
3. Auto Startup Controls For
Standby Blower
4. New Burner Assemblies
5. New Flame Temperature
Cascade Control For
Natural Gas Flow
6. New Reactor Vent Flow
Control
Plan Ref. Page
Elapsed Time.Days(Mo)
Compliance Date
1-24,25 1-28 & 1-33
1-28 1-18
II-3
11-4
30 -
240 270
270
270
4/24/86 5/8/86 11/20/86 12/20/86
12/20/86
12/20/86
1-4 1-4 1-4 1-9
(6) 8/6/86 (6) 8/6/86 (6) B/6/86 (6) 8/6/86
2-3
1-8 1-5 1-5
1-6
1-6 1-6
1-6,7
(6) 8/6/86 oooor*031
Table VI Page 3
Action
ACTION STEP
Type
III.F. (Continued)
7. Flame Arrestor Level Alarms
8. Tank Farm Vent Eductor
9. Auto. Tie-Breaker
10. New HC1 Tower Control Scheme
11. New R.O.-Caustic Dryer Vent 12. New F.I. and F.A.-L.E. Column
Accumulator Vent
13. New Adjustable High Flow
Alarms For Wee and D.C.
Venc Headers
G. Install Process Designs
Project
Of Item III.F.1-13
Plan Ref. Page
1-7 1-7 1-7 1-7,8 and 2-4 1-8 1-8
1-8
Elapsed Time,Days(Mo)
1-9
(14)
Compliance Date
4/6/87