Document La6R2Y2NOY230mdxzvyDLOZg

Gel trouble-free high pressure pumping service If you ore looking for high efficiency, low maintenance boiler feed and other pressure pumping service*, il will pay you to investigate Goulds Pig. 5S60 pumps. Power Engineers like them because (hey provides 1. HYDRAULIC BALANCE--Single suction impellers are placed back to bock In pairs with auction openingo opposed to each other. End thrust created by one set of Impellers la counter balanced by cad thrust of opposite set. 7. STUFFINO BOX PRESSURE RELIEF --Stuffing hoses at both coda of pump have an loner sealing pressure relief chamber. 3. MAINTAINED EFFICIENCY--MIN IMUM INTERNAL LEAKAGE--Leak* age from high pressure to low pressure side Is minimised by long center easing bushing with lluer. 4. ASSURED ALIGNMENT-Bearing housings ere csst as iotegral part of lower half easing. Double tongue end groove locks prevent rotation of rings sad bushings. 3. EASY ACCESSIBILITY--Removal of top bslf easing permits easy removsl of rotating element without disturbing piping connections. 6. INTERCHANGEABILITY OF PARTS --Class machining and rigid Inspection guarantee Interchangeability of psru. Save on inventory end down lime. For detailed description* specifi cations and dimensions, contact your nearly Goulds representative or wrlto for lliilletin 723.S. mwm-nm, Jim 8m(Mill sto w*#,," Out or my first jobs hand firing boitera in a |oc*j tile mill. The firai day, after __ eitosm around the plant, l tun! to ahovel coal energetically., wasn't long before 1 was and looking for the di water. Though I'd aeen the pmlj vious fireman go Into the tan room to o cooler (here seemed itf tie wisdom io going so far witA] there was a hose and water rigbal near the boilers. <j| So every now and then 1 taenfi a drink from the hose. By theeadfj of the shift my stomach bad begun to ache and I feh quite sick. NetU day I went through the same rwd tine with the same results. It wasn't until the third day (hit, the Chief, passing the boiler men'] and seeing me drink (ram tbs, hose, let out a yell. He told o*L the water coming from the hettvi was pumped from a nearby eanitjj and used only to wet down iibe*T or wash the floor. J I sph it our In -a hurry and ever} since then have been doubly caw tlous to aee that my men barer good supply of drinking walr| placed where It la easy to an aw reach at all times. D R Tessic* Indian Orchard, Most. W.I It yawr "bJgs*t W per tta Saltan tar seek ass v* yaWA. An Industry Advisory Coroutine* equipment cooling systems bsa bees bn to assist tho Air Force In overcoming problem ef extremely high tempers!) encountered by supersonic aircraft asdi Hea. Immediately beyond the ip"d soond lies a tempexainre barrier crested aerodynamic beating. The aircraft tP lure rioei from 230F at 1000 mpb to 600 at 2000 roph despite low air Ierapen"* septemW 1*1 Installations in Central Power Stations assure Absolute Dependability FOR almost half e century Nevco km tpecfettted fa ths febrke* tie# sad srtetiea 1 Piping Systems for ths btghast operating condition. Tka `'first" bats load Csstrel Station Piping System epsrariag at 1)50 lb*, and 900* (hock In '301--ths "first* carbon moijr to ks ettd la e complete Steam System ef Ctatral Station Piping--<ns el ths "first" field i-royed tyttems ef Steam Piping end on# ef tks "first" Piping lobs to asm o 1,000,000 lb. pvr basr boiler era among Mine ef tbs many Neves tnitotlettom. Consatt Moves far year east Piping fab. mgMgMfCO nmTal valve & MANUFACTURING COMPAHV -HnSBElRGH. fA. t.icco ,01"'' it SEPTEMBER 1P33