MONSANTO COMPANY Wo G. Krummrich Plant
May 12, 1967
cc:
MINUTES OP AROCLOR MEETING
Messrs.
' COMPANY CONFIDENTIAL
Messrso R0 E. Howard Jo Ro McClain Po MacDonald Wo B,, Papageorge A.C.W. Pemberton Wo Jo Wilson
0o0o
Newpor Annistf Newport
Do C. Armstrong G. W. Ashworth
- S. 2nd
A. Arpino
- Brussels
P. G. Benignus
- 0.0.
G. Ro Buchanan
GoO 0
V. Brawley
J 0 G 0 Bryant
- Anniston
H. C. Carder
- GoO.
Co Ro Colemdb P. D. Colics J. Oreseer
H. J. Day
- Newport
- G.O. - GoO. - G .0 0
10 Co Fuhrmeister - Anniston
H. 0. Hehner
- G.O.
Po Eo Heisler
H. J,, Horner
H. L. Hubbard
-- S 0 2nd
N. T. Johnson
G.O.
0. A. Meyer
G. W. Miller
- Anniston
J. W. Molloy
R. H. Munch
- S . 2nd
G 0 J .S . Perry
- Newport
Ho P. Ray
W. R. Richard
- G o0 0
V. W. Saeger
- S. 2nd
R. A. Steenrod - G.O 0
R. P. Stevens
G o0 0
J. Do Sullivan - GoO.
M. T. White, Jr. -- G.O.
C. M. Williams H. L. Williams Do Wood
G.O 0 -- Anniston - Brussels
R0 So Yates
- GoO.
A general Aroclor meeting was
held on May 9-10, 1967, in St. Louis at the Holiday Inn North. Progress to date and future plans were presented in a com pany effort to meet capacity and quality goals. Minutes of the meeting are attached.
/gg
R. M. McCutchan Technical Services
Department
DSW 200767
STLCOPCB4058831
TOPICS COVERED
Xo The Market Place - G0 R. Buchanan XXo Quality
A0 Comparison - H. 0,, Kehner Be Measurement - J,, Miller, J. G. Bryant, Ro Hc Munch C,, Improvement - J. G. Bryant, Do Co Armstrong Do Storage and Shipping Containers - J. Cc Bryant, L0 Co
Fuhrmeister Eo Plant Programs - L0 C. Fuhrmeister, G0 Jo S* Perry,
Ho F. Flay IXXo Capacity
A0 CED Plans and Timing - R. P Stevens, R* S0 Yates B, Plant Debottlenecking Programs - Lc Co Fuhrmeister,
J. Wo Molloy XVo Quality Measurement Program - R. H,, Munch
Vo Future Plans - All groups represented
oSVJ 200768
STLCOPCB4058832
ACCOMPLISHMENTS
I. The Market Place
Aroclor sales in 1966 were $19 M and a forecast of $34 M in 1971o Aroclor?s return on investment is 20%. This year's production will be approximately 70 Tfl lbs. Monsanto is being given a world-wide image, with delivery of Aroclors from any of three manufacturing plants.
II. duality
`
A. Goals
Aroclor quality goals have been set as follows?
In-Plant
As Packaged
Delivered
1254: Resistivity Power Factor
TCC
15,000>
<0.5% (J* 0.1) <0.1***
10,000* <0.4%**
--
5,000> <0.5%
0.1***
1242: Resistivity Power Factor
TCC
10,000> <0.6% (*0.1) <0.1
5,000* <0.95^*
--
3,000> <lo0%
0.1
Clear values less than these with Marketing (C. Williams). **Do not send these values- to customer. Limits must be defined by lab work.
The "as packaged" goal is being emphasized.
B. Product Refinement
1. Work at Anniston indicates that thermal chemical chlorides can be reduced to 0.1 ppm by distillation and porocel treatment. With this processing, only Anniston material meets company quality goals. WGK Aroclor will meet only the electrical properties goal with this treatment.
2. Changes in the current process will be recommended
for each manufacturing location according to each
plant"s requirements to meet company Aroclor quality
goals.
C. Chlorinator Conditions
DSW 200769
Work by WGK PR&D (D,, C. Armstrong) indicates that by altering chlorinator conditions, the effect of biphenyl variations is minimized, and a more stable Aroclor produced. Improve ments in TCC analysis were seen in the laboratory with a reaction temperature of 200C, 0.2# PeCla catalyst, and
good agitation. Lime tests were inconclusive. No plant tests to date.
STLCOPCB4058833
2
IIo Quality (Continued)
Do Drumming
Testing of clean-surface and coated drums has been carried out at Anniston,, Drums investigated were:
1. Galvanized 2* Dalbon coating 3. Clear phenolic or epoxy phenolic with additive 4. Impregnated series 46
To date the dalbon coated drums have given the best results in maintaining high Aroclor resistivity values* Increased drum cost is $3-5 each* Adding attapulgus clay to the
drummed product is not recommended as a solution to quality problems. Galvanized drums require a finished coating inside the drum to maintain the high quality desired. Confirmation of an aluminized coating used by Bayer was completed* Further work will be continued for optimum cost drums to meet quality reqiirements *
III. Measurements
'
A* Studies of power factor by Research have turned up a number of variables which must be investigated and/or controlled.
B* It has been found that bubbling oxygen through Aroclor may be a measurement of its stability (Dr* Munch;*
C. A more sensitive thermal chemical chloride test has been developed in Anniston plant efforts to measure Aroclor upgrading*
IV* Capacity
A. CEDjplans for Aroclor expansion at MCL (from 10 M #/yr to 17 M #/yr) were submitted to Newport for comments and suggestions.
B* Preliminary planning for Anniston drumming, warehousing, and storage facilities is underway* Storage capacity is to be increased from 71 M gallons to 255 M gallons.
C. The Delaware River plant Is no longer being considered as a site for Aroclor expansion (only $l6,000/yr savings).
D* Present sales forecast and Aroclor increase indicate a major
expansion of 4o 1? #/yr liquid Aroclor would be required at WGK.
DSW 200770
STLCOPCB4058834
-3-
GOALS AND FUTURE WORK
PR&D (Do Co Armstrong)
lo Assj3t in plant demonstration of optimum chlorindor operating conditions,
2. Assist as needed in closing storage tank system.
3. Find optimum conditions for continuous chlorination system.
4. Define process requirements to meet quality goals,
EDC 7/15/67
-- 11/ 1/67
-----
Manufacturing and TSD
WGK
1. Quality
a. Basket removal results (in progress) b. Individual chlorinator profile (in progress) c. Earth vs. Bauxite treatment
d. Granular vs. pulverized FeCla catalyst e. Optimization of chlorinator conditions
8/ 1/67
9/ 1/67 8/ 1/67
9/ 1/67
1. Temperature
2. % catalyst
3. Lime charge
8/ 1/67 8/ 1/67
8/ 1/67
2. Investigate recycling recovered biphenyl and Aroclors. 10/ 1/67
3. Nitrogen purge on tanks (design).
8/ 1/67
4. Capacity
a. Chlorine supply limitation (installed) b. Distillation revision (temporary) c. Flexibility (temporary) d. Storage evaluation e. Blend system (design and installation)
Anniston
1. Quality
9/ 1/67 8/ 1/67 7/ 1/67 7/ 1/67 10/ 1/67
DSW 200771
a. Plant test bauxite treating column b. Complete work on optimum container and loading
facilities c. Upgrade piping in storage (isolate systems) d. Nitrogen blanket storage and treating tanks
8/ 1/67 12/ 1/67
2. Capacity--debottleneck stills (design for indirect firing)
3. Railroad spur installation
9/ 1/67
STLCOPCB4058835
Anniston (Continued)
4. Chlorinator capacity check (feed data to CED)
5o Install and check ln-llne cell
60 Investigate vacuum HC1 removal for crude Aroclor
Newport
1 Capacity
a,, Biphenyl expansion from 5.4 to 14,7 M Ibs/yr
_ b0 Aroclor expansion from 10.0 to 17.0 M lbs/yr
1. Off-gas system 2. External cooling on chlorinators 3. Better agitation
Co Remove chlorinator baskets d,, Increase still capacity
I, Entrainment reduction 2 o Heating and cooling improvement
e. Increase storage for electrical grade Aroclor, use N2 blanket
2 o Quality
a. Better loading facilities b. Column treat (depending on Anniston work) Co In-line testing do Better TCC test and procedure
CED
1. Storage tank package at Anniston (scope and estimate)
2 Increase Aroclor capacity - Alternatives: (estimates for review)
a. Debottlenecking and expansion at both WGK and Anniston
bo 40 M lbs/yr expansion at WGK
Anniston warehouse project (complete after expansion decision)
Research
1. Round robin testing at plant locations
2. Standardization of resistivity and power factor measurements
EDO
15 to 18 mos after approval
6/ 1/68
8/ 1/67
6/ 1/67
6/15/67 8/ 1/67
10/ 1/67
DSW 200772
STLCOPCB4058836
-5 -
Research (Continued)
EDO
30 Work with customer on dielectric Aroclor capacitors
40 Firm up work on causes of instability
Marketing
lo Maintain 100% of market in U0SoA. and UoK6
2o Supply rest of world except EEC
Increase non-domestic sales
4e Create global Monsanto image
5o Create preference for askarel transformers over petroleum and dry-type units
6,, Establish manufacturing position in Japan
7c Maintain 25% excess global capacity by improved forecasts
80 Continue to improve communications with Manufacturing, Research, and Engineering
Other Commitments
lo Ho Co Carder - Tank car fleet requirements (N. L0 Sample)
2e Ho Jo Day - Recommend minimum inventories
H. Co Carder requests a monthly report of sales versus actual capacity by H. Jo Day or M. To White for domestic locationse