Document LKrnzjzQENBypqB3yQBwNMb8z

W. G. Krummrich Plant Sauget, Illinois August 22, 1968 Aroclor Expansion - W,GK (CEA 1800) Risk Analysis__________ D. C. Armstrong - WGK lX- -Brawley - WGK M. S. Feld - WGK T. E. Greenman - WGK C. W. Hamlet - WGK J. R. 'McClain - WGK R. M. McCutchan WGK J. W. Molloy - WGK P. Verna - WGK H. S. Bergen - G.O. D. B. Hosmer - G.O. R. E. Howard - G.O. R. M. Kountz - G.O. W. A. Kuhn - G.O. R. J. Stratmeyer - G.O. M. E. Gibbs - 2nd St. R. H. Munch - 2nd St. Attached are the Aroclor Expansion - WGK (CEA 1800) Risk Analysis Data Sheets indicating the major and minor risk considerations in this start up. Consider able preventive action has been taken to minimize the risk involved in the major problem areas. If there are questions concerning this analysis or any of the risks indicated, do not hesitate to contact the appropriate representative of CED, Research (PR&D) or Manufacturing. M H'. F. R; Mfg. Re; ap Attachments: R. S. Yates Proj. Mgr. oie*7*i TOWOLDMONOQ45232 1. Specific Potential Problems rH Threat .p 1. Raw Materials Received Probability Seriousness a. Biphenyl 1) Variation in quality . a) Moisture contaminated b) Impurity level 2) Availability 6.0 3 180 30 1 30 50 9 450 10 10' 100 b. Chlorine Snift Gas 1) Variation in quality a) Impurity level (Bromine) b) Sulfuric Acid content 2) Availability 100 9 900 100 9 900 5 9 45 10 10 100 c. FeCl3 1) Particle size too large or too small 2) Moisture contamination 3) Availability ' d. Lime 5 5 10 5 25 10 50 10 100 1) Availability 2) Moisture contamination e. Porocel 5 10 50 5 2 10 1) Availability 2) Moisture contamination 3) Particle size too large or too small 5 5 10 10 50 9 ^5 5 50 Raw Materials In Storage a. Biphenyl 1) Moisture contamination 2) Storage tank freeze-up 10 10 100 10 3 30 018*722 TOWOLDMONOQ45233 2. . `- rH1 . _________ Threat^ Probability Seriousness o 3. Chlorinator Area ' a. FeClq Mix Tank i) Inadequate catalyst supply to #6 chlorinator ' 5 10 50 b Chlorinators 1) Unstable product 20 10 200 2) Crude 1142 out-of-spec on Sp. Gr. 3) Inadequate biphenyl feed to #6 chlorinator 20 10 10 200 10 100 4) Inadequate temperature control 10 3 30 c. Intermediate Storage Tank 1) Cannot feed stills or head tank 10 3 30 2) Cannot maintain proper aging temperature 3) HC1 emissions ' 10 6 60 20 8 160 d. Blow Tank 1) Cannot feed stills at required rate 2) Cannot control level in tank 3) HC1 emissions *) HC1 is not removed to desired level 10 10 20 10 8 80 8 80 8 l6o 2 20 e. Off--gas system 1) Cannot control off-gas temperature 10 5 50 2) Drowning jet will not handle full HC1 load 3) High back pressure *> Water in HC1 off-gas 10 10 10 8 8o 9 90 10 100 0184723 I TOWOLDMONOQ45234 * 4. Stills 3. rH . Threat ' o3 Probability Seriousness o 1) Erosion and/or pluggage of reboiler tubes 30 10 300 2) Cannot maintain vacuum 3) Cannot meet forward flow color spec. 10 10 10 ' 10 100 100 4) Cannot control temperature 10 8 8o 5- Absorbers 1) Cannot meet electrical property specs 20 10 200 2) Cannot feed desired rate thru absorber 10 10 100 3) Canhot meet free chloride spec 10 10 100 6. Thermincl Furnace 1) Coil failure 10 - 10 100 2) Cannot provide adequate heat for stills 10 10 100 7. Housekeeping 1) Unable to achieve acceptable level 10 8 80 18*7?4 TOWOLDMONOQ45235 Aroclor Expansion (CEA l800) Risk Analysis Worksheet It. Potential Problems 4 Likely Causes Prevention Take Preventive Action or Accept Risk Protection Set Contingent Action or Accept " Risk Provide for Information Trigger Contingent ' 1. Raw Matls. Reed. a. Biphenyl 1) Variation in quality 1. Anniston operation variances. 2. Tank car coil failure 1. Accept risk 2. Sample every car 1. Review quality variation with Anniston - Lab identifies off-spec material 2) Availability 1. Anniston pro duction out age 2. Rail Strike 3. Coil failure in Associated .Sales Stg.Tk. 1. Accept Risk 2. Hold Associated Sales & Dept. Stg. Tks. at least 80% full. 1. Transfer Associ ated Sales Matl. to WGK. 2. Notify Anniston of low Biphenyl level. Daily Inventory Sheet indicates quantity on hand below 600M# b. Chlorine Snift Gas (1) Variation in quality Chlorine Dept. operation variances 1. Monitor bromine content of KCL shipments. 2. Monitor number of DeNora cells on KOH. 3. Sample snift gas chlorine supply weekly. Raise chlorination temperature to 195C. 1. High bromine content in KCL 2. High bromine content in Cl2 gas <JZi<r9T0 2) Availability Chlorine Dept, -J *' outage 1. Accept Risk 2. Obtain priority to use revapor ized chlorine. Accept risk 1. Notification of scheduled chlorine Dept, outage. 2. Low chlorine supplyppressure TOWOLDMONOQ45236 5. Potential Problems v Likely Causes Prevention lake Preventive Action or Accept Risk | Protection Set Contingent Action or Accept Risk Provide for Information Trigger Contingent 3. Chlorinator Areat a. FeCl^ Mix T&." 1. Inadequate ' catalyst supply to #6 chlorinator 1. System pluggage 1. Sightglass 1. Accept Risk provided 2. Circulating pump 2. Manually add failure 2. Motors alarmed catalyst to each chlorin- 3. Agitator failure 3. Temperature ator indicated in 4. Steam heating field system failure 4. Level recorded f 5. Mix tank is on panel empty 5. Catalyst flow 6. Catalyst flow timer on panel . controller failure S. Catalyst feed valve alarm for abnormal position Lab identifies ' unstable product b. Chlorinators ' 1) Unstable product.. o CD * . WM O . 1. Catalyst doesn't 1. Accept Risk 1. Spare catalyst carry thru chlors. 2. a) Catalyst addition nozzles 2. Inadequate cat tank level provided on each alyst feed to recorded on chlorinator. #6 chlorinator panel. 2. Accept Risk 3. Chlorination ternp. b) Catalyst 3. " " too low. . flow timer 4. Raise chlorina 4. High bromine on panel tion temperature content in c) Catalyst to 195C chlorine supply. feed valve 5. Raise overflow 5. Vapor phase alarm for level in chlor chlorination abnormal inators to de 6. Sulfuric acid position crease vapor in chlorine d) Catalyst space. supply 7. .Circulating tank agitator & pump motors 6Y . Ac!t cept Rtl isk pump failure alarmed. Lab analysis indicates off-spec material. TOWOLDMONOQ45237 Potential Problems v b. Chtainators (Contd.) 1 2) Crude 1142 o out of spec on sp.gr. * fV Likely Causes Prevention Take Preventive Action or Accept Risk Protection Set Contingent Action or Accept Risk 6. Provide for Information Trigger Contingent 8. Technology inadequate to meet corpor ate goals. 9. Continuous chlorination technology in adequate to 2. e) Sightglass 8. Lab distill in catalyst crude & analyze circulating loop. results. 3. Chlorinator 9. Initiate PR&D temperature work to improve recorded & technology. . alarmed on 10. All the above. panel meet specifi 4. a) Monitor cation on stability. DeNora cells on KoH b) Monitor . KCL Bromide Content c) Monitor bromine con tent of chlorine supply. 5. Accept Risk 6. Brink mist eliminators in chlorine supply line. 7. Motors alarmed. 8. Accept Risk 9. Continuous chlor ination demon | strated at Anniston 1. Chlorine feed 1. Flow recorded in each chlor- on panel. inator too high 2. Accept Risk or too low. 3. Flow recorded on 2. Density control panel. Low flow system failure alarm. on #9 chlorin- ator ! 1. Regulate flow manually 2. Run sp.gr. manually 3. Regulate flow manually 4. Regulate level manually Operator analysis indicates off-spec material. i i TOWOLDMONOQ45238 7. Potential . Likely Causes Problems ^ | Prevention Take Preventive Action or Accept Risk Protection Set Contingent Action or Accept Risk Provide for Information Trigger Contingent b. Chlorinators (Contd.) 3. Biphenyl feed 4. Intermediate rate to #6 Chlor Stg. Tk. level inator too high recorded on or too low. panel. Hi/Lo 4. Level controller level alarm failure on #9 on Int. Stg. chlorinator. #9 Chlor. 5. Circulating 5. Motors alarmed. pump failure 6. Operator will routinely analyze each chlorinator every two hrs. 5. Accept Risk 6. Have instrumenta tion system checked for repair. 7. Redesign Sp.Gr. control system if not adequate. . 3) Inadequate Biphenyl feed to #6 . chlorinator- 1. Biphenyl feed 1. Motor alarmed Use Biphenyl pump failure 2. Stg. tank temper transfer pump to 2. Line pluggage ature recorded feed #6 chlorina 3. Flow controllers on panel tor failure 3. Flow indicating 4. Feed tank empty controller on 5. Bate of charg panel and at FeCl3 ing FeClg mix mix & head tanks. & head tanks Lo flow alarm. is too high 4. Daily inventory. 4) `Inadequate . temperature control oI-* ' 0-*r\d> . 1. Circulating pump 1. Motors alarmed failure 2. Hi/Lo tempera 2. Temperature con ture alarms troller failure 3. Temperature 3. Line pluggages recorded on panel 4. Air cooled heat 4. Two speed fans exchanger fan provided speed too fast 5. High temperature or too slow. chlorine shut- 5. Too many or too doTM. few air cooler 5. Low temperature louvres attached fan shutdown to controller 7. Chlorine flow recorded on panel 1. Adjust number of louvres attached to controller. 2. Change chlorine flow rates 3. Accept Risk j Biphenyl flow recorder indicates loto/high flow. Lo flow alarms. Temperature recorder indicates temperature too high/low. TOWOLDMONOQ45239 8. Potential ' Likely Causes Problems > Prevention Take Preventive Action or Accept Risk b. Chlorinators (Contd.) * 4) Inadequate temp. cont. 6. Chlorine flow is too high or too low. 7. Sulfuric acid in Chlorine supply 4. Stills 1) Erosion and/ or pluggage of reboiler tubes 1. Lime-catalyst slurry at high velocities 2. Tube diameter 3. Circulating pump failure- 1. Accept Risk 2. Accept Risk 3. Motor alarmed 2) Cannot main . tain vacuum 00 * <0 1. Vacuum jet 1. Spare jet pro failure vided 2. Pressure con 2. Set up spare troller fail parts ure. Pressure gauges 3. System leaks provided 4. Receiver level 3. Accept Risk too high or 4. Hi & Lo level tank is empty alarms provided 5. Condenser 5. Sightglass in freeze-up forward flow 6. Receiver pump line. Forward packing leakage flow temperature 7. Vacuum line recorded pluggage 6. Accept Risk 8. High level in |7. Accept Risk catch tanks (8. Level gauge 1 provided Protection Set Contingent Action or Accept Risk Provide for Information Trigger Contingent 1. Set up spare heat exchanger 2. Drill out tubes 3. Set up spare pump 4. Increase pump impeller size High pluggage frequency Tube failures 1. Change to spare Vacuum recorder jet indicates poor 2. Repair controlle 7 vacuum 3- Repair leaks 4. Isolate problem & resolve 5. Raise cooling water temperatur T 6. Repack pump 7. Clean-out lines 8. Drain tanks TOWOLDMONOQ45240 o Potential Likely Causes Problems ,, Prevention Take Preventive Action or Accept Risk Protection Set Contingent Action or Accept Risk Provide for Information Trigger Contingent 3) Cannot meet forward flow color spec. 1. Entrainment separator run back line plugged 2. Inadequate lime in still 1. Sight glass pro 1. Clean out line vided 2. Re-lime still 2. Record lime charge. Modify re-lime Feed integrator frequency alarm on panel Lab analysis indicates off-spec product 5. Absorbers 1) Cannot meet electrical property specs. 2) Cannot feed ^esired rate thru absorbers , 0> 1. Treating temper 1. Column feed ature too high temperature 2. Packing is wet controller 3. Clean-up filter backed up with not removing temperature porocel parti recorder. cles 2. Analyze packing 4. In line analyzer for moisture malfunctioning prior to column 5. Packing is shot start up 3. Accept Risk 4. Accept Risk 5- In-line analyzer provided 1. Treating temp, too low-high viscosity 2. Pilot plant.s scale-up wrong 3. Pumps under sized 4. Packing chargeout time too long. Low on stream time. 1. See #1 above. 2. Accept Risk 3. Accept Risk 4. Absorbers flexibly piped up 1. Manually con Lab analysis trol tempera indicates off-spec ture. material 2. Dry packing with nitrogen prior to start up. 3. Modify filter and/or change cartridge micron ; retention size Change absorber support screen size 4. Check results ?-n laboratory : 5. Change packing 1. Raise treating Flow controller temp. to reduc e indicates below viscosity. May [ design feed rate also need to i . change electri - Low on stream time cal property specs. 2. Run more them one . absorber at a time 3. Change pumps 4. Install spare absorber TOWOLDMONOQ45241 10. Potential ' Problems Likely Causes Prevention Take Preventive Action or Accept Risk Protection Set Contingent Action or Accept Risk Provide for Information . Trigger Contingent 3) Cannot meet 1. Bad Porocel 1. Accept Risk free chloride ^ 2. Clean-up filter 2 M M soec. leaking; thru 1. Change packing Lab analysis 2. Change cartridges indicates off-spec material 6. Therminol Furnace 1) Coil Failure 1. Flame safeguard system failure 2. Air pockets in coil 3. Therminol de gradation products 1. Set up spare coil. 2. Fill system under vacuum 3. Analyze ther minol monthly 1. Changeout coil Coil leakage 2. Accept Risk Lab analysis 3. Replace Therminol indicates off- spec FR-2 2) Cannot provide 1. Therminol feed 1. Motor alarmed. 1. Changeout pump Cannot obtain adequate heat pump failure Flow recorded 2. Notify utilities 25M#/yr. still for stills 2. Low gas pressure on panel. dept. rate 3. Line pluggage 2. Low gas pressure 3. Isolate problem 4-. Flow controller shutdown. & resolve failure Pressure gauges 4. Repair controller 5. Furnace under in field 5. Install still sized 3. Low flow alarm feed preheater 4. Accept Risk 5. " " t 7. Housekeeping: 1. Processing 1. All pumps except jl. Accept Risk Low ratings in 1) Unable to problems for one on ground (2. Modify Facilities housekeeping achieve accepta - 2. Inadequate level. Drain pans f inspections ble level workforce 1 provided for each pump j2. Trench sewers [ j provided on j abo* i ground level ;3. Ground level j | curbed & floor 1 UJ j sloped to trenches i j4. Open structure design [5. Equipment layed-out with ( housekeeping problems in | mind. J ' TOWOLDMONOQ45242 Potential Likely Causes Problems x 7. Housekeeping (Contd.) * 11. Prevention Take Preventive Action or Accent Risk ` 6. Dumpster ramp for changing absorber packing provided 7. Provision made for draining transfer lines, sample points & catch tanks into drums 8. HC1 emission sources tied into drowning Jet 9. Housekeeping time alloted in work force study 10. Complete utility stations located at critical points Protection Provide for Information Set Contingent Trigger Action or Accept Contingent Risk ` 1 o-* O>D . w ru s V i i i TOWOLDMONOQ45243