Document LKpxy1GmJv25zb8mJgvron7oq
*. ------------ - 9
. ' MONSANTO COMPANY Sauget, Illinois March 8, 1972
E. STEWART
.
To: Supervisory Personnel EMISSION INVESTIGATION
Date of Incident: Location: Kind of Emission: Result of Emission:
Cause of Emission:
February 29, 1972, 7 - 11 PM
Department 213, Acid Unit #9
so3
Complaints from public Three B&O railroad personnel
reported 111
Bypassed interlock (required by operating instructions)
No adequate corrective action available to regain process control.
Investigating Committee: /ghw
Gene Maurer Richard Rhodes Gary Smith Bill BIrk Clarrie Buckley Bob Me Cutchan. Chairman
DSW 296667
STLCOPCB4066580
1
EMISSION INVESTIGATION
.
. i \ "1 'i
v " "| 1 ''
A. Time Sequence of Events 1. 2/21 or 2/22
2. 2/28 (days)
"
The flow indicator on the 9%% acid was PM'ed. To do this the interlock was by passed to avoid shutting down the de partment. Instrument was ok.
Operator Jethro Smith states .that during this time period the flow interlock was being bypassed. If so, production supervision was not informed.
3. 2/29, early on days A planned shutdown occurred.
4. 2/29, 6:10 PM
The unit was started up. The flow indicator interlock was bypassed which is normal procedure for startup.
5. About 7 PM .
The 98% acid pump stopped undetected. It is estimated that the emission began 2-3 minutes later.
6. 7:05 - 7:10 PM
Operator Rhodes noticed on the panel that the level in the oleum tower had_ . increased. He suspected that the oleum pump had stopped. He checked and this was correct. Because a shutdown of the 98% acid pump causes a shutdown of the oleum pump through another interlock, Rhodes then checked the 98% acid pump. It too had stopped. He decided immedi ately to shut down. He glanced at the
stack, the emission had already begun.
'
7. 7:10 PM
Rhodes informed Night Superintendent Womack that he had shutdown and the circumstances.
8. 7:45 PM
Foreman Klobuchar was called in regard to repairs being made on a duct. Mr. Womack also mentioned the shutdown. Mr. Klobuchar stated at that time there would be a further emission problem on starting up again, lasting 1-4 hours.
9. Maintenance found that the 985? acid pump had stopped because the motor starter fuse clips had failed. They were replaced.
10. 8:10 PM
Unit started up again.
11. 8:15 PM
Complaint from Rush City
DSW 296668
STLCOPCB4066581
EMISSION INVESTIGATION
2-
A. Time Sequence of Events (continued)
12. 8:48 PM .
Complaint from East St. Louis Police
Department (they had been called by
B&O Railroad)
'
13. 9:15 - 9:30 PM"
Tried to switch the 98# acid flow to interlock, but it wouldn't run. Cause undetermined. It was decided to run on
bypass that night and look for the problem on days, 3/1.
14. 9:30 PM
Emission had abated.
15. 10:00 PM
State of Illinois Informed of emission.
16. 11:00 PM
Stack back to normal.
17. 3/1, days
It was found that the sulfur burner high
temperature transmation unit was bad.
It was also found that the Interlock on the transmation unit was wired in series with the 98# acid flow interlock, whereas Dwg. TS-D-10074 Rev. 1 showed ' it wired independently. This is why the 98# acid flow Interlock could not be put Into service the night before.
B. Discussion
1. What caused the SOg emission on 2/29/72?
The interlock on the 98# acid pump was being bypassed as per startup instructions at the time the pump stopped (fuse clips failed). This allowed oleum to be formed in the Brink demisters and allowed SO3 to be blown Into the atmosphere. This emission lasted an estimated 5 minutes . before the unit was shut down. This process upset would have not occurred if the 98# acid pump had not been by passed at the time. (See attached process schematic).
An. emission of longer duration then occurred on start-up. With the present equipment the only way to dilute the oleum in the demisters is to run the 98# acid absorber . and blower. This causes an emission. In other words, there is presently no acceptable way of regaining pro^ss control. (See attached memo dated 5/13/69).
DSW 296669
2. Is this the only way SO3 emissions occur?
No. There are a variety of circumstances that can cause the demisters to become saturated with oleum, but once they are, there will be an emission.
STLCOPCB4066582
EMISSION INVESTIGATION
-3-
B. Discussion (continued)
3. Why is there a by-pass on the 98# acid pump interlock?
Present reasons: "
(a) The 98# acid flow indication does not operate on a start-up until the DP cell sensing legs have been bled of air.
(b) The 98# acid pump is interlocked with the blower. During oil firing after a lengthy shutdown, however, the blower must be operated without the 98# acid
pump running.
4. Were communications adequate?
No, at two levels. First, Trainee Carl Hartman made the comment that the unit had been "run on by-pass for a week". When questioned by the investigating committee. Operator Jethro Smith stated that the unit was on by-pass on the day shift Monday, 2/28. Supervision (Maurer and Klobuchar) did not know that was the case.
Second, after the second startup (8:10 PM), first-line ' supervision was not told of the emission problem and
complaints until after higher management and pollution control personnel were already involved.
5. Did WGK Production or Maintenance personnel know the sulfur
burner high temperature transmation interlock was being by
passed at the same time as when the 98# acid pump interlock
was bypassed?
........
No. This Instrumentation was installed during the last quarter of 1970. According to TS-D-10074 Rev. 1 the two interlocks were independent. It was not known that the actual Installation was different.
oSvN 2966-70
STLCOPCB4066583
EMISSION INVESTIGATION
-4-
C. Specific Recommendations
1.. Emphasize to operators the importance of keeping super
vision informed when an interlock is being by-passed.
This information must also be communicated to the next
shift.
'
>
Responsibility: Production Supervision EDO: 3/8/72
2. Wire the sulfur burner high temperature transmation inter lock independent of the 98# acid pump interlock.
Responsibility: Maintenance EDO: 3/6/72
3. Revise operating procedure and train operators to bleed DP cell sensing legs on 985? acid pumps, and to put interlock back into service, before proceeding with a start-up.
Responsibility: Production Supervision Confirm feasibility of above: 3/8/72
4. Evaluate the best method for eliminating the need to run the 98# acid pump with the interlock bypassed.
Responsibility: Maint./TSD/Production EDC: 4/15/72
5. Evaluate the best method for reducing or eliminating SO3 emission when demisters are saturated with oleum.
: Responsibility: TSD/Engineering Sales-- EDC: First status report due 4/15/72
6. Provide safer access (stairs or caged ladder) to second level at the 98^ acid flow instrumentation. Improve lighting in
the same area. Evaluate the need for a shower.
Responsibility: Maintenance/Production EDC: 5/1/72
D. General Recommendation
1. Revise the procedure for Air Emission Control and Reporting to insure that all the right personnel are informed at the right time to handle all contingencies arising from an emission.
Responsibility: EDC:
Environmental Control
Group
4/15/72
DSW 296671
STLCOPCB4066584
INSTRUMENT LINES
GAS FLOW
=D>
ACID FLOW ---------- >
DSW 296672
STLCOPCB4066585