Document LRKZOZRMvxGgOVVe9y0vZrj7
3M-32-MC (REV. 4*79)
CC EOB ^tteute file
Shell Oil Company Shell Chemical Company
Interoffice Memorandum
SEPTEMBER 25, 1981
FROM:
INDUSTRIAL HYGIENIST
TO: MANAGER - EAST MAINTENMC
MANAGER - CAT CRACKE^CJfcL
MANAGER - SAFETY REFINERY
SUBJECT: CAT CRACKER TURNAROUND
During the September, 1980 Cat Cracker Turnaround, a study of employee exposure potential was conducted by the Industrial Hygiene group. The attached report highlights their findings and the controls which were employed to reduce worker exposures. Their efforts were a continuation of Shell's interest in planning for and protecting worker health during all phases of operation, both routine and non-routine. The general applicability of certain controls utilized during the Cat Cracker Turnaround are still under review by the Health and Safety Department, e.g., respirator use by welders.
The results of this investigation are provided for your information and review. Please contact me if you have any questions regarding the study.
P.J. Snyder
PJS:md
Attachment
cc: ECB Satellite PJS Chron
DPMC-14678
1980 DPMC CAT CRACKER SHUTDOWN
LAM 013382
DPMC-14679
1980 DPMC CAT CRACKER SHUTDOWN
SUMMARY
A significant reduction in actual employee exposure from past DPMC Cat Cracker turnarounds was accomplished by the use of respirators. Industrial Hygiene workpractices and general dilution ventilation. No respiratory inhalation incidents associated with welding fume exposure were reported.
An in-depth study of ventilation rates was performed and the results com pared to measured exposure levels. While minimized, exposures associated with coated electrode welding in enclosed spaces and air arc gouging continue to be potentially excessive.
Personnel dosimetry for noise exposure identified excessive exposure levels and the need to specify the use of hearing protection on future CCU turn arounds.
The continued planning for and use of health workpractices, controlled ventilation, and respiratory protection during future CCU turnarounds is recommended.
INTRODUCTION
Since 1978, several studies of employee exposure potential during Catalytic Cracking Unit (CCU) shutdowns have been performed at various Shell manufact uring locations. These investigations have identified certain exposures which may represent an occupational health hazard including:
Air arc gouging may generate total particulates, iron oxide copper, nickel, total chromium and hexavalent chromium in excess of existing standards while cutting in vessels such as cyclones, plenum chambers, spent catalyst risers and even in larger vessels with ventilation "dead" spots.
Coated electrode welding may result in excessive levels of dusts and hexavalent chromium in enclosed spaces with poor ventilation.
Refractory removal may generate refractory and trapped catalyst dust in excess of the nuisance particulate limit.
Chipping coke deposits in the reactor may generate dust levels in excess of the TLV for particulate polycyclic aromatic hydrocarbon.
Removing asbestos containing insulation can potentially release asbestos fibers into the atmosphere and appropriate precautions must be taken.
L/VM 013383
DPMC-14680
2
Residual sand from sandblasting may result in excessive levels of crystalline silica during subsequent maintenance operations. Chipping, grinding, and air arc gouging may result in excessive levels of noise. . As a continuation of Shell's effort to understand the potential health hazards associated with major shutdowns, an Industrial Hygiene study was conducted during the September 1980 CCU shutdown. The objectives of this work were to: ,(1) further develop information on employee exposure potential
including exposure to specific metals, (2) evaluate the effectiveness of general ventilation and its
relationship to employee exposure, and (3) implement specific controls to minimize employee exposure
to previously recognized hazards. The results and findings of this study are summarized by this report. EXPOSURE MONITORING
GENERAL During the CCU shutdown, employee exposure monitoring was conducted in the Regenerator, Reactor, Third Stage Separator and Fractionator. Air samples were collected during air arc gouging, and manual coated electrode-welding. The metal being cut or ionized varied from carbon steels to high alloy stainless steels. Other samples were collected to assess exposure potential to employees not directly involved in the above welding processes.
All personnel "breathing zone" samples were collected on the outside of any respirator or welding hood in use, therefore actual exposures were less than those reported.
All air sampling was conducted using either matched weight mixed cellulose ester filters (MCE) or polyvinyl-chloride (PVC) filters. All filters were
LAM 013384
DPMC-14681
3
analyzed for total fume and for 13 selected metals. Shell's Westholl.ow Laboratory performed the required analysis by D. C. Plasma Emission Spectroscopy. The permissible exposure limits which were used in this study are provided as Table I. REGENERATOR Employee monitoring conducted over the entire period of time which employees were working inside the regenerator revealed total average fume concentra tions of 11.6 mg/m^, and 9.6 mg/m3 averaged over an eight-hour period. 25% of these measurements exceeded the eight-hour permissible limit of 10 mg/m3, used in this study (Table II). Short-term personnel and area sampling revealed excessive dost and fume exposure levels during selected work activities (Table III).
In general, short-term "investigative" air sampling indicated that air arc gouging in the Regenerator appeared to contribute to higher exposure levels than welding alone. Welder assistants, and other personnel working in the Regenerator bottom received a significant portion of their exposure from catalyst dust dropping from dip legs and suspended in air from arc cutting processes. Although probably minimized, this occurred in spite of previous vacuuming efforts. The lower exposure levels identified during welding of the cyclone support pads at the 9th level may be associated with a notice able upward ventilation flow. This is supported by the measured concentration of fumes above this work area (range 3.6 - 49.3 mg/m3). The highest area measurements for chromium (3.5 mg/m3) and manganese fume (1.8 mg/m^) collected in the regenerator are also associated with this upper cyclone area, (Table IV).
Significant exposure during stick welding occurred where work was performed in enclosed spaces, e.g., inside cyclones, and the 40" riser. General dilution ventilation did, however, prevent a static accummulation of fumes.
REACTOR
Full shift employee monitoring conducted inside the reactor revealed a total average fume concentration of 3.2 mg/m3, and 2.3 mg/m3 averaged over an eighthour period (Table II). While none of these personnel measurements'exceeded
lam 013385
DPMC-14682
4
the eight-hour permissible limit of 10 mq/m3, all employee monitoring, con ducted during the air arc gouging approached this permissible limit. Air arc cutting also resulted in excessive exposure potential to total metals (35 - 287% of permissible limit)? General dilution ventilation did not satisfactorily reduce potential employee exposure which may be associated with arc gouging, or fume contaminant levels above welding processes.
Ventilation in the reactor generally exceeded that found in the Regenerator 37 - 49 air changes/hour versus 17 - 22 air changes/hour. This combined with the presence of less catalyst dust may have contributed to the lower exposure levels measured during reactor work.
THIRD STAGE SEPARATOR
Personnel monitoring revealed excessive exposure levels to total fume on 100% of the samples collected during arc gouging, ranging 33 - 41 mg/m3, (Table II). Short-term exposures were measured to be as high as 183 mg/m3. An employee monitored for 236 minutes was determined to have an excessive peak exposure to copper fumes, (.32 mg/m3). Total chrome air concentration on this specific air sample was determined to be equivalent to the permissible limit (.5 mg/m^). Welding resulted in relatively lower measured exposure levels, ranging 2.3 - 9.3 mg/m3. Exposure to total fume and total metals were within permissible limits during welding. While the Third Stage Separator had the highest general ventilation rate, 65 - 72 air changes/hour, it alone does not appear satisfactory to reduce exposure to employees performing air arc cutting. The potential eye hazard condition created by arc cutting and high ventilation rates were protected against by the manditory use of full-facepiece respiratory protection.
FRACrtONATOR
Although limited in scope, all personnel sampling conducted in the Fractiona
tor were within permissible limits for both total welding fume and total
metal exposure (Table IV).
The highest air concentrations found were
above the welding zone.
*As a rough index of exposure, combined metal exposures exceeding a -PEL of
100% are viewed as potentially exceeding the permissible limit for individual metals.
LAM 013386
DPMC-14683
5
NOISE EXPOSURE Approximately 60% of all personnel eight-hour monitoring exceeded the 90 dB(a) permissible limit (Table V). Area sound level measurements further identified work area sound levels as potentially excessive. For example:
. All work areas on the Reactor exceeded 85 dB(a); most areas above the 7th level exceeded 90 dB(a).
. Sound levels inside manway access "penthouses" ranged from 98 dB(a) to 115 dB(a). Air driven Coppus blowers are associated with the higher sound levels.
. Sound levels in the proximity of arc welding machines (ground level) were 95 - 96 dB(a).
. The'rest area at the Regenerator 10th level was 95 dB(a). All levels on the 6th and 11th levels exceeded 90 dB(a).
Sources of noise exposure included air arc cutting, grinding, chipping, venti lators and welding machines.
The need to use hearing protection should be better communicated to contract employees on future CCU turnarounds. Beginning with the first day and weekly thereafter sound level surveys need to be conducted and high noise level areas (floors) posted with temporary signs.
Specific tasks inside vessels such as air arc cutting should be continued to be identified as mandatory hearing protection jobs. HEALTH AND SAFETY CONSIDERATIONS: WORKPRACTICES
PRE-SHUTDOWN PLANNING Input to the CCU shutdown health workpractices was received from a Head Office team representing Health and Safety - Operations, Maintenance Support - Manu facturing and Engineering Services - Products. Experiences acquired at prior CCU shutdowns at other locations were reviewed and recommendations discussed with the DPMC shutdown team. Prior to the shutdown, health and safety require ments were outlined for maintenance in written form (Attachment I).
LAM 013387
DPMC-14684
6
RESPIRATORY PROTECTION
To protect against fume and dust exposure in the Third Stage Separator, Reactor and Regenerator, air-purifying respirators were required to be worn by all personnel upon entry. Based on the incidence of eye injury during earlier CCU turnarounds, full-face masks or half-face with goggles were required.
Air-supplied respirators were specified for all welding work in all vessels. Welders were afforded an opportunity to select between the MSA full-face, constant flow mask with lens adapter and the MSA half-face, constant flow welders mask. Breathing quality air was supplied by a leased Sullair compressor and Deltech air purification unit purchased specifically for the CCU shutdown. This option was selected over purchasing air based on economic considerations. A single trailer containing breathing air was used as a backup system, however, it was not used. Air was piped to the various vessel levels where work was planned. In total, 56 respirator connections were available, many of these being located at the manway entrances.
The primary contractor was responsible for cleaning, inspecting and issuing respirators on each of the two shifts. For control purposes each mask was numbered and a record made of its use. The average number of respirators issued each day (2 shifts) were:
Full-face Airline 5 Half-face Airline 60 , Full-face Filter 100 ,, Half-face Filter 42
Respirator filter cartridges were initially replaced daily and later on a weekly basis. Respirators were returned to Shell at the completion of the shutdown. Assuring that contractor workers and Shell Staff, e.g., Inspectors followed the above requirements and used respirators at all times required extensive auditing by Industrial Hygiene personnel. Among the considerations which impacted on respirator acceptability was the periodic fogging of air-purifying ful1-facepiece respirators. This was minimized by the use of a defogging agent.
LAM 013388
DPMC-14685
7
In general, less problems were encountered with welders who found the MSA half-facepiece welder's mask an acceptable protective device. Welders reported that although they were somewhat inconvienced, they could work for longer periods of time and more comfortably.
VENTILATION General ventilation levels which were achieved were determined to be signifi cantly improved over past DPMC CCU shutdowns. Both air driven portable ventilators and electrically driven air movers were used. Electrically driven air movers were determined to be quieter and capable of a higher cfm. Placement of ventilators was made according to pre-shutdown planning. Several "access penthouses" were constructed and placed at manways so as to allow vessel entry without removing the ventilator.
A thorough study of airflow was completed during the shutdown and showed the maximum air changes per hour to be greatest for the Third Stage Separator (65 - 72 changes/hour). The Reactor was found to have 37 - 49 changes/hour and the Regenerator 17 - 22 changes/hour. The ventilation study conducted did not include the Fractionator. Maximum ventilation rates obtained were comparable to initial target levels. The use of general ventilation contri buted to overall lower welding fume air concentrations. Directed airflow created by general ventilation reduced static accumulations of fume and assisted in lowering welder exposure where fumes moved away from the breathing zone, e.g., when the welder was in a vertical position. _ However, personnel working in other areas of vessels could be exposed to such fumes although in a somewhat lower concentration. Given the same number and location of ventilators it is unlikely that general ventilation alone is sufficient to meet current permissible exposure limits for total welding fume and total metals.
The practicality of using portable local exhaust ventilators should be reviewed.
A more thorough discussion of the ventilation study conducted is included in a separate report, "1980 Cat Cracker Shutdown - Ventilation Study".
LAM 013389
DPMC-14686
8
WASH FACILITIES AND PROTECTIVE CLOTHING
Protective clothing (including slicker suits and boots) and showering'at the end of the shift was specified for personnel who had anticipated exposure potential to polycyclic aromatic (PCA) containing materials, e.g., slurry oil and coke deposits. Outer street clothing was not permitted to be worn under slicker suits. Typically 140 cloth coveralls were issued and laundered each day by the contractor. A single 34' x 10' shower trailer with 12 shower heads was rented at a cost of $700.00 a month. Disposable towels were provided by the contractor on each shift. Daily, an average of 15 employees showered indicating less than 100% participation. A separate outside wash facility supplied with soap and hot and cold water was made available to all shutdown workers.
POLYCYCLIC AROMATIC HYDROCARBONS "PCAs"
Anticipated exposure potential to "carcinogenic" PCA containing material was protected against by protective clothing and washing. To determine what concentrations of residual PCA that may be encountered during a CCU shutdown, selected bulk samples were collected on 9-16-80 and analyzed by liquid chromatography.
iSpecific PCA Pitch Off Top of Reactor Reactor
'Analyzed For Vent at 9th Floor
Floor Sludae
Phenanthrene
.101
.01I
Anthracene
<011
<01X
Pyrene
l.OOI
C.01I
Chrysene
.051 .01X
Bent (a) Pyrene
<012
.01 X
Sludge From Fractionator After Hvdroblastlng Trav #10
t.OIX <.011
.101 .02X
<.01X
The analyses presented above indicate relatively low levels of PCAs in the samples collected and reflect the decontamination procedures used.
PARTICULATE CONTROL
The contractor was required to use vacuum trucks to.clean off internal vessel horizontal surfaces on a daily basis. The purpose of this was to minimize re-entrainment of particulate matter into the work air. This practice was useful in all areas except the lower vessel areas. It should be noted that vacuum lines left in manways interfered with the use of ventilation access houses. Future access penthouses should be designed to better accommodate this need.
LAM 013390
DPMC-14687
9
SANDBLASTING - SILICA HAZARD The Complex policy of using an alternate material for silica sand was followed. ASBESTOS Personnel involved in asbestos refractory removal followed the Complex policy of using dust masks, disposable clothing and dust suspression using water. No monitoring was done for asbestos exposure. SAFETY RECORD - HEALTH RELATED INCIDENTS The primary contractor reported a generally favorable safety record during the 49-day shutdown. Foreign eye injuries accounted for 30% of all first aid cases, with the majority of these being associated with foreign bodies. No first aid cases were attributed to fume or dust exposure. This satis factory performance can be associated with improved ventilation and wider use of respiratory protection. A single doctor case which was reported is associated with a finger amputation during rigging in the Regenerator. SIDE-BY-SIDE FUME SAMPLING Table VI highlights the results of parallel side-by-side area sampling using PVC and "matched weight" MCE type filter cassettes. The results of this limited comparison indicated that under the conditions of use, the PVC cassettes showed results which were greater on 78% of the samples. Generally, the MCE filter results were 50% of the PVC. This variation may be associated with analytical and/or sampling variables. A more detailed study of field sampling reproducibility using different filter types should be conducted to better understand this observation.
LAM 013391
DPMC-14688
TABLE I
LAM 013392
DPMC-14689
TABLE I PERMISSIBLE EXPOSURE LEVELS
Nuisance Dust (Total) Welding Fume
OSHA Standard
15.00 mg/m^
_
1981 ACGIH Recommendation
10.00 mg/m3
5.0:1 inside hood
Criteria Used For This Study 15.00 mg/m3
10.00 Outside Hood*
Zinc Oxide Fume Cadmium Oxide Fume Magnesium Oxide Fume (as Mg) Manganese Fume (as Mn)
Nickel Metal (as Ni) Molybdenum, Insol Copper Fume (as Cu) Copper Dust (as Cu) Titanium Iron Oxide Fume (as Fe) Vanadium (as V) Aluminum Dust Aluminum Fumes Inorganic Lead Dust
and Fume (as Pb) Total Chromium (as Cr)
5.00 .10
15.00 5.0 ceiling
5.00 .05 ceiling
10.00 1.00
1.00 (.015 mg/m3
1.00
NIOSH proposed)
15.00
10.00
.10 .20
1.00
1.00
15.00
-
10.00
5.00
.05 ceiling
.05 ceiling
15.00
10.00
- 5.00 .05 .15
1.00 (.001 mg/m^
NIOSH pro posed for CR VI)
.50 CR III .05 CR VI
5.00 "lS/m3 .10
10.00 1.00
1.00 10.00
.10
or
15.00 5.00 .05
5.00 .05
.50 CR III .05 CR VI
5,000 100
10.000 1,000
1,000 10,000
100
15,000 5,000 50
5,000 50
500 50
*10 mg/m-3 accepted as the permissible exposure limit for total welding fume where
breathing zone samples are collected outside welding hoods; assumes that a reduction of 50S is provided by welding hoods. Equivalent criteria used during the 1978 DPMC CCU Shutdown.
LAM 013393
DPMC-14690
LAM 013394
DPMC-14691
LAM 013395
DPMC-14692
TABLE III
MEASURED TOTAL FUME CONCENTRATIONS FOR SELECTED WORK ACTIVITIES
REGENERATOR
1. Welder arc gouging out dip legs at 6th level
Personnel
Number Samples: 3
Ranqe mq/mo:
5.3 - 15.3
Mean Avq. Cone: 8.9
Area
Number Samples: 7
Ranqe mq/m3;
1.6 - 10.6
Mean Avq. Cone: 4.3
2- Welder helper in regenerator bottom during arc gouging
Personnel
Number Samples: 3
Ranqe mg/m^:
7.5 - 11.0
Mean Avq. Cone: 9.2
Number samples: 2
Area Range mq/m^:
l .8 - 9.7
(at 15') Mean Avq. Cone.: 5.7
Welding stainless steel support pads on cyclones at 9th level
Personnel
Number Samples: 4
Ranqe mq/m3:
<1.3 - 7.1
Mean Avq. Cone: 2.7
Area ( at work
level)
Number Samples: s Ranqe mq/m3: <.6 - 13 Mean Avq. Cone: 3.8
Area (above work 1 eve!)
Number Samples: 9 Ranqe mq/m3: 3.6 - 49.3 Mean Avq. Cone: 19.0
4. Welding and cutting inside regenerator cyclones
Personnel
Number Samples: 1
.Range mq/nw:
-
Mean Avq. Cone: 11.7
Area
Number Samples: 3 Range mg/nw: 4j _ 27.1
Mean Avg. Cone: 14.2
5. Welder working inside 40" riser at regenerator bottom
Personnel
Number Samd es: 2
Range mg/m3:
15-18
Mean Avq. Cone: 16.5
6. Welder cutting out air ring support at regenerator bottom
Personnel
Number Samp!es: Ranqe mq/m3: Mean Avq. Cone:
1 13.8
LAM 013396
*Each sample reported may be a composite of several measurements taken on the same employee or in the same area.
DPMC-14693
MEASURED TOTAL FUME CONCENTRATIONS FOR SELECTED WORK ACTIVITIES REGENERATOR
2
7. Welder helpers assisting in regenerator bottom during rigging, grinding, some welding
Number Samples: Personnel _ Ranqe mq/md: (one 70 mg/rrr Mean Avq. Cone:
result omitted)
5 2.1 - 12.0 6.0
8. Welding dip leg braces 2nd level, 6th floor of regenerator
Personnel
Number Samples: Ranqe mq/nr: Mean Avq. Cone:
1 3.6
9. Area measurements collected during various work phases in the general work area in the regenerator lower levels
Number Samples:
Area Ranqe mq/md: Mean Avq. Cone:
24 .99 - 38 5.4
THIRD STAGE SEPARATOR
10. Arc gouging swirl vanes out of separator
Personnel
Number Samples: 2
Ranqe mq/md:
33.7-41.2
Mean Avq. Cone: 37.5
Number Samples: Area 1 Ranqe mq/md;
Mean Avq. Cone:
2
20.6-23.2 21.9
11. ;Welding new swirl vanes into separator
Personnel FRACTIONATOR
Number Samples: 2
Ranqe mq/md;
2.3-9.3
Mean Avq. Cone: 5.8
LAM 013397*
12. Monel liner welding inside fractionator column
Personnel
Number Samples: 3
Range mg/m3:
<.8-2.5 Area
Mean Avg. Cone: "T74---------
Number samples: Range mg/m3: Mean Avg. Cone:
11
,8-12.7 4.6
*Each sample reported may be a composite of several measurements taken on same employee or in the same area.
DPMC-14694
REACTOR
MEASURED TOTAL FUME CONCENTRATIONS FOR SELECTED WORK ACTIVITIES
3
13. Welding on new 4th level reactor wall
Personnel
Number Samples: 2 Range mg/m-*: 1.4-2.4 Mean Avq. Cone: 1.9
Area (above work
area)
Number Samples: 1 Range mq/m^: Mean Avq. Cone: 3.3
14. Assisting welders working on new reactor wall
Personnel
Number Samples: 2
Range mq/m3:
.82-.84
Mean Avq. Cone: .83
15. Assisting welders arc cut out dust hoppers
Personnel
Number Samples: 1 Range mq/nH Mean Avq. Cone: 3.9
16. Arc gouging out dust hoppers/distrib. head in reactor bottom
Personnel
Number Samples: 6 Range mq/mJ: 2.3-13.3 Mean Avq. Cone: 6.5
Number Samples: 6 Area Ranqe mq/m-*: 1.3-15.4 (8-20ft Mean Avq. Cone: 7.8 from welders)
17. Chipping inside reactor cyclones
Area (above work area)
Number Samples': 4 Ranqe mq/m^: 5.5-12.3 Mean Avq. Cone: 8.4
Area (above work
area)
Number Samples: 4 Ranqe mg/m-*: 2.5-33.4 Mean Avq. Cone: 19.4
*Each sample reported may be a composite of several measurements taken on the same employee or in the same area.
LAM 013398
DPMC-14695
TABLE IV
LAM 013399
DPMC-14696
MAXIMUM FUME/DUST CONCENTRATION MEASURED AND ASSOCIATED WORK
*Measured c o n c e n tra tio n s determined to be in excess o f p e rm is s ib le exposure lim it s - See Table I f o r lim it s .
X 0J X f-- JC 0} 4-> S rC--M o> -C e CO o
sai i- c o> iX f-- a; i-- S a) c a) o > s >> o <o c sc o +->
X QJ x r-- JC ai 4-> 3 CM QJ JC c to o <o i-
QJ s<D- Tcx -- a> r3 ca> <D O > z: >> o <0 13 C L < D4J
S-
OJ o
C r-
4<-a3
-X c
o
O i-
3 4->
u
i- <T3
0) s.
X u.
03 3**"
0) s> 0) oc -Q i<0 r--
- LO o
4O) o C 4-3 *i" <0 ^c s- o o *3 4->
o s- ra QJ SrX--? LU o> c 3 iqj s> 0) oe -O -rft) r-- -c LO o
So> o C 4-3 i" <0 .x c s- o o i3 4-3
o S- (0 o> Sx ua> c 3 "" 03 S> a) .oa tc(O r-- -C LO O
&CD O C 4-3 *r- fO .X e s- o o -f3 4J
u i i- to
<u s-o Lu r-- 03 C 3 i(V s. > 03 oc JO <0 r-- -c LO o
11 x <o t-- c 03 O J4f^ >ra ruo L. S. 4-3 Ll. .
JC C 4-> f00 1-- S1 <u CM C i-- *f*
c f- c
o <o <U cr> Ss- c o <c - 4-3
s_
I
o 44
*o (0
t-- c
ao
3 f-
4-3
r>s v
S. L. 4-3 Ll.
JC C 4-> tco i-- L.
1 03 cm e r-- p*--t-- c - c
o <o a> cn s- c
cn c c
IT)
Q. rs.
ir>
r^
co
co
co
E<o UE
CO f->
co
to r-*
to
CO E
CZJD
CC
O
<c x
z o
+aj;
u
oCL
0)
a:
(/>
eac)
<0t3) <S-
ro-- V
O V
oLO
oLO CO
O
00
lo o o r-
oCD r--
Oo CO
1
C "D
i--<D iO-Ot/>)
C 4-3 3
O <J
S tSo- XoJ
c U. i-
o
CDct- oOl
tC-
1-- u
a --
<13 3
rt<Cd---
iO
4-3
1
Its
c "a
i--<U iO-- 0</)l
C 4-3 3
OO
S C
U<s0-- *soD-
o
03 fc-
o
03
tC- s- 1--
*--o
0c)
u
3aC)
rf--
o
4-3
C XJ
r-- o QJ *--
0</)>
C 4-3 3
ou
Z C
Ucs-- oio-
o
Cl*cf" CoD
1c- S- --
X-- 0C) l-*
03
3
f1---
o
4-3
<Co X
1--QJ TO*
<D
10
C 4-> 3
ou
Z fix
s- o
C Ll. i-
O
031c-
o
03
fC-- L 1--
x ai
r- C i-
QJ i- O
3 f-- 4-3
1
to
CX
f-- O QJ
CU *r 10
C+J 3
SO <Uo x
s- o
c u. s-
o
Olic--
o
03
C f--
1- s-
X 03
r-- C S-
3QJ ri--+OJ
1 to
1-- CO X03 03 i- to
It13 CX rQ-J o- taoi
<C0 X 1--QJ O-- 0</3)
1
C 4-3 3
SOI
U <0-
XO
CU. L
C 4-3 3 oo S X
s- o c u. i-
oC 4u-3 3 Z tOTJ
s- o CLl L
Oo o
co 031" 03 -C1- s- 1--
Oilc--
o
03
C 1--
1- s-
01c^
o
03
C*- s r--
X1-- 0c3 s*Q) *- o 3 -- 4-3
X QJ *
r<-U
3
11--C-
So-
4-3
X QJ *
r- C S-
aj
3
f*--
o
4-3
a. cCoD
ccro
CCOD
LO
10
in
10
e <v
CtOo 1E--
LO
10
1LO0
CCOD
Ooo
O o
ro--
o
o
o
10 V
V
s-
<3J
Q.
*
oo
o o
O o
ooo
C\J CM
o
r-s.
03
QJ 3 E LU
1--
3 o 4-3
03 LU
a>
<o 10
Q)
E L3l. a> X X o o t-- PM
03 Xf-- X o E f3XE to o
Xr-- X o E t3-- (O QJ C too>
03 E 3 Lu QL0J QJ C to o> to z:
r-- to 4-> 0) z:
0) o z
l-cH
3 Q
*> aj
EE
33
C LU
QJ
X S.
JC >>
C03L CL
Oo
z: <_J
" E 3 to 4-> 1"
E 3 LU 0) X X o o HuH
E 3r-- X 03 >
LAM 013400
DPMC-14697
MAXIMUM FUME/DUST CONCENTRATION MEASURED AND ASSOCIATED WORK
*Measured c o n c e n tra tio n s determined to be in excess o f p e rm is s ib le exposure lim it s -s e e Table I f o r lim it s .
S-
o 1 4-
C
CM
O
r-- i.X O
*3 tO -- C a; o
5 *4->
>) a
c
CL
Q.
Q_ 4-> CL r-
a. 3 CL
O o *r _c
u
(0L. 4->
o <o
fO s- i-
XT
c l.
o
Su_
*
<o CJs c o
4-> LU
U 0) *o
U OJ o
O OJ
10
CO *
S-. f V 4-> "O o f-- tC 0) sX u.
0J C
> i-
- 4-> T~ i co -- s-
i oj CM
r--
t/5 CO
oj c c fw r-- a; uc
>> O U "O
</un
<ODfC-
o *-- oj
L> >o uo
O co
5 w
O "O cn
c oo
CO
s<U- co
"O r-
QJ tO 3: 3:
E i-
CO
S<u- 'CO
*o
a> <o 33
E S-
CO OJ
w -- <U U
>5 o
u "a
o jQ U iO <D
T-
<0 o
CJ >c
0> 1s0- x-
>
o
oo S- 4-> M- O
oo U 4-> +- O
0)
>
-- *C--
gj S-
o JD 0J
5- O T- f--
to - QJ
eO - OJ
o *-Q 0)
LO 1--
<C
< J3
co ac co o: c -a
CO *r-
f- 2 r CL E a> to E co --
h-
5
CO
E 'v. CO 3
IO <T3
o: "O
o QJ f- 44
< s-
zo o CL 1-^ 0J
co
o
< CO
QC Lu
4-4 r--
3 lO
aj
QC
O to O CJ L-
--
L. 0) O f- O
0J sco O 4** Z <0
co O *r-
4-> -a cnu a) C rtJ to i- S- 3 a lu i-- -o CJ O 3 f- S-
3) " *- s: r-- w
CL EO to E LO f-
1--
LO LO
r-- . OJ o
co Oo CO CM L.
0) a.
1
1 i 1
IT) r**.
o CO
. CJ O - CT> r--> ,>
0) sO O 4-> s:
O O f-
*U T3 cr.o a iO to r- 3 -O Lu i-- *3 CJ O 3 L-
co
o o
o CO
ID
CO
to VO
O
CO
00 CO
CO
O oo o
r>-- r--
CM VO CO
f0--0
r-x ID
CM
CO
E 10
CD 3 3
u CO o to 4-> -O
oo
r-- r--
r-- r-*
to to
3 3 4*
c 3
r*
r- -
O
O o f--
05 05 -O +->
-o <0 s-
E
CE
E i-- CJ 3
CJ 0J
i- O
*r- O *r- O
0*0 0
CO 4-> CS CO
0)4-*
CD4->
05 4-* JC r--
o s-
r*
1
3 -P
3 4->
3 4->
CJ u
H o O
OO
OO
OO
s- S o
o CL o r>*
05JO 05 -Q 0) CL
<o
t
4-> Ct5 CL
UJ CO
cnuj
u i-
o s-
U S- 4J IO O
CO c
s- o
S- o
i- o 1- -C
to i-- CD
rC +4
to 4-
to 4-* t+- CO
4-> TO
U O o OJ <15 4->
r-- *t--
U to
S. to
&- to
Q. V5
3 <L> tO
r* <U
t-- <1>
t- CJ
- -r- 3
to 3 3
<cc
< OS < a:
a. i-- "o
0)
a:
,w"
ID CD CO co co ID CM
O o o o
o o
CO CO o r" CM r--
4-4 CO
to 3
3Q
"O OJ to
E OJ
3 -J
LU
o
E
t-- QJ
E
3
E
3
to 3 r--
r--
LU
E
E UO
3
O -O
L.
r~ JC
< --i #o o
<U
E
0)
3 Lu OJ
E "O
3 OJ r"
OJ E
Lu "O X r-
3 LU
OJ X
*o o E
OJ
3 i/i
E r~
CJ
3 t/>
OJ to
o E <U
*o E
r-- to to 3 fO
N u s: lu
LAM 013401
r-- o C/5 i--*
to 4-4 E OJ 3 z
OJ r-- *o OJ J2
>, o r--
O z
DPMC-14698
Measured c o n c e n tra tio n s determined to be in excess o f p e rm is s ib le exposure lim it s - see Table 1 fo r lim it s .
Cl r-- cn 3 o 01 i-
o U 4-> S- 3 3 JO
r** tO Si. 4J 3 to X r-- "3 3 5
o
O C7l
L
- i-
U -3
O
CM JS
o> c f" O. Q. *r -C o
#>
to 3 0) ~a TO tO -- c U T>> 3 <D
c 3O
>X
O -Q O
3C r*
-3
CO .O
or
f--
O)
3
O or o
r*
o +->
S- 3 re .a
f--
CO i.
4->
3 to
X -r-
r-- *3
a)
2 H-
o
E
O Cl
S_
tf- **-
u
- to
o J-
cm
'
cn r-- CL O. r" -C 3
*> to 3 0) "3 *fO to r-* o 20 33
3O > "3 o -O Cl to
-3 OO J3
3)
CL CL
-C u
* to 3 3 "3 E " O to i-- O f>5 U OJ
3O > -3 O -Q Cl 40
*T*"
-3 CO
cn r* CL OL
p~
-C u
* CO 0) a) *3 C fO to i--
> 33
3O > "3 O _Q Cl ro
-3
CO -Q
cn r* cn 3 O Cl
o if0
to i3 tO "3 r-- p-- r-- 33 25
E SOO S*4- (J
40 -3 CO Z
Ol c r* o 3 O Ol
u i40
3 > o jQ 3 tO
Cl &. 3 04-- O r- CL H- *-
3 J 4J <4_
tO O
S- 4- O
40 Ol
o **3
6 r*~
O3 4-> 3 -t->
O iO
+->
>> 40
s- s- 3T
O O (0 4-> CL
40 CL-
t- 3 tO 3 to i--
C 3 Cl Cl
Cl e C 3 i-
a: x- s.
Sampling
Time (M in .)
REACTOR
(R esults Reported as ug/m3)
Sampling.
Time (M in .) Area
MAXIMUM FUME/DUST CONCENTRATION MEASURED AND ASSOCIATED WORK
o O LO o o
U1 CO
co co
o VO CO CO
**
o Oo o
r>. o CM
r-- CM LO
V
1
o "3
Cl 3 > i-. 3 Clr-- 3 O JZ C>4->
LO 3 i- to 3 -
3 l. a f- o co
S_
o +J (J 40 3 ce
CO Oil-- O r-- I-** Cl 1 3 UJ O CTO
o 3 ad u 40 *
r-- *r" (O
C?
1 2 o 3
Cl 3 C> r- 3 cn-- 3 O - Cl -L->
in u u to 3 S-
3 S- E *4- O co
1
* oo o CM CO V
to
*
B o
4-> 4->
4-> *r~
3O E
E -Q CL in
i- S-
3O
C-4-> 3
33 3
40 O
"3 3 3
3 a: O
> Cl
OB
EO o 3 L- s-
Cd H- 40
1
* o CO
Cl pOlf-- 3 -- O 40 Cl 5 U is- o to *P
3 S- 40 r-- 3 < ad
tn CO :
r-% to
1
co 1
o 3*
oo co r-"
CO
E *^s.
Cl E
E
3oo
4->
to 4->
Qd 40 4-> O M O
O
3 -Q
3 JO
I-- "3
e 3 Cl
C1 S-
Q
O
co
UJ S- r- +J f- 4-1
zo
Ol 3
Cl 3
UJ CL 3 S- 3 S-
<3 3 O 3 O 3
UJ Of
Cl
Cl
O' 3 3
to 3 Cl 3 Cl
+* U 3
3
3 c cn < ca
to
3 ad
o' to
o CM
Personnel
ooo ooo
O O
ooo 1 o oo o 3"
o
r--
4->
to
4-1 to
3
to 3 O
3E O3
U.
3 E
33
E 3 U-
3 XI
LU E
EE
3X3 3
S- r" o
3c
X r--
Q. 3 3 B
. 4-> o
3
O r* s_ 3 t+--
o 1-- --4 > <
* o o
1O o CM
r--
4-> to 3 O
"O 3 3 _J
3 f- 3 E 33 ClLu U O -O HH 40
E 3
E O i. _c o
LAM 013402
oO oO oo in CO
3 E 3 3 Ll. E 33 Lu X r 3X Xo XE o3 r uE X T- 3 M <3
DPMC-14699
*Measured co n ce n tra tio n s determined to be in excess o f p e rm is s ib le exposure lim it s - see Table I f o r lim it s .
OT c
o> 3 o CD
u Lro
a) > o -Q o> <0
S- "O o O 11-- L. Cf O)
,,C "O +4 C co <o
a> c
so 2
s~ a; o r-- <U CO 2 QJ
CD o > I-- ou -O >> <c o
-c CO o *
o
o> c
-X So 2
s0) "O
CL) 2
0) to > 0) oc jQ O <o --
(J - >, CO o
cn c
i. o 2
to s. at <c o a; i-- L. 0) (O 2
c * a) "O oc r- <Q u > 2 oo
c a> t-- X3
Ol C p* -X LO 2
t/) Sa> to o a r-- iat <o 2
c a *r-- O) c *o oc ru > 2 <J o
c a> P*H ^
c o
CD c
-X L. o 2
u
o
0) 2
0) > 0) oc JO o ro r--
U - >, CO o
c o
CD r-
So 2
L. 0) "D r--- 0) 2
0) > a) oc oo tO r--
(J "CO <J
O) C
C t-
CC
O co
Cl
$>
OUJ
<0 co **-
CO CO CO CO
CD
ID CM
CCOO 0O0
<
00o
o CO
* ooo o CM CO
CO
IX)
o
o CNJ
o o CO
< CO
cm in
o
CO
E o
LU CD
CC 3
r?
CO to
c |Q
LU CC <3 "O
H*
0) 4->
0) 1 U -0*0 0
C +J O to -*-> s- s,, O) 0) </) c
E*c 4 <Q " CD
E P o C (O+J O 4-> O) o CTCJ3
c **r- -- S> *o O
E o L- 4-> 0) 4U
*3 4- o 1-- rO -O <u 2 OIL
co
CD a) c JD f-
"O O 4- f-
L. Sto o) o 4->
a; i-
u S- l IQ IQ
L. *(O 0) S- d) 0)0-o CD^* i-- a> -- a) a:
E
O 1 L. -0*0 0
4-* O *i" <Q PLL
CD 0) to E *D 0) f0 *- CD
1
<Q L-
0) 0) JO
0) o o> 4J o
a: to * E"0 4J
(Q *-- to E
O rr' sUJ o
CO Q.
< c LU <D
a: O111 cc rv to
UJ 44
o
0) *o 0) X3 a:
*o -o c E a> a> **-- o cr>*o CDf-- CD4-> f- O) c o CC
-- C 4- . 0) *i" (Q
2 i0) cu EC
U O 0J r- S- CT 4-> x: aj
UO U CC
CDf- *M C CD to
*- 3 S+J O 0) to CD C f-- O)
to U O) to L. 0) <<Q
-Q "D 0)
CD ^ O)
X) CD E 1- 0) 0) o cnx o 4-> C)r- 4J T- Q) o
OC 2 T J3
CD to O
C +4 i-- CD +J p c o a) tO *r* O i--" r- CD a. to 3 U B to O O fO < Q>4-> to
a>Q a; -Q CC
*0 "O p E at G) IQ o CDX +-> CDr- 0>4- f- 0) O 0 3 *- -O
0*0
O
-Q CD4->
* +4
o *o *- O 0) 0) "O -O
0)*0 CDr-- t- L.
O L- O CC 3 0)44
z
o to
o O ----
CC
o> c
CO
CO Q.
in l *d" in cm
co
oCM
CO CO
E a;
<0
LO f--
oo oo
o o
o oo o oo
oo o CO Cn.
o
cn
o o
o o
CO r^.
CO o
a> *u
X o
3 f* to a) 0) CD to 3 S LU
o
to
0)
E 3
r--
LU to
*
44 " E
ai O) 3
to 2:
Q) 0) r-- "O
tQ 0) -O
CD u to f--
>> r-- O
zs
44 to 3 a x. a> 3 LU
L. QJ CL CL O CJ>
3
to U) r" h-
LAM 013403
0) 3 Lu O o X o c o u
DPMC-14700
MAXIMUM FUME/DUST CONCENTRATION MEASURED AND ASSOCIATED WORK
Tabl e
4-> 4->
33
n
cX c c oc o o
ro
43-> O O
O to to
cn s-
cn cn
OJ O)
co
CO
c
c
CO c c
r- 4->
s-
r*
*r--
oj ro ro
.X ro
OJ
_X
.X
c >>
S- iO QJ
x r--
S- to OX
s- to oX
fO >
,_ r--
5C OJ
to cn S- OJ
0J O) cn
5^ CL
to S- 4->
3
rO CL
to
t- 4->
$-
s*r--
t2o
5
to
4t-o5
oj cn x
r-- 4->
>C O t_Q X
O) sxo r-- Q.
OJ U Xo 1-- Q.
CO
ccn
ccn
E r-
OJ 03 3
to E cn oc S- -r- E <+- S- o
4-5 - s- 4->
ro c r-
S- So cn o -- OJ 0- r--
CL
_C o
0J Cl
33 to
O) > OJ oc jQ O ro r--
U
OJ Q.
3
3 to
0J > 0J oc
JO ro
r--o
U
cn
oc3n
cn
o
c3Ocr--nn
cr--n Oc3n
r--
MoS--
<OSc- <Oi- --<
in *r- o i-- rO -Q
4-5 OJ to CL
" >> CO u
CO
>5 (J
cs-
CO C
C tm in CO CO
CL r-- CO CO <Eo QJ
to *-
0o5j
CO in OJ i
to
E
.
ro 0J J<
,,__.. CO E \ cn 3
to
cn ro o
!-- TD < 0J or 4-5 LU S-
o LU Q. <3 0J LU Ct
to 4-5 r-- 3 to OJ cn c cc c **^__' r- s:
CL E O) ro E OO -r-
H
* oO
o m to
E
to O
U 4->
0J 4->
Xr---
4-> O ro -O
0J
3 cn sco
cn r- 4-5
c cn ro
3
4-> O 0J
to cn c
r* 0J
to u cn
to s_ 0J
C CC
1
ro SO) 0J JO C 0J o cn 4-5 0J
cn
to "O Ec ro O *r- E 0J O JO cn 4->
C 4-> *0 "O !- o QJ QJ "0 JD cn*o c CHr-- -r- S_
v- QJ L O o: s cn4->
CO CO r*^ r*^
O tn
i
QJ "O S-
JO c o r-- 4-5
o s- ro P DL
0J
to "O = E -r- 0J
ro O cn
0J 0J
.O GC
"O *o c E QJ QJ r- o
cn"o
4-5
cn-- cn 4-5
V-
cn
0J c o 5 *r- JO
CO r^
* o in o CO
* E to o s- 4-5 *--> 0J 4-5 0J *u C O -- n JO CL 0J cn U ro c O to cn f- 4-> c cn ro * r- 3 S- C 4-> O <u*r to UlC r-- QJ to o cn*^to i- oj 'O' < ro o;
O Csl
*
- QJ
O
o
o
o
C c
o
o
o
o
oo
o cn
to ID
CO
f--
s_ ID
o>
Cl
--^ TO
0J ro E <D
3 __
u_
O
EE
r- QJ
33
cE
r-- C
fO 3
X r--
cnLi_
ro E 4-5 5-
C 3 to o *o
ro r- 3
cc
> < Q -- ro
E 3 n
E o s_ _c o
o o
o N
oo oo
oo CNJ VV
o 0J ou
3 o to cn O r-- Cl
X
CO 0J
cn E
o cn h~* 3 r--
< S-
cn to r-
<x ro ' 5
CL to
UJ XJ
in QJ cn
4-5 c
UJ U 1- 4-5
CD o cn 3
< CL 3 o
1-- tn
0J
cn
o cn to
oj
o to o c
c: 4-5
u <o
l-H r--- < >
3C 3
h- to
QJ
r--
n~ S- -Q S- f-- 't-- r" to
ro to to
cn E
cn c S-
c
r- 4->
XJ
1 cn 3
0J CL
3O
0)
4-
o cn to
0J oc S- ro
<>
3 to
.X QJ u c: ro ro J-- >
O
to to 0J U X
0J
0J cc c
r-
0)
in
(O
O JD
CO CO r--
O
4-J
oO oO
1 oo 'O' r-
CJ
0J
3
E U_
3
0J u. 0J
E 3
XJ 0J r"
U_ " ~o
X
r~~ o
OJ "O
x oE
f* 3
X E r--
o
3 to r- OJ
CJ E c c XJ cn
*r-- ro ro
M O s:
XJ QJ C r-- oE o S QJ o 4-> o 0J oX
r-- to c o
4-5 ro S4-5 c 0J QJ u Ec 3c Ll u
CD X to o; 0J L. c3 ro to C7> ro C jr rO IE
DPMC-14701
LAM 013404
to 0) c >to r*" Sf"2to
CD C
on
3
O on O 4-> i- 3 do
to CD c t>o r-- S-
t2o ocn on 3O O <J -t-> S- 3 do
to <D c ta >
,___
Sr*_ t2o
O) c
CD
3
O on
O S-
4->
3
do
to co> >to
s-
2to
on
T--
CD O3 on
oS-
*-
3
do
to 0c) to >
Sr"t2o
CD E
CD O3 on
O S-
*P
3
do
to o c t>o
--
L.
t2o . ' CD
c
on
3
O on
O$-
4->
3
do
1
to <D to > r-- U
<2/>
on
on
3
oOn
O i.
4J
3
<O
THIRD STAGE SEPARATOR
*Measured c o n c e n tra tio n determined to be in excess o f p e rm is s ib le exposure lim it s - see Table I fo r lim it s .
Q.
E <U <0 E
</> T-
eCsMi
CoVJ
r*N CM
o3cc LfdQl-J
<t0io.) om
toCoM
* orC-M*
oCO
ooo4c
CM
1 oCCOO
o
o
c/> 4->
oo
333 3 3
3
od O O O O O
*, CO
E
on 3
to to
-o
a> +->
so-
Q. 0) CXL
to to
o> a ce to to >>
to to
o <D to to >>
to
0) to >
r-- i. S- s- s_ t-- *p-- " f*
2222 2 co to to CO CO
CD on on on CD
C
*t-- T
T*
on CD Ol on on
3333 3
OOOO O
on on CD on O)
CO ac to > s_
5
o
CD
c/1 o o <J L> u s- s- S- S-
<ddd d
3
(/)
<D
cc
CD C
oo C i-
ZD o un
Q. co
E 0>
1t/o1 *rE--
in co
o
dj-
*
oo
o o
*oo
o o
*oo
*
o
CoM
S-
o o
CO
o
d
r10
oo
CL) r*-
a. CD
oo ooin
rC-M*
o
ttoil c
to > 2
CD
3 O
CD
dOs-
in
co
*
oo o o
l/l
r-- to
"S.
01
EE
L3t. 0>
Cc=D U3.
to _oJi
0) E U3.
d) s:
3 U3.
E
<D .X U
01
-*Qo r>--i too
Sa<D-. -u O. to
3
to
sO:
O3 OQ
t--
-ro" X o --OS-i
E 3r* *o to t0 5>
E
3r"
E
3
-lMO
-- 3
dQ
ur- "O (O to So-n 4-> O to *- Q3
E *3r" EOS-
DPMC-14702
LAM 013405
TABLE V
lam 013406
DPMC-14703
LAM 013407
DPMC-14704
RESULTS OF PARALLEL AREA SAMPLING WITH PVC AND MATCHED WT. MCE FILTERS
o
00
oCM
con
o
to
oCM
o *3*
o to
oto
o o
CM
Q)
So_
o
o to
O CO
Oto
o *3"
o <3*
O CO
o o
o
CO
o
00
o > <1-1
o CoO
o o--
o o CM
oO
oo--
o CoO
o oto
o oto
oo to
cnu 3 s|
o o
o o
o o
o o
o oCO
o o
oo o
o o
o o
CO
tO
to
*o
0) o > Q-|
'
o ro--
CO
o Cro"M*
o o r("X)
CoM to
o CM r-*
ro** CO
o oCO CM
O O 3*
o o
00
Lull C_3
oto
s: o>
oo CO, r^ to CO
oto CO
O CM CO
o CM
o o CM
O o
o oCO
oo
oo VV
ooo to 00
<D
O
oCO
CoM
o V
o V
oCM
oCO
o
CO
o
>a.
LU o s
LO
*LO* to
attoo*
CtoO
CO CO
oto
StoH>
CCOO
*Cr>M*.
-C CJ>
Cr-D
> cl|
<!) 3:
ro
to r^.
to
cn to
CM CM
CD
CO CM
CO CCOO
to
CO r-%
E
+r-o> O
CT E Lull
C_J
cn
00
CD
z| CO CM CO
*3- *3CO r--
CM to CM to
I-- <v < CD
0)
cc to a>
0}
sLO o cn +->
<0 oc
o to 4->
uTJ S. oS- u. <+- *3-
oC> r-I
f" =S
a>
c to
* c
s- o
<U +-> **-- ft-o +-> oo. 4o -a to 40-1 -o io aj - > s- c <U -r-
cn to *c1- c
to TD
> <D
t- s.
0>
> 03
O to
T3 -a <u c
uM <73 at s-- 0)
u a;
CJC
aL-; +o-> QJ
S (/)
"O<QD,
r0--) <CoL
Q. t.
u sf- 0J fO 5
1--<U *irto~. f-- <o <TJ CL S<13 0) Q.-M
L, 0)0)0
>O tio/l -<MD
-Q ra -iC U Q)
LAM 013408
DPMC-14705
lam 013409
DPMC-14706
/
M-32-MG (BEV.-7.9)
ATTACHMENT I
Shell Oil Company <* Shell Chemical Company
Interoffice Memorandum
JULY 23, 1980
FROM:
INDUSTRIAL HYGIENIST
TO:
SUPERINTENDENT - MAINTENANCE - NORTH
SUBJECT: SEPTEMBER, 1980 CCU SHUTDOWN - INDUSTRIAL HYGIENE REQUIREMENTS
Supplemental Safety and Industrial Hygiene requirements for personnel who will be involved in the September, 1980 Catalytic Cracker Shutdown have been outlined in the attached guideline. The precautionary measures to be required during the shutdown are based on good industrial hygiene practice and address potential problem areas which have been associated with cat cracker shutdowns. Recognized potential health hazards which have been taken into consideration include airborne catalyst dust,"welding fume, noise exposure from grinding and chipping, and exposure to polycyclic aromatic containing materials such as slurry oil and residual coke deposits. Additional require ments or modifications to the prepared guideline will be specified as experience is developed in this area.
Individuals involved in the CCU Shutdown should be reminded to wear the appropriate type of respiratory protection and protective clothing. Air-supplied respirators are to be worn ~ by personnel performing welding and arc cutting; other personnel are to use air-purifying masks as specified. Efforts should be made in so far as practical to minimize skin contact'with slurry oil -during the initial stages of opening lines in the fractionator slurry system. Crafts should be informed of the hazardous properties of slurry oil as covered by the attached material safety data sheet.
Vacuuming of clothing and adequate washing by personnel is recommended before eating and leaving work. Other precautionary measures not specifically included in the attached guideline which will aid in minimizing exposure potential include improved ventilation, and the periodic vacuuming of settled particulate.
Questions concerning the required precautionary measures should be directed to the Safety and Industrial Hygiene Department.
P. J. Snyder PJS/gri
lam 013410
DPMC-14707
Cat Cracker Shutdown Industrial Hygiene Guideline
Respiratory Protection Requirements
A. Available Equipment
1. Scott full-face air-purifying mask with high efficiency dust cartridges (Part No. 652L)
2. MSA full-face constant flow airline mask with attached protective weld ing lens (Part No. 461-699 and Part No. 449-646)
3. MSA half-face constant flow welder's airline mask (Part No. 460-862)
B.
Contaminant or Activity_____________
Minimum Respiratory Protection
Vessel Entry
3rd Stage Separator, Regenerator Reactor at all times including - cleaning - preparation work - inspection - observation Fractionator & furnace during dust generating activities
Cartridge Dust Mask (No. 1 above)
Fractionator and Slurry Oil System High boiling aromatic oils
A. If a heavy cool liquid: None normally required.
B. If a solid requiring chipping:
Cartridge Dust Mask (No. 1 above)
re
Sandblasting - Non-Silica Containing Grit
*
A. Sandblasters:
Blaster's Air-line Hood
B. Helpers, Transients:
Cartridge Dust Mask (No. 1 above)
Cat Cracker Catalyst Dust
Cartridge Dust Mask (No. 1 above)
1
LAM 013411
DPMC-14708
' Contaminant or Activity
Welding
Stainless Steel:
- Hex Metal (chrome) - Plenum - Cyclones - Fluffing Lines - Precipitator Clips - Etc.
Minimum F.esniratcrv Protec; ion
Inside
Welders:
Airline Mask (No. 2 or 3 on the previous page)
Helpers, Transients:
Cartridge Dust Mask (No. 1 on the previous page)
2. Use of Wash Facilities and Protective Clothing
A. Appropriate protective clothing, to prevent skin contact as far as practical (including slicker suits) washing after incidental contact and daily showering at the end of the shift required for all personnel who have anticipated exposure potential to polycyclic aromatic containing materials:
- All cleaning, preparation work inside vessels including fractionator, and on slurry oil system; removing or washing slurry oil and coke deposits.
B. Appropriate protective clothing, to prevent skin contact as far as practical, washing after incidental contact, and daily showering at the end of the shift D'.ade available.
- unflanging slurry system lines
- slurry system pump removal and cleaning
- ancillary factionator personnel
- etc."
C. Vacuuming of dust on clothing, washing prior to eating, and Leaving work , required for all personnel cutting, grinding, welding or otherwise exposed
to chrome containing metals.
Vacuuming of clothing by other personnel recommended but not required.
0. Where asbestos is encountered, special precautionary measures will be imple mented which are consistent with the Shell DPMC Asbestos Safety Order.
3. Hearing Conservation Measures
Contaminant or Activity.Required Protective Measures
j Arcing, Grinding, Hammering. Chipping
Appropriate hearing protection required. By personnel directly involved in these activities and in the immediate vicinity of the noise source.