B. Coopersmith Wayne H. C. Gaffney Chicago Plant MONTHLY REPORT 7/31/84 R. F. Anderson J. F. Daly J. S. DruzbacJcy R. L. Johnson F. F. Loffelman S. M. Lustig C. G. Neumann I. SAFETY & HEALTH A. The plant has operated 4611 days (thru 7/23) without a disabling injury. 3. There were no recordable injuries during this period.Y.T.D. X.E.A. is 6.4. C. The latest blood lead levels for 25 employees (all but office personnel) are: ,,v>y \/f" l 50 ug/Pb,;100 grams blood or above 40 - 49 below 4Q % below 50 Average II. PRODUCTION & SHIPMENTS JULY $> 12 13 100% 37 LAST 2 12 11 92 39 6 MOS. AVERAGE 2 12 11 92 39 % of Budgeted Rate Stabilizers Litharge Plant total SHIPMENTS k Pounds Stabilizers Litharge ACTUAL JULY EST. AUG. EST. SEPT. 102 67 91 106 117 110 31 117 93 555 0 550 20 400 20 CY\Nl 1-000175 2 III. INVENTORY END OF JUNE END OF JULY END OF AUG. END OF SEPT. k^ DOS k$ DOS k$ DOS k$ DOS Finished Goods 187 23 237 29 225 35 250 28 Support Goods 305 37 239 29 250 39 200 22 Plant totals 492 60 576 58 475 74 450 50 Figures reflect the inventory of pig lead purchased as a hedge against shortages due to labor problems. IV. TECHNICAL A. The second extrusion trial at Bepex, Santa Rosa, California was fairly successful as we were able to run Cyastab 1W at 300 lbs/hr and SW at 600. This would equate to 3 and 6k lbs/hrs on a 15" machine. Two problems were encountered. 1.) Maintaining a constant thruput. Control of feed rate, temperature and feed consistency is apparently critical. 2.) Cutting of the pellets at the die head. This can be accomplished by use of ain or CO2 but the optimum nozzle configuration must be worked out. The 6" machine has been rented for at least four weeks and we anticipate trial runs to start the week of August 6th. B. PPG We continue to give top priorty to laboratory experiments to re solve this problem. C. EVALUATION OF LECTRO 95 & 105 We have since learned that Lectro 95 is not being sampled ,and will be withdrawn. We understand it is/was a physical mixture of Sulfate and Phthalate. A sample of Lectro 105 is supposed to be coming from Conoco via C. E. Petersen, and a sample of Lectro 65, the base material from which it is made is coming from M.L. Siano. vooo^e IV. TECHNICAL (continued) D. LYNN PLASTICS Required information has been received. Project has been set up and assigned to B. Terzic. E. TENNECO We still need a sample of Tribase - oiled. Just received a sample of Tribase XL - oiled, which we did not need. F. ETHYL C. E. Petersen is to request the customer provide more masterbatch, and Izod bars from previous test. He will also request that they test bars we prepare in Bridgewater. G. CAPITAL WIRE 918 will function effectively in Capital's 105 formulation. We only need to test in their other formulations before submission. Project has been set up and assigned to 3. Terzic. H. PACKARD ELECTRIC In a telephone conversation. Bob Slapsak recommended that we do not do any work on new stabilizers for them in other than their formulation. He promised to send us a masterbatch as scon as possible. I. COMPLAINTS There have been no new complaints this month. The YTD total stands at 10, broken down as follows: Quality Shipping - Fault of Trucker Not justified Development problem (PPG) 2 2 5 1 CYW j-000177 4 V. GENERAL A. We have developed lead inventories and supplies to carry us into November/ December* This precaution has been taken as a result of major labor disruptions at Amex and St. Joe. Lead prices currently quoted are 30 - 34b with the latest M.W. average at 30.2b. B. PERSONNEL Salary 12 Hourly 16 one to two per week on vacation two to three per week on vacation C. MAJOR PLANT PROJECTS Stranded product. Bepex trial starts 8/6/84 idder 26 back up generator utility cost saving New dryer to replace the P & S unit New lift truck Increase Chemical Group warehousing H. C. Gaffney CYWI 1-000178 u p...