Document LKrQjmYjkq8y6q8g5rLrEzpm3

TECHNICAL BULLETIN No. 8 SEVENTH REVISION JUNE 1958 FIRE RESISTIVE RATINGS Metal Lath and Plaster CONSTRUCTION Fire Resist ance AUTHORITY l%" gypsum-vermiculite or gypsum-perlite plaster1, 11 over self- furring metal lath wrapped around column. 4-hours Underwriters' Laboratories Retardant 2851-5, 6, dated 5/15/56 and 3187-4, 5, 7 euaei 1J4" gypsum-vermiculite or perlite plaster1, n, over metal lath. Metal lath furred out 1)4' from column flanges with space between col umn flanges and lath filled with plaster. 4-hours Underwriters' Laboratories Retardants 2851-2, dated S/10/49 and 3187-3, dated 4/24/SO z 2 1'/," gypsum-perlite plaster1, H, over metal lath. Metal lath furred Vu" from column with Y" channel brackets at approximately 2' 4-hours Underwriters' Laboratories Retardant 3187-6 vertical spacings. COLUMNS STEEL COLUMNS 1" gypsum-vermiculite or perlite plaster1, u, over metal lath. Metal lath furred out \lY' from column flanges with space between col umn flanges and lath filled with plaster. 1 Yu" gypsum-vermiculite or gypsum-perlite plaster1, u, over self furring metal lath wrapped around column. 3-hours 3-hours Underwriters' Laboratories Retardants 2851-1, dated S/10/49, and 3187-1, dated 1/24/50 Underwriters' Laboratories Retardant 2851-5, 6, dated 5/15/56 and 3187-4, 5, 7 1" gypsum-perlite plaster1, H, oyer metal lath. Metal lath furred out 1)4' from column flanges. 2-hours Underwriters' Laboratories Retardant 3187-2, dated 1/24/50 1" gypsum-perlite plaster1, u, over self-furring metal lath wrapped around column. Y " gypsum-sanded plaster12, 1:3 mix on metal lath. 1' Portland-cement plaster12, 1:2 )4 mix on metal lath. 2-hours 1-hour 1-hour Underwriters' Laboratories Retardant 3187-4, 5, 7 BMS-92, Table 40 STEEL BEAMS, GIRDERS & TRUSSES CAST IRON 1H" Portland cement plaster12, lr'/io:2M> cement, lime and sand COLUMNS mix (by volume) on Y" rib metal lath with J4" broken air space. 3-hours TIMBER 1" portland-cement plaster12, on metal lath, applied over column and COLUMNS over steel or cast iron cap, %' ah space. 2-hours 1" gypsum-vermiculite plaster1, n, over metal lath with at least a 2)4" air space between lath and protected structural members. 4-hours Protected with Suspended Ceilings 1' gypsum-perlite plaster3, u, over metal lath, with at least a 3' air space between lath and structural members. Plaster on back of lath 1" minimum on ceiling, 1)4' to 3" at beam. Yi` gypsum-perlite plaster1, u, over metal lath with at least 3Y>" air space between lath and structural member.7 %" gypsum-vermiculite plaster1, *, plus vermiculite acoustical plastic over metal lath with at least a 2)4" air space between lath and structural members. 4-hours 4-hours 4-hours 1" sprayed asbestos fiber8, 1!, over metal lath with at least a 2" air space between lath and protected structural member. If beam extends below general ceiling level, rating is reduced to 2-hours. 3-hours 1" gypsum-vermiculite plaster1, 12, on metal lath.9 Protected with Ceilings Furred or in Contact with Structural Steel 1" neat wood-fibered gypsum12, or j ' gypsum-vermiculite plaster1, 12, on metal lath.3 Y" gypsum-sanded plaster12, 1:2, 1:3 mix on metal lath.9 Y" poitland cement or gypsum-sanded plaster12, 1:2, 1:3 mix on metal lath.9 Three lbs. asbestos fiber and 15 lbs. of lime added to each bag of Portland cement. 4-hours 3-hours 2-hours 1}^-hours BMS-92, Table 38 Underwriters' Laboratories Retardant 2773, dated 1/20/47 Underwriters' Laboratories Retardant 2993 (Supplement), dated 11/18/49 Underwriters' Laboratories Retardant 3355, dated 4/30/51 Underwriters' Laboratories Retardant 2773, dated 11/29/50 Underwriters' Laboratories, Retardant 2923, dated 6/15/50 BMS-92, Table 43 V/f V CONSTRUCTION Floor: 2H" concrete on metal lath. Ceiling: 1* gypsum-vermiculite plaster1, 12, on metal lath. Floor: Same as above. Ceiling: % ' gypsum-vermiculite plaster1, 12, or 1' neat wood-fibered gypsum plaster on metal lath. Fire Resist ance AUTHORITY 4-hours 3-hours TRBM-44, Table 18 STEEL CO JOIST cc O FLOORS o (Using Ui Contact, Furred or Suspended Ceilings) Floor: 2H " perlite concrete. Ceiling: gypsum-perlite plaster1, n, over metal lath. Floor: 2 " concrete on metal lath. Ceiling: % ' gypsum-vermiculite plaster1, 12, or 1' neat wood-fibered gypsum plaster, on metal lath. Floor: 2H' concrete on metal lath. Ceiling: 1" sprayed asbestos fiber12, on metal lath.8 Floor: 2H* concrete on metal lath. Ceiling: gypsum-sanded plaster12, 1:2, 1:3 mix on metal lath. Floor: 2H' concrete on metal lath. Ceiling: H " sprayed asbestos fiber12, on metal lath.8 3-hours Underwriter^' Laboratories Retardant 3454-2 23'2-hours 23'6-hours 2-hours TRBM-44, Table 18 Floor: 2 ' concrete on metal lath. Ceiling: sprayed asbestos fiber12, on metal lath.8 1 H-hours Floor: 2 " concrete on metal lath. Ceiling: % " gypsum-sanded plaster12, 1:2, 1:3 mix, or % " Portland cement plaster12, 1:2, 1:3 mix with 15 lbs. hydrated lime and 3 lbs. asbestos fiber per bag of cement, on metal lath. Floor: 2H' concrete (minimum thickness over cells). Ceiling: IVfj" gypsum-vermiculite plaster ', u, over metal lath. Metal lath required to be at least 3M" from underside of cellular steel panel. Metal lath furred around beams and plastered 1%" thick with same mix. 1 H-hours 4-hours Tested by the National Bureau of Standards Floor: 3J4" concrete (minimum thickness over cells). Ceiling: 1 " gypsum-perlite plaster2, u, over metal lath. Metal lath attached directly to underside of floor panel. Beams plastered 1H * thick over face of lath with same mix. 4-hours Underwriters' Laboratories Retardant 3789-1, dated 10/3/56 Floor: 2' concrete (minimum thickness over cells). Ceiling: H* gypsum-vermiculite plaster2, n, over metal lath. Metal lath required to be at least 2H' horn underside of cellular steel panel. 4-hours Underwriters' Laboratories Retardant 2689, dated 12/18/39 Floor: 2' perlite concrete (minimum thickness over cells). Ceiling: 1" gypsum-perlite plaster3, H, over metal lath. Metal lath required to be at least 3" from underside of floor panel and steel beams. 4-hours Underwriters' Laboratories Retardant 2993, dated 12/9/48 Floor: 2' concrete (minimum thickness over cells). Ceiling: 1" gypsum-vermiculite plaster.1, 12, on metal lath. Metal lath required to be at least 2 ' from underside of floor panel. 4-hours BMS-92, Table 45 CELLULAR STEEL FLOORS Floor: 2H' concrete (minimum thickness over cells). Ceiling: gypsum-vermiculite plaster1, n, plus H" vermiculite acoustic plastic over metal lath. Metal lath required to be at least 7H' from underside of floor panel. Floor: 2H" concrete (minimum thickness over cells). Ceiling: %" gypsum-perlite plaster1, 12, plus H" acoustical plaster on metal lath. Metal lath required to be at least 7 H * from underside of floor panel and 2 ' from steel beams. Floor: 2' concrete (minimum thickness over cells). Ceiling: 1' neat wood-fibered gypsum plaster12, on metal lath. Metal lath to be at least 9* from underside of floor panel. With lath not closer than 2', rating is 3-hours. Floor: 2' concrete (minimum thickness over cells). Ceiling: 1H* sprayed fiber8, u, over metal lath. Metal lath required to be at least 4H ' from underside of panel. Floor: 2' concrete (minimum thickness over cells). Ceiling: H' gypsum-perlite plaster1, 11, over metal lath. Space from lath to floor at least 15H*i and from lath to beams 3H'- (See 7) Floor: 2" concrete (minimum thickness over cells). Ceiling: % " gypsum-perlite mill-mixed plaster n, over metal lath. Metal lath required to be at least 15 H ' from the underside of cel lular steel panel and 3H" from steel beam. Beam rated 4 hours. (See13) 4-hours Underwriters' Laboratories Retardant 2773, dated 11/29/50 4-hours Tested by the National Bureau of Standards 4-hours BMS-92, Table 45 4-hours Underwriters' Laboratories Retardant 3431-1, dated 9/14/51 4-hours Underwriters' Laboratories Retardant 3355, dated 4/30/51 3-hours Underwriters' Laboratories Retardants 3574-6, 3789, dated 7/25/57 OOBS Floor: 2r concrete (minimum thickness over cells). Ceiling: H" gypsum-vermiculite plaster1, n, over metal lath. Space from lath to floor at least 15H', and from lath to beams 3H'- (See 6) 3-hours Underwriters' Laboratories Retardant 2689, dated 12/13/49 SGP 0003521 rr) cc O CONCRETE O --1 JOISTS Uh CONSTRUCTION Floor: 3' concrete slab10. Ceiling: 1" gypsum-vermiculite plaster1, u, over metal lath. Metal lath required to be at least 8)4" from underside of floor joists. Floor: 2" concrete slab10. Ceiling: %' gypsum-vermiculite plaster1, ", over metal lath. Metal lath required to be at least 8)4" tom underside of floor joists. Fire Resist ance AUTHORITY 4-hours Underwriters' Laboratories Re tardant 3390-13, dated 11/12/54 3-hours Underwriters' Laboratories Re tardant 3390-11, dated 1/19/54 cn cc o CORRUGATED o STEEL H FORMS Floor: 3)4" reinforced sand-gravel concrete over top of corrugations. Ceiling: 1" gypsum-vermiculite plaster1, ", over metal lath. Ceiling suspended at least 14)4 * below steel forms and 2y<i below steel beams. Floor: 3J4" reinforced expanded-slag concrete over top of corrugallons. Ceiling: Metal lath attached directly to bottom of corrugated form. Self-furring metal lath wrapped around steel beams. Gypsum-per lite plaster, 100 lbs.: 2 cu. ft. mix, applied so as to fill corrugation above lath and z/% below face of lath. Beams plastered 1)4" thick over face of lath with same mix. 4-hours 4-hours Underwriters' Laboratories Retardant 3413-1, dated 3/7/52 Underwriters' Laboratories Retardant 3413-4 Floor Assembly Ceiling Assembly of Metal Lath and Plaster Fire Resist ance Authority U1 WOOD CC O JOIST O --i FLOORS u-i % ' gypsum-sanded plaster12,1:2,1:3 mix. Metal lath attached with 1)4 U-gage, 7M" head, barbed roofing nails, at 6" c/c. l-hour Combustible Double wood floor (54' sheathing, T. & G. finish, with asbestos paper be tween) supported on 2' x 10' joists. Ordinary buildincr DaDer can be used with T. & G. sub- flooring. % ' Portland cement plaster12,1:2, 1:3 mix with 15 lbs. hydrated lime and 3 lbs. as bestos fiber per bag of cement. Metal lath attached with 1)4', 11-gauge, 7Ai" head, barbed roofing nails, at 6" c/c. Either of above 1-hour assemblies with additional supports for lath placed 27' c/c attached to alternate joists, consist ing of 1 loop of No. 18 wire slipped over each of 2 nails driven in 1)4", 2' above bottom on each side of joists, and ends of this loop tied below lath. Combustible 1 H-hours Combustible BMS-92, Table 42 Studs 2' x 4' Non-load bearing WOOD cn sz: STUD O H HOLLOW H CO<Cn PARTI- TIONS 2'x4* Load Bearing 2'x 2" Non-load bearing %" gypsum-vermiculite plaster1, 12, on metal lath attached with 1)4', 11-gauge, 14' head, barbed roofing nails, at 5" c/c. )4 gypsum-perlite plaster1, 1J, on metal lath attached with 1)4", 11-gauge, 14b" head, barbed roofing nails, at 5" c/c. lJi-hours Combustible 1 J^-hourB Combustible Tested by the National Bureau of Standards Total Thickness Plaster Both Sides on Metal Lath 5 *A" 1' neat wood-fibered gypsum12 Fire Resist ance 2-hours Combustible Authority 5? k k to to CO SVb" 5 %' s ys" 5 %" %" gypsum-sanded12, 1:2, 1:2 mix with mineral wool fill J4' gypsum-sanded12, 1:2, 1:3 mix )4" Portland cement and sand12, 1:2, i:3 mix. Add 3 lbs. asbestos fiber per bag of cement. %" gypsum-sanded 12, 1:2, 1:2 mix %' gypsum-vermiculite1,11 %' gypsum-sanded11, 1:1)4, 1:3 mix )4" gypsum-sanded11, 1:1)4, 1:3 mix 1 H-hours Combustible 1-hour Combustible 1-hour Combustible BMS-92, Table 30 Combustible 1-hour Underwriters' Laboratories Combustible Retardant 2773, dated 8/31/44 1-hour Combustible 1-hour Combustible Underwriters' Laboratories Retardant 1355, dated 8/10/22 SGP 0003522 STEEL CO STUD o H P HOLLOW CC <0-i PARTI 1 TIONS 1 SOLID CO 2 PARTI o H TIONS H CC <O-i (Non-load bearing) STEEL ROOF O-i o DECK CC ASSEM BLIES Studs Total Thickness Plaster Both Sides on Metal Lath 1" gypsum-perlite plaster l, ll, over metal lath attached to 14 * pencil rods on metal clips. 1" neat wood-hbered gypsum12 Y ' channels or Pre fabricated Steel Studs (non-load bearing) May vary, but mini mum air space of 2 ' is re quired between interior faces of metal lath Prefabri cated Load Bearing Steel Studs 1" gypsum-perlite1, 11 A " neat wood-hbered gypsum12 Y" neat wood-hbered gypsum12 7A" gypsum-sanded12, 1:2, 1:3 mix Y" portland cement12, 1:2, 1:3 with 3 lbs. of asbestos hber per bag of cement Y" gypsum-sanded12, 1:2, 1:2 mix 1' neat wood-hbered gypsum12 %' neat wood-hbered gypsum12 Y" gypsum-sanded12, 1:2, 1:2 mix H" gypsum-sanded12, 1:2, 1:3 mix Studs Total Thickness Thickness and Type of Plaster on Metal Lath 2H' 2 H' 2)4' neat wood-hbered gypsum 2lA' gypsum-perlite1 H' channels 2H' 2' 2' 2H' gypsum-vermiculite1 2' neat wood-hbered gypsum 2" gypsum-sanded 1:2, 1:2 mix 1H' VA" gypsum-perlite2 Studless 2' 2' gypsum-sanded, 1:2, 1:2 mix Roof4 2" vermiculite concrete 1' insulation board of shredded wood bonded with Portland cement. 1' insulation board of felted glass fiber. 1H' wood Hberboard insulation. Suspended Ceilings of Metal Lath and Plaster 1' gypsum-vermiculite plaster2, 12 1" gypsum-vermiculite plaster2, 12 1' gypsum-vermiculite plaster2, 12 1" gypsum-sanded plaster12, 1:2 mix 1 H' wood fiber and ce ment binder. 1' wood hberboard in sulation. Yi" gypsum-sanded plaster12, 1:2 mix Y ' gypsum-sanded plaster12,1:2,1:3 mix Fire Resist ance 3 H-hours Authority Ohio State University Test No. T-799 2 H-hours 2-hours 2-hours 1 J^-hours 1-hour 1-hour BMS-92, Table 31 University of California Laboratory Tests of 1-48 and 4-51 BMS-92, Table 31 1-hour 2-hours5 1 H-hours 1-hour 1-hour BMS-92, Table 27 Fire Resist ance 2H-hours 2-hours 2-hours 2-hours 1-hour 1-hour 1-hour Fire Resist ance 4-hours Authority BMS-92, Table 32 Underwriters' Laboratories Retardant 3453, dated 2/13/52 National Bureau of Standards National Bureau of Standards Ohio State University, Test No. 129 Ohio State University, Test No. 147 Ohio State University, Test No. 162 Authority 3-hours 2-hours 2-hour8 Tested by the National Bureau of Standards 2-hours 1 H-hours SGP 0003523 NOTE: Many of these fire resistive ratings, especially those for cellular steel floors, actually exceeded the fire-resistive period shown. They are listed as 1, Wi, 2, 21 i>, 3, and 4 hour assemblies to facilitate use of the data in conjunction with building code regulations. Gypsum-sanded or Portland cement plaster mixed 1:2, 1:2 means 1 part neat to 2 parts sand aggregate by weight for both scratch and brown coats. 1. Scratch coat: 100 lbs. gypsum to 2 cu. ft. of aggregate. Brown coat: 100 lbs. gypsum to 3 cu. ft. of aggregate. 2. 100 lbs. gypsum to 2^ cu. ft. of aggregate for both scratch and brown coats. 3. 100 lbs. gypsum to 3 cu. ft. of aggregate for both scratch and brown coats. 4. Equivalent insulation permissible. 5. 2H hr. rating if load does not exceed 5120 psi of stud area. 6. Tested with openings for noncombustible ducts, electrical outlets, and pipes. Their permissible combined area did not exceed 100 sq. in. per 100 sq. ft. of ceiling area. No failure, but test arbitrarily discontinued at 3 hours. 7. Tested with openings for noncombustible ducts, electrical outlets, etc. Their permissible combined area did not exceed 100 sq. in. per 100 sq. ft. of ceiling area. No failure; test arbitrarily discontinued after 4 hours. 8. Sprayed fiber is a proprietary product, usually applied by contractor licensed by the manufacturer. 9. These ratings are based on tests in which light-rolled sections and open-web joists were protected with metal lath and plaster ceilings attached directly to the bottom flanges. 10. Add 2* to overall floor slab thickness where electrical raceways and junc tion boxes ate used. 11. Plaster thickness is measured from face of metal lath to finished plaster surface. 12. Plaster thickness is measured from back plane.oLmetal lath, exclusive of ribs to finished plaster surface. ^ 13. Tested with openings for noncombustible/ ducts not exceeding 113 sq. in. per 100 sq. ft., and one electrical outlet not exceeding each 90 sq. ft., of ceiling area. Authorities cited are: BMS-92: National Bureau of Standards, Building Materials and Structures Report No. 92. TRBM-44: National Bureau of Standards, Technical Report on Building Materials No. 44. Values attributed to NBS are derived from unpublished NBS test reports. Additional information or details of construction available upon request. Printed in U.S.A. SGP 0003519