Document LKngmVke7GpJGZdQ2BLn3grQ7
UNITED STATESUNITED STATES ENVIRONMENTAL PROTECTION AGENCY
* *REGION 1
ENVIRONMENTAL
AGENCY5 POST OFFICEB OSSTQOUN,A RMAE ,0 21S0U9-I3T9E12
100
PROTECTION
Date:Dated as shown on electronic signature(s)
Subj:Inspection Report
Clean Water Act - National Pollutant Discharge Elimination System
(" NPDES ")
The Village at Shepley Hill
From:Eleanor Horvath, Inspector
Thru:Stephanie Tougas, Inspector
To:File
I. Facility Information
A. Facility Name:The Village at Shepley Hill
B. Facility Location:Longley Road
Groton, MA 01450
C. Facility Contacts:David Sampo, Project Manager
Restoration Capital
PO Box 1044
Sudbury, MA 01776
(603) 759-8244, dsampo@restorationcapital.net
D. NPDES ID No (s).: MAR1003PE
II. Background Information
A. Date(s) of inspection: April 16, 2024
B. Weather Conditions: Sunny, 60 degrees Fahrenheit
C. US EPA Representative(s):
Eleanor Horvath
Stephanie Tougas
D. State / Local Representative(s):
None
ED_019088B_00000288-00001
E. Federally Enforceable Requirements Covered During the Inspection:
EPA 2022 Construction General Permit
F. Previous Enforcement Actions:
None
III. Type and Purpose of Inspection
Routine Compliance Evaluation
IV. Facility Description
The site is approximately 50 acres, 23 of which are being disturbed from construction
activities, and is located off Longley Road in Groton, MA. It is being developed by
Restoration Capital into a residential community. The site is surrounded by open space
to the west, and low - density residential and agricultural land to the north, south, and
east. There are mapped wetlands and streams to the west, north, and east of the site.
V. Inspection
Inspector Horvath called Mr. David Sampo in the morning prior to the inspection at
approximately 9:00 AM to request site access. Mr. Sampo granted access and said he
would be on site to accompany EPA on the inspection. EPA arrived at the site at
approximately 9:50 AM.
A. Opening Conference
Mr. Sampo met EPA onsite and introduced himself as the project manager. Inspector
Horvath presented her credentials and explained the purpose of the inspection.
The opening conference occurred at the eastern entrance to the site on Longley Road.
Inspectors Horvath and Tougas explained that EPA was present for a routine site visit,
not due to a complaint. Inspector Horvath asked Mr. Sampo about the availability of the
sites Stormwater Pollution Prevention Plan (SWPPP), and Mr. Sampo indicated that it
could be found online. Inspector Horvath informed him that she would follow up via
email to request an electronic copy of the SWPPP.
B. Facility Tour
EPA and Mr. Sampo began the site tour by walking west along an unnamed road from
the site entrance on Longley Road. The group crossed a bridge over what Mr. Sampo
explained was an intermittent stream and wetlands. On the other side of the bridge,
EPA observed the first of two cleared areas on the site, which contained two completed
structures. This area included two retention basins, both on the north side of the
unnamed road. EPA observed catch basins along the road that Mr. Sampo explained
were draining into the retention basins.
2
ED_019088B_00000288-00002
The group crossed another bridge over wetland areas into the second, larger cleared
area on the site and began walking south along the perimeter of the site. EPA observed
a structure to the south of the unnamed road that was still under construction. The
structure had a steep slope behind it that was covered in riprap, with a third retention
basin at the bottom of the slope. EPA observed an east - west swale between the
structure and the road that drained to the retention basin.
The group continued walking south along the eastern perimeter of the disturbed area.
EPA noticed more wetlands at the bottom of a slope behind several completed
structures, to the east of the disturbed areas. EPA observed a north - south swale running
along the slope behind these completed properties, between the structures and the
wetlands, and into the same retention basin. The slopes between the structures and the
swale were nearly completely stabilized with hydroseed and erosion control blankets.
Mr. Sampo indicated that the small, exposed area that had not yet been stabilized was
going to be hydroseeded in the next 1-2 weeks.
The group arrived at the southernmost structure on the site. EPA observed that the
slopes surrounding the structure were stabilized and there was a silt fence at the
bottom of the slope between the disturbed area and the open space. The group
continued walking north along the western perimeter. The stabilized slopes and silt
fence continued along the edge of the disturbed area. EPA observed the fourth
retention basin on the west side of the disturbed area, as well as two slopes with riprap
behind a completed structure and behind the retention basin.
The group continued walking north along the western perimeter of the site. The
stabilized slopes and silt fences continued along the edge of the disturbed area. EPA
observed a flat, gravel - covered area for the properties'well systems, which was
surrounded by silt fences and stabilized slopes. EPA also observed active stockpiles and
two more retention basins at the northernmost edge of the site.
The group approached the northern entrance to the site off Sand Hill Road. EPA
observed a bridge with a large culvert at the entrance, with a stream and wetland areas
below the bridge. The slopes along the bridge supports were exposed, and Mr. Sampo
indicated that they would be hydroseeded in the future. They were stabilized with silt
fences between the slopes and the stream. EPA observed that the silt fences were
intact, but nearly filled with sediment, and may require maintenance in the future.
Inspector Tougas conveyed this information to Mr. Sampo.
The group continued walking south along the remaining eastern perimeter, then
returned to the easternmost entrance on Longley Road, where the site tour was
concluded.
3
ED_019088B_00000288-00003
C. Closing Conference
Inspector Horvath explained that she would be following up to request copies of Mr.
Sampo's erosion control inspection reports and the site SWPPP. She also said she would
follow up with a copy of the inspection report within 60 days. Inspector Tougas said that
Mr. Sampo may need to address the near - full silt fences under the bridge at the
northernmost entrance to the site and follow up with documentation showing that they
were addressed.
EPA departed at approximately 10:45 AM.
On April 18, 2024 (two days after the inspection), Inspector Horvath emailed Mr. Sampo
to request copies of the site's SWPPP and recent inspection reports.
Unless otherwise noted, this report describes conditions at the facility / property as
observed by EPA inspector(s), and / or through records provided to and / or information
reported to EPA inspector(s) by facility representatives and as understood by the
inspector(s). This report may not capture all operations or activities ongoing at the time
of the inspection. This report does not make final determinations on potential areas of
concern. Nothing in this report affects EPA's authorities under federal statutes and
regulations to pursue further investigation or action.
VI. Inspection Photos
Photo Log PageImage Descriptions
20Site sign
19Crossing 1
18Storm drain control
Catch basins at entrance drain into this detention
17
pond
16Catch basin leads to retention pond
15Catch basin leads to retention pond
14Retention pond by second crossing
13Swale and retention pond
12Swale and retention pond
11Geogrid on slope
10Planning to seed asap
9Back of house stabilized
187 Riprap
Retention pond gutter drain
Stabilized slope behind foundation
6543
Wells
4Collects water from catch basins on site
Area to tend to remove sediment
4
ED_019088B_00000288-00004
2 Tend to sediment accumulation
1
Retention pond
50
ED_019088B_00000288-00005