Document LKrnzjzQENBypqB3yQBwNMb8z
W. G. Krummrich Plant Sauget, Illinois
August 22, 1968
Aroclor Expansion - W,GK (CEA 1800) Risk Analysis__________
D. C. Armstrong - WGK
lX- -Brawley - WGK
M. S. Feld
- WGK
T. E. Greenman - WGK
C. W. Hamlet
- WGK
J. R. 'McClain - WGK
R. M. McCutchan WGK
J. W. Molloy
- WGK
P. Verna
- WGK
H. S. Bergen
- G.O.
D. B. Hosmer
- G.O.
R. E. Howard
- G.O.
R. M. Kountz
- G.O.
W. A. Kuhn
- G.O.
R. J. Stratmeyer - G.O.
M. E. Gibbs - 2nd St. R. H. Munch - 2nd St.
Attached are the Aroclor Expansion - WGK (CEA 1800) Risk Analysis Data Sheets indicating the major and minor risk considerations in this start up. Consider able preventive action has been taken to minimize the risk involved in the major problem areas.
If there are questions concerning this analysis or any of the risks indicated, do not hesitate to contact the appropriate representative of CED, Research (PR&D) or Manufacturing.
M
H'. F. R; Mfg. Re;
ap Attachments:
R. S. Yates Proj. Mgr.
oie*7*i
TOWOLDMONOQ45232
1.
Specific Potential Problems
rH
Threat
.p
1. Raw Materials Received
Probability Seriousness
a. Biphenyl
1) Variation in quality . a) Moisture contaminated b) Impurity level
2) Availability
6.0 3 180 30 1 30 50 9 450
10 10' 100
b. Chlorine Snift Gas
1) Variation in quality a) Impurity level (Bromine) b) Sulfuric Acid content
2) Availability
100 9 900 100 9 900
5 9 45
10 10 100
c. FeCl3
1) Particle size too large or too small
2) Moisture contamination
3) Availability
'
d. Lime
5 5 10
5 25 10 50 10 100
1) Availability 2) Moisture contamination e. Porocel
5 10 50 5 2 10
1) Availability 2) Moisture contamination 3) Particle size too large or too small
5 5 10
10 50 9 ^5 5 50
Raw Materials In Storage a. Biphenyl
1) Moisture contamination 2) Storage tank freeze-up
10 10 100 10 3 30
018*722
TOWOLDMONOQ45233
2.
. `-
rH1
. _________ Threat^
Probability Seriousness o
3. Chlorinator Area
'
a. FeClq Mix Tank
i) Inadequate catalyst supply to #6 chlorinator '
5 10 50
b Chlorinators
1) Unstable product
20 10 200
2) Crude 1142 out-of-spec on Sp. Gr.
3) Inadequate biphenyl feed to #6 chlorinator
20 10
10 200 10 100
4) Inadequate temperature control
10
3 30
c. Intermediate Storage Tank
1) Cannot feed stills or head tank
10
3 30
2) Cannot maintain proper aging temperature
3) HC1 emissions
'
10 6 60 20 8 160
d. Blow Tank 1) Cannot feed stills at required rate 2) Cannot control level in tank 3) HC1 emissions *) HC1 is not removed to desired level
10 10 20 10
8 80 8 80 8 l6o 2 20
e. Off--gas system 1) Cannot control off-gas temperature
10
5 50
2) Drowning jet will not handle full HC1 load
3) High back pressure
*> Water in HC1 off-gas
10 10 10
8 8o 9 90 10 100
0184723
I
TOWOLDMONOQ45234
* 4. Stills
3. rH
.
Threat
' o3
Probability Seriousness o
1) Erosion and/or pluggage of reboiler tubes
30 10 300
2) Cannot maintain vacuum 3) Cannot meet forward flow color spec.
10 10
10 ' 10
100 100
4) Cannot control temperature
10 8 8o
5- Absorbers 1) Cannot meet electrical property specs
20
10 200
2) Cannot feed desired rate thru absorber
10
10 100
3) Canhot meet free chloride spec
10 10 100
6. Thermincl Furnace
1) Coil failure
10 - 10 100
2) Cannot provide adequate heat for stills 10
10 100
7. Housekeeping 1) Unable to achieve acceptable level
10
8 80
18*7?4
TOWOLDMONOQ45235
Aroclor Expansion (CEA l800) Risk Analysis Worksheet
It.
Potential Problems
4
Likely Causes
Prevention Take Preventive
Action or Accept Risk
Protection Set Contingent Action or Accept
" Risk
Provide for Information
Trigger
Contingent
'
1. Raw Matls. Reed. a. Biphenyl
1) Variation in quality
1. Anniston operation variances.
2. Tank car coil failure
1. Accept risk
2. Sample every car
1. Review quality variation with Anniston
-
Lab identifies off-spec material
2) Availability
1. Anniston pro duction out age
2. Rail Strike 3. Coil failure
in Associated
.Sales Stg.Tk.
1. Accept Risk
2. Hold Associated Sales & Dept. Stg. Tks. at least 80% full.
1. Transfer Associ ated Sales Matl. to WGK.
2. Notify Anniston of low Biphenyl level.
Daily Inventory Sheet indicates quantity on hand below 600M#
b. Chlorine Snift Gas
(1) Variation in quality
Chlorine Dept. operation variances
1. Monitor bromine content of KCL shipments.
2. Monitor number of DeNora cells on KOH.
3. Sample snift gas chlorine supply weekly.
Raise chlorination temperature to 195C.
1. High bromine content in KCL
2. High bromine content in Cl2 gas
<JZi<r9T0
2) Availability Chlorine Dept,
-J *'
outage
1. Accept Risk
2. Obtain priority to use revapor ized chlorine.
Accept risk
1. Notification of scheduled chlorine Dept, outage.
2. Low chlorine supplyppressure
TOWOLDMONOQ45236
5.
Potential Problems
v
Likely Causes
Prevention lake Preventive
Action or Accept Risk
| Protection Set Contingent Action or Accept Risk
Provide for Information Trigger Contingent
3. Chlorinator Areat
a. FeCl^ Mix T&."
1. Inadequate ' catalyst
supply to #6 chlorinator
1. System pluggage 1. Sightglass
1. Accept Risk
provided
2. Circulating pump
2. Manually add
failure
2. Motors alarmed
catalyst to
each chlorin-
3. Agitator failure 3. Temperature
ator
indicated in
4. Steam heating
field
system failure
4. Level recorded f
5. Mix tank is
on panel
empty
5. Catalyst flow
6. Catalyst flow
timer on panel .
controller
failure
S. Catalyst feed
valve alarm
for abnormal
position
Lab identifies ' unstable product
b. Chlorinators
' 1) Unstable product..
o
CD * .
WM
O
.
1. Catalyst doesn't 1. Accept Risk 1. Spare catalyst
carry thru chlors. 2. a) Catalyst
addition nozzles
2. Inadequate cat
tank level
provided on each
alyst feed to
recorded on
chlorinator.
#6 chlorinator
panel.
2. Accept Risk
3. Chlorination ternp.
b) Catalyst 3. "
"
too low. .
flow timer
4. Raise chlorina
4. High bromine
on panel
tion temperature
content in
c) Catalyst
to 195C
chlorine supply.
feed valve
5. Raise overflow
5. Vapor phase
alarm for
level in chlor
chlorination
abnormal
inators to de
6. Sulfuric acid
position
crease vapor
in chlorine
d) Catalyst
space.
supply 7. .Circulating
tank agitator & pump motors
6Y .
Ac!t cept
Rtl isk
pump failure
alarmed.
Lab analysis indicates off-spec material.
TOWOLDMONOQ45237
Potential Problems
v
b. Chtainators (Contd.)
1
2) Crude 1142 o out of spec on sp.gr. * fV
Likely Causes
Prevention Take Preventive Action or Accept
Risk
Protection
Set Contingent Action or Accept
Risk
6.
Provide for Information Trigger Contingent
8. Technology inadequate to meet corpor ate goals.
9. Continuous chlorination
technology in adequate to
2. e) Sightglass
8. Lab distill
in catalyst
crude & analyze
circulating loop.
results.
3. Chlorinator
9. Initiate PR&D
temperature
work to improve
recorded &
technology.
.
alarmed on
10. All the above.
panel
meet specifi 4. a) Monitor
cation on stability.
DeNora cells on KoH
b) Monitor .
KCL Bromide
Content
c) Monitor
bromine con
tent of chlorine
supply.
5. Accept Risk
6. Brink mist
eliminators in
chlorine supply
line.
7. Motors alarmed.
8. Accept Risk
9. Continuous chlor
ination demon
|
strated at
Anniston
1. Chlorine feed 1. Flow recorded
in each chlor-
on panel.
inator too high 2. Accept Risk
or too low.
3. Flow recorded on
2. Density control
panel. Low flow
system failure
alarm.
on #9 chlorin-
ator
!
1. Regulate flow
manually 2. Run sp.gr.
manually 3. Regulate flow
manually 4. Regulate level
manually
Operator analysis indicates off-spec material.
i
i
TOWOLDMONOQ45238
7.
Potential
. Likely Causes
Problems ^
| Prevention Take Preventive
Action or Accept Risk
Protection
Set Contingent Action or Accept
Risk
Provide for Information
Trigger Contingent
b. Chlorinators (Contd.)
3. Biphenyl feed
4. Intermediate
rate to #6 Chlor Stg. Tk. level
inator too high
recorded on
or too low.
panel. Hi/Lo
4. Level controller
level alarm
failure on #9
on Int. Stg.
chlorinator.
#9 Chlor.
5. Circulating
5. Motors alarmed.
pump failure
6. Operator will
routinely
analyze each
chlorinator
every two hrs.
5. Accept Risk 6. Have instrumenta
tion system checked for repair. 7. Redesign Sp.Gr. control system if not adequate.
.
3) Inadequate Biphenyl feed to #6
. chlorinator-
1. Biphenyl feed
1. Motor alarmed
Use Biphenyl
pump failure
2. Stg. tank temper transfer pump to
2. Line pluggage
ature recorded
feed #6 chlorina
3. Flow controllers
on panel
tor
failure
3. Flow indicating
4. Feed tank empty
controller on
5. Bate of charg
panel and at FeCl3
ing FeClg mix
mix & head tanks.
& head tanks
Lo flow alarm.
is too high
4. Daily inventory.
4) `Inadequate . temperature
control
oI-* ' 0-*r\d> .
1. Circulating pump 1. Motors alarmed
failure
2. Hi/Lo tempera
2. Temperature con
ture alarms
troller failure 3. Temperature
3. Line pluggages
recorded on panel
4. Air cooled heat 4. Two speed fans
exchanger fan
provided
speed too fast 5. High temperature
or too slow.
chlorine shut-
5. Too many or too
doTM.
few air cooler 5. Low temperature
louvres attached
fan shutdown
to controller
7. Chlorine flow
recorded on panel
1. Adjust number of louvres attached to controller.
2. Change chlorine flow rates
3. Accept Risk
j
Biphenyl flow
recorder indicates
loto/high flow.
Lo flow alarms.
Temperature
recorder indicates temperature too high/low.
TOWOLDMONOQ45239
8.
Potential
' Likely Causes
Problems
>
Prevention
Take Preventive Action or Accept
Risk
b. Chlorinators
(Contd.)
*
4) Inadequate temp. cont.
6. Chlorine flow is too high or too low.
7. Sulfuric acid in Chlorine
supply
4. Stills
1) Erosion and/ or pluggage of reboiler tubes
1. Lime-catalyst slurry at high velocities
2. Tube diameter
3. Circulating pump failure-
1. Accept Risk 2. Accept Risk 3. Motor alarmed
2) Cannot main . tain vacuum
00
* <0
1. Vacuum jet
1. Spare jet pro
failure
vided
2. Pressure con 2. Set up spare
troller fail
parts
ure.
Pressure gauges
3. System leaks
provided
4. Receiver level 3. Accept Risk
too high or
4. Hi & Lo level
tank is empty
alarms provided
5. Condenser
5. Sightglass in
freeze-up
forward flow
6. Receiver pump
line. Forward
packing leakage
flow temperature
7. Vacuum line
recorded
pluggage
6. Accept Risk
8. High level in |7. Accept Risk
catch tanks
(8. Level gauge
1 provided
Protection
Set Contingent Action or Accept Risk
Provide for Information Trigger Contingent
1. Set up spare heat exchanger
2. Drill out tubes 3. Set up spare
pump 4. Increase pump
impeller size
High pluggage frequency
Tube failures
1. Change to spare Vacuum recorder jet indicates poor
2. Repair controlle 7 vacuum
3- Repair leaks 4. Isolate problem
& resolve
5. Raise cooling water temperatur T
6. Repack pump
7. Clean-out lines 8. Drain tanks
TOWOLDMONOQ45240
o
Potential
Likely Causes
Problems ,,
Prevention
Take Preventive Action or Accept
Risk
Protection Set Contingent Action or Accept
Risk
Provide for Information Trigger Contingent
3) Cannot meet forward flow color spec.
1. Entrainment
separator
run back line
plugged
2. Inadequate lime
in still
1. Sight glass pro
1. Clean out line
vided
2. Re-lime still
2. Record lime charge.
Modify re-lime
Feed integrator
frequency
alarm on panel
Lab analysis indicates off-spec product
5. Absorbers 1) Cannot meet electrical property specs.
2) Cannot feed ^esired rate thru absorbers
, 0>
1. Treating temper 1. Column feed
ature too high
temperature
2. Packing is wet
controller
3. Clean-up filter
backed up with
not removing
temperature
porocel parti
recorder.
cles
2. Analyze packing
4. In line analyzer
for moisture
malfunctioning
prior to column
5. Packing is shot
start up
3. Accept Risk
4. Accept Risk
5- In-line analyzer
provided
1. Treating temp,
too low-high viscosity
2. Pilot plant.s scale-up wrong
3. Pumps under sized
4. Packing chargeout time too long. Low on stream time.
1. See #1 above.
2. Accept Risk 3. Accept Risk 4. Absorbers flexibly
piped up
1. Manually con Lab analysis
trol tempera indicates off-spec
ture.
material
2. Dry packing
with nitrogen
prior to start
up.
3. Modify filter
and/or change
cartridge micron
;
retention size
Change absorber
support screen size
4. Check results ?-n laboratory
:
5. Change packing
1. Raise treating Flow controller
temp. to reduc e indicates below
viscosity. May [ design feed rate
also need to i
.
change electri - Low on stream time
cal property specs.
2. Run more them one
.
absorber at a time
3. Change pumps
4. Install spare
absorber
TOWOLDMONOQ45241
10.
Potential ' Problems
Likely Causes
Prevention Take Preventive Action or Accept
Risk
Protection Set Contingent Action or Accept
Risk
Provide for Information . Trigger Contingent
3) Cannot meet
1. Bad Porocel
1. Accept Risk
free chloride ^ 2. Clean-up filter 2 M M
soec.
leaking; thru
1. Change packing
Lab analysis
2. Change cartridges indicates off-spec
material
6. Therminol Furnace
1) Coil Failure
1. Flame safeguard system failure
2. Air pockets in coil
3. Therminol de gradation
products
1. Set up spare coil.
2. Fill system under vacuum
3. Analyze ther minol monthly
1. Changeout coil
Coil leakage
2. Accept Risk
Lab analysis
3. Replace Therminol indicates off-
spec FR-2
2) Cannot provide 1. Therminol feed 1. Motor alarmed.
1. Changeout pump
Cannot obtain
adequate heat
pump failure
Flow recorded
2. Notify utilities 25M#/yr. still
for stills
2. Low gas pressure
on panel.
dept.
rate
3. Line pluggage
2. Low gas pressure 3. Isolate problem
4-. Flow controller
shutdown.
& resolve
failure
Pressure gauges
4. Repair controller
5. Furnace under
in field
5. Install still
sized
3. Low flow alarm
feed preheater
4. Accept Risk
5. "
"
t
7. Housekeeping:
1. Processing
1. All pumps except jl. Accept Risk
Low ratings in
1) Unable to
problems
for one on ground (2. Modify Facilities housekeeping
achieve accepta - 2. Inadequate
level. Drain pans f
inspections
ble level
workforce 1 provided for each
pump
j2. Trench sewers
[
j provided on
j
abo*
i ground level ;3. Ground level
j
| curbed & floor 1 UJ j sloped to trenches i
j4. Open structure design
[5. Equipment layed-out with
( housekeeping problems in
| mind.
J
'
TOWOLDMONOQ45242
Potential
Likely Causes
Problems x
7. Housekeeping (Contd.)
*
11.
Prevention
Take Preventive
Action or Accent
Risk
`
6. Dumpster ramp for changing absorber packing provided
7. Provision made for draining transfer lines, sample points & catch tanks into drums
8. HC1 emission sources tied into drowning Jet
9. Housekeeping time alloted in work force study
10. Complete utility stations located at critical points
Protection
Provide for Information
Set Contingent
Trigger
Action or Accept Contingent
Risk
`
1
o-* O>D . w
ru
s
V
i
i
i
TOWOLDMONOQ45243