Document LYG8kLEw2vNLJn1V0665m15d
) yjjfj
EHMD-MS
(UNIT)
INTERNAL CORRESPONDENCE
PLAINTIFr'S EXHIBIT
JO FROM
W. Litton Janet SmitfP^
DATE
JulY 10' 1987
siiR.iFr.T Asbestos Removal Southwestern Refinery
KRC-511
This is a followup to our phone conversation of July 8, 1987 regarding asbestos removal from the BTX exchangers and piping at Southwestern Refinery.
The three proposals I reviewed are inadequate. Since the original solicitation for bids was not full and complete, these proposals do not include information necessary to insure a safe project. The deficiencies in each of the proposals are explained in Attachment 1.
In addition, I have contacted E.J. Vaughan, who is an attorney in the Corporate
Law Department She recommends that Southwestern resubmit the solicitation for
bids. In the interim, letters should be sent to each contractor explaining
that the June solicitation did not meet the company's required asbestos
contract specifications and that another solicitation will be submitted at a
later date.
Medical Services has developed extensive asbestos bid
specifications. I have enclosed a copy of this bid package (see Attachment 2).
Each project requires some modification. I recommend you review this bid
package, insert any additional information and return the draft to me. A
contract for the asbestos removal will then be developed by the Corporate Legal
Department.
To assist you in locating additional contractors, I have included a listing of asbestos contractors in the State of Texas (Attachment 3).
The combination of high humidity, hot summer temperatures, Visqueen enclosures, Tyvek clothing and respiratory protection greatly increases the potential for employee heat stress. I strongly recommend that you consider rescheduling this project to coincide with cooler temperatures. If this project cannot be postponed, altered work schedules should be considered so that employees are working either during the cooler morning hours or late evening.
Should you have questions, please contact me at extension 2534.
JS/ih
attachment
Copies without attachment to:
C. DeYona E. R. Goltra, M.D. T. Sands E. J. Vaughan J. E. Warn
S^Asbesfos 6446
1H 041806
ATTACHMENT 1
ASBESTOS PROPOSAL REVIEW:
I. INSULATION AND SHEET METAL SPECIALIST, INC. . 5617 WEST UNIVERSITY P.O. BOX 6588 ODESSA, TEXAS 79767
THIS PROPOSAL DOES NOT ADDRESS: - CERTIFICATION OF ASBESTOS INSURANCE - AIR MONITORING & FREQUENCY - METHODS OF ENCLOSURE - RESPIRATORY PROTECTION - MEDICAL SURVEILLANCE - PREVIOUS REMOVAL EXPERIENCE - NOTIFICATION & PERMITS - CRITERIA FOR RE-ESTABLISHING WORK AREA - EMPLOYEE TRAINING/EXPERIENCE - FINAL CLEARANCE/LOCK DOWN PROCEDURES - "COMPETENT PERSON" INFORMATION
II. THORPE INSULATION COMPANY 4780 WESTWAY DRIVE P.O. BOX 9785 CORPUS CHRISTI, TEXAS 78469
THIS PROPOSAL DOES NOT ADDRESS:
CERTIFICATION OF ASBESTOS INSURANCE CONTRACTOR SHOULD FURNISH THIS PRIOR TO BEING AWARDED THE CONTRACT FREQUENCY OF AIR MONITORING LABORATORY UTILIZED FOR AIR MONITORING CONTRACTOR SHOULD PROVIDE ON-SITE ASBESTOS COUNTING NOTIFI CAT 10 NS, P ERMIT S FINAL CLEARANCE MONITORING "COMPETENT PERSON" INFORMATION
III.
SERVICE ABATEMENT COMPANY P.O. BOX 306 BEAUMONT, TEXAS 77704
THIS PROPOSAL DOES NOT ADDRESS: - PERMITS, NOTIFICATIONS - AIR MONITORING, FREQUENCY - THE REFERENCE TO "DISPOSAL BY OTHERS" SHOULD BE DEFINED; WHO ARE THEY REFERRING TO? DOES THIS OTHER COMPANY HAVE ASBESTOS INSURANCE? TRAINED EMPLOYEES?
1H 041807 SWRf/Asbestos 6^47
ATTACHMENT 2 BASIS OF BIDS ASBESTOS REMOVAL PROJECT SOUTHWESTERN REFINERY
DATE
SWRf/Asbestos 6448 1H 041808
Section I
II III
IV
TABLE OF CONTENTS
Title Instruction to Bidders Description of Work Pertinent Regulations Asbestos Removal Agreement
SWRf/Asbestos 6449
1 1H 041809
SECTION I INSTRUCTIONS TO BIDDERS
TABLE OF CONTENTS
Page 1.0 INTRODUCTION ................................................................................................. 2.0 OVERVIEW ......................................................................................................... 3.0 CONTRACTOR REQUIREMENTS........................................................................... 4.0 BID REQUIREMENTS ........................................................................................ 5.0 SUCCESSFUL BIDDER REQUIREMENTS ......................................................... 6.0 BID SHEET.........................................................................................................
SWRf/Asbestos 6450
1H 041810
2
SECTION I
SECTION I - INSTRUCTIONS TO BIDDERS
1.0 INTRODUCTION
The purpose of Section I is to provide the CONTRACTOR with a summary of pertinent information and Kerr-McGee (hereinafter referred to as COMPANY) requirements to be used in evaluating and selecting a successful bidder.
Sections II, III and IV of this BASIS OF BIDS detail this information and may request additional information. The CONTRACTOR is expected to review all sections for COMPANY requests requiring a response in CONTRACTOR'S propos al. If, in the CONTRACTOR'S opinion, additional information would aid in the evaluation of its proposal, the CONTRACTOR should provide such information in the proposal.
2.0 OVERVIEW
2.1 The CONTRACTOR is to bid on a project to remove and dispose of asbestos and metal jackets from:
- Two shell/tube exchangers, 22 feet long and 49 inches in diameter (O.D.). Insulation thickness is 3 inches.
- Approximately 135 feet of 16 inche pipe in seven pieces. Insulation thickness is 3 inches.
-3-
SWRf/Asbestos 6451
1H 041811
CONTRACTOR is to submit fixed-price type bids which are required to include:
2.1.1 Supervision, labor, procurement, materials, tools, equipment, storage, site security, expediting, inspection, air monitor ing, disposal of asbestos and other waste, and such other office and field services as may be required for this project in accordance with this BASIS OF BIDS.
2.1.2 All taxes, assessments, fees and royalties, profits, contri butions, insurance, escalation, and other direct and indirect expenses encountered in performance of the work; and
2.1.3 The cost of any permits and licenses required to be in the CONTRACTOR'S name as required by state, federal, and local authorities (these are to be itemized and defined).
2.2 The proposal shall be firm for a period of 60 days. The bidder shall furnish COMPANY three copies of the proposal.
2.3 The bidder's prooosals shall be in accordance with this BASIS OF BIDS, any specific conditions stated in the Letter of Transmittal, and any addenda issued during the bidding period.
2.4 It shall be the CONTRACTOR'S responsibility to check to assure CONTRACTOR'S bids are complete.
SWRf/Asbestos 6452
1H 041812
4
2.5 Proposals shall not contain any recapitulation of the scope of work. Oral, telegraphic, or telephonic proposals or modification wi11 not be accepted.
2.6 The COMPANY reserves the right to reject any or all bids, and no public opening of the bids will be made.
2.7 The CONTRACTOR shall contact the following person if discrepancies or inconsistencies are found in the BASIS OF BIDS, if questions arise during proposal preparation, and to arrange for a site visit
r< C+ COn,4p,cV (aT_
3.0 CONTRACTOR REQUIREMENTS
3.1 CONTRACTOR'S workers will be reauired to be experienced bv previ-, ous work.j Proof must be submitted with the bid proposal. \\\ 041813 5
SWRf/Asbestos 6453
V CONTRACTOR must supply name and address of the physician con
ducting medical surveillance.
CONTRACTOR must have the proper equipment for the work as speci fied by State Law and job standards as listed in Section III.
3.Jf
CONTRACTOR must indicate payment rate and schedule for extra work as may be added to the scope of this project.
CONTRACTOR must supply the Federal and State employer's registra tion numbers.
4.0 BID REQUIREMENTS
4.1 The bidder's proposal shall include all information required by the COMPANY to make a complete evaluation. BASIS OF BIDS documents which remain unaltered in support of the proposal shall not be resubmitted with the proposal.
4.2 The BASIS OF BID'S documentation which has been added to, revised, or otherwise altered in support of the base proposal, exceptions, or alternate must be submi
4.3 A copy of the abatement pUn io be /i'feo ccH-h .Pf} 'Seaicff mucsf be.
submitted with the bid. This plan must be complete and in a form
Rppreopi-i'ahs feeaulafow-i Au+hcM-ties'.
suitable for filing with +be
COMPANY may request changes in
the plan of the successful bidder to assure compliance with COMPANY
job specifications.
SWRf/Asbestos6454
6 1H 041814
4.4 A copy of the written respirator program must be submitted with the bid.
4.5 The bid is to be a fixed-price bid.
4.6 Recommendations for an Industrial Hygiene Consulting firm to be used in conducting air monitoring programs must be submitted for COMPANY approval.
5.0 SUCCESSFUL BIDDER REQUIREMENTS
The successful bidder shall:
5.1 Provide evidence of satisfactory notification to the State and Federal regulatory agencies.
z-
5./ Provide evidence of satisfactory insurance coverage.
Co-Yipen-iAfion fino Aibeolei kwnbili'icj)
uJockew
4 5./T Obtain and deliver to the COMPANY payment and performance bonds.
h 5. Execute the Contract on the COMPANY'S contract form.
SWRffAsbestos 6455
7
1H 041815
6.0 BID SHEET The attached bid sheet shall be filled out in full by the CONTRACTOR and shall be returned to the COMPANY along with the other documents of the CONTRACTOR'S proposal.
SWRf/Asbestos 6456
1H 041816
8 ; i -[
BID SHEET
6.1 ASBESTOS REMOVAL PRICE
6.1.1
Two shell/tube exchangers
6.1.2
16" diameter piping
COST
TOTAL BID PRICE $
1H 041817
SWRf/Asbestos 645
SECTION II DESCRIPTION OF WORK
TABLE OF CONTENTS Page
1 .0 INTRODUCTION............................................................................................ 2.0 SCOPE OF WORK ........................................................................................ 3.0 DESCRIPTION OF WORK ........................................................................... 4.0 JOB SPECIFICATIONS.................................................................. ....
SWRf/Asbestos 6458
1H 041818
SECTION II - DESCRIPTION OF WORK 1.0 INTRODUCTION
SECTION II
1yZ The CONTRACTOR is to furnish project management, design, procure ment, labor, materials, tools, equipment, transportation, ware housing, site security, supervision, expediting, inspection and other such home office and field services as may be required for this project in accordance with the BASIS OF BIDS.
-n-
1H 041819
SWRf/Asbestos 6459
7^ 1 The CONTRACTOR is to remove and properly dispose of all asbestos-
containing materials and decontaminate the lines and equipment.
2.0 SCOPE OF WORK
2.1 The CONTRACTOR is to prepare a plan for removal of all asbestos-
containing materials according to State and Federal Code and the
following job specifications. CONTRACTOR is to obtain necessary
approval of this plan from the appropriate
authority as well
as the COMPANY.
2.2 CONTRACTOR is to prosecute the work of asbestos removal according to the plan and in compliance with COMPANY, State, and Federal requirements.
2.3 CONTRACTOR is to arrange for and dispose of asbestos-contaminated materials in an approved landfill.
2.4 CONTRACTOR is to decontaminate the work area and return to the COMPANY work areas which have been decontaminated of any asbestos hazards.
2.5 CONTRACTOR is to gain approval of appropriate civil authorities, as well as the COMPANY, in declaring the work areas decontaminated.
1H 041820
12 . j
SWRf/Asbestos 6460
Scotch 7664 "Post-it" Routing-Request Pad
ROUTING - REQUEST
Please
O READ
To
HANDLE APPROVE and
PzPE. - 778
13A C/J
OK-'
/c /v6
FORWARD
RETURN
___ SWRf/Asbestos 6461
KEEP OR DISCARD
REVIEW WITH ME
041821
Date
From
2.6 CONTRACTOR is to take such other steps as may be necessary for the successful prosecution of this work.
3.0 DESCRIPTION OF WORK
3.1 There is approximately
square feet of asbestos
containing insulation to be removed and disposed of from
two shell/tube exchangers, each 22 feet long and 49 inches
in diameter. The exchangers have metal jackets which must
also be removed and disposed of as asbestos contianing material.
The insulation contains
percent
asbestos
with the balance being
3.2 There is approximately 135 linear feet of insulation on 16
inch diameter pipe which is divided into seven pieces. This
insulation has a 3 inch thickness. Selected bulk samples
of this insulation indicate it contains
percent
asbestos with the balance being
SWRf/Asbestos 6462
14 j n 041822
4.0 JOB SPECIFICATIONS
The following job specifications provide added details to the way the
CONTRACTOR is to proceed with the work.
C"i *
; /^ t
>' ,
4.1 COMPANY will furnish electric power at no cost to CONTRACTOR. CON
(,
TRACTOR will be responsible for connecting to approved COMPANY sources. CONTRACTOR is to provide list of electrical users and show
i'rti
voJtage and horsepower ratings.
?
COMPANY will supply water for showers, washdown and other nonpotable uses. CONTRACTOR will be responsible for connecting to approved COMPANY sources.
O 0?
r-OV 'i
X
4.3 CONTRACTOR must supply his own source of potable water.
Jy X>'
4.4 Working hours are from^8:00am to 4:30pm\,1 Monday through Friday.) CON TRACTOR working hours are restricted to this time interval ~7^he " \
^ gate into the plant area will be secured by the COMPANY" t h e--e-n-d--^ \ of each workday and opened in the morning at approx-rmate 1 y 7:30am. Jp*''
r^ V' U~-`
/ /,, /
SV\'RT/Asbestos 6463
15 - 1H 041823
4.5 Pre-Abatement Meeting
After the contract has been executed, the Project Manager shall arrange for a Drp-aha+oment meeting to be attended by the Project Manager, '^o^^^srs-levirr'Representatives, Corporate Medical Services and the Asbestos Abatement Contractor.
4.5.1 At this conference, the CONTRACTOR'S abatement plans shall be reviewed in detai1.
4.5.1.1 Abatement Plans: These plans shall include; draw ings of the decontamination facilities and their locations, work area isolation plan with layout of engineering controls (e.g., HEPA filters, etc.,); security program, routing plan for removal of con taminated material from the work site; and a list ing of tools, equipment and supplies proposed for use in the abatement program.
4.5.1.2 Description of protective clothing and approved respirators to be used.
4.5.1.3 Explanation of decontamination sequence to be used.
4.5.1.4 Description of stripping, removal, encapsulation, and disposal methods to be used.
1H 041824
16 SWRf/Asbestos 6464
4.5.1.5 Description of the final clean-up procedures to be used.
4.5.1.6 Proposed landfill for disposal of waste materials.
4.5.1.7 Names and addresses of all consultants, industrial hygienists, testing laboratories, or other sub contractors to be utilized during the project.
4.5.1.8 Means of informing the
COMPANY of any health hazards created during
abatement. This will include, but is not limited
to, such occurrences as breaching the containment
area, air monitoring tests indicating airborne
asbestos above acceptable levels, accidents, etc.
4.5.2 The CONTRACTOR'S standard operating procedures will be reviewed in detai1 .
4.5.3 Methods of" transmitting data and the time requirements shall be discussed and agreed upon.
4.5.4 Emergency notification requirements will be reviewed and discussed in detai1 .
1H 041825
SWRf/Asbestos 6465
17
4.6 ASBESTOS ABATEMENT SPECIFICATIONS
4.6.1 DEFINITIONS:
4.6.1.1 All terms not defined herein shall have the meaning given in the applicable publications and regulations.
4.6.1.2 Authorized Visitors: Any visitor authorized by the Project Manager or any representative of a regula tory agency or other agency having jurisdiction over the project.
4.6.2 AIR MONITORING: DAILY air monitoring requirements shall comply with paragraph (f) of the OSHA Construction Industry Standard 1926.58.
4.6.2.1 Daily air monitoring shall be conducted by a Certified Industrial Hygienist from an independent consulting firm. The choice of the firm is subject to approval by the company.
-'"S
/
1H 041826
18 SWRf/Asbestos 6466
"Therae uJi'H be
4.6.2.2 One personal air sample for every four workers.
rnus 4- b
fid a minimum^ two (2) personal air samples, collected cW/M from within the work area.; One of these personal air samples must be from a worker collecting and bagging asbestos.
4.6.2.3 Minimum of, but not limited to, one (1) air sample from each independent exit area collected directly outside and adjacent to the work area.
4 4.6.2./ Air monitoring equipment shall be calibrated to draw
the required flow rate during the sampling period.
4.6.3 CLEAN TESTS: After all abatement and clean-up procedures are concluded, a clean test shall be conducted by the CONTRACTOR to ensure cleanliness of the abatement area, prior to re-occupancy of the abatement area.
19 -
1H 041827
SWRf/Asbestos 6467
q. i t :
4.6.3.2 Clean Test samples shall be by aggressive sampling techniques.
4.6.3.3 To be approved, the clean test concentration shall o.o\
be less than VBH0 fibers per cubic centimeter, or
the air concentration of asbestos fibers outside the
abatement area, whichever is greater.
4.6.3.4 Re-establishment of the work and systems: COMPANY retains the option of conducting additional air monitoring to confirm the results of the clean air testing. This monitoring is in addition to that conducted outside the enclosure. Electron micro scopy may be employed for one or more samples to confirm the results of the final testing.
4.6.3.5 Air monitoring results shall be submitted by the CONTRACTOR'S representative to the Project Manager in a timely manner.
4.6.4 ANALYSES: All asbestos analyses shall be performed by
laboratories certified by the American Industrial Hygiene
Association or by laboratories which:
041828
4.6.4.1 Utilize only laboratory technicians which have successfully completed NIOS'H approved courses in the type analysis performed by the technician, and
20 -
SWRf/Asbestos 6468
~J ' J-C.
4.6.4.2 Which participates in the:
a. EPA bulk asbestos sample quality assurance test ing program, latest round, and attained a seventy-five (75) percent correct score for that round, for laboratories providing bulk sample analyses, and/or:
b. NIOSH Proficiency Analytical Testing Program, latest round, and attained average results not more than one (1) standard deviation from the NIOSH reported average for the round, for labor atories providing fiber counting analysis.
4.6.4.3 All reports of analyses shall be signed by the technician performing the analyses.
4.6.5 AVAILABILITY OF TRAINED PERSONNEL: There shall be a suffi cient number of trained and qualified workers, foreman and superintendents to accomplish the work.
^ 041829
4.6.6 STANDARD OPERATING PROCEDURES: Develop, document, and implement a standard operating procedure during abatement work to ensure maximum protection and safeguard from asoestos
SWRt/Asbestos
exposure of the workers, visitors, employees, and the
environment.
paoceotviti -sboolo flDoaeid:
4.6.6.1 Security from unauthorized entry into the work space.
4.6.6.2 Proper protective clothing and respiratory protec tion prior to entering the work space from the out side.
4.6.6.3 Safe work practices in the workplace, including provisions for inter-room communications, exclusion of eating, drinking, smoking, or in any way breaking the respiratory protection.
4.6.6.4 Proper exit practices from the work space to the outside through the showering and decontamination faci1ities.
4.6.6.5 Removing, encapsulating or enclosing asbestos in ways that minimize release of fibers.
4.6.6.6 Packing, labeling, loading, transporting, and disposing of contaminated material in a wav that minimizes exposure and contamination.
1H 041830
22
SWRf/Asbestos 6470
C'5
4.6.6.7 Emergency evacuation for medical or safety (fire and smoke) so that exposure will be minimized.
4.6.6.8 Safety from accidents in the work space, especially from electrical shocks, slippery surfaces, and entanglements in loose hoses and equipment.
4.6.6.9 Provisions for effective supervision, air monitoring and personnel monitoring for exposure during the work.
4.6.6.10 Engineering systems that minimize exposure to fibers in the work space.
4.6.7 NOTIFICATIONS, PERMITS, WARNING SIGNS, LABELS, AND POSTERS
4.6.7.1 Provide the required notification to EPA and any. other regional. State and local authority having jurisdiction over the project.
Secure al1 the permits required for the work, including disposal of asbes tos in an approved landfill.
SWRf/Asbestos 6471
1H 041831
23
4.6.7.2 Erect warning signs at every point of potential entry from the outside, showing the legend:
DANGER ASBESTOS CANCER AND LUNG DISEASE
HAZARD AUTHORIZED PERSONNEL ONLY RESPIRATORS AND PROTECTIVE CLOTHING REQUIRED IN THIS AREA
The warning signs shall be a bright color so that they will be easily noticeable. The size of the sign and the size of the lettering shall be no less than the OSHA requirements (Ref: 29 CFR 1926.58 (k)(ii>.
4.6.7.3 Provide the OSHA required labels for a'l plastic bags and all drums utilized to transport contam inated material to the landfill.
4.6.7.4 Provide any other signs, labels, warnings, and
posted instructions that are necessary to protect,
;nform and warn people of the hazard from asbestos
exposure. Post in a prominent and convenient place,
at the jobsite, a copy of the latest applicable And
regulations from OSHA* EPA.
- 24 -
1H 041832
SWRf/Asbestos 6472
4.6.8 SUBMITTALS DURING THE WORK: Submit copies of the following items to the Project Manager:
4.6.8.1 Security and safety logs showing names of persons entering the workplace, date and time of entry and exit, record of any accident or emergency evacuation, and any other safety and/or health incident.
4.6.8.2 Disposal certificates.
4.6.8.3 Required permits, clearances, licenses, etc. 4.6.8.4 Air monitoring results.
4.6.9 EMERGENCY PRECAUTIONS: The CONTRACTOR shall establish emer gency and fire exits from the work area. Emergency proce dures shall have priority.
4.6.9.1 The CONTRACTOR shall be prepared to administer first
aid to injured personnel after decontamination.
Seriously injured personnel shall be treated immedi
ately or evacuated without delay for decontamin
ation. When an injury occurs, the CONTRACTOR shall
stop work and implement fiber reduction techniques
(e.g., water spraying) until the injured person has
been removed from the work area.
1H 041833
25 SWRf/Asbestos 6473
4.6.9.2 Trie work area shall have a dry-charge ammonium phos phate fire extinguisher with an Underwriters Laboratories, Inc. rating of at least 10 A:B:C, which must be decontaminated upon removal.
4.6. 10 RESPIRATORY PROTECTION:
4.6.10.1
The Contractor shall provide works^with supplied air respiratory protection. All employees working inside the enclosure will be required to wear supplied air respiratory protection. SINGLE USE, DISPOSABLE RESPIRATORS WILL NOT BE APPROVED.
4.6.10.2
While in the work area, workers shall always wear a respirator properly fitted to the face.
4.6.10.3
CONTRACTORS shall instruct and train workers in proper respirator use and maintenance, including daily maintenacne and sanitizing procedures.
SWRf/Asbestos 6474
1H 041834
26
4.6.10.4 Supplied Air Respiratory Protection: 4.6.10.4.1 Supplied air respirators shall be worn for all gross asbestos removal, excluding glovebag operatons. As a minimum, employees must wear powered air purifying respirators during glovebag operations.
SWRf/Asbestos 6475
27 1H 041835
<XA<- i^r4.6.10.4.3 When type^X^ Respirators are employed,
the Air Supply System shall provide Grade "D" breathing air in accordance with OSHA 29 CFR 1910.134 and ANSI 286.1-1973 Commodity Specification for Air.
clcK. 4.6.10.4.4 The Compressed Air System for Xj&>iLJSCj
Respirators (pressure demand/continuous flow) shall be high pressure, with a compressor capacity to satisfy the respirator manufacturer's recommenda tions. The receiver shall have suffi cient capacity to allow a 15 minute escape time for the respirator wearers in the event of compressor failure or malfunction. The Compressed Air System shall have compressor failure alarm, high temperature alarm, carbon monoxide alarm, and suitable in-line air purify ing sorbent beds and filters to assure Grade "D" Breathing Air.
SistfzfdcAJL-o OuJ^
4.6.10.4.5
Respirators shall be worn with
belt to minimize possibility of
dislodging face mask when hose is
snagged in the work. area.
sWRf/Asbestos 6476
- 28 -
1H 041836
05'Ii
4.6.10.4.6
_A a minimum of two spare hose
-OkrtI! and facepieces tm be available at any
time to the Project Manager and his
authorized visitors and inspectors to
connect to their assigned Type "C"
Respirator without having to wait for
removal of workers from working area
to obtain hose connections.
4.6.10.4.7 All respiratory equipment shall be inspected by CONTRACTOR'S project supervisory personnel at the beginning of each work period, including breaks and lunch periods.
4.6.11 PERSONNEL PROTECTION AND DECONTAMINATION
4.6.11.1 Provide to all workers, foreman, superintendents, and authorized visitors and inspectors protective disposable clothing consisting of full body cover alls, head covers, gloves and foot covers or reus able footwear. Non-disposable footwear shall be left in the work area at all times until disposal at the job completion.
29 -
SWRf/Asbestos 647 (
1H 041837
:: -
4.6.11.2 Provide eye protection and hard hats as required by job condition and safety regulations. Reusable footwear, hardhats and eye protection devices shall be left in the "Contaminated Equipment Room" until the end of the asbestos abatement work.
4.6.11.3 All disposable protective clothing shall be discarded and disposed of as asbestos waste every time the wearer exits from the work space to the outside through the decontamination facilities.
4.6.11.4 Workers shall wear disposable, full body coveralls and disposable head covers and footwear in the work area.
4.6.11.5 The CONTRACTOR shall provide a change room for workers to put on disposable coveralls, respirators, and head covers before entering the work area.
4.6.11.6 All workers without exception shall:
4.6.11.6.1 Remove street clothes in the change
room and put on the disposable cover
alls and respirators before entering
the work area.
SWRf/Asbestos 6478
1H 041838
30
4.6.11.6.2 Remove the disposable coveralls, head covers, and footwear in the work area before leaving the work area, and dis pose in labeled plastic bags for asbestos waste. Still wearing their respirators, proceed to the showers and remove their respirators, while showering with soap and water.
4.6.11.6.3 Shower at the end of each day's work before entering the change room to change into street clothes.
4.6.11.7 Workers shall not eat, drink, smoke, chew gum, or chew tobacco in the work area. To eat, drink, or smoke, workers shall remove the disposable work clothes and footwear in the work area before leaving the work area. Still wearing their respir ators, workers shall proceed to the showers and remove their respirators while showering with soap and water. Workers shall then dress into a new, clean, disposable coverall to eat, smoke, or drink. The new coveralls can be worn to reenter the work area.
SWRf/Asbestos 6479
1H 041839
31
4.6.11.8 The CONTRACTOR shall provide a respirator and disposable coveralls, headcover and footwear to any official representative of the owner, or any regulatory official who inspects the jobsite.
4.6.11.9 All persons entering the work area shall wear approved respirators and disposable coveralls, headcover, footwear, and shall follow the decon tamination procedures.
4.6.12 ENCLOSURES, SHOWERS AND TOILETS:
4.6.12.1 For each abatement area, the CONTRACTOR shall provide decontamination facilities located in an area agreed upon with the Project Manager. The decontamination facilities shall include a Decon tamination Enclosure System for workers and visi tors and a Decontamination Enclosure System for loading of asbestos into trucks for transportation to the landfi11.
4.6.12.2 The Decontamination Enclosure System for workers
and visitors shall consist of three rooms that
serve as three Air Locks as follows: Clean Room
at entrance followed by shower(s), followed by
Dirty Equipment Room. Figure F-4 illustrates a
typical hygiene facility layout contiguous and
adjacent to the work. area.
1H 041840
32 SWRf/Asbestos 6480
uork area
> > *: J-rO. CI W>
>C H
e re
> jo Ore 5
FIGURE F-4
WORK AREA
5 /N
pc O' -a Xre x H
rerex: -o -- > 5"
F. H >
SI
l O
> jo 5 n
JC
t/j c re
JO
DECONTAMINATION AREA
re z n re o
tA
re e
JO
c n re
SWRf/Asbestos 6481
- S3 -
1H 041841
0660E
4.6.12.3 The Decontamination Enclosure System for loading of asbestos into trucks shall consist of an Air Lock from the work area leading into the Drum Wash and Wipe Room, and another Air Lock leading into the open loading platform and the truck.
4.6.12.4 An Air Lock is a system permitting ingress and egress without permitting air movement. It con sists of two curtained doorways, at least eight feet apart. Each curtained doorway shall be constructed by placing three overlapping sheets of plastic over a framed doorway, securing each along the top of the doorway. The first and third sheet shall be secured on one side of the doorway and the middle sheet shall be secured on the other side of the doorway.
4.6.12.5 Provide lockers for storage of street clothes of
workers in the Clean Room. Provide in the same
room uncontaminated disposable protective clothing
and equipment. This room shall be used by workers
and visitors to change from street clothes to dis
posable protective clothing and gear prior to
entering into the contaminated area and to dress
into street clothing after they have showered and
dried in the shower room as they exit from the
contaminated area.
1H 041842
-i SWRf/Asbestos 6482
4.6.12.6 All shower waste water shall be filtered down to the 5 micron range utilizing filtering mechanisms. The shower filtrates shall be disposed of as a contaminated material. All shower decontamination facilities shall have hot running water.
4.6.12.7 Provide the Dirty Equipment Room with storage for contaminated equipment. In this room, workers and visitors dispose of their disposable protective clothing, except the respirator, as they prepare to enter the Shower Room.
4.6.12.8 The Drum Wash and Wipe Room shall be equipped with
,V-
o_ V'\
the facilities to wash and wipe the outside of the drums prior to the loading into the trucks for
V -? -'
ia V. ' / .k pj
transportation f.o-a--Va-ndfTTl . Make provisions to prevent any contaminated runoff from the Drum Wash
RoonL____ __
_______________.
4.6.12.9 The CONTRACTOR shall provide sanitary facilities for abatement personnel outside the enclosed work area and maintain them in a clean and sanitary condition throughout the project.
SWRf/Asbsstos 6483
1H 041843
35
4.6.13 EQUIPMENT TO BE SUPPLIED BY CONTRACTOR
4.6.13.1 A sufficient quantity of negative pressure ventil ation units Is required. Units shall be equipped with HEPA filtration and operated in accordance with ANSI Z9.2-79 (local exhaust ventilation requirements) and EPA guidance document EPA 560. latest edition, Guidance for Controlling AsbestosContaining Materials in Building "Recommended Specifications and Operating Procedures For the Use of Negative Pressure systems for Asbestos Abatement" shall be utilized so as to provide one workplace air change every 15 minutes, and shall not exhaust into occupied areas.
4.6.13.2 A sufficient supply of disposable mops, rags and sponges for work area decontamination shall be avaiTable.
4.6.13.3 A sufficient supply of scaffolds, ladders, lifts and hand tools (e . g . . scrapers, wire cutters, brushes, utility knives, wire saws, etc.) shall be provided as needed.
4.6.13.4 Sprayer for spraying amended water shall be prov-
ided as needed.
SWRf/Asbestos 6484
1H 041844
36 051 3E
4.6.13.5 Rubber dustpans and rubber squeegees shall be provided for cleanup.
4.6.13.6 Brushes utilized for removing loose asbestoscontaining material shall have nylon or fiber bristies, not metal.
4.6.13.7 A sufficient supply of HEPA filtered vacuum systems shall be available during cleanup.
4.6.13.8 Hand tools equipped with HEPA filtered local exhaust ventilation shall be utilized during the installation of enclosures and supports if there is any need to disturb asbestos-containing materials. (As an alternative, asbestos material may be partially removed following proper removal procedures prior to the installation of supports and enclosures.>
4.6.14 SUBMITTALS: In accordance with the Approved Asbestos Abatement Plan, furnish information for the
following:
4.6.14.1 Layout of project execution showing the abatement
work in stages corresponding to the qualified per
sonnel employed and the configuration of the work
space.
1H 041845
37 SWRf/Asbestos 6485
4.6.14.2 Security System, warning signs and labels for bags and drums.
4.6.14.3 Wetting agents and low pressure wetting system.
4.6.14.4 Encapsulants
4.6.14.5 Enclosures
4.6.14.6 Wall, floor and opening coverings and sealing tapes.
4.6.14.7 Standard Operating Procedure showing how workmen, visitors, and employees will be protected from exposure and how spaces outside the work areas will be protected from contamination until completion of the work.
4.6.14.8 Samples of disposable protective clothing.
4.6.14.9 Respiratory Protection System including samples of respirators; hoses and a certificate with system literature for the air supply system from manu facturer stating that air supply system meets specifications on quality, quantity and escape time.
1H 041846
38 SWRf/Asbestos 6486
4.6.14.10 Fire and emergency evacuation plan.
4.6.14.11 Detailed plans for decontamination facilities, toilets and systems allowing inter-room communication and communication between the work area and the outside.
4.6.14.12 Engineering systems for control exposure showing the number, location and capacity of supply and exhaust systems, the expected direction of flow and the minimum negative pressure in each room.
4.6.14.13 Medical Surveillance records for all personnel.
4.6.15 APPLICABLE PUBLICATIONS: The publications listed below form a part of this specification to the extent referenced. The publications are referenced in text by basic designation only.
4.6.15.1 Environmental Protection Agency (EPA): Regulations for Asbestos (Coce of Federal Regulations Title 40, Part 61. Guidance for Controlling Friable Asbestos Containing Materials in Buildings.
1H 041847
39 SWRf/Asbestos 6487
4.6.15.2 Occupational Safety and Health Administration (OSHA): Asbestos Regulations (Code of Federal Regulations title 29, Part 1901, Section 1926.58).
4.6.15.3 National Institute for Occupational Safety and Health (NIOSH): "Respiratory Protection .... A Guide for the Employee."
4.6.15.4 American National Standards Institute (ANSI): Z86.1-1973 . . Commodity Specification for Air Z88.2-1980 . . Practices for Respiratory Protection Z9.2-1979 . . Local Exhaust Ventilation Require ments
6 4.6.15X U.S. Environmental Protection Agency National
Emission Standards for Hazardous Air Pollutants
(NESHAPS) Asbetos Regulations (40 CFR 61.
Sutpart M).
1H 041848
40 -
SWRf/Asbestos 6488
4.6.16 MATERIALS:
4.6.16.1 Polyethylene sheeting for walls and stationary objects shall be a minimum of 4-mil thickness. For floors and all other uses, sheeting of at least 6-mil thickness shall be used in widths selected to minimize the frequency of joints. Polyethylene sheeting utilized for worker decontamination enclosure shall be opaque white or black in color.
4.6.16.2 Disposal bags shall be of 6-mil polyethylene, with labels to meet EPA or 05HA requirements.
4.6.16.3 Lock-down material shall be tinted to ensure full coverage.
4.6.16.4 Disposal drums shall be metal or fiberboard with locking ring tops, with labels to meet EPA or OSHA requirements.
4.6.16.5 Surfactant (wetting agent) shall be a 50/50 mixture of polyoxyethylene ether and polyoxy ethylene ester, or equivalent, mixed 'n a proportion of 1 fluid ounce to 5 gallons of water or as specified by manufacturer.
1H 041849
SWRf/Asbestos 6489 41
4.6.17 TOOLS AND EQUIPMENT:
4.6.17.1 Airless Sprayer: An airless sprayer, suitable for application of encapsulating materials, shall be used.
4.6.17.2 Asbestos Filtration Device (AFD): Asbestos filtration devices shall utilize high efficiency particulate absolute (NEPA) filtration system.
4.6.17.3 Scaffolding: Scaffolding, as required to accomp lish the specified work, shall meet all applicable safety regulations.
4.6.17.4 Transportation Equipment: Transportation equipment as required, shall be suitable for loading, temporary storage, transport, and unloading of contaminated waste without exposure to persons or property.
4.6.17.5 Vacuum Equipment: All vacuum equipment utilized in the work area shall utilize HEPA filtration systems. Do not use any methods that would raise dust such as dry sweeping or vacuuming with equipment not equipped with HEPA filters.
W 041850
SWRf/Asbestos 6490 4
4.6.17.6 Water Sprayer: The water sprayer shall be an air less or other low pressure sprayer for amended water application.
4.6.17.7 Other Tools and Equipment: The CONTRACTOR shall provide other suitable tools for the stripping, removal, encapsulation and disposal activities including but not limited to: hand-held scrappers, brushes, sponges, rounded edge shovels, brooms, and carts.
4.6.18 PRE-ASBESTOS ABATEMENT PREPARATIONS:
4.6.18.1 Prior to any abatement work in an area, seal off the entire area to anybody other than trained per sonnel and authorized visitors. Errect signs around the perimeter in accordance with EPA, OSHA and this specification. Provide security against unauthorized entry during abatement process. Maintain a log of all people entering and exiting the workplace.
4.6.18.2 Seal all walls with one layer of 4-mil plastic sheet and the ground floors with 6-mil plastic sheets. For asbestos containing materials within buildings, seal off all duct openings, doors, win dows, fan coil units, radiators, etc., with 4-mil
SWRf/Asbestos 6491
43
1H 041851
C5 I 3
plastic. Ensure the barriers are effectively sealed and taped. Repair damaged barriers and remedy defects immediately and visually inspect enclosures prior to each workday. Use smoke meth ods to test effectiveness of barriers.
4.6.18.3 Secure the approval of the Project Manager prior to the start of the work for the following: Enclosures, showers and toilets, personnel protec tion and decontamination procedures, exposure con trol systems, notifications and permits, standard operating procedures, personnel training and test ing, removable decontamination and storage, sealing off and securing of the work area and equipment for inter-room communications.
4.6.19 UTILITIES
4.6.19.1 Provide all necessary connections for temporary
utilities in the workplace during abatement work,
preserve in operating condition all active ducts,
piping and utilities. If any of the above will be
disturbed, notify the Project Manager immediate1;/
and undertake remedial action as required. Shut
down and disconnect all electric power to the work
area, if required, so that there is no possibility
of reactivation and electrical shock during the
entire abatement process. - 44 -
1hi 041852
0513E SWRf/Asbeslos 6492
4.6.19.1.1 Ensure safe installation (including ground fault interrupters) of tempor ary power sources and equipment by compliance with all applicable elec trical code requirements and OSHA requirement for temporary electrical systems.
4.6.19.1.2 The temporary electrical power shall be in accordance with OSHA and Electrical Code for Wet Environment.
4.6.19.2 Remove all heating, ventilating and air condition ing system filters and dispose of as asbestos waste. Replace all filters with a set of new filters at the end of the decontamination work.
4.6.20 ASBESTOS REMOVAL:
4.6.20.1 Except as noted herein and/or in drawings, spray with water, which contains a wetting agent, all asbestos that is to be removed. The wetting agent shall be 50 percent polyoxyethylene ether and 50 percent polyoxyethylene ester, or the equivalent, mixed one ounce to five gallons of water. Apply a low pressure fine spray of the amended water to minimize fiber release. Saturate sufficiently the material throughout the removal process sc that
- 45
tH 041853
L SWRf/Asbestos 6493
there wilt be at no time of removal fiber release from dry asbestos. In many areas, it may be necessary to presaturate asbestos materials the day prior to removal.
4.6.20.2 Immediately following removal, the wetted asbestos shall be packed into labeled 6-mil plastic bags to prevent the material from drying. Pack and seal all bagged material in drums which are also labeled. Thoroughly clean the exterior of the sealed drums prior to loading on the truck for transportation to the landfill.
4.6.20.3 Disposal shall be in a landfill, meeting EPA requirements. Do not throw bags into landfills in a way that may cause the bags to burst open. Ensure that bags are not broken open in the process.
- 46 -
1H 041854
SWRf/Asbestos 6494
4.6.21 CLEANING AND DECONTAMINATION:
4.6.21.1 Remove and place in containers all visible accumu lations of asbestos-containing material and asbestos-contaminated debris utilizing rubber dust pans and rubber squeegees to move material about. Do not use metal shovels to pick up or move accumulated waste. Special care shall be taken to minimize damage to floor sheeting.
4.6.21.2 Wet clean all surfaces in the work area using rags, mops and sponges as appropriate.
4.6.21.3 Remove the cleaned outer layer of plastic sheeting from walls and floors. (This applies to removal within buildings only.) Windows, doors, HVAC system vents and all other openings shall remain sealed. The negative pressure ventilation units shall remain in place and be utilized.
4.6.21.4 After cleaning the work area, wait at least 24 hours to allow fibers to settle, and HEPA vacuum and wet clean all objects and surfaces in the work area again.
1H 041855
a *>
'~
SWRf/Asbestos 6495
t.: 1
4.6.21.5 Remove all waste in containers from the work area through the load-out Air Lock.
4.6.21.6 Decontaminate all tools and equipment and remove at the appropriate time in the cleaning sequence.
4.6.21.7 Inspect the work area for visible residue. If any accumulation of residue is observed, it will be assumed to be asbestos and the 24-hour settling period/cleaning cycle repeated.
4.6.21.8 After the work area has been rendered free of visible residue,, a th'in~~coat of a satisfactory . ^ lockdown agent shall be applied to all surfaces in the work area including structural members, build ing components and plastic sheeting on walls, floors, and covering nonremovable items, to seal in nonvisible residue. The lock-down agent shall be tinted to ensure full coverage.
4.6.22 RE-ESTABLISHMENT OF THE WORK AREA AND SYSTEMS:
4.6.22.1 Re-establishment of the work area shall only occur following the completion of clean-up procedures and after clearance air monitoring has been performed and documented.
1H 041856
48 SWRf/Asbestos 6496
4.6.22.3 The CONTRACTOR shall notify the peo-jed- manage*--for a visual inspection of the work area for any remain ing visible residue. Evidence of contamination will necessitate additional cleaning requirements.
4.6.22.
Additional air monitoring shall be performed if additional cleanup is necessary.
4.6.22.5 Following satisfactory clearance of the work area, remaining polyethylene barriers may be removed and disposed of as asbestos-contaminated waste.
4.6.22.6 Remove contaminated HVAC system filters and dispose of as asbestos-contaminated waste. Decontaminate filter assemblies using HERA vacuums and wet cleaning techniques.
4.6.22.7 Items to be salvaged must be properly decontaminated.
1H 041857
49 SWRf/Asbestos 6497
SECTION III PERTINENT REGULATIONS - ASBESTOS
TABLE OF CONTENTS
j.Q V.O 3/.0 4/.0
OSHA REGULATION 29 CFR 1926.58 EPA REGULATION 40 CFR PART 61 SUBPART M (NESHAPS) ANSI 288.2 - 1980 ANSI Z9.2 - 1979
SWRf/Asbestos 6498
1H 041858
50
ATTACHMENT 3
THIS IS A LIST OF COMPANIES WHICH HAVE INDICATED AN INTEREST IN CONDUCTING ASBESTOS ABATEMENT WORK. THIS LIST DOES NOT CONTAIN ALL COMPANIES AND IT DOES NOT INDICATE ANY TYPE OF EPA APPROVAL.
TEXAS
A-l Specialties P. 0. Box 477 Gatesville, Texas James Lanham (817) 865-7922
76528
American Tex-Seal , Inc. 218 Beasley Street Sulphur Springs, Texas Danny Blount
75482
Artie Insulation Company 4201 Lindberg P. 0. Box 864 Addison, Texas 75001 (214) 385-7652
Asbestos Removal, Inc. P. 0. Box 9386 Odessa, Texas 79767 (915) 362-0711
USI and Associates 408 N. Bowser #100 Richardson, Texas 75081 (214) 783-8353/231-9035
Basin Insulation Service 1301 Jarvis Lubbock, Texas 79408 (806) 795-9706
B.M.S. Technology Inc. 1 Summit Avenue Suite 202 Ft. Worth, Texas 76102 (817) 926-5296
Environ-Control Inc. 7878 Growlane Houston, Texas 77040
Building Specialties, Inc.
P. 0. Box 920837 6230 Bingle
Houston, Texas 77292-0837 (713) 939-1115
Pro-Kote Inc. P.0. Box 1416 Roundrock, Texas (512) 244-9186
78680
Clean-America, Inc. 5200 Mitchelldale Houston, Texas 77092 Larry D. Jones, Pres. (713) 686-2103
Costal Environmental Control P. 0. Box 1277 La Marque, Texas 77568 Alan Dodd (409) 945-8077
Continental Coatings, Inc. P.0. Box 3000 La Porte, Texas 77571 (713) 471-8580
Ramzel-Waddel 1 Inc. P.0. Box 180383 Austin, Texas 78718 (512) 251-2637
REVISED: 3/19/87
SWRt/Asbestos 6499
1H 041859
2- -
Fire Safe of Houston, 16203 Park Row Houston, Texas 77084 Don Sabrsula (713) 578-0595
Inc.
Gregg Industrial Insulators Inc. P. 0. Box 1887 Kilgore, Texas 75662 David Brooks
Bill Kittrell Acoustics 2017 Stephenson Drive Mesquite, Texas 75149 (214) 288-0754 Steve Kittrell
Inc.
I.C.E. , Inc. Insulation Specialists P.0. Box 2482 Conroe, Texas 77305 A. T. (Jack) Cain (409) 760-2550
Latin American Construction Co. 6115 Denton Drive Dallas, Texas 75235 (214) 956-7903
W. T. Stephens, Contracting Inc. 1400 Post Oak Blvd., Suite 750 Houston, Texas 77056 Cody Birdwell (713) 965-9324
Little-Tex Insulation Co., 911 N. Frio Street San Antonio, Texas 78207 Olin A. Warnick, President (512) 222-8094
Inc.
B. C.P. Construction Inc. Asbestos Abatement Contractors 712 No. Beach Street Fort Worth, Texas 76111 (817) 429-475-5801
South Texas Insulation Co. 200 Seguin Street San Antonio, Texas 78208 Joseph M. Dawson (512) 226-5480
Texas Insulators, Inc. 4623 Steffani Houston, Texas 77041 Ron Van Guilder, Pres. (713) 466-6717
Sublett & Associates 4623 Steffani Houston, Texas 77041 (713) 466-6717
Contracting Specialist Inc. P. 0. Box 300586 Houston, Texas 77230-0586 (713) 741-7069
U.S. Asbestos Abatement, 10543 Doric Street P.0. Box 20880 Dallas, Texas 75220 Charles W. Jordan (214) 357-2740
Inc.
Abatement Associates 504 Danny Drive Desoto, Texas 75115 (214) 223-1749
Best Renovating Company H. C. Flynn 6212 Samuel Blvd. Dallas, Texas 75228 (214) 324-4373
SWRf/Asbestos 6500
1H 041860
-3-
Thuro-Care Systems, Inc. 1201 1/2 East Tyler Harlingen, Texas 78550 O.A. Knight Jr., Pres. (512) 425-2277
Pico Inc. Rt. 3 P.0. Box 140 Tuttle, Oklahoma 73089 (405) 381-3821
Little-Tex Insulation Co., Inc. 911 N. Frio Street San Antonio, Texas 78207 Olin A. Warnick, President (512) 222-8094
Triangle Plastering Co., Inc. P. 0. Box 38325 Dallas, Texas 75238 Bob Baker (214) 285-8976
Power Masters, Inc. 625 Howard Avenue Deer Park, Texas 77536 P.0. Box 778 (713) 930-1400
Tri-Pro Services, Inc. P.0. Box 271 Kaufman, Texas 75142 Horace Crow, A.I.A. (214) 932-4351
USI and Associates 408 East Broadway Pond Creek, Oklahoma (405) 532-4272
73766
Win-Way, Inc. P. 0. Box Drawer GG Freeport, Texas 77541 (713) 393-1272
SWRf/Asbestos 6501
1H 041861
By States in Region VI
LOUISIANA
Reynolds Contracting Asbestos Control 141 E. Boyd Street Suite 405 Baton Rouge, Louisiana 70808 Mark Reynolds, President (504) 767-4164
Richard Construction Co. Inc. 18744 Keystone Greenwell Springs, Louisiana 70739 Rob Richard (504) 261-8196
Insul - Tech P.0. Box 98 Harvey, Louisiana (504) 362-1550
70059
Louisiana Insulation & Fireproofing Inc. 18744 Keystone Greenwell Springs, Louisiana 70739 (504) 261-8196
NEW MEXICO
Keers, Environmental 3323 Stanford Drive N.E. P.0. Box 6848 Albuquerque, New Mexico 87197 (505) 888-9525
BCP Corporation 2432 West Peoria, Suite 1205 Phoenix, Arizona 85029 (602) 861-9205
SWRf/Asbestos 6502
1H 041862
ARKANSAS
Custom Insulation Co., Inc. 2811 Miramar Street Pine Bluff, Arkansas 71611 (501) 534-8850
J. W. Construction Co. 916 Garland Avenue Little Rock, Arkansas 72201
Mid-Ark Fireproofing & Insulation, Inc. P. 0. Box 9682 Little Rock, Arkansas 72219 (501) 888-6063
OKLAHOMA
The McIntosh Co., Inc. 1402 S. 69th E. Ave. Tulsa, Oklahoma 74112 (918) 836-0301
PICO Inc. Rt. 3 P.0. Box 140 Tuttle, Oklahoma 73089 (405) 381-3821
Nationwide Asbestos Abatement Serv. 710 North Peoria Tulsa, Oklahoma 74106 Lamar L. Anderson (918) 587-4176
Sublett Associates 100 N.E. 26th Oklahoma City, Oklahoma (405) 528-6365
73105
Pettus Construction Co. Inc. P.0. Box 6 Tulsa, OK 73754 (405) 796-2400
U.S. Pollution Control, 2000 Classen Center Suite 400 South Oklahoma City, Oklahoma (405) 528-8371
Inc. 73106
U S I and Associates 408 E. Broadway Pond Creek, Oklahoma 73766 George A. McCutchan (405) 532-4272
SWRf/Asbestos 6503
1H 041863
OUT OF REGION VI
A-l Disposal Corporation P. 0. Box 248 400 Broad Street Plainwell, Michigan 49080 (616) 685-9801
Aaxon Industrial, Inc. 1043 Rt. One Avene 1 , New Jersey 07001 Linda Paul in (201) 636-1581
Asbestos Containment Corporation P. 0. Box 229 Watervilt, New York 12189 Arthur H. Cody, President (518) 273-4685
Mechnical Asbestos Removal, Inc 2436 Cockeysville Road Cockeysvi1le, Maryland 21030 Richard D. Ehrlich (301) 785-2525
Control Resources Corporation P. 0. Box R Michigan City, Indiana 46360 R. Steven Lutterbach, President (219) 872-4747
Midwest Materials Company 417 West Mi 11 Street P. 0. Box 845 M. P. 0. Springfield, Missouri 65806 J. C. Goodin (417) 862-3541
Midwest Asbestos Removal Service, P.0. Box 933 Tinley Park, Illinois 60477 (312) 532-2244
In
Professional Asbestos Removal 1548 N. Barnes Avenue Springfield, Missouri 65802 (417) 865-5628
Superior Systems, Inc. 3224 Twiliman St. Charles, Missouri 63301 Bob Canaday, President (314) 946-0448
Thermo Spray Insulation, Ltd. P. 0. Box 18976 Memphis, Tennessee 38118 James R. Stewart (901) 794-6060
B.C.P. Corporation 2432 W. Peoria, Suite 1205 Phoenix, Arizona 85029 (602) 861-9205
SWRf/Asbestos 6504