Document LKgjY0eRK5MaBegBZVLXmG3Eg
From: Sent: To: Subject: Attachments:
Lombardi, Kyle Wed, 14 May 2025 14:04:15 +0000 Matesic, Hannah (OST); Priebe, Jack (OST) AIP Grant Question - Redding Airport Redding AIP Grant Application.pdf
k This email originated from outside of the Department of Transportation (DOT). Do not click on links or open attachments unless you recognize the sender and know the content is safe.
Hi Hannah and Jack,
When I was out in the district last month, I visited the Redding Airport in Shasta County, California. My understanding is they applied for $27.5M in AIP funding from the FAA (see attached application). FAA did not make this award in 2023 or 2024. This project is ready to go, but for the FAA AIP funds. Contractors are in place but may need to be let go if this funding doesn't come through in 2025. Airport officials are under the impression that FAA will issue them these funds this year, which would be great, in the first round of awards in June or July. However, our constituents heard that their grant was on pause at FAA HO for review.
I checked with Dan Neumann at FAA congressional affairs about Redding's AIP grant. He said Redding is a priority, but that he didn't know about timing of awards because the Administration is reviewing all grants to ensure they are consistent with its priorities.
Redding would use these AIP funds to resurface its main runway. I toured this airport last month, and the runway has some issues. There is some cupping, as week as some pieces of sealant and concrete are coming loose. The airport is patching this stuff to keep the runway safe and up to spec, but the long-term solution is resurfacing. Redding airport is home to a firefighter hotshot facility and is used extensively by firefighting aircraft. It is also the only commercial airport in CA north of Sacramento and pulls travelers from across the region and southern Oregon.
It would be much appreciated if you can you tell me what the status of the Redding Airport AIP grant is and when the FAA will start making awards?
Thanks for the help on this issue. Best,
Kyle
Kyle Lombardi Deputy Chief of Staff Congressman Doug LaMalfa (CA-01)
OST-2025-1200 Page 00732
Sierra Club v. Dept. of Transp. - 3:25-cv-06221
SC_EVERSPLIT0014909
408 Cannon House Office Building Washington, D.C. 20515 Office: (b)(6)
OST-2025-1200 Page 00733
Sierra Club v. Dept. of Transp. - 3:25-cv-06221
SC_EVERSPLIT0014910
Application for Federal Assistance SF-424
*1. Type of Submission:
*2. Type of Application
u Preapplication X Application
X New u Continuation
u Changed/Corrected Application u Revision
OMB Number: 4040-0004 Expiration Date: 11/30/2025
* If Revision, select appropriate letter(s): * Other (Specify)
*3. Date Received:
5a. Federal Entity Identifier: 3-06-0194-xxx
4. Applicant Identifier: RDD
*5b. Federal Award Identifier:
State Use Only: 6. Date Received by State: 8. APPLICANT INFORMATION:
7. State Application Identifier:
*a. Legal Name: City of Redding
*b. Employer/Taxpayer Identification Number (EIN/TIN): 94-60000401
*c. UEI: XL3JUNNVFLL9
d. Address:
*Street 1:
777 Cypress Avenue
Street 2:
*City: County/Parish:
Redding Shasta
*State:
CA
*Province: *Country: *Zip / Postal Code
USA: United States 96001-2718
e. Organizational Unit:
Department Name: Public Works
Division Name: Airports
f. Name and contact information of person to be contacted on matters involving this application:
Prefix:
Mr.
*First Name: Andrew
Middle Name:
*Last Name:
Solsvig
Suffix:
Title: Airports Manager
Organizational Affiliation: City of Redding
*Telephone Number: 5302244321
Fax Number:
*Email: asolsvig@cityofredding.org
OST-2025-1200 Page 00734
Sierra Club v. Dept. of Transp. - 3:25-cv-06221
SC_EVERSPLIT0014911
Application for Federal Assistance SF-424 *9. Type of Applicant 1: Select Applicant Type:
C: City or Township Government Type of Applicant 2: Select Applicant Type:
Pick an applicant type Type of Applicant 3: Select Applicant Type:
Pick an applicant type *Other (Specify)
*10. Name of Federal Agency: Federal Aviation Administration 11. Catalog of Federal Domestic Assistance Number: 20.106 CFDA Title: Airport Improvement Program
*12. Funding Opportunity Number:
*Title:
13. Competition Identification Number: N/A Title: N/A
14. Areas Affected by Project (Cities, Counties, States, etc.): City of Redding, County of Shasta, California
*15. Descriptive Title of Applicant's Project:
Runway 16-34 Rehabilitation; Connector Taxiway H, Rwy 16-34 Shoulder and Runway 16-34 Blast Pad Reconstruction; MAGVAR updates; Runway 16-34 High Intensity Light Replacement (HIRL) and Airfield Signage Improvements; Phase 2, Construction.
Attach supporting documents as specified in agency instructions. OST-2025-1200 Page 00735
Sierra Club v. Dept. of Transp. - 3:25-cv-06221
SC_EVERSPLIT0014912
Application for Federal Assistance SF-424
16. Congressional Districts Of: *a. Applicant: CA-1
*b. Program/Project: CA-1
Attach an additional list of Program/Project Congressional Districts if needed.
17. Proposed Project: *a. Start Date: 6/30/2025
18. Estimated Funding ($):
*a. Federal *b. Applicant *c. State *d. Local *e. Other *f. Program Income *g. TOTAL
$ 27,751,162 $ 1,488,613 $ 0 $ 0 $ 0 $ 0
$ 29,239,775
*b. End Date: 02/01/2026
*19. Is Application Subject to Review By State Under Executive Order 12372 Process?
u a. This application was made available to the State under the Executive Order 12372 Process for review on
.
X b. Program is subject to E.O. 12372 but has not been selected by the State for review.
u c. Program is not covered by E.O. 12372.
*20. Is the Applicant Delinquent On Any Federal Debt? Yes X No
If "Yes", explain:
21. *By signing this application, I certify (1) to the statements contained in the list of certifications** and (2) that the statements herein are true, complete and accurate to the best of my knowledge. I also provide the required assurances** and agree to comply with any resulting terms if I accept an award. I am aware that any false, fictitious, or fraudulent statements or claims may subject me to criminal, civil, or administrative penalties. (U. S. Code, Title 218, Section 1001)
X ** I AGREE
** The list of certifications and assurances, or an internet site where you may obtain this list, is contained in the announcement or agency specific instructions.
Authorized Representative:
Prefix: Middle Name: *Last Name: Suffix:
Mr. Solsvig
*First Name: Andrew
*Title: Airports Manager
*Telephone Number: 530-224-4321
Fax Number:
* Email: asolsvig@cityofredding.org
*Signature of Authorized Representative: AndrewOSSoTl-s2v0i2g5-g1"a.2::'021',nY0,;5'9P07a014gb!.e'l': 05d:03'7.0537%6105''g
*Date Signed:
Sierra Club v. Dept. of Transp. - 3:25-cv-06221
SC_EVERSPLIT0014913
011 U.S. Department of Transportation Xere Federal Aviation Administration
OMB CONTROL NUMBER: 2120-0569 EXPIRATION DATE: 12/31/2026
Application for Federal Assistance (Development and Equipment Projects)
PART II - PROJECT APPROVAL INFORMATION
Part II - SECTION A
The term "Sponsor" refers to the applicant name provided in box 8 of the associated SF-424 form.
Item 1. Does Sponsor maintain an active registration in the System for Award Management (www.SAM.gov)?
X Yes
u No
Item 2. Can Sponsor commence the work identified in the application in the fiscal year the grant is made or within six months after the grant is made, whichever is later?
X Yes u No u N/A
Item 3. Are there any foreseeable events that would delay completion of the project? If yes, provide attachment to this form that lists the events.
u Yes X No u N/A
Item 4. Will the project(s) covered by this request have impacts or effects on the environment that require mitigating measures? If yes, attach a summary listing of mitigating measures to this application and identify the name and date of the environmental document(s).
Item 5. Is the project covered by this request included in an approved Passenger Facility Charge (PFC) application or other Federal assistance program? If yes, please identify other funding sources by checking all applicable boxes.
u Yes X No u N/A X Yes u No u N/A
X The project is included in an approved PFC application. If included in an approved PFC application, does the application only address AIP matching share?
X Yes
u No
u The project is included in another Federal Assistance program. Its CFDA number is below.
Item 6. Will the requested Federal assistance include Sponsor indirect costs as described in 2 CFR Appendix VII to Part 200, States and Local Government and Indian Tribe Indirect Cost Proposals?
X Yes u No u N/A
If the request for Federal assistance includes a claim for allowable indirect costs, select the applicable indirect cost rate the Sponsor proposes to apply:
X De Minimis rate of 10% as permitted by 2 CFR 200.414.
u Negotiated Rate equal to on
% as approved by (Date) (2 CFR part 200, appendix VII).
(the Cognizant Agency)
Note: Refer to the instructions for limitations of application associated with claiming Sponsor indirect costs.
FAA Form 5100-100 (1/24) SUPERSEDES PREVIOUS EDITION OST-2025-1200 Page 00737
Sierra Club v. Dept. of Transp. - 3:25-cv-06221
Page 1 of 7
SC_EVERSPLIT0014914
OMB CONTROL NUMBER: 2120-0569 OMB EXPIRATION DATE: 12/31/2026
PART II - SECTION B
Certification Regarding Lobbying The declarations made on this page are under the signature of the authorized representative as identified in box 21 of form SF-424, to which this form is attached. The term "Sponsor" refers to the applicant name provided in box 8 of the associated SF-424 form.
The Authorized Representative certifies, to the best of his or her knowledge and belief, that:
(1) No Federal appropriated funds have been paid or will be paid, by or on behalf of the Sponsor, to any person for influencing or attempting to influence an officer or employee of an agency, a Member of Congress, an officer or employee of Congress, or an employee of a Member of Congress in connection with the awarding of any Federal contract, the making of any Federal grant, the making of any Federal loan, the entering into of any cooperative agreement, and the extension, continuation, renewal, amendment, or modification of any Federal contract, grant, loan, or cooperative agreement.
(2) If any funds other than Federal appropriated funds have been paid or will be paid to any person for influencing or attempting to influence an officer or employee of any agency, a Member of Congress, an officer or employee of Congress, or an employee of a Member of Congress in connection with this Federal contract, grant, loan, or cooperative agreement, the Authorized Representative shall complete and submit Standard Form-LLL, "Disclosure Form to Report Lobbying," in accordance with its instructions.
(3) The Authorized Representative shall require that the language of this certification be included in the award documents for all sub-awards at all tiers (including subcontracts, subgrants, and contracts under grants, loans, and cooperative agreements) and that all subrecipients shall certify and disclose accordingly.
This certification is a material representation of fact upon which reliance was placed when this transaction was made or entered into. Submission of this certification is a prerequisite for making or entering into this transaction imposed by section 1352, title 31, U.S. Code. Any person who fails to file the required certification shall be subject to a civil penalty of not less than $10,000 and not more than $100,000 for each such failure.
FAA Form 5100-100 (1/24) SUPERSEDES PREVIOUS EDITION OST-2025-1200 Page 00738
Sierra Club v. Dept. of Transp. - 3:25-cv-06221
Page 2 of 7
SC_EVERSPLIT0014915
OMB CONTROL NUMBER: 2120-0569 OMB EXPIRATION DATE: 12/31/2026
PART II - SECTION C
The Sponsor hereby represents and certifies as follows: 1. Compatible Land Use -- The Sponsor has taken the following actions to assure compatible usage of land adjacent to or in the vicinity of the airport: The County has a compatible land use plan.
2. Defaults -- The Sponsor is not in default on any obligation to the United States or any agency of the United States Government relative to the development, operation, or maintenance of any airport, except as stated herewith:
None
3. Possible Disabilities -- There are no facts or circumstances (including the existence of effective or proposed leases, use agreements or other legal instruments affecting use of the Airport or the existence of pending litigation or other legal proceedings) which in reasonable probability might make it impossible for the Sponsor to carry out and complete the Project or carry out the provisions of the Grant Assurances, either by limiting its legal or financial ability or otherwise, except as follows:
None
4. Consistency with Local Plans -- The project is reasonably consistent with plans existing at the time of submission of this application) of public agencies that are authorized by the State in which the project is located to plan for the development of the area surrounding the airport.
Yes
5. Consideration of Local Interest -- It has given fair consideration to the interest of communities in or near where the project may be located.
Yes
6. Consultation with Users -- In making a decision to undertake an airport development project under Title 49, United States Code, it has consulted with airport users that will potentially be affected by the project ( 47105(a)(2)). Yes, multiple public outreach meetings were held throughout the project design.
7. Public Hearings -- In projects involving the location of an airport, an airport runway or a major runway extension, it has afforded the opportunity for public hearings for the purpose of considering the economic, social, and environmental effects of the airport or runway location and its consistency with goals and objectives of such planning as has been carried out by the community and it shall, when requested by the Secretary, submit a copy of the transcript of such hearings to the Secretary. Further, for such projects, it has on its management board either voting representation from the communities where the project is located or has advised the communities that they have the right to petition the Secretary concerning a proposed project.
Yes, multiple public outreach meetings were held throughout the project design.
8. Air and Water Quality Standards -- In projects involving airport location, a major runway extension, or runway location it will provide for the Governor of the state in which the project is located to certify in writing to the Secretary that the project will be located, designed, constructed, and operated so as to comply with applicable and air and water quality standards. In any case where such standards have not been approved and where applicable air and water quality standards have been promulgated by the Administrator of the Environmental Protection Agency, certification shall be obtained from such Administrator. Notice of certification or refusal to certify shall be provided within sixty days after the project application has been received by the Secretary.
N/A
FAA Form 5100-100 (1/24) SUPERSEDES PREVIOUS EDITION OST-2025-1200 Page 00739
Page 3 of 7
Sierra Club v. Dept. of Transp. - 3:25-cv-06221
SC_EVERSPLIT0014916
PART II - SECTION C (Continued)
OMB CONTROL NUMBER: 2120-0569 OMB EXPIRATION DATE: 12/31/2026
9. Exclusive Rights -- There is no grant of an exclusive right for the conduct of any aeronautical activity at any airport owned or controlled by the Sponsor except as follows:
None
10. Land -- (a) The sponsor holds the following property interest in the following areas of land, which are to be developed or used as part of or in connection with the Airport subject to the following exceptions, encumbrances, and adverse interests, all of which areas are identified on the aforementioned property map designated as Exhibit "A". [1]
Yes, the most current Exhibit A dated July 2018 was submitted to FAA.
The Sponsor further certifies that the above is based on a title examination by a qualified attorney or title company and that such attorney or title company has determined that the Sponsor holds the above property interests.
(b) The Sponsor will acquire within a reasonable time, but in any event prior to the start of any construction work under the Project, the following property interest in the following areas of land on which such construction work is to be performed, all of which areas are identified on the aforementioned property map designated as Exhibit "A". [1] N/A
(c) The Sponsor will acquire within a reasonable time, and if feasible prior to the completion of all construction work under the Project, the following property interest in the following areas of land which are to be developed or used as part of or in connection with the Airport as it will be upon completion of the Project, all of which areas are identified on the aforementioned property map designated as Exhibit "A". [1] N/A
1 State the character of property interest in each area and list and identify for each all exceptions, encumbrances, and adverse interests of every kind and nature, including liens, easements, leases, etc. The separate areas of land need only be identified here by the area numbers shown on the property map.
FAA Form 5100-100 (1/24) SUPERSEDES PREVIOUS EDITION OST-2025-1200 Page 00740
Page 4 of 7
Sierra Club v. Dept. of Transp. - 3:25-cv-06221
SC_EVERSPLIT0014917
OMB CONTROL NUMBER: 2120-0569 OMB EXPIRATION DATE: 12/31/2026
PART III - BUDGET INFORMATION - CONSTRUCTION
SECTION A - GENERAL
1. Assistance Listing Number: 2. Functional or Other Breakout:
20.106 Airport Improvement Program
SECTION B -- CALCULATION OF FEDERAL GRANT
Cost Classification 1. Administration expense
Latest Approved Amount
(Use only for revisions)
Adjustment + or (-) Amount
(Use only for revisions)
2. Preliminary expense
3. Land, structures, right-of-way
4. Architectural engineering basic fees
5. Other Architectural engineering fees
6. Project inspection fees
(Construction Admin)
7. Land development
8. Relocation Expenses
9. Relocation payments to Individuals and Businesses
10. Demolition and removal
11. Construction and project improvement
12. Equipment 13. Miscellaneous
(Flight Check)
14. Subtotal (Lines 1 through 13)
15. Estimated Income (if applicable)
16. Net Project Amount (Line 14 minus 15)
17. Less: Ineligible Exclusions (Section C, line 23 g.)
18. Subtotal (Lines 16 through 17)
19. Federal Share requested of Line 18
20. Grantee share
21. Other shares
22. TOTAL PROJECT (Lines 19, 20 & 21)
Total Amount Required
$ 270,000
1,717,000
27,106,881 145,894
$ 29,239,775 29,239,775
$ 29,239,775 27,751,162 1,488,613
$ 29,239,775
FAA Form 5100-100 (1/24) SUPERSEDES PREVIOUS EDITION OST-2025-1200 Page 00741
Sierra Club v. Dept. of Transp. - 3:25-cv-06221
Page 5 of 7
SC_EVERSPLIT0014918
SECTION C - EXCLUSIONS 23. Classification (Description of non-participating work)
OMB CONTROL NUMBER: 2120-0569 OMB EXPIRATION DATE: 12/31/2026
Amount Ineligible for Participation
a.
b.
c.
d.
e.
f.
g.
Total
SECTION D - PROPOSED METHOD OF FINANCING NON-FEDERAL SHARE 24. Grantee Share -- Fund Categories
a. Securities b. Mortgages c. Appropriations (by Applicant) d. Bonds e. Tax Levies f. Non-Cash g. Other (Explain): h. TOTAL - Grantee share 25. Other Shares a. State b. Other c. TOTAL - Other Shares 26. TOTAL NON-FEDERAL FINANCING
Amount
1,488,613
$ 1,488,613
Amount
$ 1,488,613
Included with this application: Exhibit A - Property Map Exhibit B - Project Layout Plan Exhibit Cl - Cost Summary Exhibit C2 - Scope of Work Narrative Exhibit D - Project Bid Tabulation Exhibit E - Project Schedule Exhibit F - Grant Assurances Exhibit G - Standard DOT Title VI Exhibit H - Sponsor Certifications
SECTION E - REMARKS
(Attach sheets if additional space is required)
FAA Form 5100-100 (1/24) SUPERSEDES PREVIOUS EDITION OST-2025-1200 Page 00742
Sierra Club v. Dept. of Transp. - 3:25-cv-06221
Page 6 of 7
SC_EVERSPLIT0014919
PART IV - PROGRAM NARRATIVE (Suggested Format)
OMB CONTROL NUMBER: 2120-0569 OMB EXPIRATION DATE: 12/31/2026
PROJECT: Rwy 16-34 Rehab; Connector Txy H, Rwy 16-34 Shoulder and Blast Pad Reconst, MAGVAR, HIRL CA
AIRPORT: Redding Regional (RDD)
1. Objective: Perform a major runway pavement rehabilitation (last one performed in 2001) to continue to maintain airfield surface. Replace the existing age-distressed High Intensity Runway Lighting system to maintain night and low visibility operations. The project will also include MAGVAR updates and taxiway renaming elements to maintain compliance with current FAA orders and briefs.
2. Benefits Anticipated:
Extend the useful life of the pavement and allow the pavement to continue to support current and future operations. Shoulder and runway lighting improvements will enhance the safety of operations by providing more stable shoulders and reliable LED lights.
3. Approach: (See approved Scope of Work in Final Application)
The project will involve the construction of the following elements: Runway 16-34 Rehabilitation (116,700 SY, PCI 46) - Variable depth mill-and-fill, P-403 asphalt concrete leveling course, and P-401 asphalt concrete surface course and pavement markings Connector Taxiway H (1,300 SY, PCI 40), Runway 16-34 Shoulders (39,000 SY, PCI 58-64), and Runway 16-34 Blast Pad Reconstruction (8,900 SY, PCI 58-64) - Cement treated subgrade, P-209 aggregate base, and P-401 asphalt concrete pavement section and pavement markings MAGVAR Updates - New runway designators and airfield signage for MAGVAR updates for Runway 16-34 (future 17-35) and Runway 12-30 (future 13-31) High Intensity Runway 16-34 Edge Light Replacement (84 fixtures) - Installation of new edge lights, conduit, counterpoise, and conductors. Fixtures and base cans to be procured under separate grant. Airfield Signage Improvements (50 signs) - New signage and legend replacement to rename taxiways in conformance with Engineering Brief 89 and MAGVAR updates. Airfield signs and base cans to be procured under separate grant.
4. Geographic Location: City of Redding, County of Shasta, California
5. If Applicable, Provide Additional Information:
The project was bid in spring of 2024 with a Contractor holding bids until June 6, 2025. The City will work closely with the FAA on when grant funding can be released. In the event the grant is not received by May 31, 2025 (allowing contract to be executed by June 06, 2025), the project will be repackaged and rebid in summer of 2025.
6. Sponsor's Representative: (include address & telephone number)
Mr. Andrew Solsvig, Airports Manager 777 Cypress Avenue, Redding, CA 96001 Phone: 530-224-4321
FAA Form 5100-100 (1/24) SUPERSEDES PREVIOUS EDITION OST-2025-1200 Page 00743
Page 7 of 7
Sierra Club v. Dept. of Transp. - 3:25-cv-06221
SC_EVERSPLIT0014920
Exhibit A Property Map
OST-2025-1200 Page 00744
Sierra Club v. Dept. of Transp. - 3:25-cv-06221
SC_EVERSPLIT0014921
Parcel
1
)1 2
)
E5)
Q1)
-6-4
19
21
(2.;.4. )
Owner:
City of Redding
City of Redding
City of Redding
City of Redding
City of Redding
City of Redding City of Redding
City of Redding
City of Redding
City of Redding
City of Redding
City of Redding
City of Redding
City of Redding
City of Reddin.
City of Redding
City of Redding
City of Redding
City of Redding
City of Redding
City of Redding
City of Redding
City of Redding
City of Redding
City of Redding
City of Redding
City of Redding
City of Redding
City of Redding
City of Redding
City of Redding
City of Redding
City of Redding
Acreage
108.13 320.00 193.88 60.37 256.55 118.68
2.87 52.73 47.25 9.93 18.89 12.00 4.62 0.86 1.24 5.08 5.50 1.25 1.60 46.87 20.00 10.20 3.40 1.88
1.6 1.27 4.34 5.15 5.12 1 41 1.55 1 55 1 38
Date Recorded
06/06/1949 12/08/1947 12/08/1947 06/06/1973 12/08/1947 12/08/1947 12/08/1947
04/15/04 04/15/2004 08/23/2004 08/23/2004 08/27/2004 10/08/1984 08/04/1980 08/04/1980 11/25/1970 05/27/1971 09/27/1972 09/27/1972 04/04/1968 03/20/1975 02/29/1968 12/13/1999 08/04/2003 08/04/2003 12/08/1947 12/08/1947 12/08/1947 12/08/1947 12/08/1047 12/08/1047 12/08/1047 12/00/1047
Recording Information
054-260-001-000 054-270-004-000 054-280-005-000 056-130-009-000 056-130-008-00 056-010-025-000 054-260-002-000 056-080-009-000 056-080-010-000 056-080-008-000 056-080-007-000 056-100-001-000 056-090-040-000 056-090-012-000 056-090-016-000 056-090-015-000 056-090-015-000 056-090-015-000 056-090-015-000 056-080-006-000 056-590-014-000 056-580-021-000 056-580-021-000 056-590-012-000 056-590-013-000 056-610-017-000 056-610-004-000 056-610-008-000 054-640-001-000 054-C40-010 000 054-C40-012-000 056 640 013 000 056-C40-020-000
RECORDING INFORMATION 1
Grantor/Method
Parcel
Owner:
Acreage
Date Recorded
Recording Information
Grantor/Method
Parcel
Owner:
Quick Claim Dead D-339
Instrument of Transfer
Instrument of Transfer
Fee Simple
Instrument of Transfer
Instrument of Transfer
Instrument of Transfer
AIP# 03-06-0194-28 Fee Simple
AIP# 03-06-0194-28 Fee Simple
AIP# 03-06-0194-28 Fee Simple
AIP# 03-06-0194-28 Fee Simple
AIP# 03-06-0194-28 Fee Simple
AIP# 03-06-0194-10 Fee Simple
AIP# 03-06-0194-10 Condemnation
AIP# 03-06-0194-10 Condemnation
ADAP# 8-06-0194-01 Fee Simple
ADAP# 8-06-0194-01 Fee Simple
Fee Simple
Fee Simple
ADAP# 8-06-0194-01/Fee Simple 9-04-062-C804
ADAP# 8-06-0194-01/Condemnation 9-04-062-C804
ADAP# 8-06-0194-01 Fee Simple
AIP# 03-06-0194-21 Fee Simple
AIP# 03-06-0194-22
AIP# 03-06-0194-22
(32)
r 3b
3 )
r,33o,
-/ 331 *
434
35
36
7)
C3B)
City of Redding
Cit of Redding
City of Redding
City of Redding
City of Redding
City of Redding
City of Redding
City of Redding
City of Redding
City of Redding
City of Redding
City of Redding
City of Redding
City of Redding
City of Redding
City of Redding
City of Redding
City of Redding
City of Redding
City of Redding
13.0
12/08/1947
23.67 9.28 9.42 9.28 9.42 25.70 9.42 5.00 20.00 5.00 3.00 2.0 4.71 4.78 4.73 4.9 8.01 1.03
12/08/1947 01/08/1970 04/15/1970 12/16/1968 10/13/1971 07/12/1971 03/12/1969 04/30/1968 06/22/1972 04/09/1973 02/26/1971 01/22/1971 02/28/1986 08/28/1996 08/28/1996 08/28/1996 01/17/1986 02/26/1993
056-640-006-000 C C10 014 000
054-280-006-00 054-210-052-000 054-210-051-000 054-210-052-000 054-210-051-000 054-210-051-000 054-210-051-000 054-210-052-000 054-210-051-000 054-210-051-000 054-210-051-000 054-210-051-000 054-210-030-000 054-210-034-000 054-210-033-000 054-210-020-000 054-200-034-000 054-200-016-000 642 231A
Instrument of Transfer
Instrument of Transfer
Instrument of Transfer
ADAP# 08-06-0194-01/Fee Simple 09-04-062-C804
ADAP# 08-06-0194-01/Fee Simple 09-04-062-C804
ADAP# 08-06-0194-01/Fee Simple 09-04-062-C804
ADAP# 8-06-0194-01 Fee Simple
ADAP# 8-06-0194-01 Fee Simple
ADAP# 08-06-0194-01/Fee Simple 09-04-062-C804
ADAP# 8-06-0194-01 Fee Simple
ADAP# 8-06-0194-01 Fee Simple
ADAP# 8-06-0194-01 Fee Simple
ADAP# 8-06-0194-01 Fee Simple
ADAP# 8-06-0194-01 Fee Simple
Fee Simple
AIP# 03-06-0194-13 Condemnation
AIP# 03-06-0194-13 Condemnation
AIP# 03-06-0194-13 Condemnation
AIP# 03-06-0194-10 Fee Simple
AIP# 03-06-0194-13 Fee Simple
NOTE:
1. All Property Recording Information was provided by the City of Redding.
40 41
44 45
.)
(52)
2
57
City of Redding
City of Redding
City of Redding
City of Redding
City of Redding
City of Redding
City of Redding
City of Redding
City of Redding
City of Redding
City of Redding
City of Redding
City of Redding
City of Redding
City of Reddin
City of Redding
City of Redding
City of Redding
Total Acreage
2. Parcels have been sold.
LAND RELEASED FROM FEDERAL OBLIGATIONS (MARCH 11, 2008)
Instrument of Transfer Instrument of Transfer
STILLWATER BUSINESS PARK
Instrument of Transfer
Instrument of Transfer
En
Instrument of Transfer Instrument of Transfer
Instrument of Transfer
Instrument of Transfer
BRL/APL
Acreage
Date
Recorded
.51 .48 .72 .35 .53 2.31 .41 4.26 .42 .42 .42 .42
02/17/1983 03/05/1984 08/29/1985 10/25/1984 03/20/1984 02/26/1993 12/08/1983 12/22/2004 10/02/2001 09/08/2004 07/21/2004 07/21/2004
.42 5.18 .50 76 88 .50 .70
01/14/2003 10/01/2004 10/12/1983 01/27/2005 02/01/1984 10/02/2001
1:1,502.95
Recording Information
054-200-023-000 054-200-024-000 054-200-022-000 054-200-025-000 054-200-006-000 054-200-067-000 054-200-026-000 056-080-012-000 056-120-007-000 056-120-006-000 056-120-018-000 056-120-002-000 056-120-001-000 056-110-001-000 056-230-013-000 056 160 005 000 056-230-014-00 056-230-015-000
Grantor/Method
AlP# 03-06-0194-10 Fee Simple
AlP# 03-06-0194-10 Fee Simple
AIP# 03-06-0194-10 Fee Simple
AIP# 03-06-0194-10 Fee Simple
AIP# 03-06-0194-10 Fee Simple
AIP# 03-06-0194-13 Fee Simple
AIP# 03-06-0194-28 Fee Simple
Pending Grant/Fee Simple
AIP# 03-06-0194-22 Fee Simple
AIP# 03-06-0194-28 Fee Simple
AIP# 03-06-0194-28 Fee Simple
AIP# 03-06-0194-28 Fee Simple
AIP# 03-06-0194-22 Fee Simple
AIP# 03-06-0194-28 Fee Simple
AIP# 03-06-0194-10 Fee Simple
Pending Crant/Fee Simple
AIP# 03-06-0194-10
AIP# 03-06-0194-22
26 36
Spoop,-- tsilsaS
es 0
ULT. HIGH POINT RWY 16L END EL. 489.0' TDZE 489.9' 4030'53.63"W 12217'09.37"N
WOODED ARE
LEGEND
EXISTING ULTIMATE
DESCRIPTION
REDDING MUNICIPAL AIRPORT PROPERTY LINE
4-
4-
AIRPORT REFERENCE POINT (ARP)
Ai*
*
AIRPORT ROTATING BEACON
[=:,:.:,/ v\.?\.(. .,i`v. ,,' 15] PAVEMENT TO BE REMOVED
- _
HH[__ -
BRL- BUILDING RESTRICTION LINE (BRL)
-
-
- DRAINAGE
FACILITY CONSTRUCTION
-
O-
O-
O- FENCING
VASI
:
PAPI-4 NAVIGATIONAL AID INSTALLATION
.
- RUNWAY END IDENTIFICATION LIGHTS (REIL)
RUNWAY THRESHOLD LIGHTS
4425 232y
273/
SECTION CORNER
...,
1080
r
RSA
OFA
0
1080
P
RSA(U)
0FA(U)
SEGMENTED CIRCLE/WIND INDICATOR TOPOGRAPHIC CONTOURS (See Note 5) WIND INDICATOR RUNWAY SAFETY AREA (RSA) OBJECT FREE AREA (OFA)
0FZ
0FZ(U)
OBSTACLE FREE ZONE (OFZ)
-worm-le
-ig-rewl.-
HOLD POSITION MARKINGS PARCELS
EXISTING RPZ
20:1 APPROACH SLOPE
500' X 1,700' X 1010'
(OWN IN FEE)
EXIST. LOW PT. RWY. 30 END EL. 492.3' TD 12217'09.47"W 4030'04.10"N
ULTIMATE RPZ 250' X 1,000' X 450' 20:1 APPROACH SLOPE
(OWN IN FEE)
POTENIAL RUNWAY RPZ 1000' x 1510' x 1700' 34:1 NON PREC.
PI
...
POTENIAL 1,000' RUNWAY EXTENSION (SEE GENERAL NOTE #14)
EXIST. HIGH PT. RWY. 16 END EL. 504.80'
4031'13.2064"N
12217'41.4746"W
TDZ EL 504.8'
20:1 APPROACH SLOPE 250' X 1,000' X 450' (OWN IN FEE)
BRL/APL
(n)vsa ULT. RUNWAY
X 75' N 0' 04'
ERVE NON-AVIATION ji
EXIST.ARP 12217'36.2000"W 4030'32.4000"N
ULT. ARP 1 22 17'30.844"W 40`30'31.144"N
RESERVE AVIATION
TERMINAL VOR ANTENNA
-
=
ULT. LOW PT. RWY. 34R END EL. 488.5' 4030'14.527"N 12217'22.798"W TDZ EL. 489.3'
EXIST. LOW PT. RWY. 34L END EL. 490.7' 4030'04.0044"N 12217'41.5903"W TDZ EL. 490.7'
Ore on Trail
Service Road
'KS,.`'SvziNsScc AvS\SN 'ssiv:S tr\=x\. ?.\.% \VA\.?..
I *s-Avays16. n\.\
.
II
II
U.S.F S.
II'
HELICOPTER
RAMP
EXISTING RPZ 34:1 APPROACH SLOPE 500' X 1,700' X 1010' (OWN IN FEE)
PAPI-4
U.S.F.S. AND
CALIFORNIA DEPARTMENT
OF FORESTRY
I T,A.X!WAYJ
TOFA rta
0FZ
EXIST. 7 003 X 150' RUNWAY N 0 4' 48" E(Truel
CLE/ TEE
GLIDE SLOPE ANTENNA "J5 RSA 0FZ
VVV7 7 7 7
V 7 V
MALSR
DETEN ION POND
EXISTING RPZ 1,000' X 2,500' X 1,75 50:1 APPROACH SL
(OWN IN FEE)
SOLAR ARRAY SITE
-r
AIRPORT PROPERTY LEGEND
I EXISTING AIRPORT I PROPERTY
1 FUTURE AIRPORT I PROPERTY
Magnetic Declination 14 22' East (June 2015) Annual Rate of Change 00 6.0' West (June 2015)
0
600
1200
SCALE IN FEET
1
SUBMITTED BY:
Coffittlii Associates
FOR APPROVAL BY:
APPROVED BY:
ON THE DATE OF:
Bryant Garrett Airports Manager Department of Public Works Airports Division, City of Redding, California
Ai
WOODED AREA
EXISTING RPZ
500' X 1,700' X 1,010'
20:1 APPROACH SLOPE
O
(OWN IN FEE)
MEM
EXIST. RWY. END HIGH PT. 500.1' TDZE 500.1' 12217'49.8393"W 4030'42.8961"N
LAND RELEASED FROM FEDERAL OBLIGATIONS (MARCH 6, 2000)
ACCESS TO
LAND RELEASED FROM FEDERAL OBLIGATIONS (AUGUST 7, 1997)
REDDING MUNICIPAL AIRPORT
AIRPORT PROPERTY MAP (EXHIBIT "A")
AIRPORT LAYOUT PLAN UPDATE (MASTER PLAN) 12/15/15
REDDING, CALIFORNIA
AIRPORT LAYOUT PLAN UPDATE (MASTER PLAN) 08/29/05
CA 11/08/05 PLANNED BY: %eve Wagner
No.
REVISIONS
DATE
BY I APP'D... DETAILED BY: Maggie Deaver
THE PREPARATION OF THESE DOCUMENTS WAS FINANCED IN PART THROUGH A PLANNING GRANT FROM THE FEDERAL AVIATION ADMINISTRATION AS PROVIDED UNDER SECTION 505 OF THE AIRPORT AND AIRWAY IMPROVEMENT ACT OF 1982. AS AMENDED. THE CONTENTS DO NOT NECESSARILY REFLECT THE OFFICIAL VIEWS OR POLICY OF THE FAA. ACCEPTANCE OF THESE DOCUMENTS BY THE FAA DOES NOT IN ANY WAY CONSTITUTE A COMMITMENT OF THE PART OF THE UNITED STATES TO PARTICIPATE IN ANY DEVELOPMENT DEPICTED HEREIN NOR DOES IT INDICATE THAT THE PROPOSED DEVELOPMENT IS ENVIRONMENTALLY ACCEPTABLE IN ACCORDANCE WITH THE APPROPRIATE PUBLIC LAWS.
APPROVED BY: Jim Harr i5
JUILI 2018
SHEET
1 6 OF
Coffman
Associates
7 Airport Consultants Vww.coffmanassociates.comi
OST-2025-1200 Page 00745
Sierra Club v. Dept. of Transp. - 3:25-cv-06221
SC_EVERSPLIT0014922
Exhibit B Project Layout Plan
OST-2025-1200 Page 00746
Sierra Club v. Dept. of Transp. - 3:25-cv-06221
SC_EVERSPLIT0014923
LEGEND
BLAST PAD RECONSTRUCTION RUNWAY 16-34 REHABILITATION RUNWAY INTERSECTION REHABILITATION TAXIWAY CONNECTORS REHABILITATION TAXIWAY H RECONSTRUCTION PAVED SHOULDER RECONSTRUCTION SIGN REPLACEMENTS SIGN REPLACEMENTS HIRL
UPDATE LANDING DESIGNATOR MARKINGS PER MAGVAR IMPROVMENTS, TYP
RSA
RSA
TAXIWAY H RECONSTRUCTION
Air - INSTALL (N) 12 RCP STORM DRAIN
RSA
RSA
RUNWAY 16 BLAST PAD RECONSTRUCTION
RSA
RSA
REPLACE SIGNS PER AIRFIELD RENAMING. TYP
Yr .) Y,(-) y-
TAXIWAY CONNECTOR REHABILITATION (2-INCH MILL AND OVERLAY)
O O
RUNWAY 16-34 REHABILITATION (4-INCH MILL AND OVERLAY)
AND MAGVAR IMPROVEMENTS.
RSA
RSA
RUNWAY INTERSECTION REHABILITATION
(2-INCH MILL AND OVERLAY)
RSA
RSA
RUNWAY 16.34 (EXISTING) RUNWAY 17-35 (PROPOSED)
RSA
RSA
F4 F-1
UPDATE SURFACE PAINTED HOLDING POSITION MARKINGS PER MAGVAR IMPROVMENTS, TYP
RUNWAY SHOULDER RECONSTRUCTION
RSA
RSA
REMOVE AND INSTALL NEW HIRLS, BASE CANS, CONDUIT, CABLE AND COUNTERPOISE
RSA m
TWY D
RSA
RSA
RSA
(N) AIRFIELD ELECTRICAL HOMERUN
VAULT BUILDING EQUIPMENT IMPROVEMENTS
-X TERMINAL BUILDING
RUNWAY 34 BLAST PAD RECONSTRUCTION
x
x
X " "''''''
X
RDD-)-
REDDING REGIONAL AIRPORT RUNWAY 16-34 REHABILITATION; CONNECTOR TAXIWAY H, RUNWAY 16-34 SHOULDER AND RUNWAY 16-24 BLAST PAD RECONSTRUCTION; MAGVAR UPDATES; RUNWAY 16-34 HIGH
INTENSITY LIGHT REPLACEMENT; AND AIRFIELD SIGNAGE IMPROVEMENTS (PHASE 2)
REDDING REGIONAL AIRPORT CLIENT PROJECT #
1817600-242903.01
10/29/2024
OST-2025-1200 Page 00747
Sierra Club v. Dept. of Transp. - 3:25-cv-06221
MUNICIPAL BLVD
0
300
600
Mead I lunt
SC_EVERSPLIT0014924
Exhibits Cl and C2 Cost Summary and Scope of Work
OST-2025-1200 Page 00748
Sierra Club v. Dept. of Transp. - 3:25-cv-06221
SC_EVERSPLIT0014925
Airport: Redding Regional Airport Sponsor: City of Redding Project: Runway 16-34 and Taxiway Connectors Rehabilitation and MAGVAR Improvements Cost Summary for AIP Grant Application (FY25)
Date
03/20/25
Base Bid
Element
City Administration Construction Administration Construction Reimbursable Agreement #1 Reimbursable Agreement $12 Construction Reimbursable Agreement HIRL Flight Check
Grant Application Category
1. Administration Expense 6. Project Inspection Fees 11. Construction and Project Improvement 13. Miscellaneous 13. Miscellaneous 13. Miscellaneous 13. Miscellaneous
Total Cost
Federal Share (95%)
Non-Federal Share
$ 200,000.00 $
190,000.00 $
10,000.00
$ 1,331,300.00 $
1,264,735.00 $
66,565.00
$ 20,111,190.00 $
19,079,006.75 $ 1,032,183.25
$
57,604.76 $
54,724.52 $
2,880.24
$
58,288.91 $
55,374.46 $
2,914.45
$
15,000.00 $
14,250.00 $
750.00
5
$
- $
-
Total $ 21,773,383.67 $
20,658,090.74 $ 1,115,292.93
Bid Alternate 1
Element
City Administration Construction Administration Construction Reimbursable Agreement #1 Reimbursable Agreement $12 Construction Reimbursable Agreement HIM. Flight Check
Grant Application Category
1. Administration Expense
$
6. Project Inspection Fees
$
11. Construction and Project Improvement
$
13. Miscellaneous
$
13. Miscellaneous
$
13. Miscellaneous
$
13. Miscellaneous
$
Total 5
Total Cost 70,000.00
385,700.00 7,666,587.00
15,000.00 8,137,287.00
Federal Share (95%)
$
66,500.00
$
366,415.00
$
7,283,257.65
$
$
-
$
$
14,250.00
$
7,730,422.65
Non-Federal
Share
$
3,500.00
$
19,285.00
$ 383,329.35
$
$
$
$
750.00
$ 406,864.35
Runway 16-34 Rehabilitation; Connector Taxiway H, Runway 16-34 Shoulder and Runway 16-34 Blast Pad Reconstruction; MAGVAR
Updates; Runway 16-34 High Intensity Light Replacement; and Airfield Si na e Improvements (Phase 2) Project
Element
Grant Application Category
Total Cost
Federal Share (95%)
Non-Federal Share
City Administration
1. Administration Expense
$
270,000 $
256,500 $
13,500
Construction Administration
6. Project Inspection Fees
$
1,717,000 $
1,631,150 $
85,850
Construction (2024 RAC Bid)
11. Construction and Project Improvement
$ 27,777,777 $
26,326,540 $
1,451,237
Construction (Deduct Airfield Lighting
Procurement)
11. Construction and Project Improvement
$
Construction (Deduct Runway Closure
Markers, being procured under separate 11. Construction and Project Improvement
$
grant)
Reimbursable Agreement #1-Runway
13. Miscellaneous
$
Reimbursable Agreement #2-RSA
13. Miscellaneous
$
Construction Reimbursable Agreement 13. Miscellaneous
$
HIRL Flight Check
13. Miscellaneous
$ Total $
(600,746.00) 5
(70,150.00) $
57,605 $ 58,289 $ 15,000 $ 15,000 $ 29,239,775 $
(534,983.95) $ (65,762.05)
(66,642.50) $
54,725 $ 55,374 $ 14,250 $ 14,250 $ 27,751,162 $
(3,507.50)
2,880 2,914
750 750 1,488,612
OST-2025-1200 Page 00749
Sierra Club v. Dept. of Transp. - 3:25-cv-06221
SC_EVERSPLIT0014926
Item 1 2 3 4 S 6
7
Element Runway 16-34 Rehabilitation Runway 16-34 Blast Pad Reconstruction Taxiway Connector Rehabilitation Runway 16-34 MAGVAR Runway 12-30 MAGVAR (City Funded) Runway 16-34 Shoulder Reconstruction Runway 16.34 Edge Lighting (HIRIS) and Signage
TOTAL PROJECT
Federal Share
$ 17,883,553 $
5
1,499,796 $
$
1,071,461 $
$
98,728 $
$
- $
$
5,185,226 $
$
2,012,399 $
$ 27,751,162 $
Construction
NPR PURPOSE
Admin (City + FAA Reimbursable COMPONENT TYPE
Local Share
Total Cost
Construction
Mead & Hunt)
+ Flight Check
(PCT)
941,240 $ 18,824,792 $ 17,376,404 $
1,332,495 $
115,894
RC RW CO
78,937 $
1,578,733 $
1,466,460 $
112,273
RC RW CO
56,393 $
1,127,853 $
1,047,645 $
80,208
RC TW CO
5,196 $
103,924 $
82,600 $
6,324 $
15,000
ST RW CO
28,025 $
28,025 $
28,025 $
ST RW CO
272,907 $
5,458,133 $
5,129,191 $
328,941
RC RW CO
105,916 $ 1,488,612 $
2,118,314 $ 29,239,775 $
1,976,556 $ 27,106,881 $
126,759 $ 1,987,000 $
15,000 145,894
SA RW LI
NPR CODE 80.4 80.4 75.6 73.7 73.7 80.4
83.2
OST-2025-1200 Page 00750
Sierra Club v. Dept. of Transp. - 3:25-cv-06221
SC_EVERSPLIT0014927
CITY OF REDDING REDDING REGIONAL AIRPORT
Runway 16/34 and Taxiway Connectors Rehabilitation and Magnetic Variation (MAGVAR) Improvements
Construction Administration Scope of Services AIP No. 3-06-0194-06X-2025 April 2025
PROJECT DESCRIPTION This Scope of Services details the Construction Administration (CA) services to be provided by Mead & Hunt, Inc. (CONSULTANT) for the Runway 16/34 Rehabilitation and Magnetic Variation (MAGVAR) Improvements Project (Project) at the Redding Regional Airport (Airport) for the City of Redding (SPONSOR).
Background The CONSULTANT completed the design for this Project and bid opening was complete on March 5, 2024. The SPONSOR will submit a final grant application to the FAA to receive federal funding for construction of the Project. It is anticipated that the FAA will award the construction grant in May of 2024, in order to meet the scheduled runway closure period of October 2025.
Project Elements The Project will consist of the following elements:
1) Runway 16/34 and Taxiway Connectors Rehabilitation (Base Bid) a. Variable depth asphalt concrete mill-and-replace, in addition to a leveling course for grade correction b. Adjust existing runway edge lights c. Application of pavement markings
2) Magnetic Variation (MAGVAR) Improvements (Base Bid) a. Renaming of Runway 16/34 to Runway 17/35 and Runway 12/30 to Runway 13/31 including updates to the airfield guidance signs and landing designators updates
3) Runway 16/34 Edge Lighting and Airfield Signage Improvements (Bid Alternate No. 1) a. Remove existing runway edge lights and base cans b. Install new conduit, cable, counterpoise systems c. Installation of new homerun circuit and electrical vault building equipment improvements d. Install new high intensity runway edge lights e. Install new and modify existing airfield guidance signs based on MAGVAR updates in addition to proposed taxiway naming convention
4) Runway 16/34 Pavement Shoulder Reconstruction (Bid Alternate No. 1) a. Asphalt pavement and underlying base removal
Mead & Hunt, Inc. 1 1360 19th Hole Drive, Suite 200, Windsor, CA 95492-7717 I 707-526-5010 I meadhunt.com
OST-2025-1200 Page 00751
Sierra Club v. Dept. of Transp. - 3:25-cv-06221
SC_EVERSPLIT0014928
Redding Regional Airport Runway 16/34, Taxiway Connectors Rehabilitation & MAGVAR Improvements Construction Administration Scope of Services April 2025
b. Full depth subgrade excavation
c. Cement treatment of subgrade
d. New asphalt and aggregate base pavement section
Exhibit A
There was one bid for the Project, with a Base Bid cost of $20,106,000, and a Bid Alternate No. 1 cost of $7,671,777.
Project Duration
The Project has been divided into two Elements: 1) Mobilization and 2) Construction. The SPONSOR will issue separate Notice to Proceeds (NTPs) to the Contractor for the Mobilization Element and the Construction Element. The NTP for the Construction Element will not be issued until the Mobilization Element is complete and the Contractor-provided Safety Plan Compliance Document (SPCD) is approved by the SPONSOR. The anticipated Project duration is shown on the following table:
Project Element Mobilization Construction Phase 1 Construction Phase 2 (Base Bid Only) Construction Phase 2 (Base Bid and Bid Alternate No. 1) Pavement Cure Period Construction Phase 3*
Total (Base Bid Only) Total (Base Bid and Bid Alternate No. 1)
Duration 60 Calendar Days 30 Calendar Days 25 Calendar Days 28 Calendar Days 30 Calendar Days 18 Calendar Days 163 Calendar Days 166 Calendar Days
* Construction Phase 3 consists of the final application of pavement markings and runway grooving; 30 calendar days minimum cure time will be required between the placement of HMA surface course, and the application of the final coat of markings and grooving. All other construction is required to be completed at the end of Construction Phase 2.
The Construction Safety and Phasing Plan (CSPP) is included in the Project Specifications and contains additional details on the time limitations as well as specific phasing requirements for the Project.
For the purpose of scoping CA efforts, it is assumed that the schedule will be as follows:
1) FAA awards grant in May 2025. 2) SPONSOR issues NTP to CONSULTANT and Mobilization NTP to Contractor in May 2025. 3) SPONSOR issues Construction NTP to Contractor in June 2025. 4) Construction Phase 1 occurs between July 2025 and September 2025 including the following:
a. Survey verification (assume 10 calendar days on-site) b. Asphalt concrete test strips (assume 2 needed) c. Electrical site verification (assume 4 calendar days on-site) -- Only if Bid Alternate No. 1 is
awarded d. Electrical homerun installation outside runway safety area (assume 14 calendar days) -- Only if
Bid Alternate No. 1 is awarded
5) Public Outreach workshop for airport users in August/September 2024. 6) Construction Phase 2
Page 2 of 22
OST-2025-1200 Page 00752
Mead&I lunt
Sierra Club v. Dept. of Transp. - 3:25-cv-06221
SC_EVERSPLIT0014929
Redding Regional Airport Runway 16/34, Taxiway Connectors Rehabilitation & MAGVAR Improvements Construction Administration Scope of Services Aall 2025
Exhibit A
a. Base Bid Only -- Runway closure period October 1, 2025 -- October 25, 2025
b. Base Bid and Bid Alternate No. 1 -- Runway closure period October 1, 2025 -- October 28, 2025
7) Construction Phase 3 expected in end of November through mid-December 2025 timeframe. 8) Construction substantially completed in mid-December 2025. 9) Final project closeout January -- April 2026.
Project Team
The CONSULTANT team will assign following staff to this Project:
1) Senior Associate -- Contracting, general Project coordination, Quality Assurance coordination and review, attend coordination meetings.
2) Senior Civil Project Engineer (SCPE) - Assist Project management, assist general Project coordination, assist field staff/RPR coordination, quality control, attend coordination meetings, periodic site visits to review construction activities.
3) Senior Engineer / Project Manager (PM) -- Engineer of Record, Project management, general Project coordination, field staff/RPR coordination, quality control, attend and lead coordination meetings, regular site visits to review construction activities, monitor continuity through the Project.
4) Construction Manager (CM) -- CONSULTANT's lead point of contact through the Project construction, quality control, attend and lead weekly construction coordination meetings, coordination with material QA testing subconsultant, RFIs, daily construction observation and reporting, monitor conformance with Project Plans and Specifications. Construction manager will have a minimum of 20 years of airfield construction experience.
5) Resident Project Representative (RPR) 3 - Daily construction observation, coordinate with QC testing subconsultant, daily construction activity reporting. RPR 3 will have a bachelor's degree in engineering (licensed PE) with a minimum of 7 years of experience or a minimum of 20 years of airfield construction experience.
6) RPR 2 -- Daily construction observation, coordinate with QC testing subconsultant, daily construction activity reporting. RPR 2 will have a bachelor's degree in engineering (EIT certificated) with a minimum of 4 years of airfield construction experience.
7) RPR 1 -- Daily construction observation, coordinate with QC testing subconsultant, daily construction activity reporting. RPR 1 will have an associate or bachelor's degree in engineering with a minimum of 2 years of airfield construction experience.
8) Engineer III -- Office support for submittal reviews, RFIs, RFCPs, Field Directives, Contract Change Orders, Pay Applications, and other construction documentation.
9) Engineer I -- Office support assisting the PM and Engineer I with documents described herein, as well as AutoCAD exhibits.
10) Administrative Assistant -- Project invoicing, document editing, proofing, and formatting.
The CONSULTANT will subcontract with the following subconsultants for specialty services: 1) CGI Technical Services Inc (CGI): CGI will perform quality assurance material testing services. 2) Arellano Associates (AA): AA will perform public outreach services.
Page 3 of 22
OST-2025-1200 Page 00753
Sierra Club v. Dept. of Transp. - 3:25-cv-06221
Mead&-I lunt
SC_EVERSPLIT0014930
Redding Regional Airport Runway 16/34, Taxiway Connectors Rehabilitation & MAGVAR Improvements Construction Administration Scope of Services April 2025
Exhibit A
SCOPE OF SERVICES
The CONSULTANT's scope of work for the Project will be phased as follows (and so referenced):
1) Phase 1 Pre-Construction Services
2) Phase 2 Construction Administration Services
3) Phase 3 Construction Observation
4) Phase 4 Material Testing
5) Phase 5 Public Outreach Services
6) Phase 6 Post-Construction Services
The services to be provided by CONSULTANT under each of these phases and the associated tasks are described below.
***To allow for flexibility on the Project award (whether only base bid or base bid and bid alternate are awarded), italicized language is added where additional effort is needed for bid alternate efforts.
PHASE 1 PRE-CONSTRUCTION SERVICES
1.1 PHASE 1 PROJECT MANAGEMENT AND COORDINATION
Project management tasks during Phase 1 will consist of the following:
1.1.1
Prepare Contract and Project Setup The PM and administrative staff will process the contract between the CONSULTANT and the SPONSOR. Administrative staff will also setup the internal Project database for finance tracking.
1.1.2
Prepare Schedule The PM will prepare a coordination schedule upon receiving the Notice to Proceed (NTP) from the SPONSOR. This schedule will only show major milestones to facilitate overall coordination of the Project. The Contractor will be responsible for submitting a detailed construction schedule with work activities.
1.1.3
Prepare Project Management Plan (PMP) The PM will prepare a PMP that will address the following Project elements: Vision and Objectives, Project Team Roles and Responsibilities, Document Distribution Plan, Communications Plan, Quality Control Plan, and Change Management Plan. The PM will use the PMP as a tracking tool for the various elements throughout the Project.
1.1.4
Coordinate CONSULTANT Team The PM will assign team members to the Project for office CA activities and assign the appropriate Construction Manager and RPRs to the Project for day-to-day field observation activities. The PM will coordinate with the Construction Manager to plan for construction activities and identify additional team members if needed to support the RPRs.
*** If bid alternate is awarded, additional coordination with the CONSULTANT team will be necessary for organizing team for construction activities.
Page 4 of 22
OST-2025-1200 Page 00754
Sierra Club v. Dept. of Transp. - 3:25-cv-06221
Mead&I lunt
SC_EVERSPLIT0014931
Redding Regional Airport Runway 16/34, Taxiway Connectors Rehabilitation & MAGVAR Improvements Construction Administration Scope of Services April 2025
Exhibit A
1.1.5 1.1.6
Coordinate Subconsultant(s) The PM will prepare subcontract / work order for the subconsultant(s) upon receiving the NTP from the SPONSOR. Once subcontract(s) / work order(s) is/are executed, the PM will coordinate subconsultant work efforts, arrange for airport badges and discuss site access restrictions and requirements.
Prepare Invoices The PM will maintain a Project budget spreadsheet to track costs on a monthly basis. At the beginning of each month, the PM will review accrued costs from the previous month and work with accounting staff to prepare invoices for the SPONSOR. The invoices will be submitted in accordance with the SPONSOR's standard invoice requirements. The invoices will include detailed cost breakdowns referencing the items in this scope of work and indicate percent complete for each item. The PM will also review subconsultant invoices. It is anticipated that three (3) invoices will be prepared during Phase 1.
1.2 PHASE 1 PROJECT MEETINGS AND COMMUNICATION
The CONSULTANT will participate in various meetings and calls during Phase 1. Meetings and communication items will be as follows:
1.2.1
Pre-Construction Conferences The CONSULTANT will arrange for and conduct the pre-construction conferences (up to two conferences anticipated due to the nature of the Project). The purpose is to review FAA and Project-specific requirements, as well as coordinate Contractor activities with Airport operations and administration staff prior to commencing construction. The conferences are anticipated to be conducted at the Airport and will be attended by the CONSULTANT, Materials Testing Subconsultant, SPONSOR, representatives of FAA Airports District Office (if possible), Contractor, subcontractors, and Airport tenants affected by construction. The conferences will include the following sub-tasks:
a. The CONSULTANT will schedule the conferences and prepare an agenda to support the meeting, as well as presentation materials to illustrate the Project work areas (as necessary).
b. The CONSULTANT will obtain and review the Project construction schedules from the Contractor prior to presentation at the pre-construction conference. The SPONSOR will be provided with copies of the construction schedules.
c. The CONSULTANT will preside at the pre-construction conferences, prepare a record of the conference, submit meeting minutes to the SPONSOR for review and comment, and distribute the final meeting minutes to attendees. Up to four (4) members from CONSULTANT team will attend in person (anticipated to consist of PM, SCPE, CM, and RPR 2). A representative from the Material Testing will also attend (costs included in Phase 4).
*** If bid alternate is awarded, an additional RPR 3 will attend one of the preconstruction conferences.
1.2.2
Quality Control (QC) / Quality Assurance (QA) Workshop The CONSULTANT will arrange for and conduct a QC/QA workshop in accordance with Project Specification Item C-100. A separate meeting agenda and minutes will be prepared for the QC/QA workshop. The meeting is anticipated to be conducted at the
Page 5 of 22 OST-2025-1200 Page 00755
Mead6/ lunt
Sierra Club v. Dept. of Transp. - 3:25-cv-06221
SC_EVERSPLIT0014932
Redding Regional Airport Runway 16/34, Taxiway Connectors Rehabilitation & MAGVAR Improvements Construction Administration Scope of Services April 2025
Exhibit A
Airport and will be attended by the CONSULTANT, Materials Testing Subconsultant,
SPONSOR, representatives of FAA Airports District Office (if possible), Contractor,
subcontractors, and the Contractor's QC testing firm. Up to four (4) members from the
CONSULTANT team will attend (anticipated to consist of PM, SCPE, CM, and RPR 2).
A representative from the Material Testing Subconsultant will also attend (costs included
in Phase 4). The QC/QA workshop is anticipated to be concurrent with the second pre-
construction conference.
1.2.3
General Communication with SPONSOR and Contractor The CONSULTANT will communicate with the SPONSOR and Contractor throughout Phase 1 as needed via phone calls or email in addition to the meetings listed herein to discuss Project schedule, explanation of intent of design and execution of work, collaboration on various Project elements, and advance preparation of upcoming meetings.
*** If bid alternate is awarded, additional communication will be required.
1.3 PREPARE PROJECT DOCUMENTATION
The CONSULTANT will review / prepare the following Project documentation:
a. The CONSULTANT will review the construction contract and subcontractor contracts in accordance with federal provision requirements.
b. The CONSULTANT will assist the SPONSOR in preparing NTP letters for both the Mobilization and Construction elements.
c. The CONSULTANT will setup templates for Project documentation on CONSULTANT standard forms or SPONSOR-provided forms as applicable. Documentation will include, but is not limited to, submittal review forms, weekly FAA reports, weekly charged working day reports, RFIs, RFCPs, field directives, contract change orders, non-compliance notices, and applications for payment.
d. The CONSULTANT will assemble and provide the Contractor with CAD files if requested (upon receipt of CONSULTANT-provided disclaimer form signed by Contractor).
*** If bid alternate is awarded, additional Project documentation needs will be required.
1.4 PREPARE ISSUED FOR CONSTRUCTION PLANS AND SPECIFICATIONS
The CONSULTANT will prepare an issued-for-construction plan set and specification package. The plan set and specification package will be based on the bid set prepared during the design contract, but will also incorporate addenda issued during bid administration, as well as data obtained from Contractor site investigations during the Mobilization Element, such as grade verification and electrical investigation. Changes to the plan set beyond the items described herein will not be included and are not anticipated. The construction set and specification package will be stamped and signed by the Engineer-of-Record responsible for stamping the bid set.
*** If bid alternate is awarded, additional coordination and effort for the bid alternate elements of the plans and specifications assembled as part of the bid documents will be required.
Page 6 of 22
OST-2025-1200 Page 00756
Sierra Club v. Dept. of Transp. - 3:25-cv-06221
Mead6/ lunt
SC_EVERSPLIT0014933
Redding Regional Airport Runway 16/34, Taxiway Connectors Rehabilitation & MAGVAR Improvements Construction Administration Scope of Services April 2025
1.5 PREPARE CONSTRUCTION MANAGEMENT PLAN (CMP)
Exhibit A
The CONSULTANT will obtain the Contractor's QC Plan and will subsequently prepare the CMP. The CMP combines data from the QC Plan with information of Project responsibilities from the SPONSOR and CONSULTANT. The CMP will outline the submittal requirements and materials testing requirements, as set forth in the construction documents and contained in FAA Advisory Circular (AC) 150/5370-10H, Standard Specifications for Construction of Airports. The CMP will summarize the types and frequency of testing required for quality acceptance, in addition to the credentials of those performing the testing. A preliminary copy of the CMP will be submitted to the SPONSOR and FAA for approval. After SPONSOR and FAA review, the CMP will be revised if needed, and issued to the Contractor for use during the Project.
PHASE 1 DELIVERABLES 1) Pre-Construction Conferences Meeting Minutes -- electronic files to SPONSOR and attendees 2) QC/QA Workshop Meeting Minutes -- electronic files to SPONSOR and attendees 3) Issued for Construction Plan Set and Specification Package -- electronic files to SPONSOR and
Contractor 4) CMP -- electronic files to SPONSOR, FAA, and Contractor
PHASE 2 CONSTRUCTION ADMINISTRATION (CA) SERVICES
2.1 PHASE 2 PROJECT MANAGEMENT AND COORDINATION
Project management tasks during Phase 2 will consist of the following:
2.1.1
Schedule Coordination Throughout construction (Mobilization and Construction Phases 1-3), the CONSULTANT will review the weekly progress schedules submitted by the Contractor, and coordinate
with the SPONSOR and Contractor on tracking overall timeline of the Project. The CONSULTANT will also coordinate with the SPONSOR, Contractor, and subconsultants on daily work hours and site access logistics. Coordination of Project schedules are anticipated for the Project are anticipated for 24 weeks (Mobilization through Construction Phases 1-3).
*** If bid alternate is awarded, additional schedule coordination and efforts for the bid alternate elements of the bid documents will be required.
2.1.2
Coordinate PMP Updates The PM will continue to coordinate and monitor PMP during Phase 2.
*** If bid alternate is awarded, additional PMP updates for the bid alternate elements of the bid documents will be required.
2.1.3
Coordinate CONSULTANT Team The PM will assign responsibilities to office staff to complete the documentation efforts described herein. The PM will also communicate with the Construction Manager and RPRs on a regular basis to monitor progress in the field. As part of this effort, the Construction Manager will create and maintain a detailed construction checklist for the RPRs to keep track of action items, quantities, production rates, and contractor compliance with Plans and Specifications. The PM and Construction Manager will also review daily reports prepared by the RPRs.
Page 7 of 22 OST-2025-1200 Page 00757
Mead&I lunt
Sierra Club v. Dept. of Transp. - 3:25-cv-06221
SC_EVERSPLIT0014934
Redding Regional Airport Runway 16/34, Taxiway Connectors Rehabilitation & MAGVAR Improvements Construction Administration Scope of Services April 2025
Exhibit A
2.1.4 Coordinate Subconsultants
The PM will coordinate with Material Testing and Public Outreach subconsultants to
schedule site visits, tests and dissemination of Project information. The PM will also
review field and lab test results and discuss recommendations provided by the
subconsultants.
' If bid alternate is awarded, additional materials testing subconsultant efforts for the bid alternate elements of the bid documents will be required.
2.1.5
Prepare Invoices The PM will continue to maintain the Project budget spreadsheet and prepare invoices as defined in Phase 1. It is anticipated that five (5) invoices will be prepared during Phase 2.
2.2 REVIEW MATERIAL SUBMITTALS
The CONSULTANT will review Contractor-submitted material cut sheets, mix designs, shop drawings, and certificates for compliance with Plans and Specifications. It is expected that up to twenty five (25) submittals will be provided by the Contractor for review. The scope assumes each submittal will require up to one (1) resubmittal due to incomplete or incorrect information by the Contractor. If more than one (1) resubmittal is required due to incomplete or incorrect information by the Contractor, the cost for the CONSULTANT to review the resubmittal will be the responsibility of the Contractor as stated in Specification Item SP-100. The CONSULTANT will also maintain a submittal checklist, and track dates of submission and review.
*** If bid alternate is awarded, and additional fifteen (15) submittals are anticipated for the bid alternate elements of the bid documents.
2.3 PHASE 2 PROJECT MEETINGS AND COMMUNICATION
The CONSULTANT will participate in various meetings and calls during Phase 2. Meetings and communication items will be as follows:
2.3.1
Periodic and Weekly Construction Progress Meetings The CONSULTANT will conduct periodic progress meetings during preliminary construction efforts prior to the main runway closure in addition to weekly meetings with the SPONSOR and Contractor to discuss safety, schedule, work progress, action items, documentation, reimbursable agreement/flight check coordination with FAA and SPONSOR, and other items as needed to keep construction on track. Subcontractors, subconsultant firms, and FAA representatives may also attend some of the meetings if appropriate. Up to fifteen (15) meetings are anticipated during Phase 2 as follows:
2.3.1.1 Construction Phase 1-- up to six (6) periodic construction coordination meetings with up to four (4) members of the CONSULTANT team present (PM, SCPE, Construction Manager and RPR 2). It is anticipated three (3) meetings will be in-person and three (3) meeting will be virtual.
2.3.1.2 Construction Phase 2 -- up to six (6) weekly construction coordination meetings with up to two (2) members of the CONSULTANT team present (PM and SCPE). Note, Construction Manager and RPRs will be present and included in Phase 3 scope/budget. The meetings are anticipated to be held in-person at a location near the job site or airport administrative offices.
Page 8 of 22
OST-2025-1200 Page 00758
Mead&I lunt
Sierra Club v. Dept. of Transp. - 3:25-cv-06221
SC_EVERSPLIT0014935
Redding Regional Airport Runway 16/34, Taxiway Connectors Rehabilitation & MAGVAR Improvements Construction Administration Scope of Services April 2025
Exhibit A
2.3.1.3 Construction Phase 3 -- up to three (3) weekly construction coordination meetings
with up to two (2) members of the CONSULTANT team present (PM and SCPE). Note,
Construction Manager and RPRs will be present and included in Phase 3 scope/budget.
The meetings are anticipated to be held in-person at a location near the job site or airport
administrative offices.
The CONSULTANT will prepare an agenda and minutes to support each meeting.
2.3.2
Site Visits During Construction The CONSULTANT will conduct periodic site visits to review Project progress and monitor construction activities through substantial completion of the Construction Element (Phase 1-3). Up to five (5) site visits are anticipated during Phase 2. Up to two (2) members from the CONSULTANT team will attend each site visit (anticipated to consist of PM and SCPE).
*** If bid alternate is awarded, one (1) additional site visit by the PM and SCPE will be conducted.
2.3.3
General Communication with SPONSOR and Contractor The CONSULTANT will communicate with the SPONSOR and Contractor throughout Phase 2 as needed via phone calls or email in addition to the meetings listed herein.
*** If bid alternate is awarded, additional communication efforts for the bid alternate elements of the bid documents will be required.
2.4 WEEKLY CALENDAR-DAY REPORTS
The CONSULTANT will prepare weekly calendar-day reports tracking contract time and submit to the Contractor for review. The reports will include days charged and documented weather, as well as identification of days not charged due to inclement weather or other justified delays. Up to fifteen (15) weekly calendar-day reports are anticipated for the Project.
2.5 WEEKLY FAA PROGRESS REPORTS
The CONSULTANT will prepare weekly FAA reports documenting the progress of the Project. The reports will be based on FAA form 5370-1, Construction Progress and Inspection Report, and include days charged, weather summary, percent completion, work in progress for current week and following week, summary of material testing, and problem areas if applicable. The CONSULTANT will also attach photographs documenting work completed. The CONSULTANT will sign each report and send to FAA. Up to fifteen (15) FAA weekly progress reports are anticipated for the Project.
2.6 REQUESTS FOR INFORMATION (RFIs)
The CONSULTANT will prepare written responses, as necessary, to Contractor RFIs to clarify design intent. Depending on the RFI, the response may require review of documentation not included in the Contract Documents, as well as coordination with and review by additional CONSULTANT staff, SPONSOR, or FAA. Up to fifteen (15) RFIs are anticipated for the Project.
*** If bid alternate is awarded, up to an additional fifteen (15) RFIs are anticipated.
Page 9 of 22
OST-2025-1200 Page 00759
Sierra Club v. Dept. of Transp. - 3:25-cv-06221
Mead6/ lunt
SC_EVERSPLIT0014936
Redding Regional Airport Runway 16/34, Taxiway Connectors Rehabilitation & MAGVAR Improvements Construction Administration Scope of Services April 2025
2.7 GENERAL FIELD COORDINATION
Exhibit A
In addition to formal RFIs, the CONSULTANT will respond to various questions and concerns that arise in the field. Depending on the issue, the response may require review of documentation not included in the Contract Documents, as well as coordination with and review by additional CONSULTANT staff, SPONSOR, or FAA. Regular communication and coordination between the PM, SCPE, CM and RPRs will also occur.
*** If bid alternate is awarded, additional field coordination efforts for the bid alternate elements of the bid documents will be required.
2.8 REQUESTS FOR COST PROPOSALS (RFCPs)
The CONSULTANT will prepare RFCPs if additional work is anticipated or desired, either due to unforeseen site conditions, SPONSOR request for additional work, or other reasons as applicable. The RFCP(s) will include a description of change, quantity estimates, and exhibits as needed to illustrate the change. The CONSULTANT will send the RFCP to the Contractor to provide a cost proposal. The CONSULTANT and the SPONSOR will then review the cost proposal to determine if it is reasonable and follow up with negotiations, as necessary. The CONSULTANT will communicate the proposed change and cost to the FAA for their concurrence prior to authorizing the work. Depending on the determination, the CONSULTANT will prepare a field directive or change order as described below. Up to six (6) RFCPs are anticipated for this Project.
*** If bid alternate is awarded, up to an additional six (6) RFCPs are anticipated.
2.9 FIELD DIRECTIVES
The CONSULTANT will prepare field directives as necessary to formalize direction that is not otherwise stated in the Project Plans or Specifications, or in a response to an RFI. Following the RFCP process above, the CONSULTANT will prepare a field directive authorizing the Contractor to proceed with work as described. The field directive will include a description of change, quantity estimates, and the related RFCP as applicable. If the field directive results in a change of quantities or cost, it will be followed with a change order as described below. Up to nine (9) field directives are anticipated for the Project.
*** If bid alternate is awarded, up to an additional six (6) FDs are anticipated.
2.10 CONTRACT CHANGE ORDERS (CCOs)
Following the RFCP and field directive processes, the CONSULTANT will prepare CCOs to formalize the change to the Contract cost. The CCO will consist of a format that follows the guidance of FAA Standard Operating Procedure (SOP) 7.00, Airport Improvement Program Construction Project Change Orders. The FAA forms will include a table of the bid items that changed in quantity, or new bid items that were created to capture the CCO cost. The FAA form will also include additional pages containing the FAA-required justification items in accordance with SOP 7.00. Documentation to support the CCO will be attached to the forms, including but not limited to RFCPs, field directives, Contractor time-and-expense reports, emails, and exhibits. CCOs will be submitted to the SPONSOR and Contractor for review and signature and then the FAA forms will be submitted to the FAA by the CONSULTANT or the SPONSOR. CCOs that require new
Page 10 of 22
OST-2025-1200 Page 00760
Sierra Club v. Dept. of Transp. - 3:25-cv-06221
Mead&I lunt
SC_EVERSPLIT0014937
Redding Regional Airport Runway 16/34, Taxiway Connectors Rehabilitation & MAGVAR Improvements Construction Administration Scope of Services April 2025
Exhibit A
design elements are not included in this scope of services. Up to three (3) FAA CCOs are
anticipated for the Project.
*** If bid alternate is awarded, up to an additional one (1) CCO is anticipated.
2.11 REVIEW OF QC/QA TEST RESULTS
The CONSULTANT will review test results provided by the Contractor and Material Testing Subconsultant to determine conformance with the Project Plans and Specifications. If test results are failing, the CONSULTANT will coordinate with the SPONSOR and Contractor to establish corrective actions. Depending on the nature of the testing, the CONSULTANT may need to coordinate with the FAA to determine appropriate actions.
*** If bid alternate is awarded, additional review of QC/QA test results will be required for bid alternate work elements.
2.12 MONTHLY APPLICATIONS FOR PAYMENT
The CONSULTANT will track quantities on a weekly basis, based on RPR daily reports, and share with the Contractor for concurrence. At the beginning of each month, the CONSULTANT will review progress billings submitted by the Contractor, prepare applications for payment using a combination of SPONSOR and CONSULTANT standard forms, and submit to the SPONSOR for processing. The CONSULTANT will maintain a tracking spreadsheet with the bid items, showing work complete for previous periods, current period, and total to date. This spreadsheet will be attached to the application for payment each month. An explanation of variation between the contract and pay quantities (if any) will be provided. A subcontractor and tracking of DBE payments form will also be assembled and tracked as part of the pay application. FAA eligibility and delineation between FAA eligible portions and SPONSOR portions will be delineated on the pay application cover sheet. Up to eight (8) applications for payment are anticipated for the Project.
*** If bid alternate is awarded, additional pay applications are not anticipated, however, additional review time for bid alternate bid items will be required.
2.13 SUBSTANTIAL COMPLETION WALK-THROUGH AND DOCUMENTATION
2.13.1
Substantial Completion Walk-Through The CONSULTANT will schedule and conduct a walk-through with the SPONSOR and the Contractor to determine whether the Project has reached substantial completion and verify that the work is in reasonable conformance with the Plans and Specifications. The CONSULTANT will document items found to be deficient and will provide the Contractor with a list of those items, as stated in 2.13.2 below. The walk-through will be scheduled to occur at the end of construction when the Contractor is still on-site and can easily mobilize to complete punch list items. The PM and the CM will attend the walk-through (CM attendance as described in Phase 3). It is anticipated that a follow-up walk-through will be needed to review punch list items completed after the initial walk-through. The Construction Manager and SPONSOR will observe the completed Project during final marking application, and the SPONSOR will continue to monitor punch list items if needed after final marking application.
***Ifbid alternate is awarded, walk-through willbe concurrent with base bid work elements.
Page 11 of 22
OST-2025-1200 Page 00761
Sierra Club v. Dept. of Transp. - 3:25-cv-06221
Mead&-I lunt
SC_EVERSPLIT0014938
Redding Regional Airport Runway 16/34, Taxiway Connectors Rehabilitation & MAGVAR Improvements Construction Administration Scope of Services April 2025
Exhibit A
2.13.2 Punch List and Substantial Completion Letter
Prior to the substantial completion walk-through, the PM will coordinate with the CM to
identify punch list items. The CONSULTANT will prepare a punch list to define the
deficient items and will continue to add and update items as they are identified and
subsequently completed. The CONSULTANT will send each punch list update to the
SPONSOR and Contractor. Upon completion of the walk-through, the CONSULTANT will
prepare a substantial completion letter summarizing the findings of the walk-through and
outstanding items remaining for Project closeout; the letter will include the current version
of the punch list items. The CONSULTANT will submit this letter to the SPONSOR and
Contractor.
*** If bid alternate is awarded, additional time will be required to review and develop punchlist for bid alternate work elements.
PHASE 2 DELIVERABLES 1) Review of Contractor Submittals -- electronic files to SPONSOR and Contractor 2) Weekly Construction Progress Meeting Minutes -- electronic files to attendees 3) Weekly Working-Day Reports -- electronic files to the SPONSOR and Contractor 4) Weekly FAA Progress Reports -- electronic files to the SPONSOR and FAA 5) RFI Responses -- electronic files to the SPONSOR and Contractor 6) RFCPs -- electronic files to the SPONSOR and Contractor 7) Field Directives -- electronic files to the SPONSOR and Contractor 8) CCOs -- electronic files to the SPONSOR, Contractor, and FAA 9) Monthly Applications for Payment -- electronic files to the SPONSOR 10) Punch List and Substantial Completion Letter -- electronic files to SPONSOR and Contractor
PHASE 3 CONSTRUCTION OBSERVATION
3.1 DAILY CONSTRUCTION OBSERVATION
This task will include construction observation, coordination of material testing during construction, and on-site construction administration for the duration of the Project. A Construction Manager (CM) and multiple RPRs will be assigned to this Project. The CM and RPRs will have experience with civil improvement projects as required for the Project and will work with the PM to oversee the construction progress throughout the Project.
The duration for the Construction Element is anticipated to be in accordance with the table below and the proposed Construction Safety and Phasing Plan. Due to the operational impact of the construction improvements, the Project is scheduled to include contractor performing work seven (7) days a week, 20 hours per day with a 4-hour-down period for equipment maintenance. As such, the construction observation will include multi-staffed teams working 11- and 12-hour shifts as detailed in the table, for the duration of the Project Construction Phase 2. Anticipate durations for on-site work relating to Construction Phases 1 and 2 are also identified. The budget for construction observation has been developed based upon the table below, which includes two (2) additional days at the beginning and end of construction for set-up and clean-up of field office as well as construction staff communications. Please note, staff time/travel to and from the Project site is not
Page 12 of 22
OST-2025-1200 Page 00762
Sierra Club v. Dept. of Transp. - 3:25-cv-06221
Mead&I lunt
SC_EVERSPLIT0014939
Redding Regional Airport Runway 16/34, Taxiway Connectors Rehabilitation & MAGVAR Improvements Construction Administration Scope of Services April 2025
Exhibit A
included in the table below. CM and RPR efforts assume the following for Construction Phase 2 during runway closure period:
1) Base Bid
a. CM on-site for 12-hour-shift, up to two (2) RPRs for morning 11-hour-shift and up to two (2) RPRs for afternoon/evening 11-hour- shift.
2) Bid Alternate No. 1 (additional staff beyond Base Bid staff)
a. Up to up to two (2) RPRs for morning 11-hour shift and one (1) RPR for afternoon/evening 11-hour shift.
Phase 1 Survey Verification
ElectricalSite Verification (BA Only) Asphalt Concrete Test Strips
Electrical Homerun Construction Phase 2
Base Bid Only Addition of Bid Alternate Phase 3
Base Bid
Duration (Days)
10 4 2 14
30 32
18
Shifts by Staff Classification PM (11-hour SCPE (11- CM (12- RPR 3 (11- RPR 2 (11- RPR 1 (11-
shifts) hour shifts) hour shifts) hour shifts) hour shifts) hour shifts)
10 4 2 14
11
13
24
33
79
25
22
20
18
The CM and RPRs will perform construction observation services including (as applicable), but not limited to, the following:
a. Prepare daily reports to record the construction history of the Project. The reports will be made available to the SPONSOR upon request for review during inspections or visits. The daily reports will include, but not be limited to, the following information: weather conditions, number of Contractor / subcontractor personnel and major equipment onsite, general location of work, description of work items, estimated quantities, safety items, materials delivered, delays / issues (if applicable), QC/QA tests performed, failed tests (if any) and action taken, instructions to Contractors, record of visitors to Project and verbal or written instructions given, record of telephone conversations and any verbal instructions received or authorizations granted, engineering field force activity and hours worked, and detailed log of work completed throughout the day.
b. Review and check layout and surveys conducted by the Contractor in accordance with the Plans and Specifications.
c. Review construction activities for compliance with Plans and Specifications.
d. Respond to Contractor questions that arise in the field and communicate with PM to coordinate direction.
e. Evaluate and determine the acceptability of substitute materials and equipment proposed by the Contractor.
f. Assist office staff with RFI review as applicable based on communication with Contractor regarding site conditions.
g. Review field measurements. h. Monitor the Contractor's compliance with the CSPP and immediately bring any non-compliance
issues to the attention of the Contractor and the SPONSOR.
i. Monitor Contractor's compliance with the Contractor's QC Program.
Page 13 of 22
OST-2025-1200 Page 00763
Mead&-I lunt
Sierra Club v. Dept. of Transp. - 3:25-cv-06221
SC_EVERSPLIT0014940
Redding Regional Airport Runway 16/34, Taxiway Connectors Rehabilitation & MAGVAR Improvements Construction Administration Scope of Services April 2025
Exhibit A
j. Assist PM in coordinating Material Testing subconsultant to perform QA testing as stated in Phase 4. Communicate with Contractor to facilitate the scheduling of QC testing.
k. Assist PM in coordinating public outreach subconsultant efforts as stated in Phase 5.
I. Attend weekly construction progress meetings as stated in Phase 2.
m. Provide field information for office staff to prepare weekly FAA progress reports as stated in Phase 2.
n. Conduct labor interviews to monitor Contractor's compliance with paying employees, in accordance with the Davis-Bacon Act requirements, and provide to SPONSOR for certified payroll review.
o. Provide field information for office staff to prepare RFCPs, field directives, and CCOs as stated in Phase 2.
p. Assist in preparing applications for payment as described in Phase 2. Throughout construction, the construction observation team will check quantities as work is performed and communicate with the Contractor to establish quantities that will be included in monthly progress billings.
q. Work with Contractor to markup construction Plans with field changes if applicable and provide
to office staff to prepare Record Drawings as described in Phase 6.
r. Receive from Contractor and review the required maintenance and operating instructions, schedules, guarantees, bonds, inspection certificates, tests, approvals, and other relevant documents.
s. Identify punch list items in advance of the substantial completion walk-through to support preparation of punch list as stated in Phase 2.
t. Attend the substantial completion walk-through as stated in Phase 2.
This type of Project requires construction observation staff with experience in the construction oversight of airfield pavement improvement projects. For this reason, CONSULTANT staff will relocate for the duration of the Project. This scope assumes the work will be completed without weather delays. The travel and per diem cost included in the proposal, per staff, are as follows:
1) Food Per Diem --seven (7) days a week, for duration of the Project at a rate of $59 per day (follows GSA guidelines).
2) Lodging, Actual Cost plus Markup--seven (7) days a week for duration of Project at a rate of $150 per night (extended stay rate estimate) plus 15% markup.
3) Auto Rental, Actual Cost plus Markup --seven (7) days a week for duration of Project at a rate of $95 per day (extended rental rate and includes fuel) plus 15% markup.
PHASE 4 MATERIAL TESTING
4.1 MATERIAL TESTING
The material testing services will be performed by subconsultant in conformance with the Project Specifications. The CONSULTANT will be responsible for coordinating and scheduling QA material testing with Material Testing subconsultant throughout the construction duration.
Material Testing Subconsultant will perform necessary acceptance tests in accordance with the cited requirements and standard methods of FAA, ASTM, and AASHTO; record test results on the appropriate forms; prepare a summary and disposition of testing and material inspection; record deviating tests; conduct material inspections and acceptance tests required by the FAA and
Page 14 of 22
OST-2025-1200 Page 00764
Mead&-I lunt
Sierra Club v. Dept. of Transp. - 3:25-cv-06221
SC_EVERSPLIT0014941
Redding Regional Airport Runway 16/34, Taxiway Connectors Rehabilitation & MAGVAR Improvements Construction Administration Scope of Services April 2025
Exhibit A
observe and evaluate such tests made by the Contractor in the field and laboratory as necessary
in accordance with Plans and Specifications; and monitor Contractor's performance of the required
quality control tests and furnish copies of test reports to the CONSULTANT, for CONSULTANT to
provide to the SPONSOR. Any non-compliance issues shall immediately be reported to the
Contractor and SPONSOR.
This scope assumes the following material testing and construction administration support. a. Review Contractor-submitted QC program and submittals (as necessary). b. Attend pre-construction conference (one conference only) and QC/QA workshop. c. Conduct site visits, provide recommendations, and perform testing for the following Items as
described in the Project Specifications:
(1) Item P-156, Cement-Treated Subgrade: Visit site to evaluate existing subgrade / aggregate base mixture to be treated with cement, or a combination of both. Work with the CONSULTANT and Contractor to provide recommendations on the appropriate percentages of lime and cement for each area of differing subgrade conditions. Visit site to obtain sample of cement-treated material for compaction testing (up to 2 tests). Visit site to perform field density testing if needed to supplement QC testing (up to two tests).
*** If bid alternate is awarded, additional P-156 QA materials testing for bid alternate work elements (up to 2 additional tests).
(2) Item P-209, Crushed Aggregate Base Course: Visit site to obtain sample of aggregate base for compaction testing (up to 2 tests). Visit site to perform field density testing if needed to supplement QC testing (up to 2 tests).
*** If bid alternate is awarded, additional P-209 QA materials testing for bid alternate work elements (up to 2 additional tests).
(3) Item P-401 and P-403, Asphalt Mix Pavement: Review Contractor-submitted mix design for P-401 and P-403 Asphalt Mix Pavements. Attend pre-paving meeting. Visit site to monitor production paving (including checking paving method, temperature, rolling, and joint construction), perform random sampling for cores to be taken by Contractor; perform QA lab testing (up to 25 days of paving are anticipated). Produce test reports for each lot. Furnish a QA testing laboratory accredited in accordance with ASTM D3666. The QA laboratory accreditation will be current and listed on the accrediting authority's website. Test methods required for acceptance sampling and testing will be listed on the lab accreditation.
*** If bid alternate is awarded, additional P-401 QA materials testing for bid alternate work elements (up to 3 additional days ofpaving).
Page 15 of 22 OST-2025-1200 Page 00765
Mead&-I lunt
Sierra Club v. Dept. of Transp. - 3:25-cv-06221
SC_EVERSPLIT0014942
Redding Regional Airport Runway 16/34, Taxiway Connectors Rehabilitation & MAGVAR Improvements Construction Administration Scope of Services April 2025
(4) Item P-610, Concrete for Miscellaneous Structures:
Exhibit A
Review Contractor-submitted mix design for P-610 Concrete for Miscellaneous Structures.
QA personnel on-site each day concrete is placed to perform QA testing required per section 610-4.1 of the Technical Specification. QA testing includes slump tests and compressive strength tests (up to 3 tests).
Produce test reports for each day concrete is placed and for lab testing performed. Reports will be submitted to CONSULTANT.
Furnish a QA testing laboratory accredited in accordance with ASTM C1077. The QA laboratory accreditation will be current and listed on the accrediting authority's website. Test methods required for acceptance sampling and testing will be listed on the lab accreditation.
*** If bid alternate is awarded, additional P-610 QA materials testing for bid alternate work elements (up to 2 additional tests). d. Prepare final QA report summarizing and assembling the field and lab tests performed herein.
PHASE 4 DELIVERABLES 1) Quality Acceptance Reports -- Electronic files to SPONSOR and Contractor
PHASE 5 PUBLIC OUTREACH SERVICES
The CONSULTANT will subcontract with Arellano Associates (AA) to develop and implement an appropriate public outreach program for the Project.
5.1 DEVELOP, ORGANIZE, AND FACILITATE PUBLIC OUTREACH MEETING
The CONSULTANT and AA will coordinate one (1) in-person public outreach informational meeting / workshop to provide an opportunity for the community to learn about and comment on the Project. The meeting will be held prior to the runway closure (Phase 2 Construction) to engage and inform the public. The focus of the meeting / workshop will be to provide information about the Project, share information about the Project's construction schedule, educate the public on the factors considered in the planning process, and provide a forum for stakeholders to ask questions. The workshop will offer updated Project information.
The CONSULTANT and AA will lead in the coordination and support of the meeting including coordination of the meeting time, location, scheduling of team calendars, organization of facility details, which could include in-person set-up / clean-up and photography. Meeting materials, including fact sheets, FAQ, sign-in sheets, comment forms, and directional signage will also be prepared and printed by AA. The CONSULTANT will provide large display boards, exhibits, and maps as needed, for the meeting. It is assumed that the SPONSOR will provide in-person meeting presentation equipment to include but not limited to laptop, HDMI cable, screen, projector, chairs, podium, audio equipment and tables, as needed, and handle venue costs and refreshments. AA will provide support presentation equipment for the in-person meeting, as directed and within budget. Meeting will include up to three CONSULTANT team staff (PM, SCEP, CM) and up to two (2) AA staff.
Page 16 of 22
OST-2025-1200 Page 00766
Sierra Club v. Dept. of Transp. - 3:25-cv-06221
Mead&-I lunt
SC_EVERSPLIT0014943
Redding Regional Airport Runway 16/34, Taxiway Connectors Rehabilitation & MAGVAR Improvements Construction Administration Scope of Services April 2025
Exhibit A
Following the meeting, AA will prepare a summary of the meeting that will include the number of
participants, key stakeholders, and key issues and common themes raised by meeting attendees.
All comments captured at the meeting will be recorded and input into a Comment Log.
Deliverables: a. Sign-in sheets / directional, as needed b. In-person meeting collateral c. Comment log d. Meeting summary reports, to include notification efforts, cumulative participation at meeting,
materials presented, and photographs of meeting
5.2 DEVELOP NOTIFICATIONS FOR MEDIA AND STAKEHOLDERS The CONSULTANT and AA will work with the Project Team to develop up to two (2) e-blast campaigns, local digital newspaper advertisements, press releases (as directed), geo fencing, and or social media campaigns to promote knowledge of the Project and the public meeting / workshop.
The notifications and/or advisories are anticipated to be released prior to the public workshop and at completion of the Project construction. It is assumed that the SPONSOR will maintain and provide the stakeholder database for notification of the workshop.
PHASE 5 DELIVERABLES: 1) Up to two (2) media/stakeholder notifications and/or advisories 2) Newspaper and briefing sheets 3) Press releases 4) Geo fencing / social media ads
PHASE 6 POST-CONSTRUCTION SERVICES
6.1 PHASE 6 PROJECT MANAGEMENT
Project management tasks during Phase 6 will consist of the following:
6.1.1
Update Schedule The schedule created during Phase 1 will be updated to show Project closeout milestones.
6.1.2
Coordinate PMP Updates The PM will continue to coordinate and monitor PMP during Phase 6.
6.1.3
Coordinate CONSULTANT Team The PM will assign responsibilities to office staff to complete the documentation efforts described herein. The PM will also coordinate with the Construction Manager for providing field data to complete the documentation efforts described herein.
' If bid alternate is awarded, additional CONSULTANT team coordination and efforts for the bid alternate elements of the bid documents will be required.
6.1.4
Coordinate with Subconsultants The PM will coordinate with subconsultants to complete final reports.
Page 17 of 22 OST-2025-1200 Page 00767
Sierra Club v. Dept. of Transp. - 3:25-cv-06221
Mead&I lunt
SC_EVERSPLIT0014944
Redding Regional Airport Runway 16/34, Taxiway Connectors Rehabilitation & MAGVAR Improvements Construction Administration Scope of Services April 2025
Exhibit A
6.1.5 Prepare Invoices
The PM will continue to maintain the Project budget spreadsheet and prepare invoices
as defined in Phase 1. It is anticipated that four (4) invoices will be prepared during Phase
6.
6.2 PHASE 6 COMMUNICATION The CONSULTANT will communicate with the SPONSOR and Contractor throughout Phase 6 as needed via phone call or email.
*** If bid alternate is awarded, additional communication and coordination and efforts for the bid alternate elements of the bid documents will be required.
6.3 RECORD DRAWINGS
The RPR and Contractor will coordinate throughout construction to document field constructed conditions, encountered existing utilities, and markup the construction Plans as stated in Phase 3. Upon completion of construction, the CONSULTANT will prepare the Record Drawings using AutoCAD Civil 3D 2020, by updating the drawing files created during design. The Drawings will become record information. The CONSULTANT will provide the SPONSOR with a set of reproducible Record Drawings in digital format.
*** If bid alternate is awarded, additional record drawing efforts for the bid alternate elements of the bid documents will be required.
6.4 FINAL CONSTRUCTION REPORT (FCR) Upon completion of construction, the CONSULTANT will prepare and assemble the FCR in conformance with FAA standards and requirements. The contents of the report will include, but are not limited to, the following: a. Project Description and Overview b. Project Personnel c. Contract Award and NTP (Including Bid Tabulation, Contract, and NTP Letters as Appendices) d. Project Timeline e. Summary of Work Accomplished (Including Table of Work Activities and Weeks Performed, as well as weekly FAA progress reports as Appendix) f. Contract Time g. Labor Provisions h. SPONSOR Administrative Costs i. CONSULTANT Costs j. Force Account (if applicable) k. Construction Costs (including Final Application for Payment and CCOs as Appendices) I. Summary of DBE Utilization (including Contractor's DBE Utilization Form as Appendix) m. Buy American Provisions (including Submittal Checklist as Appendix) n. Construction Material Testing and Acceptance (including QC and QA Test Results as Appendices) o. Contactor's Statement of Completion (including Contractor's Letter of Completion and Warranty as Appendix)
Page 18 of 22 OST-2025-1200 Page 00768
Mead&I lunt
Sierra Club v. Dept. of Transp. - 3:25-cv-06221
SC_EVERSPLIT0014945
Redding Regional Airport Runway 16/34, Taxiway Connectors Rehabilitation & MAGVAR Improvements Construction Administration Scope of Services April 2025
Exhibit A
p. Record of Completion (including Substantial Completion Letter and SPONSOR Notice of Completion as Appendices)
q. FAA-Required Sponsor Certification of Final Construction Acceptance as Appendix. This certification will be signed by the SPONSOR.
r. Recommendations
The CONSULTANT will coordinate with the Contractor, SPONSOR, and FAA to complete Project closeout activities and assemble the documents to be included in the FCR. The CONSULTANT will submit a draft version of the FCR for SPONSOR review. Upon receipt of SPONSOR review / comments, the CONSULTANT will finalize the FCR and submit to the SPONSOR and FAA.
*** If bid alternate is awarded, additional FCR efforts for the bid alternate elements of the bid documents will be required.
6.5 AIRPORT LAYOUT PLAN (ALP) RECORD DRAWING UPDATE -- NOT IN CONTRACT (NIC) The SPONSOR will coordinate any updates to the ALP as part of a separate contract.
6.6 UPDATE AIRFIELD PAVEMENT MANAGEMENT SYSTEM (APMS)
The CONSULTANT will update the current APMS previously prepared by the CONSULTANT to reflect the pavement improvements completed in this Project, as well as updates to complete airfield. The methods and techniques used in preparation of the APMS shall be in conformance with Federal Aviation Administration (FAA) Advisory Circular (AC) 150/5380-7B, Airport Pavement Management Program (PMP). The APMS is a set of defined procedures for collecting, analyzing, maintaining, and reporting pavement data. Federally obligated airports should perform a detailed inspection of airports every year, or every three years if a Pavement Condition Index (PCI) survey is performed. The APMS study will cover all City-owned pavement at the Airport. The APMS update with include the following:
6.6.1
Visual Condition Survey. The CONSULTANT will conduct a visual condition survey of all City-maintained pavement area (airfield) to identify and quantify pavement distresses. The survey will consist of measuring length and area of various distresses as defined in the distress manuals provided with FAA AC 150/5380-7B.
6.6.2
Generate Pavement Condition Index Ratings. The CONSULTANT will generate the current Pavement Condition Index (PCI) ratings for each paved area based upon the visual condition survey and the CONSULTANT'S judgement of the pavement condition. The CONSULTANT will utilize the FAA PAVEAIR PMP software to perform PCI calculations. PAVEAIR is a free, web-based solution that meets the requirements of FAA AC 150/5380-7B.
6.6.3
Maintenance Program and Costs. Based upon the results of the pavement inspection and analysis, the CONSULTANT will prepare pavement improvement recommendations for the next five (5) years. The recommendations will include itemized cost estimates.
6.6.4
Aircraft Fleet Mix Analysis. The CONSULTANT will use the fleet mix from the runway pavement design project. The previously accepted fleet mix will be the basis for the final PCR calculation and determination.
Page 19 of 22
OST-2025-1200 Page 00769
Mead&-I lunt
Sierra Club v. Dept. of Transp. - 3:25-cv-06221
SC_EVERSPLIT0014946
Redding Regional Airport Runway 16/34, Taxiway Connectors Rehabilitation & MAGVAR Improvements Construction Administration Scope of Services April 2025
Exhibit A
6.6.5 PCR Calculations.
The CONSULTANT will perform PCR calculations for all airfield pavements using the
FAA FAARFIELD program in accordance with FAA AC 150/5335-5D, Standardized
Method of Reporting Airport Pavement Strength - PCR.
6.6.6
Prepare Draft Airport Pavement Management System (APMS) Report. The CONSULTANT shall prepare a draft report detailing analysis and recommendations. The contents of the APMS report will be as follows: a) Pavement history b) Visual condition summary, including distress descriptions and photos for each area c) Pavement condition summary, including PCI ratings for each area d) Pavement maintenance recommendations, including itemized cost estimates Exhibits will also be attached to the report, which will include the following: a) Pavement feature map b) Pavement section history table c) Pavement distress table d) Pavement condition map e) Maintenance history and programming table f) Recommended projects map g) PCR evaluation report
6.6.7
Final APMS Report. After the SPONSOR's review, the CONSULTANT will incorporate the SPONSOR's comments, finalize, and provide two (2) hard copies and an electronic copy of the final report to the SPONSOR.
6.7 UPDATE AIRFIELD SIGNAGE AND MARKING PLAN
The CONSULTANT will update the SPONSOR's signage and marking plan to incorporate the updated signage and pavement markings (including MAGVAR) completed in this Project, including an 11x17 plan set and large-format poster.
6.8 AGIS AS-BUILT SURVEY -- NIC Due to the nature of Project improvements, an AGIS survey will not be performed or required by the FAA as part of this Project.
PHASE 6 DELIVERABLES 1) Record Drawings -- reproducible hardcopy and electronic files to SPONSOR 2) FCR -- electronic file to SPONSOR and FAA 3) APMS Update --electronic files to SPONSOR 4) Signage and Marking Plan -- reproducible hardcopy and electronic files (11x17 plans and poster)
Page 20 of 22
OST-2025-1200 Page 00770
Sierra Club v. Dept. of Transp. - 3:25-cv-06221
Mead6/ lunt
SC_EVERSPLIT0014947
Redding Regional Airport Runway 16/34, Taxiway Connectors Rehabilitation & MAGVAR Improvements Construction Administration Scope of Services April 2025
Exhibit A
SCHEDULE OF COMPLETION
Phases 1-5
The CONSULTANT will complete the work called for under Phases 1-5 on a schedule submitted by the Contractor and approved by the SPONSOR.
Phase 6 The CONSULTANT will complete the work called for under Phase 6 within 50 working days of the receipt of a copy of the Notice of Completion filed by the SPONSOR.
SERVICES TO BE PROVIDED BY THE SPONSOR AND EXCLUDED SERVICES
The SPONSOR and CONSULTANT agree that the following items will be provided by the SPONSOR or excluded from this scope and, if added to the CONSULTANT's work, will be considered as extra services and a negotiated fee will be established, and an Amendment prepared:
1) Issuing of Notices to Airmen (NOTAMs) and announcements regarding the impact of the Project on aviation activities.
2) Guaranteed access to and make provisions for the CONSULTANT to enter the Airport as required for the CONSULTANT to perform his work under this Agreement.
3) Examination of documents requested by the SPONSOR and presented by the CONSULTANT and render in writing decisions pertaining thereto within a reasonable time so as not to delay the work of the CONSULTANT.
4) Review of Certified Payroll submitted by the Contractor.
5) Any environmental surveys.
6) Contract change orders that require new design elements beyond the scope of the awarded contract.
7) Extensions of construction time beyond the awarded contract timeframes.
8) FAA grant reimbursement submission. 9) Timely review of CONSULTANT-provided items for SPONSOR review to avoid construction
delays/impacts.
10) SPONSOR filing of the Notice of Completion.
COMPENSATION FOR SERVICES
1) The total amount for CONSULTANT's services described in this Scope of Services is One Million Three Hundred Thirty-One Thousand Two Hundred and Thirty-Three Dollars ($1,331,233) for the Base Bid, and Three Hundred Eighty-Five Thousand Six Hundred Twenty-Six Dollars ($388,626) for Bid Alternate 1, for a combined total of One Million Seven Hundred Sixteen Thousand Eight Hundred Fifty-Nine Dollars ($1,716,859). This fee includes labor, materials, expenses, and incidentals necessary to complete the work as described herein. Cost and payment are broken out as follows:
a. Time-and-expense: Payment for work outlined in Phases 1, 2, 3, 4, and 5 of this Scope of Services shall be made on a time-and-expense basis not-to-exceed One Million Five Hundred Ninety Thousand Two Hundred Sixty-Eight Dollars ($1,590,268). Payments shall be made monthly based on the hours of work complete, in conformance with the Mead & Hunt, Inc. Standard Billing Rate Schedule, effective January 1, 2025, included as Exhibit C.
Page 21 of 22
OST-2025-1200 Page 00771
Mead&I lunt
Sierra Club v. Dept. of Transp. - 3:25-cv-06221
SC_EVERSPLIT0014948
Redding Regional Airport Runway 16/34, Taxiway Connectors Rehabilitation & MAGVAR Improvements Construction Administration Scope of Services April 2025
Exhibit A
b. Lump Sum: Payment for work outlined in Phase 6 of this Scope of Services shall be a lump
sum fee of One Hundred Twenty-Six Thousand Five Hundred Ninety-One Dollars ($126,591).
Payments will be made monthly based on the percentage of work complete.
These amounts shall not be exceeded without written authorization from the SPONSOR. The cost breakdown is included as Exhibit B.
2) Payment for any additional services requested by the SPONSOR will be performed on a time-andexpense basis in conformance with the Mead & Hunt, Inc. Standard Billing Rate Schedule, effective January 1, 2025, included as Exhibit C. The CONSULTANT will establish the budget for additional services prior to the start of work and may not exceed the budget without written authorization from the SPONSOR. Any additional services must be authorized in writing by the SPONSOR.
End of Scope of Services
Respectfully submitted by, MEAD & HUNT, Inc. -DRAFTAlex Radovanovich, PE Project Manager
Exhibits Exhibit B -- Construction Administration Cost Estimate Exhibit C - Mead & Hunt, Inc. Standard Billing Rate Schedule (2025)
Page 22 of 22
OST-2025-1200 Page 00772
Sierra Club v. Dept. of Transp. - 3:25-cv-06221
Mead&-I lunt
SC_EVERSPLIT0014949
BASE BID
edding Regional Airport unway 16-34 and Taxiway
nstruction Administration
Connectors Services
Rehabilitation
and MAGVAR Improvements
PHASES and TASKS PHASE 1 - PRECONSTRUCTION SERVICES
kload & Hut Hab teure and rate.)
4
gl If ii 'l .
E. 3f- -3 'ia1I &'@i 10 372 I
40
3
... , .tu,
eo u; g
3362 $298 $240 5240 5277 0194 $224 $172 3199 $154 $178 $184
1.1 Phase 1 Ptciecl Managerntee and Coettlnalion
1.1.1
FTePare Castool and PrEsecl Setup
1.1.2
Propare Schndule
1.1.3
Propare Prcioct Managenont Pbn (PKIP)
1.1.4
Coordinate CONSULTANT Um
1.1.6
Coordinate Subccnsullant(0)
1.1.6
Prepare Inveces
1.2 Phno 1 Prtloct Madlin94 MO Communtalkn
1.2.1
PraCmslruUknCodamoes
1.2.2 1.2.3
gurkt), Conbol (QC)4 Quollt), Asstranco (QA) W084.9 Genaal Conantalicaten with SPONSOR and C.ordractor
1.3 Prepare %je Occurnennalico
1.4 %qmm Issued la Consbuclicn Fern and Specitaticns
1.5 Prepare Cmsbuch= Management Plan (ChIP)
emee 1 Subtotal
PHASE 2 CONSTRUCTION ADMIHISTRATION (CA) SERVICES
1
2
2
4
4
4
8
1
2
8
10
2
2
2
2
2
6
4
1.5
2
24
28
16
28
1.5
1.5
1.5
1.5
4
16
24
24
4
1
2
8
12
6
30
2
16
8
49.5
92
73.5
0
2
0
31.5
0
2
0
62
2.1 Phase 2 Prcien Management and Cmelaben
2.1.1
Schedole Coctd,naten
2.1.2
Coordlnate PUP Updates
2.1.3
Coordnete CONSULTANT Tunt
2.1.4
Coordnete secmeuteen
2.1.5
Prepare In...
2.2 Review Matand DJDmaats - Up to 25 Antedat.
2.3 Phon, 2 Prciect meaurgs and ConununIcatkr,
2.3.1
Ponock an] Weekly Cmabmalen Progress mentings
2.3.2
Slte Vislis Meng Constructbn
2.3.3
Gelereleonmun.ean with SPONSOR and Cordnactor
2.4 Wade Calender.Day Reports- Up to 15Mtklpated
2.5 Weekty FAA Progreas Repteta - Up to 15 Anteeted
2.6 Ftequeus fee mernaten (RFle) - Up tol5Anacksated
2.7 Genand Field Cocedlration
2.8 Requests la Ccat Propcsaa (RFCPs) - Up to 8mtiopsted
2.9 %unkend.. - Up toaAntepated
2.10 Conbact Change Ordens (CC09) - Up to 3fflopsted
2.11 Red. cd OC/OA Test Results
2.12 swens/Appicat forPayment - Up to 8 Ant pated
2.13 SttetanlIal Conlake Walk-Throughand Domnentake
2.13.1 Subst8,004 Corngtellm Walk-TIvougn
2 13.2 Punch Lot ard Subsitettal Comoleton LoIter
Phase 2 Subtotal
PHASE 3 . CONSTRUCTION OBSERVATION
6
18
4
1
2
2
1
4
8
2
2
2
8
6
2.5
3
4
12
20
38
66
72
42
36
80
80
8
36
54
16
7
7
15
1
4
10
15
10
14
24
42
24
8
6
e
18
3
9
12
9
6
12
2
e
9
18
18
3
6
12
15
2
12
2
4
2A
10
16
2
16
8
24
1
4
41
243 400.5 215
0
18
0
44
0
0
0
166
_Ior), (..;:nt..otton 065, ..... ,. Phase 3 Subtotal
140 i 170 I 245 105 535 I 210 I 670 270
I
I
0
140 170 245 105 535 210 670 270
0
0
0
3154 2 8 42 6 58
0
e -e 2
$132 $104
Subconsuttant too 15% murkup
7.
I-
e. l
1
I'
2
2,' 1
1
1
3
2 2 e 1.5
2
4
16
2
8
1
4
48.5
3 5
5
-
1 1
2.5
7 8 7 4 6
9
4.5
1
0 5
- $
-
I 16
I
0
16 8
- 8
-
V
-
Fe .=
V
3 30 ,
I .1.5 i Z e ...
30.700 $111 3555
2
1
0
2
1
11 10
0
23
0
I 226 I 3
0
226
3
lUpermaa
D.Ito 4,2025
e
-
Reproducten and sttippe -
3175 $68 $24
Total Cost
1
14
1
0
14 $
$ $ $ $ $ $
a
$ $ $ $ $ $
1.2:3'. 1.0.4 3.65 7.75 se,.
97
24,56002 1,425.00 19,000.00 4,272.00 19,256.00 exatoo
91,82 00
3
3
62
10
30
14
0
92 $
226 226 I
I
226 228
0 $
$ $ $ 0 $
$ $ $ $ $ $ $ $ $ $ $
5 -
5 3
11,904.00 744).00
5,074.00 3,3450.00 1,482.00 15,864.00
56,658.00 48,820.00 30,424.00
2,604.00 5,496.00 10,318.00 35,040.00 12,972.00 13,492.00 12,544.00 13,020.00 11,828.00 . 4,577.00 1.39000 295,407.00
573.538.00 573,538.00
X31817600`212108.02CFEEIProp.d61d1 I F. IRDD RWY RIND CA). 202511e5
OST-2025-1200 Page 00773
142
Sierra Club v. Dept. of Transp. - 3:25-cv-06221
.11,2025
SC_EVERSPLIT0014950
BASE BID
edding Regional Airport unway 16.34 and Taxiway Connectors Rehabilitation and MAGVAR Improvements
nstruction Administration Services
. g -i t
Mead & Hut label hours 004 rates)
PHASES and TASKS
PHASE 4 - MATERIAL TESTING I
t,
Phase 4 Subtotal
PHASE 5.PUBLIC OUTREACH SERVICES
5.1 10.a.. Organza. and Fe.atate Publ. Outreach meeting
5.2 De...0 Notloations for Media sod Stakehlders
Phese 5 Subtotal
i
PHASE 8 POST CONSTRUCTION SERVICES
6.1 Phase 6 PI900 Management SI.I Update Schedule 6.1.2 Coordinate PMP Upelat. 6.1.3 Coordinate CONSULTANT Team 6.1.4 Coordinate Subc.sultants 6.1.5 Pregere Inveces 6.2 Phase 6 Commun... 6.3 Record Cravings 6.4 Arai C.W.O. Regal (FCR) 6.5 Airport Lowell Man (ALP) RecoP Damen (mute- NIC 06 Update A0800 Pavement Management System (APk4S) 6.6.1 Vie.. Cenelthen Survey 6.6.2 Generate Pavement CenOticei Index Range 6.6.3 Maintenance Program and Costs 6.6.4 Aircraft Fleet Met AnaNsis 6.6.5 PCR Calculabons 6.8.6 Prepare Draft APMS Report 6.8.7 Fna APMS Recorl 6.7 Update Arlielel Serape and Marking Pan 6.8 AGIS As-Buitt Survey-NIC
Phase 0 Subtotal
TOTAL BASE BID BUDGET
1 .".l--i il
i
l it .
Z w gie w lg i
i
1
t g gj L.I i 1 gm & gm t gm s 1,
4 l/e i 118
OS
u; .
a
A
$362 $298 $240 $240 $277 $194 $224 $172 $199 $154 $178 3184 $154
0 01010 0 01010 0 01010 0
18
22
18
4
1
4
2
4
0
19 1 28 1 20
0
0I 0I 0
0
0I 0I 8
0
1
1
0.5
1
0.5
2
0.5
1
2
2
4
12
24
4
16
16
2
4
8
1
0.5
2
2
18
24
52
24
4
6
2
2
8
1
10
4
14
2
4
2
4
30
30
8
2
32
12
4
36
12
24
8
6
2
6
10
2
21.5 88
49
0
0
0
0
0
0
0 210.5 132
II
1
-51 5
le6.
.4
$132 $104
Subcon ultant tee 15% markup
1
il
4
.
2
g' 2
1
1
1
&I
la
,,..,.0 .
iv
.1
RI
30.700 $111 $555
S 225 802 ..0
0 0 Is 225.002.50 3'-
A
2
I $ 17.818.50
i
S Z583 DO
3I 0 0
- $ 20.401.50
0 1 0 1 0
I 21 012I 1
0.5 0.5
2
4
1
1
2
1
6
2
1
17
4 0
_a_
- $ IIM
0
0
0
Dote 01x025
lEtprinma
-- 0 7, 5 2. 1 R.,,,,,,,,,,,,n
t ' k 1 l et .ndsriPPha
$175 $88 $24
1
Total Cost
Wi
ll
$
225.802.50
mums
3
I 12 I
3
0 1 12 1S
$ 5 -
35.372.50 5.189.00
40.561.50
S
5
5
$
S
5
5
1.200.00 S
S $
842.00 306.00 907.00 608.00 1.112.00 14.132.00 22.600.00 8.876.00
-
5
S
5
5
5
s s
S
250.00 S
5
0
0
0 S
1,450.00 5
11.580.00 2.856.00 9.656.00
976.00 10872.00 10.992.00
3.336.00 4.450.00
104,101 00
s 1.331.233.00
X.318I7600t2I2108.02CFEE,Prcposa'Att 1 F. (ROD RWY Rehab CA). 2025 rat.
OST-2025-1200 Page 00774
2 of 2
Sierra Club v. Dept. of Transp. - 3:25-cv-06221
SC_EVERSPLIT0014951
BID ALTERNATE 1
Redding Regional Airport Runway 16-34 and Taxiway Connectors Rehabilitation and IVIAGVAR Improvements
I onstruction Administration Services
Mead 8 Hunt (labor hours and rates)
PHASES and TASKS
PHASE 1 PRECONSTRUCTION SERVICES
1.1 Phase 1 Project Management and CoordnatIon 1.1.1 Prepare Contract and Project Setup 1.1.2 Prepare Schedule 1.1.3 Prepare Project Management Plan (PMP) 1.1.4 Coordinate CONSULTANT Team 1.1.5 Coordinate Subconsultant(s) 1.1.6 Prepare Invoices 1.2 Phase 1 Project Meetings and Canrnunicalion 1.2.1 Pre-Construction CaVerences 1.2.2 Ouabty Control (0C)1Ouality Aasuranoe (OA) Worksb. 1.2.3 General Communication with SPONSOR and Contractor 1.3 Prepare Project Co.rnentation 1.4 Prepare Issued for Ccosaucton Plans and Specifications 1.5 Prepare Construction hlanagernenl Plan (CUP)
Phase 1 Subtotal
PHASE 2 . CONSTRUCTION ADMINISTRATION (CA) SERVICES
m-
2.1 Phase 2 Proma Management and Coon:Motion 2.1.1 Schedule Coordination 21.2 Coordinate PMP Updates 21.3 Coordinate CONSULTANT Team 21.4 Coordinate Subconsullants 2.1.5 Prepare Invoices 2,2 Renew Matenal SuOrrolals - Up to 15 Antiquated (Addibona0 2.3 Phase 2 Proma Meetrigs and Communication 2.3.1 Penodic and Weekly Constructan Progress Meetings 23.2 Sae Vises During Construct's., 23.3 General Communication with SPONSOR and Contractor 2.4 Weekly Calendar-Day Reports 2.5 WeeNy FAA Progress Reports 2.6 Requests for 'donna. (RFIs) - Up to 15Antidpated (Addibonai) 2.7 General Field Coordination 2.8 Requests for Cost Proposals (RFCPs) - Up to 6 Anacipmed (Addruore0 2.9 Field Directives - Up to 6.entioneted (Additional) 2.10 Contract Change Orders 1CCON - Up to I Anticipated ineeiteneg 2.11 Renew of OC.OA Test Results 2.12 Monthly Aporcations tor Payment 2.13 Substantial Completion WA-Through and Documentation 2.13.1 Subelancel Completion Walt-Through 2.13.2 Punch List and Substantial ConVeton Letter
Phase 2 Subtotal
PHASE 3 - CONSTRUCTION OBSERVATION
3 I Oally Construction Cb,cria33/, Nuts* 3 Subtotal
i
It
II' 5 - I 5
I
1'
tu
al g! I.I' El. i Ei i gi i /i
i a. 1 gi g5 ji g-
gw
g`g g
g cif
5362 $298 5240 $240 5277 $194 5224 $172 $199 $154 $178 5184
0.5
1
4
5
1
1
1
1
18
1.5
2
8
12
12
2
0.5
1
4
8
4
12
2.5
13
24.5
22
0 -I 20.5
0
1
0
1
0
15
2
6
10
0.5
1
2
2
9
12
22
18
18
4
18
27
8
1
4
10
15
7
12
21
12
3
9
12
9
1
4
6
12
1
2
4
5
2
4
24
10
2
8
6
4 I
3
6
1
10
3
a
12
12
4
16
24
1
4
21
74 144.5 101
0
11
0
3
0
3
0
100
I
I
300
75
270
70
176
60
II
0I 0
0
0
300 76
270 70 I 176 I 60
0
V
i_ ,1I
1 .I.,Q
0154 $132
1
1
2
4
8
20
4
25
15
0.5 0.5
7 2
6 6
1.5
8
1
0
32.5
0
0
Sibc.ons.u.ltadrcdupfee 15%
.
I
i
3. *2
I
t
t ,3
2
.
S
a
i
5104
1
1
1
1 5
- 5
-
0 S
- $
-
0S -$
Expanses
Date: 41112025
if ik 3g li i' i
LE II I/--' 3*/--. it
I' I Reproduction
1=S end ShIPPIng
50.700 5111 $555 $175 $88 $24
1
Tot., Co,
1
1
4
0
1
1
0
0
4 S
5 5 $ S S 5
$ $ S S $ 5 - 5
8829.00
-
Sl
i
4,254.00
291.00
9,500.00
2136.00
9,888.00
29,695.00
2
6
0
2
0
0
0
6 $
I 75
7
75 I
0 I 75
0
715
76 I 0 S
$ $ $ $ $
S
5 $ $ $ 3 3 3
3 3
3 3
s
s 5
- $
I $ IS
4.630.00 186.00 720.00 -
9.684.00
8.974.00 15.212.00
10.318.00 17.520.00 12.972.00
8.874.00 4.246.00 13.020.00 9.428.00
-
1.390.00 117,174.00
199,704.00 199,704.00
Kl18176001212108.021CFESProposalten 1-F. (ROO RWT Rehab CA). 2025 rates
OST-2025-1200 Page 00775
I of 2
411/2025
Sierra Club v. Dept. of Transp. - 3:25-cv-06221
SC_EVERSPLIT0014952
BID ALTERNATE 1
Redding Regional Airport Runway 16-34 and Taxiway Connectors Rehabilitation and IVIAGVAR Improvements I onstruction Administration Services
Mead & Hunt (labor hours end rates)
PHASES and TASKS
PHASE 4 MATERIAL TESTING 4.1 /.1,,,,, 16,1-6 Phase 4 Subtotal
PHASE 5 PUBLIC OUTREACH SERVICES 5.1 IDevetop. Organize. and Facildate Pupae Outreach Meeting 5.2 De re 09 No (cation for Media and Stakeholders 'Phase 5 Subtotal
PHASE 6 POST CONSTRUCTION SERVICES 6.1 Phase 6 Project Management 6 1.1 Update Schedule 6.1.2 Coordinate PhIP Updates 6.1.3 Coordinate CONSULTANT Team &IA Coordinate Subconsultants 61.5 Prepare Invoices 6.2 Phase 6 Communication 6.3 Record Drawings 6.4 Final Construcbon Report (FCR) 6.5 Airport Layout Plan (ALP) Record Drawing Update - NIC 6.6 Update Airfield Pavement Management System (APMS) 6.6.1 Visual Condition Survey 66.2 Generate Pavement Condition Wax Ratings 66.3 Maintenance Program and Costs 66.4 Aircraft Fleet Mix Analy s 6.8.5 PCR Calculations 6.8.6 Prepare Drat APMS Report 6.8.7 Final APMS Report 6.7 Update Arfield Signago and Marking Plan 6.8 AGIS As-Boil) Survey- NIC Phase 6 Subtotal
TOTAL BASE BID BUDGET
al
- 4
i -m' ,,e
a S2 /
OVERTIME RPR 2
Ill
w ,,,
Xi X
$362 $298 $240 6240 5277 $194 $224 6172 5199 $154 $178 5184
I 0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
O
0
0
0
0
0
0
0.5
I
2
1
6
10
6
2
6
6
12
1
2
4
8
I
2
4
143
20
0
0
0
0
0
0
0
27
i
_ zi
ul $154
Z
$132
0I 0
0
0
2
30
4
1
7B
1
Subconsultant foe 15% markup
I 1
]. 2a
I
t
4
t ,S
i
S
1
$104
1
1
S 16.540.0)
0
16.560.00 6
0
0
-
Expenses
i-
$' g
al
.--
t ,- -g8 -
R./ 3i ..
$0.700 $111 6555 5175 968
0
0
0
0
0
I0
0
O
0
Ate: N1/2025
,,,
-, i R.p.duction
f,;.; and Slapping
$24 0 6
Total Cent
14.56000 16.560.00
0 $
- f
S s
$
$
S
1,400.00 $
s
304.00 -
6,274.00 11,704.00
3.958.00
S 0
S
s
$ $ $ $ $ 250.00 $ S 1,650.00 5
-
-
250.00
22.490.00
S 385.626.00
X,518176001212108.021CFESProposahAtt 1- Fee (ROO RWY Rehab CA). 2025 rates
OST-2025-1200 Page 00776
2 012
Sierra Club v. Dept. of Transp. - 3:25-cv-06221
41/2025
SC_EVERSPLIT0014953
Standard Billing Rates
MEAD & HUNT, Inc. Standard Billing Rate Schedule
Effective January 1, 2025
Clerical
$104.00 / hour
Technical Editor
$138.00 / hour
Accounting, Administrative Assistant
$132.00 / hour
Technician I, Technical Writer
$122.00 / hour
Technician II, Surveyor - Instrument Person
$140.00 / hour
Technician III
$164.00 / hour
Technician IV
$174.00 / hour
Senior Technician
$216.00 / hour
Engineer I, Scientist I, Architect I, Interior Designer I, Planner I
$154.00 / hour
Engineer II, Scientist II, Architect II, Interior Designer II, Planner II
$172.00 / hour
Engineer III, Scientist III, Architect III, Interior Designer III, Planner III
$184.00 / hour
Construction Resident Project Representative (RPR)
$194.00 / hour
Senior Engineer, Senior Scientist, Senior Architect, Senior Interior Designer, Senior Planner, Construction Manager
$240.00 / hour
Project Engineer, Project Scientist, Project Architect, Project Interior Designer, Project Planner $260.00 / hour
Senior Project Engineer, Senior Project Scientist, Senior Project Architect, Senior Project Interior Designer
Senior Project Planner
$298.00 / hour
Senior Associate, Principal, Senior Client / Project Manager
$362.00 / hour
Expenses Geographic Information or GPS Systems Out-Of-Pocket Direct Job Expenses Such as reproductions, sub-consultants / contractors, etc.
$100.00 / day cost plus 15%
Travel Expense Company or Personal Car Mileage
* Rates will be charged at Current IRS rate
Air and Surface Transportation Lodging and Sustenance
$ IRS rate / mile*
cost plus 15% cost plus 15%
Billing and Payment
Travel time is charged for work required to be performed out-of-office. A minimum of two hours will be billed for any work out-of-office.
Invoicing is on a monthly basis for work performed. Payment for services is due within 30 days from the date of the invoice. An interest charge of 1.5% per month is made on the unpaid balance starting 30 days after the date of invoice.
This schedule of billing rates is effective January 1, 2025, and will remain in effect until December 31, 2025, unless unforeseen increases in operational costs are encountered. We reserve the right to change rates to reflect such increases.
2025 Current MH California rates
OST-2025-1200 Page 00777
Sierra Club v. Dept. of Transp. - 3:25-cv-06221
SC_EVERSPLIT0014954
Exhibit D Project Bid Tabulation
OST-2025-1200 Page 00778
Sierra Club v. Dept. of Transp. - 3:25-cv-06221
SC_EVERSPLIT0014955
BID TABULATION FOR:
Redding Regional Airport Runway 16-34 & Taxiway Connector Rehabilitation & MAGVAR Improvements
Bid Schedule No.: 5451
9944-33
ENGINEER'S EST
Redding Airport Constructors
UNIT
UNIT
ITEM DESCRIPTION
UNIT QTY
PRICE
TOTAL
PRICE
TOTAL
Airfield Safety and Traffic
1 Control Construction Staking and
LS
1
$465,000.00
$465,000.00 $2,150,000.00
$2,150,000.00
2 Survey Layout Temporary Haul Route
LS
1
$200,000.00
$200,000.00 $200,000.00
$200,000.00
3 Improvements
LS
1
Airport Access and Haul Route
$20,000.00
$20,000.00 $125,000.00
$125,000.00
4 Repair Contractor Quality Control
CY 400
$65.00
$26,000.00
$100.00
$40,000.00
5 Program (CQCP)
LS
1
$335,000.00
$335,000.00 $1,175,000.00
$1,175,000.00
Prepare Storm Water Pollution
6 Prevention Plan (SWPPP) Implement Storm Water
LS
1
$20,000.00
$20,000.00
$5,000.00
$5,000.00
Pollution Pollution Prevention
7 Plan (SWPPP) 8 Mobilization 9 Engineer/RPR Field Office
Install Runway Threshold
LS
1
$75,000.00
$75,000.00 $175,000.00
LS
1 $1,479,000.00
$1,479,000.00 $2,000,000.00
LS
1
$80,000.00
$80,000.00 $200,000.00
$175,000.00 $2,000,000.00
$200,000.00
10 Survey Monument
EA
2
$3,500.00
$7,000.00
$20,000.00
$40,000.00
Remove and Salvage Runway /
Taxiway Light Fixture, and
11 Transformer Remove Runway Light Base
EA
73
$500.00
$36,500.00
$700.00
$51,100.00
Can and Transformer, Salvage
12 _Light Fixture 13 Asphalt Pavement Removal
Cold Milling, 4-inch Depth and
EA
16
SY 10110
$780.00 $9.50
$12,480.00 $96,045.00
$800.00 $10.00
$12,800.00 $101,100.00
14 Stockpile On-site Cold Milling, 2-inch Depth and
SY 119330
$8.00
$954,640.00
$11.00
$1,312,630.00
15 Stockpile On-site
SY 13680
$7.00
$95,760.00
$5.00
$68,400.00
Cold Milling, Variable Depth
16 Transition and Stockpile On-site SY
17 Crack Repair
LF
22090 30000
$11.00 $2.50
$242,990.00 $75,000.00
$1.00 $2.00
$22,090.00 $60,000.00
18 Daily Crack Repair Mobilization EA
35
19 Asphalt Pavement Repair
CY 1400
Unclassified Excavation and
20 Stockpile On-Site"
CY 2040
$4,000.00 $60.00
$140,000.00 $84,000.00
$85.00
$173,400.00
OST-2025-1200 Page 00779
$2,000.00 $150.00
$125.00
$70,000.00 $210,000.00
$255,000.00
Page 1 of 9
Sierra Club v. Dept. of Transp. - 3:25-cv-06221
SC_EVERSPLIT0014956
BID TABULATION FOR:
Redding Regional Airport Runway 16-34 & Taxiway Connector Rehabilitation & MAGVAR Improvements
Bid Schedule No.: 5451
9944-33
ENGINEER'S EST
Redding Airport Constructors
UNIT
UNIT
ITEM DESCRIPTION
UNIT QTY
PRICE
TOTAL
PRICE
TOTAL
21 Subgrade Preparation
SY 13480
$4.50
$60,660.00
$1.00
$13,480.00
22 RSA Grading
SY 1170
$12.00
$14,040.00
$10.00
$11,700.00
Cement Treated Subgrade, 16-
23 inch Depth
SY 10110
$22.00
$222,420.00
$25.00
$252,750.00
24 In-Place Drying of Subgrade
SY 2530
$8.00
$20,240.00
$2.00
$5,060.00
Excavation of Unsuitable
25 Subgrade
CY 680
$65.00
$44,200.00
$100.00
$68,000.00
26 Multi-axial Geogrid
SY 2030
$5.00
$10,150.00
$15.00
$30,450.00
27 Recycled Base
CY 1140
$85.00
$96,900.00
$150.00
$171,000.00
Crushed Aggregate Base
28 Course
CY 2710
$90.00
$243,900.00
$175.00
$474,250.00
29 Asphalt Surface Course
TON 34640
$185.00
$6,408,400.00
$175.00
$6,062,000.00
30 Asphalt Mixture Leveling Course TON 12750
$175.00
$2,231,250.00
$175.00
$2,231,250.00
Asphalt Mixture Leveling Course
31 for Asphalt Pavement Repair TON
32 Emulsified Asphalt Tack Coat TON
Marking, Initial Application,
33 White with Reflective Media
SF
Marking, Final Application,
34 White with Reflective Media
SF
Marking, Initial Application, 35 White without Reflective Media SF
Marking, Final Application,
36 White without Reflective Media SF
Marking, Initial Application,
37 Yellow with Reflective Media
SF
Marking, Final Application,
38 Yellow with Reflective Media
SF
3650 122 92300 92300 52000
52000 8000 8000
$195.00 $1,200.00
$1.30 $1.00 $1.00
$0.85 $1.30 $1.00
$711,750.00 $146,400.00 $119,990.00
$92,300.00 $52,000.00
$44,200.00 $10,400.00
$8,000.00
$175.00 $2,000.00
$1.50 $1.00 $0.75
$0.75 $2.50 $2.25
$638,750.00 $244,000.00 $138,450.00
$92,300.00 $39,000.00
$39,000.00 $20,000.00 $18,000.00
Marking, Initial Application, 39 Yellow without Reflective Media SF
6500
$1.00
$6,500.00
$1.50
$9,750.00
Marking, Final Application,
40 Yellow without Reflective Media SF
Marking, Single Application,
41 Yellow with Reflective Media
SF
6500 4800
$0.85 $1.00
$5,525.00 $4,800.00
$1.00 $4.00
$6,500.00 $19,200.00
OST-2025-1200 Page 00780
Page 2 of 9
Sierra Club v. Dept. of Transp. - 3:25-cv-06221
SC_EVERSPLIT0014957
BID TABULATION FOR:
Redding Regional Airport Runway 16-34 & Taxiway Connector Rehabilitation & MAGVAR Improvements
Bid Schedule No.: 5451
9944-33
ENGINEER'S EST
Redding Airport Constructors
UNIT
UNIT
ITEM DESCRIPTION
UNIT QTY
PRICE
TOTAL
PRICE
TOTAL
Marking, Single Application,
42 Yellow without Reflective Media SF 4300
Marking, Single Application,
43 Black
SF 79300
Surface Painted Signs, Initial
Application with Reflective
44 Media
SF 3630
Surface Painted Signs, Final
Application with Reflective
45 Media
SF 3630
Storm Drain Pipe, 12-inch, RCP
46 Class III
LF 240
Removal of Foreign
47 Substances/contaminates
SF 43300
48 Grooving
SY 100900
49 Seeding
ACRE 10
Remove Miscellaneous Airfield
50 Electrical Components
LS
1
No. 8 AWG, 5 kV, L-824, Type
C Cable, Installed in Duct Bank
51 or Conduit
LF 580
Concrete Encased, Electrical
Conduit, 1-Way 2-Inch Sch 40
PVC,
52 Type 1 Trench
LF 370
No. 6 AWG, Solid, Bare
Counterpoise Wire, Installed in
Trench Above Duct Bank or
Conduit, Including Ground Rods
53 and Ground Connectors
LF 370
Encase Existing FAA Conduit
54 with Concrete
LF
70
Airfield Sign Legend
55 Replacement
EA
26
$0.85 $0.85
$8.50
$8.50 $210.00
$3.00 $4.50 $10,500.00 $12,000.00
$3.00
$100.00
$3.50 $90.00 $1,000.00
$3,655.00 $67,405.00
$1.50 $1.00
$30,855.00
$10.00
$30,855.00
$50,400.00
$129,900.00 $454,050.00 $105,000.00
$12,000.00
$6.00
$400.00
$1.00 $4.00 $6,000.00
$50,000.00
$1,740.00
$5.00
$37,000.00
$60.00
$1,295.00 $6,300.00 $26,000.00
$5.00 $300.00 $2,500.00
$6,450.00 $79,300.00
$36,300.00
$21,780.00 $96,000.00 $43,300.00 $403,600.00 $60,000.00 $50,000.00
$2,900.00
$22,200.00
$1,850.00 $21,000.00 $65,000.00
OST-2025-1200 Page 00781
Sierra Club v. Dept. of Transp. - 3:25-cv-06221
Page 3 of 9
SC_EVERSPLIT0014958
BID TABULATION FOR:
Redding Regional Airport Runway 16-34 & Taxiway Connector Rehabilitation & MAGVAR Improvements
Bid Schedule No.: 5451
9944-33
ENGINEER'S EST
Redding Airport Constructors
UNIT
UNIT
ITEM DESCRIPTION
UNIT QTY
PRICE
TOTAL
PRICE
TOTAL
Install Salvaged Elevated
Runway Edge Light Fixture and
Transformer on Existing Can,
56 without elevation adjustment
EA
10
Install Salvaged Elevated
Runway Edge Light Fixture and
Transformer on Existing Can,
57 with elevation adjustment
EA
55
Install Salvaged In-pavement Runway Edge Light Fixture and Transformed on Existing Can,
58 with elevation adjustment Install Salvaged Elevated Runway Light Fixture and
59 Transformer on New Can
EA
8
EA
16
Existing Electrical Junction
60 Structure Elevation Adjustment EA
9
Existing Electrical Junction Can
61 Elevation Adjustment
EA
2
Install L-853 Retroreflective
62 Marker, Complete
EA
9
TOTAL BASE BID
$350.00
$3,500.00
$1,000.00
$10,000.00
$1,600.00
$88,000.00
$2,800.00
$154,000.00
$2,600.00
$20,800.00
$2,600.00
$41,600.00
$7,800.00
$70,200.00
$2,500.00
$5,000.00
$500.00
$4,500.00
$16,361,895.00
$3,000.00
$24,000.00
$4,000.00
$64,000.00
$9,000.00 $3,000.00
$500.00
$81,000.00
$6,000.00
$4,500.00 $20,111,190.00
Additive Alternate 1
Contractor Quality Control 1 Program (CQCP)
Airfield Safety and Traffic 2 Control
Construction Staking and 3 Survey Layout 4 Mobilization
Implement Storm Water Pollution Pollution Prevention 5 Plan (SWPPP) Remove Airfield Light Fixture 6 and Base Can, Complete
LS
1
LS
1
LS
1
LS
1
LS
1
EA
88
$26,000.00 $16,000.00 $15,000.00 $792,000.00
$55,000.00 $1,000.00
$26,000.00
$16,000.00
$15,000.00 $792,000.00
$194,506.00
$200,000.00
$50,000.00 $760,000.00
$55,000.00 $88,000.00
$100,000.00 $600.00
$194,506.00 $200,000.00
$50,000.00 $760,000.00
$100,000.00 $52,800.00
OST-2025-1200 Page 00782
Page 4 of 9
Sierra Club v. Dept. of Transp. - 3:25-cv-06221
SC_EVERSPLIT0014959
BID TABULATION FOR:
Redding Regional Airport Runway 16-34 & Taxiway Connector Rehabilitation & MAGVAR Improvements
Bid Schedule No.: 5451
9944-33
ENGINEER'S EST
Redding Airport Constructors
UNIT
UNIT
ITEM DESCRIPTION
UNIT QTY
PRICE
TOTAL
PRICE
TOTAL
Remove Runway Light Base
Can and Transformer, Salvage
7 Light Fixture
EA
1
$780.00
$780.00
$1,000.00
$1,000.00
Remove Taxiway Light Base
Can and Transformer, Salvage
8 Light Fixture
EA
2
$780.00
$1,560.00
$1,000.00
$2,000.00
Underground Utility Investigation
9 and Potholing
HR 52
$670.00
$34,840.00
$1,000.00
$52,000.00
10 Remove Existing Junction Can EA
6
Remove Existing Junction
11 Structure
EA
16
Remove Existing Airfield
Guidance Sign and Protect PCC
12 Pad, Complete
EA
17
Remove Existing Airfield
Guidance Sign and PCC Pad,
13 Complete
EA
29
14 Asphalt Pavement Removal
SY 35730
Unclassified Excavation and
15 Stockpile On-Site
CY 1400
16 Subgrade Preparation
SY 42100
17 RSA Grading
SY 6690
Cement Treated Subgrade, 16-
18 inch Depth
SY 42100
Crushed Aggregate Base
19 Course
CY 7480
20 Asphalt Surface Course
TON 8980
21 Emulsified Asphalt Tack Coat TON 5
Asphalt Surface Treatment, P-
22 608
SY 840
Marking, Initial Application,
23 Yellow with Reflective Media
SF 4300
Marking, Final Application,
24 Yellow with Reflective Media
SF 4300
25 Seeding
ACRE 1.4
Remove Miscellaneous Airfield
26 Electrical Components
LS
1
$850.00 $3,100.00
$1,200.00
$5,700.00 $9.50
$85.00 $4.50
$12.00 $22.00 $90.00 $185.00 $1,200.00 $30.00
$1.30 $1.00 $10,500.00
$150,000.00
$5,100.00 $49,600.00
$500.00 $1,000.00
$20,400.00
$500.00
$165,300.00 $339,435.00
$119,000.00 $189,450.00
$80,280.00
$926,200.00
$673,200.00 $1,661,300.00
$6,000.00
$25,200.00
$5,590.00
$4,300.00 $14,700.00
$150,000.00
$1,500.00 $11.00
$125.00 $1.00
$10.00
$25.00
$175.00 $175.00 $2,000.00
$50.00
$8.00
$4.00 $6,000.00
$240,591.00
$3,000.00 $16,000.00
$8,500.00
$43,500.00 $393,030.00 $175,000.00
$42,100.00 $66,900.00 $1,052,500.00 $1,309,000.00 $1,571,500.00 $10,000.00 $42,000.00 $34,400.00 $17,200.00
$8,400.00
$240,591.00
OST-2025-1200 Page 00783
Sierra Club v. Dept. of Transp. - 3:25-cv-06221
Page 5 of 9
SC_EVERSPLIT0014960
BID TABULATION FOR:
Redding Regional Airport Runway 16-34 & Taxiway Connector Rehabilitation & MAGVAR Improvements
Bid Schedule No.: 5451
9944-33
ENGINEER'S EST
Redding Airport Constructors
UNIT
UNIT
ITEM DESCRIPTION
UNIT QTY
PRICE
TOTAL
PRICE
TOTAL
No. 8 AWG, 5 kV, L-824, Type
C Cable, Installed in Duct Bank
27 or Conduit
LF 28800
$3.00
$86,400.00
$4.00
$115,200.00
No. 6 AWG, Solid, Bare
Counterpoise Wire, Installed in
Trench Above Duct Bank or
Conduit, Including Ground Rods
28 and Ground Connectors
LF 20300
$3.50
$71,050.00
$2.00
$40,600.00
Non-Encased Electrical Duct
Bank, 1-Way 2-Inch Sch 40
29 PVC
LF 3660
$30.00
$109,800.00
$25.00
$91,500.00
Concrete-Encased Electrical
Duct Bank , 4-Way 4-Inch Sch
30 40 PVC
LF 240
$80.00
$19,200.00
$120.00
$28,800.00
Concrete-Encased Electrical
Duct Bank, 6-Way 4-Inch Sch
31 40 PVC
LF 510
$100.00
$51,000.00
$150.00
$76,500.00
Concrete-Encased Electrical
Duct Bank , 1-Way 2-Inch Sch
32 40 PVC, Type 1 Trench
LF 12880
$42.00
$540,960.00
$35.00
$450,800.00
Concrete-Encased Electrical
Duct Bank , 1-Way 2-Inch Sch
33 40 PVC, Type 2 Trench
LF 660
$210.00
$138,600.00
$35.00
$23,100.00
Concrete-Encased Electrical
Duct Bank , 2-Way 2-Inch Sch
34 40 PVC, Type 1 Trench
LF 1150
$52.00
$59,800.00
$52.00
$59,800.00
Concrete-Encased Electrical
Duct Bank, 8-Way 4-Inch Sch
35 40 PVC, Type 1 Trench
LF 200
$300.00
$60,000.00
$325.00
$65,000.00
Directional Bore Electrical Duct
36 Bank, 2-Way 4-Inch HDPE
LF 980
$100.00
$98,000.00
$175.00
$171,500.00
Directional Bore Electrical Duct
37 Bank, 4-Way 4-Inch HDPE
LF 120
Electrical Junction Can, L-868,
38 Type C
EA
15
$210.00 $10,500.00
$25,200.00 $157,500.00
$425.00 $2,200.00
$51,000.00 $33,000.00
OST-2025-1200 Page 00784
Sierra Club v. Dept. of Transp. - 3:25-cv-06221
Page 6 of 9
SC_EVERSPLIT0014961
BID TABULATION FOR:
Redding Regional Airport Runway 16-34 & Taxiway Connector Rehabilitation & MAGVAR Improvements
Bid Schedule No.: 5451
9944-33
ENGINEER'S EST
Redding Airport Constructors
UNIT
UNIT
ITEM DESCRIPTION
UNIT QTY
PRICE
TOTAL
PRICE
TOTAL
Electrical Junction Structure,
Aircraft Rated with Spring
39 Assisted Cover, Size 2, 2'x3'x3' EA
16
Install L-862(L) High Intensity
LED Elevated Runway Edge
40 Light, Complete
EA
64
Install L-862E(L) High Intensity
LED Elevated Runway
41 Threshold Light, Complete
EA
16
Install L-850C(L) High Intensity
LED In-pavement Runway Edge
42 Light, Complete
EA
6
Install Salvaged Elevated
Runway Light Fixture and
43 Transformer on New Can
EA
1
Install Salvaged Elevated
Taxiway Light Fixture and
44 Transformer on New Can
EA
2
Airfield Sign Legend
Replacement with New
45 Transformer
EA
25
Install L-858 Airfield Guidance
Sign LED, 1 Module, Size 2 on
46 Existing PCC Pad, Complete
EA
5
Install L-858 Airfield Guidance
Sign LED, 2 Module, Size 2 on
47 Existing PCC Pad, Complete
EA
6
Install L-858 Airfield Guidance
Sign LED, 3 Module, Size 2 on
48 Existing PCC Pad, Complete
EA
3
Install L-858 Airfield Guidance
Sign LED, 4 Module, Size 2 on
49 Existing PCC Pad, Complete
EA
2
Install L-858 Airfield Guidance
Sign LED, 1 Module, Size 2 on
50 New PCC Pad
EA
5
$36,000.00 $3,000.00 $3,600.00
$576,000.00
$17,000.00
$192,000.00
$3,500.00
$57,600.00
$4,000.00
$3,300.00 $2,100.00 $2,000.00 $1,200.00 $4,100.00
$19,800.00 $2,100.00 $4,000.00
$30,000.00 $20,500.00
$5,000.00 $3,000.00 $2,800.00 $2,200.00 $3,000.00
$5,700.00
$34,200.00
$4,000.00
$6,700.00
$20,100.00
$5,000.00
$9,800.00
$19,600.00
$15,500.00
$77,500.00
OST-2025-1200 Page 00785
$6,000.00 $7,000.00
$272,000.00 $224,000.00
$64,000.00
$30,000.00 $3,000.00 $5,600.00
$55,000.00 $15,000.00
$24,000.00
$15,000.00
$12,000.00
$35,000.00
Page 7 of 9
Sierra Club v. Dept. of Transp. - 3:25-cv-06221
SC_EVERSPLIT0014962
BID TABULATION FOR:
Redding Regional Airport Runway 16-34 & Taxiway Connector Rehabilitation & MAGVAR Improvements
Bid Schedule No.: 5451
9944-33
ENGINEER'S EST
Redding Airport Constructors
UNIT
UNIT
ITEM DESCRIPTION
UNIT QTY
PRICE
TOTAL
PRICE
TOTAL
Install L-858 Airfield Guidance
Sign LED, 2 Module, Size 2 on
51 New PCC Pad
EA
9
Install L-858 Airfield Guidance
Sign LED, 3 Module, Size 2 on
52 New PCC Pad
EA
12
Install L-858 Airfield Guidance
Sign LED, RDR, Size 4 on New
53 PCC Pad
EA
7
Install New Windcone
54 Transformer
EA
2
Airfield Electrical Vault
55 Equipment Improvements
LS
1
$18,500.00
$21,500.00
$35,000.00 $1,500.00
$100,000.00
$166,500.00
$7,500.00
$258,000.00
$10,000.00
$245,000.00 $3,000.00
$100,000.00
$8,000.00 $500.00
$52,000.00
$67,500.00
$120,000.00
$56,000.00 $1,000.00
$52,000.00
Cold Milling, Variable Depth 56 Transition and Stockpile On-site SY -20190
$11.00
($222,090.00)
$1.00
($20,190.00)
57 Asphalt Mixture Leveling Course TON
Remove Miscellaneous Airfield
58 Electrical Components
LS
Marking, Single Application,
59 Yellow with Reflective Media
SF
No. 8 AWG, 5 kV, L-824, Type
C Cable, Installed in Duct Bank
60 or Conduit
LF
Concrete Encased, Electrical
Conduit, 1-Way 2-Inch Sch 40
PVC,
61 Type 1 Trench
LF
No. 6 AWG, Solid, Bare
Counterpoise Wire, Installed in
Trench Above Duct Bank or
Conduit, Including Ground Rods
62 and Ground Connectors
LF
-2600 -1
-4300 -580
-370
-370
$175.00 $12,000.00
$1.00 $3.00
$100.00
$3.50
($455,000.00) ($12,000.00) ($4,300.00)
$175.00 $50,000.00
$4.00
($1,740.00)
$5.00
($37,000.00)
$60.00
($1,295.00)
$5.00
($455,000.00) ($50,000.00) ($17,200.00) ($2,900.00)
($22,200.00)
($1,850.00)
Existing Electrical Junction
63 Structure Elevation Adjustment EA
-9
$7,800.00
($70,200.00)
$9,000.00
($81,000.00)
OST-2025-1200 Page 00786
Sierra Club v. Dept. of Transp. - 3:25-cv-06221
Page 8 of 9
SC_EVERSPLIT0014963
BID TABULATION FOR:
Redding Regional Airport Runway 16-34 & Taxiway Connector Rehabilitation & MAGVAR Improvements
Bid Schedule No.: 5451
9944-33
ENGINEER'S EST
Redding Airport Constructors
UNIT
UNIT
ITEM DESCRIPTION
UNIT QTY
PRICE
TOTAL
PRICE
TOTAL
Existing Electrical Junction Can
64 Elevation Adjustment
EA
-2
$2,500.00
($5,000.00)
$3,000.00
($6,000.00)
Airfield Sign Legend
65 Replacement
EA -26
$1,000.00
($26,000.00)
$2,500.00
($65,000.00)
Remove and Salvage Runway /
Taxiway Light Fixture, and
66 Transformer
EA -73
$500.00
($36,500.00)
$700.00
($51,100.00)
Remove Runway Light Base
Can and Transformer, Salvage
67 Light Fixture
EA -16
$780.00
($12,480.00)
$800.00
($12,800.00)
Install Salvaged Elevated
Runway Edge Light Fixture and
Transformer on Existing Can,
68 without elevation adjustment
EA -10
Install Salvaged Elevated
Runway Edge Light Fixture and
Transformer on Existing Can,
69 with elevation adjustment
EA -55
Install Salvaged In-pavement
Runway Edge Light Fixture and
Transformed on Existing Can,
70 with elevation adjustment
EA
-8
$350.00
($3,500.00)
$1,000.00
($10,000.00)
$1,600.00
($88,000.00)
$2,800.00
($154,000.00)
$2,600.00
($20,800.00)
$3,000.00
($24,000.00)
Install Salvaged Elevated Runway Threshold Light Fixture 71 and Transformer on New Can EA -16
$2,600.00
($41,600.00)
$4,000.00
($64,000.00)
TOTAL BID ALTERNATE 1
TOTAL BASE BID PLUS ADDITIVE ALTERNATE
$7,670,140.00 $24,032,035.00
$7,666,587.00 $27,777,777.00
NOTE: PROCUREMENT OF AIRFIELD ELECTRICAL ITEMS WILL BE FUNDED UNDER A SEPARATE GRANT. SEE EXHIBIT Cl COST SUMMARY FOR BREAKDOWN OF PROJECT COSTS.
OST-2025-1200 Page 00787
Page 9 of 9
Sierra Club v. Dept. of Transp. - 3:25-cv-06221
SC_EVERSPLIT0014964
Exhibit E Schedule
OST-2025-1200 Page 00788
Sierra Club v. Dept. of Transp. - 3:25-cv-06221
SC_EVERSPLIT0014965
Preliminary Proposed Project Schedule
Redding Regional Airport - FY 2025 Runway 16-34
Preliminary Proposed Project Schedule for the following Project:
Runway 16-34 Rehabilitation; Connector Taxiway H, Runway 16-34 Shoulder and Runway 16-34 Blast Pad Reconstruction; MAGVAR Updates; Runway 16-34 High Intensity Light Replacement; and Airfield Signage Improvements (Phase 2)
AIP 3-06-0194-XXX-2025
The project schedule for the grant items included in the application is as follows:
1) Contract and NTP 2) Update 95% Design 3) Final Design 4) Bid Advertisement 5) Final Grant Submission 6) Grant Received 7) Construction Mobilization 8) Construction (Runway Closure)
January 2024 February 2024 March 2024 March 2024 April 2025 May 2025 June 2025 - September 2025 September 2025 -- October 2025
OST-2025-1200 Page 00789
Sierra Club v. Dept. of Transp. - 3:25-cv-06221
SC_EVERSPLIT0014966
Exhibit F Sponsor Grant Assurances
OST-2025-1200 Page 00790
Sierra Club v. Dept. of Transp. - 3:25-cv-06221
SC_EVERSPLIT0014967
FAA Airports
ASSURANCES
AIRPORT SPONSORS
A. General.
1. These assurances shall be complied with in the performance of grant agreements for airport development, airport planning, and noise compatibility program grants for airport sponsors.
2. These assurances are required to be submitted as part of the project application by sponsors requesting funds under the provisions of Title 49, U.S.C., subtitle VII, as amended. As used herein, the term "public agency sponsor" means a public agency with control of a public-use airport; the term "private sponsor" means a private owner of a public-use airport; and the term "sponsor" includes both public agency sponsors and private sponsors.
3. Upon acceptance of this grant offer by the sponsor, these assurances are incorporated in and become part of this Grant Agreement.
B. Duration and Applicability.
1. Airport development or Noise Compatibility Program Projects Undertaken by a Public Agency Sponsor.
The terms, conditions and assurances of this Grant Agreement shall remain in full force and effect throughout the useful life of the facilities developed or equipment acquired for an airport development or noise compatibility program project, or throughout the useful life of the project items installed within a facility under a noise compatibility program project, but in any event not to exceed twenty (20) years from the date of acceptance of a grant offer of Federal funds for the project. However, there shall be no limit on the duration of the assurances regarding Exclusive Rights and Airport Revenue so long as the airport is used as an airport. There shall be no limit on the duration of the terms, conditions, and assurances with respect to real property acquired with federal funds. Furthermore, the duration of the Civil Rights assurance shall be specified in the assurances.
2. Airport Development or Noise Compatibility Projects Undertaken by a Private Sponsor.
The preceding paragraph (1) also applies to a private sponsor except that the useful life of project items installed within a facility or the useful life of the facilities developed or equipment acquired under an airport development or noise compatibility program project shall be no less than ten (10) years from the date of acceptance of Federal aid for the project.
3. Airport Planning Undertaken by a Sponsor.
Unless otherwise specified in this Grant Agreement, only Assurances 1, 2, 3, 5, 6, 13, 18, 23, 25, 30, 32, 33, 34, and 37 in Section C apply to planning projects. The terms, conditions, and
Airport Sponsor Assurances 5/2022
OST-2025-1200 Page 00791
Page 1of 19
Sierra Club v. Dept. of Transp. - 3:25-cv-06221
SC_EVERSPLIT0014968
assurances of this Grant Agreement shall remain in full force and effect during the life of the project; there shall be no limit on the duration of the assurances regarding Exclusive Rights and Airport Revenue so long as the airport is used as an airport.
C. Sponsor Certification. The sponsor hereby assures and certifies, with respect to this grant that:
1. General Federal Requirements It will comply with all applicable Federal laws, regulations, executive orders, policies, guidelines, and requirements as they relate to the application, acceptance, and use of Federal funds for this Grant including but not limited to the following:
FEDERAL LEGISLATION a. 49 U.S.C. subtitle VII, as amended. b. Davis-Bacon Act, as amended -- 40 U.S.C. 3141-3144, 3146, and 3147, et seq.1 c. Federal Fair Labor Standards Act -- 29 U.S.C. 201, et seq. d. Hatch Act -- 5 U.S.C. 1501, et seq.2 e. Uniform Relocation Assistance and Real Property Acquisition Policies Act of 1970, 42 U.S.C. 4601, et seq.1, 2 f. National Historic Preservation Act of 1966 -- Section 106 -- 54 U.S.C. 306108.1 g. Archeological and Historic Preservation Act of 1974 - 54 U.S.C. 312501, et seq.' h. Native Americans Grave Repatriation Act -- 25 U.S.C. 3001, et seq. i. Clean Air Act, P.L. 90-148, as amended -- 42 U.S.C. 7401, et seq. j. Coastal Zone Management Act, P.L. 92-583, as amended -- 16 U.S.C. 1451, et seq. k. Flood Disaster Protection Act of 1973 - Section 102(a) - 42 U.S.C. 4012a.1 I. 49 U.S.C. 303, (formerly known as Section 4(f)). m. Rehabilitation Act of 1973 - 29 U.S.C. 794. n. Title VI of the Civil Rights Act of 1964 (42 U.S.C. 2000d et seq., 78 stat. 252) (prohibits discrimination on the basis of race, color, national origin). o. Americans with Disabilities Act of 1990, as amended, (42 U.S.C. 12101 et seq.) (prohibits discrimination on the basis of disability). p. Age Discrimination Act of 1975 - 42 U.S.C. 6101, et seq. q. American Indian Religious Freedom Act, P.L. 95-341, as amended. r. Architectural Barriers Act of 1968, as amended --42 U.S.C. 4151, et seq.' s. Powerplant and Industrial Fuel Use Act of 1978 -- Section 403 --42 U.S.C. 8373.1 t. Contract Work Hours and Safety Standards Act -- 40 U.S.C. 3701, et seq.1 u. Copeland Anti-kickback Act -- 18 U.S.C. 874.1
Airport Sponsor Assurances 5/2022
OST-2025-1200 Page 00792
Sierra Club v. Dept. of Transp. - 3:25-cv-06221
Page 2 of 19
SC_EVERSPLIT0014969
v. National Environmental Policy Act of 1969 - 42 U.S.C. 4321, et seq.' w. Wild and Scenic Rivers Act, P.L. 90-542, as amended -- 16 U.S.C. 1271, et seq. x. Single Audit Act of 1984 - 31U.S.C. 7501, et seq.2 y. Drug-Free Workplace Act of 1988 - 41U.S.C. 8101through 8105. z. The Federal Funding Accountability and Transparency Act of 2006, as amended (P.L. 109-282, as
amended by section 6202 of P.L. 110-252). aa. Civil Rights Restoration Act of 1987, P.L. 100-259. bb. Build America, Buy America Act, P.L. 117-58, Title IX.
EXECUTIVE ORDERS a. Executive Order 11246 -- Equal Employment Opportunity' b. Executive Order 11990 -- Protection of Wetlands c. Executive Order 11998 -- Flood Plain Management d. Executive Order 12372 -- Intergovernmental Review of Federal Programs e. Executive Order 12699 -- Seismic Safety of Federal and Federally Assisted New Building Construction' f. Executive Order 12898 -- Environmental Justice
g. Executive Order 13166 -- Improving Access to Services for Persons with Limited English
Proficiency h. Executive Order 13985 -- Executive Order on Advancing Racial Equity and Support for
Underserved Communities Through the Federal Government i. Executive Order 13988 -- Preventing and Combating Discrimination on the Basis of Gender Identity
or Sexual Orientation J. Executive Order 14005 -- Ensuring the Future is Made in all of America by All of America's
Workers k. Executive Order 14008 -- Tackling the Climate Crisis at Home and Abroad
FEDERAL REGULATIONS a. 2 CFR Part 180 - OMB Guidelines to Agencies on Governmentwide Debarment and Suspension (Nonprocurement). b. 2 CFR Part 200 -- Uniform Administrative Requirements, Cost Principles, and Audit Requirements for Federal Awards. 4' 5 c. 2 CFR Part 1200 -- Nonprocurement Suspension and Debarment. d. 14 CFR Part 13 -- Investigative and Enforcement Procedures. e. 14 CFR Part 16 -- Rules of Practice for Federally-Assisted Airport Enforcement Proceedings. f. 14 CFR Part 150 -- Airport Noise Compatibility Planning.
Airport Sponsor Assurances 5/2022
OST-2025-1200 Page 00793
Sierra Club v. Dept. of Transp. - 3:25-cv-06221
Page 3 0119
SC_EVERSPLIT0014970
g. 28 CFR Part 35 -- Nondiscrimination on the Basis of Disability in State and Local Government Services.
h. 28 CFR 50.3 -- U.S. Department of Justice Guidelines for the Enforcement of Title VI of the Civil Rights Act of 1964.
i. 29 CFR Part 1-- Procedures for Predetermination of Wage Rates.'
J. 29 CFR Part 3 -- Contractors and Subcontractors on Public Building or Public Work Financed in Whole or in Part by Loans or Grants from the United States.'
k. 29 CFR Part 5 -- Labor Standards Provisions Applicable to Contracts Covering Federally Financed and Assisted Construction (Also Labor Standards Provisions Applicable to Nonconstruction Contracts Subject to the Contract Work Hours and Safety Standards Act).'
I. 41CFR Part 60 - Office of Federal Contract Compliance Programs, Equal Employment Opportunity, Department of Labor (Federal and Federally-assisted contracting requirements).'
m. 49 CFR Part 20 -- New Restrictions on Lobbying.
n. 49 CFR Part 21-- Nondiscrimination in Federally-Assisted Programs of the Department of Transportation - Effectuation of Title VI of the Civil Rights Act of 1964.
o. 49 CFR Part 23 -- Participation by Disadvantage Business Enterprise in Airport Concessions.
p. 49 CFR Part 24 -- Uniform Relocation Assistance and Real Property Acquisition for Federal and Federally-Assisted Programs.'. 2
q. 49 CFR Part 26 -- Participation by Disadvantaged Business Enterprises in Department of Transportation Financial Assistance Programs.
r. 49 CFR Part 27 -- Nondiscrimination on the Basis of Disability in Programs or Activities Receiving Federal Financial Assistance.'
s. 49 CFR Part 28 -- Enforcement of Nondiscrimination on the Basis of Handicap in Programs or Activities Conducted by the Department of Transportation.
t. 49 CFR Part 30 -- Denial of Public Works Contracts to Suppliers of Goods and Services of Countries That Deny Procurement Market Access to U.S. Contractors.
u. 49 CFR Part 32 -- Governmentwide Requirements for Drug-Free Workplace (Financial Assistance).
v. 49 CFR Part 37 --Transportation Services for Individuals with Disabilities (ADA).
w. 49 CFR Part 38 -- Americans with Disabilities Act (ADA) Accessibility Specifications for Transportation Vehicles.
x. 49 CFR Part 41-- Seismic Safety.
FOOTNOTES TO ASSURANCE (C)(1) 1 These laws do not apply to airport planning sponsors. 2 These laws do not apply to private sponsors. 3 2 CFR Part 200 contains requirements for State and Local Governments receiving Federal assistance. Any requirement levied upon State and Local Governments by this regulation shall
Airport Sponsor Assurances 5/2022
OST-2025-1200 Page 00794
Sierra Club v. Dept. of Transp. - 3:25-cv-06221
Page 4 of 19
SC_EVERSPLIT0014971
apply where applicable to private sponsors receiving Federal assistance under Title 49, United States Code. 4 Cost principles established in 2 CFR part 200 subpart E must be used as guidelines for determining the eligibility of specific types of expenses. 5 Audit requirements established in 2 CFR part 200 subpart F are the guidelines for audits.
SPECIFIC ASSURANCES
Specific assurances required to be included in grant agreements by any of the above laws, regulations or circulars are incorporated by reference in this Grant Agreement.
2. Responsibility and Authority of the Sponsor.
a. Public Agency Sponsor:
It has legal authority to apply for this Grant, and to finance and carry out the proposed project; that a resolution, motion or similar action has been duly adopted or passed as an official act of the applicant's governing body authorizing the filing of the application, including all understandings and assurances contained therein, and directing and authorizing the person identified as the official representative of the applicant to act in connection with the application and to provide such additional information as may be required.
b. Private Sponsor:
It has legal authority to apply for this Grant and to finance and carry out the proposed project and comply with all terms, conditions, and assurances of this Grant Agreement. It shall designate an official representative and shall in writing direct and authorize that person to file this application, including all understandings and assurances contained therein; to act in connection with this application; and to provide such additional information as may be required.
3. Sponsor Fund Availability.
It has sufficient funds available for that portion of the project costs which are not to be paid by the United States. It has sufficient funds available to assure operation and maintenance of items funded under this Grant Agreement which it will own or control.
4. Good Title.
a. It, a public agency or the Federal government, holds good title, satisfactory to the Secretary, to the landing area of the airport or site thereof, or will give assurance satisfactory to the Secretary that good title will be acquired.
b. For noise compatibility program projects to be carried out on the property of the sponsor, it holds good title satisfactory to the Secretary to that portion of the property upon which Federal funds will be expended or will give assurance to the Secretary that good title will be obtained.
5. Preserving Rights and Powers.
a. It will not take or permit any action which would operate to deprive it of any of the rights and powers necessary to perform any or all of the terms, conditions, and assurances in this Grant Agreement without the written approval of the Secretary, and will act promptly to acquire, extinguish or modify any outstanding rights or claims of right of others which would interfere
Airport Sponsor Assurances 5/2022
OST-2025-1200 Page 00795
Sierra Club v. Dept. of Transp. - 3:25-cv-06221
Page 5 of 19
SC_EVERSPLIT0014972
with such performance by the sponsor. This shall be done in a manner acceptable to the Secretary.
b. Subject to the FAA Act of 2018, Public Law 115-254, Section 163, it will not sell, lease, encumber, or otherwise transfer or dispose of any part of its title or other interests in the property shown on Exhibit A to this application or, for a noise compatibility program project, that portion of the property upon which Federal funds have been expended, for the duration of the terms, conditions, and assurances in this Grant Agreement without approval by the Secretary. If the transferee is found by the Secretary to be eligible under Title 49, United States Code, to assume the obligations of this Grant Agreement and to have the power, authority, and financial resources to carry out all such obligations, the sponsor shall insert in the contract or document transferring or disposing of the sponsor's interest, and make binding upon the transferee all of the terms, conditions, and assurances contained in this Grant Agreement.
c. For all noise compatibility program projects which are to be carried out by another unit of local government or are on property owned by a unit of local government other than the sponsor, it will enter into an agreement with that government. Except as otherwise specified by the Secretary, that agreement shall obligate that government to the same terms, conditions, and assurances that would be applicable to it if it applied directly to the FAA for a grant to undertake the noise compatibility program project. That agreement and changes thereto must be satisfactory to the Secretary. It will take steps to enforce this agreement against the local government if there is substantial non-compliance with the terms of the agreement.
d. For noise compatibility program projects to be carried out on privately owned property, it will enter into an agreement with the owner of that property which includes provisions specified by the Secretary. It will take steps to enforce this agreement against the property owner whenever there is substantial non-compliance with the terms of the agreement.
e. If the sponsor is a private sponsor, it will take steps satisfactory to the Secretary to ensure that the airport will continue to function as a public-use airport in accordance with these assurances for the duration of these assurances.
f. If an arrangement is made for management and operation of the airport by any agency or person other than the sponsor or an employee of the sponsor, the sponsor will reserve sufficient rights and authority to ensure that the airport will be operated and maintained in accordance with Title 49, United States Code, the regulations and the terms, conditions and assurances in this Grant Agreement and shall ensure that such arrangement also requires compliance therewith.
g. Sponsors of commercial service airports will not permit or enter into any arrangement that
results in permission for the owner or tenant of a property used as a residence, or zoned for residential use, to taxi an aircraft between that property and any location on airport. Sponsors of general aviation airports entering into any arrangement that results in permission for the owner of residential real property adjacent to or near the airport must comply with the requirements of Sec. 136 of Public Law 112-95 and the sponsor assurances.
6. Consistency with Local Plans.
The project is reasonably consistent with plans (existing at the time of submission of this application) of public agencies that are authorized by the State in which the project is located to plan for the development of the area surrounding the airport.
Airport Sponsor Assurances 5/2022
OST-2025-1200 Page 00796
Sierra Club v. Dept. of Transp. - 3:25-cv-06221
Page 6 0119
SC_EVERSPLIT0014973
7. Consideration of Local Interest.
It has given fair consideration to the interest of communities in or near where the project may be located.
8. Consultation with Users.
In making a decision to undertake any airport development project under Title 49, United States Code, it has undertaken reasonable consultations with affected parties using the airport at which project is proposed.
9. Public Hearings.
In projects involving the location of an airport, an airport runway, or a major runway extension, it has afforded the opportunity for public hearings for the purpose of considering the economic, social, and environmental effects of the airport or runway location and its consistency with goals and objectives of such planning as has been carried out by the community and it shall, when requested by the Secretary, submit a copy of the transcript of such hearings to the Secretary. Further, for such projects, it has on its management board either voting representation from the communities where the project is located or has advised the communities that they have the right to petition the Secretary concerning a proposed project.
10. Metropolitan Planning Organization.
In projects involving the location of an airport, an airport runway, or a major runway extension at a medium or large hub airport, the sponsor has made available to and has provided upon request to the metropolitan planning organization in the area in which the airport is located, if any, a copy of the proposed amendment to the airport layout plan to depict the project and a copy of any airport master plan in which the project is described or depicted.
11. Pavement Preventive Maintenance-Management.
With respect to a project approved after January 1, 1995, for the replacement or reconstruction of pavement at the airport, it assures or certifies that it has implemented an effective airport pavement maintenance-management program and it assures that it will use such program for the useful life of any pavement constructed, reconstructed or repaired with Federal financial assistance at the airport. It will provide such reports on pavement condition and pavement management programs as the Secretary determines may be useful.
12. Terminal Development Prerequisites.
For projects which include terminal development at a public use airport, as defined in Title 49, it has, on the date of submittal of the project grant application, all the safety equipment required for certification of such airport under 49 U.S.C. 44706, and all the security equipment required by rule or regulation, and has provided for access to the passenger enplaning and deplaning area of such airport to passengers enplaning and deplaning from aircraft other than air carrier aircraft.
13. Accounting System, Audit, and Record Keeping Requirements.
a. It shall keep all project accounts and records which fully disclose the amount and disposition by the recipient of the proceeds of this Grant, the total cost of the project in connection with which this Grant is given or used, and the amount or nature of that portion of the cost of the project supplied by other sources, and such other financial records pertinent to the project. The
Airport Sponsor Assurances 5/2022
OST-2025-1200 Page 00797
Sierra Club v. Dept. of Transp. - 3:25-cv-06221
Page 7 of 19
SC_EVERSPLIT0014974
accounts and records shall be kept in accordance with an accounting system that will facilitate an effective audit in accordance with the Single Audit Act of 1984.
b. It shall make available to the Secretary and the Comptroller General of the United States, or any of their duly authorized representatives, for the purpose of audit and examination, any books, documents, papers, and records of the recipient that are pertinent to this Grant. The Secretary may require that an appropriate audit be conducted by a recipient. In any case in which an independent audit is made of the accounts of a sponsor relating to the disposition of the proceeds of a grant or relating to the project in connection with which this Grant was given or used, it shall file a certified copy of such audit with the Comptroller General of the United States not later than six (6) months following the close of the fiscal year for which the audit was made.
14. Minimum Wage Rates.
It shall include, in all contracts in excess of $2,000 for work on any projects funded under this Grant Agreement which involve labor, provisions establishing minimum rates of wages, to be predetermined by the Secretary of Labor under 40 U.S.C. 3141-3144, 3146, and 3147, Public Building, Property, and Works), which contractors shall pay to skilled and unskilled labor, and such minimum rates shall be stated in the invitation for bids and shall be included in proposals or bids for the work.
15. Veteran's Preference.
It shall include in all contracts for work on any project funded under this Grant Agreement which involve labor, such provisions as are necessary to insure that, in the employment of labor (except in executive, administrative, and supervisory positions), preference shall be given to Vietnam era veterans, Persian Gulf veterans, Afghanistan-Iraq war veterans, disabled veterans, and small business concerns owned and controlled by disabled veterans as defined in 49 U.S.C. 47112. However, this preference shall apply only where the individuals are available and qualified to perform the work to which the employment relates.
16. Conformity to Plans and Specifications.
It will execute the project subject to plans, specifications, and schedules approved by the Secretary. Such plans, specifications, and schedules shall be submitted to the Secretary prior to commencement of site preparation, construction, or other performance under this Grant Agreement, and, upon approval of the Secretary, shall be incorporated into this Grant Agreement. Any modification to the approved plans, specifications, and schedules shall also be subject to approval of the Secretary, and incorporated into this Grant Agreement.
17. Construction Inspection and Approval.
It will provide and maintain competent technical supervision at the construction site throughout the project to assure that the work conforms to the plans, specifications, and schedules approved by the Secretary for the project. It shall subject the construction work on any project contained in an approved project application to inspection and approval by the Secretary and such work shall be in accordance with regulations and procedures prescribed by the Secretary. Such regulations and procedures shall require such cost and progress reporting by the sponsor or sponsors of such project as the Secretary shall deem necessary.
Airport Sponsor Assurances 5/2022
OST-2025-1200 Page 00798
Sierra Club v. Dept. of Transp. - 3:25-cv-06221
Page 8 of 19
SC_EVERSPLIT0014975
18. Planning Projects.
In carrying out planning projects:
a. It will execute the project in accordance with the approved program narrative contained in the project application or with the modifications similarly approved.
b. It will furnish the Secretary with such periodic reports as required pertaining to the planning project and planning work activities.
c. It will include in all published material prepared in connection with the planning project a notice that the material was prepared under a grant provided by the United States.
d. It will make such material available for examination by the public, and agrees that no material prepared with funds under this project shall be subject to copyright in the United States or any other country.
e. It will give the Secretary unrestricted authority to publish, disclose, distribute, and otherwise use any of the material prepared in connection with this grant.
f. It will grant the Secretary the right to disapprove the sponsor's employment of specific consultants and their subcontractors to do all or any part of this project as well as the right to disapprove the proposed scope and cost of professional services.
g. It will grant the Secretary the right to disapprove the use of the sponsor's employees to do all
or any part of the project.
h. It understands and agrees that the Secretary's approval of this project grant or the Secretary's approval of any planning material developed as part of this grant does not constitute or imply any assurance or commitment on the part of the Secretary to approve any pending or future application for a Federal airport grant.
19. Operation and Maintenance.
a. The airport and all facilities which are necessary to serve the aeronautical users of the airport, other than facilities owned or controlled by the United States, shall be operated at all times in a safe and serviceable condition and in accordance with the minimum standards as may be required or prescribed by applicable Federal, state, and local agencies for maintenance and operation. It will not cause or permit any activity or action thereon which would interfere with its use for airport purposes. It will suitably operate and maintain the airport and all facilities thereon or connected therewith, with due regard to climatic and flood conditions. Any proposal to temporarily close the airport for non-aeronautical purposes must first be approved by the Secretary. In furtherance of this assurance, the sponsor will have in effect arrangements for:
1. Operating the airport's aeronautical facilities whenever required;
2. Promptly marking and lighting hazards resulting from airport conditions, including temporary conditions; and
3. Promptly notifying pilots of any condition affecting aeronautical use of the airport. Nothing contained herein shall be construed to require that the airport be operated for aeronautical use during temporary periods when snow, flood, or other climatic conditions interfere with such operation and maintenance. Further, nothing herein shall be construed as requiring the maintenance, repair, restoration, or replacement of any structure or
Airport Sponsor Assurances 5/2022
OST-2025-1200 Page 00799
Sierra Club v. Dept. of Transp. - 3:25-cv-06221
Page 9 of 19
SC_EVERSPLIT0014976
facility which is substantially damaged or destroyed due to an act of God or other condition or circumstance beyond the control of the sponsor.
b. It will suitably operate and maintain noise compatibility program items that it owns or controls upon which Federal funds have been expended.
20. Hazard Removal and Mitigation.
It will take appropriate action to assure that such terminal airspace as is required to protect instrument and visual operations to the airport (including established minimum flight altitudes) will be adequately cleared and protected by removing, lowering, relocating, marking, or lighting or otherwise mitigating existing airport hazards and by preventing the establishment or creation of future airport hazards.
21. Compatible Land Use.
It will take appropriate action, to the extent reasonable, including the adoption of zoning laws, to restrict the use of land adjacent to or in the immediate vicinity of the airport to activities and purposes compatible with normal airport operations, including landing and takeoff of aircraft. In addition, if the project is for noise compatibility program implementation, it will not cause or permit any change in land use, within its jurisdiction, that will reduce its compatibility, with respect to the airport, of the noise compatibility program measures upon which Federal funds have been expended.
22. Economic Nondiscrimination.
a. It will make the airport available as an airport for public use on reasonable terms and without unjust discrimination to all types, kinds and classes of aeronautical activities, including commercial aeronautical activities offering services to the public at the airport.
b. In any agreement, contract, lease, or other arrangement under which a right or privilege at the airport is granted to any person, firm, or corporation to conduct or to engage in any aeronautical activity for furnishing services to the public at the airport, the sponsor will insert and enforce provisions requiring the contractor to:
1. Furnish said services on a reasonable, and not unjustly discriminatory, basis to all users thereof, and
2. Charge reasonable, and not unjustly discriminatory, prices for each unit or service, provided that the contractor may be allowed to make reasonable and nondiscriminatory discounts, rebates, or other similar types of price reductions to volume purchasers.
c. Each fixed-based operator at the airport shall be subject to the same rates, fees, rentals, and other charges as are uniformly applicable to all other fixed-based operators making the same or similar uses of such airport and utilizing the same or similar facilities.
d. Each air carrier using such airport shall have the right to service itself or to use any fixed-based operator that is authorized or permitted by the airport to serve any air carrier at such airport.
e. Each air carrier using such airport (whether as a tenant, non-tenant, or subtenant of another air carrier tenant) shall be subject to such nondiscriminatory and substantially comparable rules, regulations, conditions, rates, fees, rentals, and other charges with respect to facilities directly and substantially related to providing air transportation as are applicable to all such air carriers which make similar use of such airport and utilize similar facilities, subject to reasonable
Airport Sponsor Assurances 5/2022
OST-2025-1200 Page 00800
Sierra Club v. Dept. of Transp. - 3:25-cv-06221
Page 10 of 19
SC_EVERSPLIT0014977
classifications such as tenants or non-tenants and signatory carriers and non-signatory carriers. Classification or status as tenant or signatory shall not be unreasonably withheld by any airport provided an air carrier assumes obligations substantially similar to those already imposed on air carriers in such classification or status.
f. It will not exercise or grant any right or privilege which operates to prevent any person, firm, or corporation operating aircraft on the airport from performing any services on its own aircraft with its own employees (including, but not limited to maintenance, repair, and fueling) that it may choose to perform.
g. In the event the sponsor itself exercises any of the rights and privileges referred to in this
assurance, the services involved will be provided on the same conditions as would apply to the furnishing of such services by commercial aeronautical service providers authorized by the sponsor under these provisions.
h. The sponsor may establish such reasonable, and not unjustly discriminatory, conditions to be met by all users of the airport as may be necessary for the safe and efficient operation of the airport.
i. The sponsor may prohibit or limit any given type, kind or class of aeronautical use of the airport if such action is necessary for the safe operation of the airport or necessary to serve the civil aviation needs of the public.
23. Exclusive Rights.
It will permit no exclusive right for the use of the airport by any person providing, or intending to provide, aeronautical services to the public. For purposes of this paragraph, the providing of the services at an airport by a single fixed-based operator shall not be construed as an exclusive right if both of the following apply:
a. It would be unreasonably costly, burdensome, or impractical for more than one fixed-based operator to provide such services, and
b. If allowing more than one fixed-based operator to provide such services would require the reduction of space leased pursuant to an existing agreement between such single fixed-based operator and such airport. It further agrees that it will not, either directly or indirectly, grant or permit any person, firm, or corporation, the exclusive right at the airport to conduct any aeronautical activities, including, but not limited to charter flights, pilot training, aircraft rental and sightseeing, aerial photography, crop dusting, aerial advertising and surveying, air carrier operations, aircraft sales and services, sale of aviation petroleum products whether or not conducted in conjunction with other aeronautical activity, repair and maintenance of aircraft, sale of aircraft parts, and any other activities which because of their direct relationship to the operation of aircraft can be regarded as an aeronautical activity, and that it will terminate any exclusive right to conduct an aeronautical activity now existing at such an airport before the grant of any assistance under Title 49, United States Code.
24. Fee and Rental Structure.
It will maintain a fee and rental structure for the facilities and services at the airport which will make the airport as self-sustaining as possible under the circumstances existing at the particular airport, taking into account such factors as the volume of traffic and economy of collection. No part of the Federal share of an airport development, airport planning or noise compatibility project for
Airport Sponsor Assurances 5/2022
OST-2025-1200 Page 00801
Sierra Club v. Dept. of Transp. - 3:25-cv-06221
Page 11 of 19
SC_EVERSPLIT0014978
which a Grant is made under Title 49, United States Code, the Airport and Airway Improvement Act of 1982, the Federal Airport Act or the Airport and Airway Development Act of 1970 shall be included in the rate basis in establishing fees, rates, and charges for users of that airport.
25. Airport Revenues.
a. All revenues generated by the airport and any local taxes on aviation fuel established after December 30, 1987, will be expended by it for the capital or operating costs of the airport; the local airport system; or other local facilities which are owned or operated by the owner or operator of the airport and which are directly and substantially related to the actual air transportation of passengers or property; or for noise mitigation purposes on or off the airport. The following exceptions apply to this paragraph:
1. If covenants or assurances in debt obligations issued before September 3, 1982, by the owner or operator of the airport, or provisions enacted before September 3, 1982, in governing statutes controlling the owner or operator's financing, provide for the use of the revenues from any of the airport owner or operator's facilities, including the airport, to support not only the airport but also the airport owner or operator's general debt obligations or other facilities, then this limitation on the use of all revenues generated by the airport (and, in the case of a public airport, local taxes on aviation fuel) shall not apply.
2. If the Secretary approves the sale of a privately owned airport to a public sponsor and provides funding for any portion of the public sponsor's acquisition of land, this limitation on the use of all revenues generated by the sale shall not apply to certain proceeds from the sale. This is conditioned on repayment to the Secretary by the private owner of an amount equal to the remaining unamortized portion (amortized over a 20-year period) of any airport improvement grant made to the private owner for any purpose other than land acquisition on or after October 1, 1996, plus an amount equal to the federal share of the current fair market value of any land acquired with an airport improvement grant made to that airport on or after October 1, 1996.
3. Certain revenue derived from or generated by mineral extraction, production, lease, or other means at a general aviation airport (as defined at 49 U.S.C. 47102), if the FAA determines the airport sponsor meets the requirements set forth in Section 813 of Public Law 112-95.
b. As part of the annual audit required under the Single Audit Act of 1984, the sponsor will direct that the audit will review, and the resulting audit report will provide an opinion concerning, the use of airport revenue and taxes in paragraph (a), and indicating whether funds paid or transferred to the owner or operator are paid or transferred in a manner consistent with Title 49, United States Code and any other applicable provision of law, including any regulation promulgated by the Secretary or Administrator.
c. Any civil penalties or other sanctions will be imposed for violation of this assurance in accordance with the provisions of 49 U.S.C. 47107.
26. Reports and Inspections.
It will:
a. submit to the Secretary such annual or special financial and operations reports as the Secretary may reasonably request and make such reports available to the public; make available to the
Airport Sponsor Assurances 5/2022
OST-2025-1200 Page 00802
Sierra Club v. Dept. of Transp. - 3:25-cv-06221
Page 12 of 19
SC_EVERSPLIT0014979
public at reasonable times and places a report of the airport budget in a format prescribed by the Secretary;
b. for airport development projects, make the airport and all airport records and documents affecting the airport, including deeds, leases, operation and use agreements, regulations and other instruments, available for inspection by any duly authorized agent of the Secretary upon reasonable request;
c. for noise compatibility program projects, make records and documents relating to the project and continued compliance with the terms, conditions, and assurances of this Grant Agreement including deeds, leases, agreements, regulations, and other instruments, available for inspection by any duly authorized agent of the Secretary upon reasonable request; and
d. in a format and time prescribed by the Secretary, provide to the Secretary and make available to the public following each of its fiscal years, an annual report listing in detail:
1. all amounts paid by the airport to any other unit of government and the purposes for which each such payment was made; and
2. all services and property provided by the airport to other units of government and the amount of compensation received for provision of each such service and property.
27. Use by Government Aircraft.
It will make available all of the facilities of the airport developed with Federal financial assistance and all those usable for landing and takeoff of aircraft to the United States for use by Government aircraft in common with other aircraft at all times without charge, except, if the use by Government aircraft is substantial, charge may be made for a reasonable share, proportional to such use, for the cost of operating and maintaining the facilities used. Unless otherwise determined by the Secretary, or otherwise agreed to by the sponsor and the using agency, substantial use of an airport by Government aircraft will be considered to exist when operations of such aircraft are in excess of those which, in the opinion of the Secretary, would unduly interfere with use of the landing areas by other authorized aircraft, or during any calendar month that:
a. Five (5) or more Government aircraft are regularly based at the airport or on land adjacent thereto; or
b. The total number of movements (counting each landing as a movement) of Government aircraft is 300 or more, or the gross accumulative weight of Government aircraft using the airport (the total movement of Government aircraft multiplied by gross weights of such aircraft) is in excess of five million pounds.
28. Land for Federal Facilities.
It will furnish without cost to the Federal Government for use in connection with any air traffic control or air navigation activities, or weather-reporting and communication activities related to air traffic control, any areas of land or water, or estate therein as the Secretary considers necessary or desirable for construction, operation, and maintenance at Federal expense of space or facilities for such purposes. Such areas or any portion thereof will be made available as provided herein within four months after receipt of a written request from the Secretary.
Airport Sponsor Assurances 5/2022
OST-2025-1200 Page 00803
Sierra Club v. Dept. of Transp. - 3:25-cv-06221
Page 13 of 19
SC_EVERSPLIT0014980
29. Airport Layout Plan.
a. Subject to the FAA Reauthorization Act of 2018, Public Law 115-254, Section 163, it will keep up to date at all times an airport layout plan of the airport showing:
1. boundaries of the airport and all proposed additions thereto, together with the boundaries of all offsite areas owned or controlled by the sponsor for airport purposes and proposed additions thereto;
2. the location and nature of all existing and proposed airport facilities and structures (such as runways, taxiways, aprons, terminal buildings, hangars and roads), including all proposed extensions and reductions of existing airport facilities;
3. the location of all existing and proposed non-aviation areas and of all existing improvements thereon; and
4. all proposed and existing access points used to taxi aircraft across the airport's property boundary.
Such airport layout plans and each amendment, revision, or modification thereof, shall be subject to the approval of the Secretary which approval shall be evidenced by the signature of a duly authorized representative of the Secretary on the face of the airport layout plan. The sponsor will not make or permit any changes or alterations in the airport or any of its facilities which are not in conformity with the airport layout plan as approved by the Secretary and which might, in the opinion of the Secretary, adversely affect the safety, utility or efficiency of the airport.
b. Subject to the FAA Reauthorization Act of 2018, Public Law 115-254, Section 163, if a change or alteration in the airport or the facilities is made which the Secretary determines adversely affects the safety, utility, or efficiency of any federally owned, leased, or funded property on or off the airport and which is not in conformity with the airport layout plan as approved by the Secretary, the owner or operator will, if requested, by the Secretary:
1. eliminate such adverse effect in a manner approved by the Secretary; or
2. bear all costs of relocating such property (or replacement thereof) to a site acceptable to the Secretary and all costs of restoring such property (or replacement thereof) to the level of safety, utility, efficiency, and cost of operation existing before the unapproved change in the airport or its facilities except in the case of a relocation or replacement of an existing airport facility due to a change in the Secretary's design standards beyond the control of the airport sponsor.
30. Civil Rights.
It will promptly take any measures necessary to ensure that no person in the United States shall, on the grounds of race, color, and national origin (including limited English proficiency) in accordance with the provisions of Title VI of the Civil Rights Act of 1964 (78 Stat. 252, 42 U.S.C. 2000d to 2000d-4); creed and sex (including sexual orientation and gender identity) per 49 U.S.C. 47123 and related requirements; age per the Age Discrimination Act of 1975 and related requirements; or disability per the Americans with Disabilities Act of 1990 and related requirements, be excluded from participation in, be denied the benefits of, or be otherwise subjected to discrimination in any program and activity conducted with, or benefiting from, funds received from this Grant.
Airport Sponsor Assurances 5/2022
OST-2025-1200 Page 00804
Sierra Club v. Dept. of Transp. - 3:25-cv-06221
Page 14 of 19
SC_EVERSPLIT0014981
a. Using the definitions of activity, facility, and program as found and defined in 49 CFR 21.23(b) and 21.23(e), the sponsor will facilitate all programs, operate all facilities, or conduct all programs in compliance with all non-discrimination requirements imposed by or pursuant to these assurances.
b. Applicability
1. Programs and Activities. If the sponsor has received a grant (or other federal assistance) for any of the sponsor's program or activities, these requirements extend to all of the sponsor's programs and activities.
2. Facilities. Where it receives a grant or other federal financial assistance to construct, expand, renovate, remodel, alter, or acquire a facility, or part of a facility, the assurance extends to the entire facility and facilities operated in connection therewith.
3. Real Property. Where the sponsor receives a grant or other Federal financial assistance in the form of, or for the acquisition of real property or an interest in real property, the assurance will extend to rights to space on, over, or under such property.
c. Duration. The sponsor agrees that it is obligated to this assurance for the period during which Federal financial assistance is extended to the program, except where the Federal financial assistance is to provide, or is in the form of, personal property, or real property, or interest therein, or structures or improvements thereon, in which case the assurance obligates the sponsor, or any transferee for the longer of the following periods:
1. So long as the airport is used as an airport, or for another purpose involving the provision of similar services or benefits; or
2. So long as the sponsor retains ownership or possession of the property.
d. Required Solicitation Language. It will include the following notification in all solicitations for bids, Requests For Proposals for work, or material under this Grant Agreement and in all proposals for agreements, including airport concessions, regardless of funding source: "The CITY OF REDDING, in accordance with the provisions of Title VI of the Civil Rights Act of 1964 (78 Stat. 252, 42 U.S.C. 2000d to 2000d-4) and the Regulations, hereby notifies all bidders or offerors that it will affirmatively ensure that for any contract entered into pursuant to this advertisement, [select businesses, or disadvantaged business enterprises or airport concession disadvantaged business enterprises] will be afforded full and fair opportunity to submit bids in response to this invitation and no businesses will be discriminated against on the grounds of race, color, national origin (including limited English proficiency), creed, sex (including sexual orientation and gender identity), age, or disability in consideration for an award."
e. Required Contract Provisions.
1. It will insert the non-discrimination contract clauses requiring compliance with the acts and regulations relative to non-discrimination in Federally-assisted programs of the Department of Transportation (DOT), and incorporating the acts and regulations into the contracts by reference in every contract or agreement subject to the non-discrimination in Federally-assisted programs of the DOT acts and regulations.
Airport Sponsor Assurances 5/2022
OST-2025-1200 Page 00805
Sierra Club v. Dept. of Transp. - 3:25-cv-06221
Page 15 of 19
SC_EVERSPLIT0014982
2. It will include a list of the pertinent non-discrimination authorities in every contract that is subject to the non-discrimination acts and regulations.
3. It will insert non-discrimination contract clauses as a covenant running with the land, in any deed from the United States effecting or recording a transfer of real property, structures, use, or improvements thereon or interest therein to a sponsor.
4. It will insert non-discrimination contract clauses prohibiting discrimination on the basis of race, color, national origin (including limited English proficiency), creed, sex (including sexual orientation and gender identity), age, or disability as a covenant running with the land, in any future deeds, leases, license, permits, or similar instruments entered into by the sponsor with other parties:
a. For the subsequent transfer of real property acquired or improved under the applicable activity, project, or program; and
b. For the construction or use of, or access to, space on, over, or under real property acquired or improved under the applicable activity, project, or program.
f. It will provide for such methods of administration for the program as are found by the Secretary to give reasonable guarantee that it, other recipients, sub-recipients, sub-grantees, contractors, subcontractors, consultants, transferees, successors in interest, and other participants of Federal financial assistance under such program will comply with all requirements imposed or pursuant to the acts, the regulations, and this assurance.
g. It agrees that the United States has a right to seek judicial enforcement with regard to any
matter arising under the acts, the regulations, and this assurance.
31. Disposal of Land.
a. For land purchased under a grant for airport noise compatibility purposes, including land serving as a noise buffer, it will dispose of the land, when the land is no longer needed for such purposes, at fair market value, at the earliest practicable time. That portion of the proceeds of such disposition which is proportionate to the United States' share of acquisition of such land will be, at the discretion of the Secretary, (1) reinvested in another project at the airport, or (2) transferred to another eligible airport as prescribed by the Secretary. The Secretary shall give preference to the following, in descending order:
1. Reinvestment in an approved noise compatibility project;
2. Reinvestment in an approved project that is eligible for grant funding under 49 U.S.C. 47117(e);
3. Reinvestment in an approved airport development project that is eligible for grant funding under 49 U.S.C. 47114, 47115, or 47117;
4. Transfer to an eligible sponsor of another public airport to be reinvested in an approved noise compatibility project at that airport; or
5. Payment to the Secretary for deposit in the Airport and Airway Trust Fund.
If land acquired under a grant for noise compatibility purposes is leased at fair market value and consistent with noise buffering purposes, the lease will not be considered a disposal of the land. Revenues derived from such a lease may be used for an approved airport development
Airport Sponsor Assurances 5/2022
OST-2025-1200 Page 00806
Sierra Club v. Dept. of Transp. - 3:25-cv-06221
Page 16 of 19
SC_EVERSPLIT0014983
project that would otherwise be eligible for grant funding or any permitted use of airport revenue.
b. For land purchased under a grant for airport development purposes (other than noise compatibility), it will, when the land is no longer needed for airport purposes, dispose of such land at fair market value or make available to the Secretary an amount equal to the United States' proportionate share of the fair market value of the land. That portion of the proceeds of such disposition which is proportionate to the United States' share of the cost of acquisition of such land will, upon application to the Secretary, be reinvested or transferred to another eligible airport as prescribed by the Secretary. The Secretary shall give preference to the following, in descending order:
1. Reinvestment in an approved noise compatibility project;
2. Reinvestment in an approved project that is eligible for grant funding under 49 U.S.C. 47117(e);
3. Reinvestment in an approved airport development project that is eligible for grant funding under 49 U.S.C. 47114, 47115, or 47117;
4. Transfer to an eligible sponsor of another public airport to be reinvested in an approved noise compatibility project at that airport; or
5. Payment to the Secretary for deposit in the Airport and Airway Trust Fund.
c. Land shall be considered to be needed for airport purposes under this assurance if (1) it may be needed for aeronautical purposes (including runway protection zones) or serve as noise buffer land, and (2) the revenue from interim uses of such land contributes to the financial selfsufficiency of the airport. Further, land purchased with a grant received by an airport operator or owner before December 31, 1987, will be considered to be needed for airport purposes if the Secretary or Federal agency making such grant before December 31, 1987, was notified by the operator or owner of the uses of such land, did not object to such use, and the land continues to be used for that purpose, such use having commenced no later than December 15, 1989.
d. Disposition of such land under (a), (b), or (c) will be subject to the retention or reservation of any interest or right therein necessary to ensure that such land will only be used for purposes which are compatible with noise levels associated with operation of the airport.
32. Engineering and Design Services.
If any phase of such project has received Federal funds under Chapter 471 subchapter 1 of Title 49 U.S.C., it will award each contract, or sub-contract for program management, construction management, planning studies, feasibility studies, architectural services, preliminary engineering, design, engineering, surveying, mapping or related services in the same manner as a contract for architectural and engineering services is negotiated under Chapter 11of Title 40 U S.C., or an equivalent qualifications-based requirement prescribed for or by the sponsor of the airport.
33. Foreign Market Restrictions.
It will not allow funds provided under this Grant to be used to fund any project which uses any product or service of a foreign country during the period in which such foreign country is listed by
Airport Sponsor Assurances 5/2022
OST-2025-1200 Page 00807
Sierra Club v. Dept. of Transp. - 3:25-cv-06221
Page 17 of 19
SC_EVERSPLIT0014984
the United States Trade Representative as denying fair and equitable market opportunities for products and suppliers of the United States in procurement and construction.
34. Policies, Standards, and Specifications. It will carry out any project funded under an Airport Improvement Program Grant in accordance with policies, standards, and specifications approved by the Secretary including, but not limited to, current FAA Advisory Circulars (https://www.faa.gov/airports/aip/media/aip-pfc-checklist.pdf) for AIP projects as of APRIL 28, 2025.
35. Relocation and Real Property Acquisition.
a. It will be guided in acquiring real property, to the greatest extent practicable under State law, by the land acquisition policies in Subpart B of 49 CFR Part 24 and will pay or reimburse property owners for necessary expenses as specified in Subpart B.
b. It will provide a relocation assistance program offering the services described in Subpart C of 49 CFR Part 24 and fair and reasonable relocation payments and assistance to displaced persons as required in Subpart D and E of 49 CFR Part 24.
c. It will make available within a reasonable period of time prior to displacement, comparable replacement dwellings to displaced persons in accordance with Subpart E of 49 CFR Part 24.
36. Access By Intercity Buses. The airport owner or operator will permit, to the maximum extent practicable, intercity buses or other modes of transportation to have access to the airport; however, it has no obligation to fund special facilities for intercity buses or for other modes of transportation.
37. Disadvantaged Business Enterprises. The sponsor shall not discriminate on the basis of race, color, national origin, or sex, in the award and performance of any DOT-assisted contract covered by 49 CFR Part 26, or in the award and performance of any concession activity contract covered by 49 CFR Part 23. In addition, the sponsor shall not discriminate on the basis of race, color, national origin or sex in the administration of its Disadvantaged Business Enterprise (DBE) and Airport Concessions Disadvantaged Business Enterprise (ACDBE) programs or the requirements of 49 CFR Parts 23 and 26. The sponsor shall take all necessary and reasonable steps under 49 CFR Parts 23 and 26 to ensure nondiscrimination in the award and administration of DOT-assisted contracts, and/or concession contracts. The sponsor's DBE and ACDBE programs, as required by 49 CFR Parts 26 and 23, and as approved by DOT, are incorporated by reference in this agreement. Implementation of these programs is a legal obligation and failure to carry out its terms shall be treated as a violation of this agreement. Upon notification to the sponsor of its failure to carry out its approved program, the Department may impose sanctions as provided for under Parts 26 and 23 and may, in appropriate cases, refer the matter for enforcement under 18 U.S.C. 1001 and/or the Program Fraud Civil Remedies Act of 1986 (31 U.S.C. 3801-3809, 3812).
38. Hangar Construction. If the airport owner or operator and a person who owns an aircraft agree that a hangar is to be constructed at the airport for the aircraft at the aircraft owner's expense, the airport owner or operator will grant to the aircraft owner for the hangar a long term lease that is subject to such terms and conditions on the hangar as the airport owner or operator may impose.
Airport Sponsor Assurances 5/2022
OST-2025-1200 Page 00808
Sierra Club v. Dept. of Transp. - 3:25-cv-06221
Page 18 of 19
SC_EVERSPLIT0014985
39. Competitive Access.
a. If the airport owner or operator of a medium or large hub airport (as defined in 49 U.S.C. 47102) has been unable to accommodate one or more requests by an air carrier for access to gates or other facilities at that airport in order to allow the air carrier to provide service to the airport or to expand service at the airport, the airport owner or operator shall transmit a report to the Secretary that:
1. Describes the requests;
2. Provides an explanation as to why the requests could not be accommodated; and
3. Provides a time frame within which, if any, the airport will be able to accommodate the requests.
b. Such report shall be due on either February 1 or August 1 of each year if the airport has been unable to accommodate the request(s) in the six month period prior to the applicable due date.
Airport Sponsor Assurances 5/2022
OST-2025-1200 Page 00809
Sierra Club v. Dept. of Transp. - 3:25-cv-06221
Page 19 of 19
SC_EVERSPLIT0014986
Exhibit G Title VI Assurances
OST-2025-1200 Page 00810
Sierra Club v. Dept. of Transp. - 3:25-cv-06221
SC_EVERSPLIT0014987
STANDARD DOT TITLE VI ASSURANCES
CITY OF REDDING (hereinafter referred to as the Sponsor) hereby agrees that as a condition to receiving Federal financial assistance from the Department of Transportation (DOT), it will comply with Title VI of the Civil Rights Act of 1964 (42 U.S.C. 2000d et seq.) and all requirements imposed by 49 CFR Part 21, - Nondiscrimination in Federally Assisted Programs of the Department of Transportation -- Effectuation of Title VI of the Civil Rights Act of 1964 (hereinafter referred to as the "Regulations") to the end that no person in the United States shall, on the ground of race, color, or national origin, be excluded from participation in, be denied the benefits of, or be otherwise subjected to discrimination under any program or activity for which the applicant receives Federal financial assistance and will immediately take any measures necessary to effectuate this agreement. Without limiting the above general assurance, the sponsor agrees concerning this grant that:
1. Each "program" and "facility" (as defined in Sections 21.23(e) and 21.23 (b)) will be conducted or operated in compliance with all requirements of the Regulations.
2. It will insert the clauses of Attachment 1 of this assurance in every contract subject to the Act and the Regulations.
3. Where Federal financial assistance is received to construct a facility, or part of a facility, the assurance shall extend to the entire facility and facilities operated in connection therewith.
4. Where Federal financial assistance is in the form or for the acquisition of real property or an interest in real property, the assurance shall extend to rights to space on, over, or under such property.
5. It will include the appropriate clauses set forth in Attachment 2 of this assurance, as a covenant running with the land, in any future deeds, leases, permits, licenses, and similar agreements entered into by the sponsor with other parties:
(a) for the subsequent transfer of real property acquired or improved with Federal financial assistance under this Project; and
(b) for the construction or use of or access to space on, over, or under real property acquired or improved with Federal financial assistance under this Project.
6. This assurance obligates the Sponsor for the period during which Federal financial assistance is extended to the program, except where the Federal financial assistance is to provide, or is in the form of personal property or real property or interest therein or structures or improvements thereon, in which case the assurance obligates the sponsor or any transferee for the longer of the following periods.
(a) the period during which the property is used for a purpose for which Federal financial assistance is extended, or for another purpose involving the provision of similar services or benefits, or
(b) the period during which the sponsor retains ownership or possession of the property.
OST-2025-1200 Page 00811
Sierra Club v. Dept. of Transp. - 3:25-cv-06221
SC_EVERSPLIT0014988
7. It will provide for such methods of administration for the program as are found by the Secretary of Transportation or the official to whom he delegates specific authority to give reasonable guarantee that it, other sponsors, subgrantees, contractors, subcontractors, transferees, successors in interest, and other participants or Federal financial assistance under such program will comply with all requirements imposed or pursuant to the Act, the Regulations, and this assurance.
8. It agrees that the United States has a right to seek judicial enforcement with regard to any matter arising under the Act, the Regulations, and this assurance.
THIS ASSURANCE is given in consideration of and for the purpose of obtaining Federal financial assistance for this Project and is binding on its contractors, the sponsor, subcontractors, transferees, successors in interest and other participants in the Project. The person or persons whose signatures appear below are authorized to sign this assurance on behalf of the Sponsor.
DATED
CITY OF REDDING
(Sponsor)
Digitally signed by Andrew
Andrew Solsvig Solsvig
By
Date: 2025.04.04 11:47:21 -07'00'
(Signature of Authorized Official)
Andrew Solsvig, Airports Manager
OST-2025-1200 Page 00812
Sierra Club v. Dept. of Transp. - 3:25-cv-06221
SC_EVERSPLIT0014989
CONTRACTOR CONTRACTUAL REOUIREMENTS
ATTACHMENT 1
During the performance of this contract, the contractor, for itself, its assignees and successors in interest (hereinafter referred to as the "contractor") agrees as follows:
1. Compliance with Regulations. The contractor shall comply with the Regulations relative to nondiscrimination in federally assisted programs of the Department of Transportation (hereinafter, "DOT") Title 49, Code of Federal Regulations, Part 21, as they may be amended from time to time (hereinafter referred to as the Regulations), which are herein incorporated by reference and made a part of this contract.
2. Nondiscrimination. The contractor, with regard to the work performed by it during the contract, shall not discriminate on the grounds of race, color, or national origin in the selection and retention of subcontractors, including procurements of materials and leases of equipment. The contractor shall not participate either directly or indirectly in the discrimination prohibited by section 21.5 of the Regulations, including employment practices when the contract covers a program set forth in Appendix B of the Regulations.
3. Solicitations for Subcontracts, Including Procurements of Materials and Equipment. In all solicitations either by competitive bidding or negotiation made by the contractor for work to be performed under a subcontract, including procurements of materials or leases of equipment, each potential subcontractor or supplier shall be notified by the contractor of the contractor's obligations under this contract and the Regulations relative to nondiscrimination on the grounds of race, color, or national origin.
4. Information and Reports. The contractor shall provide all information and reports required by the Regulations or directives issued pursuant thereto and shall permit access to its books, records, accounts, other sources of information, and its facilities as may be determined by the Sponsor or the Federal Aviation Administration (FAA) to be pertinent to ascertain compliance with such Regulations, orders, and instructions. Where any information required of a contractor is in the exclusive possession of another who fails or refuses to furnish this information, the contractor shall so certify to the sponsor or the FAA, as appropriate, and shall set forth what efforts it has made to obtain the information.
5. Sanctions for Noncompliance. In the event of the contractor's noncompliance with the nondiscrimination provisions of this contract, the sponsor shall impose such contract sanctions as it or the FAA may determine to be appropriate, including, but not limited to:
a. Withholding of payments to the contractor under the contract until the contractor complies, and/or
b. Cancellation, termination, or suspension of the contract, in whole or in part.
6. Incorporation of Provisions. The contractor shall include the provisions of paragraphs 1 through 5 in every subcontract, including procurements of materials and leases of equipment, unless exempt by the Regulations or directives issued Pursuant thereto. The contractor shall take such action with respect to any subcontract or procurement as the sponsor or the FAA may direct as a means of enforcing such provisions including sanctions for noncompliance. Provided, however, that in the event a contractor becomes involved in, or is threatened with, litigation with a subcontractor or supplier as a result of such direction, the contractor may request the Sponsor to enter into such litigation to protect the interests of the sponsor and, in addition, the contractor may request the United States to enter into such litigation to protect the interests of the United States.
OST-2025-1200 Page 00813
Sierra Club v. Dept. of Transp. - 3:25-cv-06221
SC_EVERSPLIT0014990
CLAUSES FOR DEEDS, LICENSES, LEASES, PERMITS OR SIMILAR INSTRUMENTS
ATTACHMENT 2
The following clauses shall be included in deeds, licenses, leases, permits, or similar instruments entered into by the Sponsor pursuant to the provisions of Assurances 5(a) and 5(b).
1. The (grantee, licensee, lessee, permitee, etc., as appropriate) for himself, his heirs, personal representatives, successors in interest, and assigns, as a part of the consideration hereof, does hereby covenant and agree (in the case of deeds and leases add "as a covenant running with the land") that in the event facilities are constructed, maintained, or otherwise operated on the said property described in this (deed, license, lease, permit, etc.) for a purpose for which a DOT program or activity is extended or for another purpose involving the provision of similar services or benefits, the (grantee, licensee, lessee, permitee, etc.) shall maintain and operate such facilities and services in compliance with all other requirements imposed pursuant to 49 CFR Part 21, Nondiscrimination in Federally Assisted Programs of the Department of Transportation, and as said Regulations may be amended.
2. The (grantee, licensee, lessee, permitee, etc., as appropriate) for himself, his personal representatives, successors in interest, and assigns, as a part of the consideration hereof, does hereby covenant and agree (in the case of deeds and leases add "as a covenant running with the land") that: (1) no person on the grounds of race, color, or national origin shall be excluded from participation in, denied the benefits of, or be otherwise subjected to discrimination in the use of said facilities, (2) that in the construction of any improvements on, over, or under such land and the furnishing of services thereon, no person on the grounds of race, color, or national origin shall be excluded from participation in, denied the benefits of, or otherwise be subjected to discrimination, (3) that the (grantee, licensee, lessee, permitee, etc.) shall use the premises in compliance with all other requirements imposed by or pursuant to 49 CFR Part 21, Nondiscrimination in Federally Assisted Programs of the Department of Transportation, and as said Regulations may be amended.
OST-2025-1200 Page 00814
Sierra Club v. Dept. of Transp. - 3:25-cv-06221
SC_EVERSPLIT0014991
Exhibit H Sponsor Certifications
OST-2025-1200 Page 00815
Sierra Club v. Dept. of Transp. - 3:25-cv-06221
SC_EVERSPLIT0014992
DEPARTMENT OF TRANSPORTATION `1101 FEDERAL AVIATION ADMINISTRATION
OMB CONTROL NUMBER: 2120-0569 EXPIRATION DATE: 12/31/2026
Agreement on State Sponsorship and Airport Sponsor Obligations Airport Improvement Program
Airport: Redding Regional (RDD)
Sponsor: City of Redding hereinafter called the "Airport Sponsor"
Associated City: Redding hereinafter called the "Associated City"
Project Description:
Runway 16-34 Rehabilitation; Connector Taxiway H, Rwy 16-34 Shoulder and Runway 16-34 Blast Pad Reconstruction; MAGVAR updates; Runway 16-34 High Intensity Light Replacement (HIRL) and Airfield Signage Improvements; Phase 2, Construction.
hereinafter called the "Project"
State: CA
hereinafter called the "State"
In accordance with 49 USC 47105 the Airport Sponsor hereby consents to the Project sponsorship by the State for the Project at the above airport and associated city.
Sponsor's Certification
I assure and certify, for the project identified herein, the Airport Sponsor will comply with terms, conditions, and assurances contained in the Project Application submitted to the Federal Aviation Administration by the state and to Grant Agreement Conditions required by the Federal Aviation Administration. A copy of the Project Application Assurances and Grant Agreement Conditions is attached and made part of this Agreement on State Sponsorship and Airport Sponsor Obligations.
Executed on this
day of
Name of Sponsor: City of Redding
Name of Sponsor's Authorized Official: Andrew Solsvig
Title of Sponsor's Authorized Official: Airports Manager
Signature of Sponsor's Authorized Official:
Digitally signed by Andrew
Andrew Solsvig Date.20250404 I 1 488 07'W
I declare under penalty of perjury that the foregoing is true and correct. I understand that knowingly and willfully providing false information to the federal government is a violation of 18 USC 1001 (False Statements) and could subject me to fines, imprisonment, or both.
FAA Form 5100-128 (2/24) SUPERSEDES PREVIOUS EDITION
OST-2025-1200 Page 00816
Sierra Club v. Dept. of Transp. - 3:25-cv-06221
SC_EVERSPLIT0014993
AI U.S. Department of Transportation
`1101 Federal Aviation Administration
OMB CONTROL NUMBER: 2120-0569 EXPIRATION DATE: 12/31/2026
Construction Project Final Acceptance Airport Improvement Program Sponsor Certification
Sponsor: City of Redding
Airport: Redding Regional (RDD)
Project Number: 3-06-0194-0XX-2025
Description of Work: Runway 16-34 Rehabilitation; Connector Taxiway H, Rwy 16-34 Shoulder and Runway 16-34 Blast Pad Reconstruction; MAGVAR updates; Runway 16-34 High Intensity Light Replacement (HIRL) and Airfield Signage Improvements; Phase 2, Constructi
Application 49 USC 47105(d), authorizes the Secretary to require me certification from the sponsor that it will comply with the statutory and administrative requirements in carrying out a project under the Airport Improvement Program. General standards for final acceptance and close out of federally funded construction projects are in 2 CFR 200.343 -- Closeout and supplemented by FAA Order 5100.38. The sponsor must determine that project costs are accurate and proper in accordance with specific requirements of the grant agreement and contract documents.
Certification Statements Except for certification statements below marked not applicable (N/A), this list includes major requirements of the construction project. Selecting "Yes" represents sponsor acknowledgment and confirmation of the certification statement. The term "will" means Sponsor action taken at appropriate time based on the certification statement focus area, but no later than the end of the project period of performance. This list is not comprehensive and does not relieve the sponsor from fully complying with all applicable statutory and administrative standards. The source of the requirement is referenced within parenthesis.
1. The personnel engaged in project administration, engineering supervision, project inspection, and acceptance testing were or will be determined to be qualified and competent to perform the work (Grant Assurance). Yes u No u N/A
2. Construction records, including daily logs, were or will be kept by the resident engineer/construction inspector that fully document contractor's performance in complying with:
a. Technical standards (Advisory Circular (AC) 150/5370-12); b. Contract requirements (2 CFR part 200 and FAA Order 5100.38); and c. Construction safety and phasing plan measures (AC 150/5370-2).
Yes No N/A 3. All acceptance tests specified in the project specifications were or will be performed and
documented. (AC 150/5370-12).
Yes No N/A
FAA Form 5100-129 (2/24) SUPERSEDES PREVIOUS EDITION
OST-2025-1200 Page 00817
page 1 of 3
Sierra Club v. Dept. of Transp. - 3:25-cv-06221
SC_EVERSPLIT0014994
4. Sponsor has taken or will take appropriate corrective action for any test result outside of allowable tolerances (AC 150/5370-12).
0 Yes u No u N/A
5. Pay reduction factors required by the specifications were applied or will be applied in computing final payments with a summary made available to the FAA (AC 150/5370-10).
Z Yes u No u N/A
6. Sponsor has notified, or will promptly notify the Federal Aviation Administration (FAA) of the following occurrences:
a. Violations of any federal requirements set forth or included by reference in the contract documents (2 CFR part 200);
b. Disputes or complaints concerning federal labor standards (29 CFR part 5); and
c. Violations of or complaints addressing conformance with Equal Employment Opportunity or Disadvantaged Business Enterprise requirements (41 CFR Chapter 60 and 49 CFR part 26).
Yes O No El N/A
7. Weekly payroll records and statements of compliance were or will be submitted by the prime contractor and reviewed by the sponsor for conformance with federal labor and civil rights requirements as required by FAA and U.S. Department of Labor (29 CFR Part 5).
0 Yes u No u N/A
8. Payments to the contractor were or will be made in conformance with federal requirements and contract provisions using sponsor internal controls that include:
a. Retaining source documentation of payments and verifying contractor billing statements against actual performance (2 CFR 200.302 and FAA Order 5100.38);
b. Prompt payment of subcontractors for satisfactory performance of work (49 CFR 26.29);
c. Release of applicable retainage upon satisfactory performance of work (49 CFR 26.29); and
d. Verification that payments to DBEs represent work the DBE performed by carrying out a commercially useful function (49 CFR 26.55).
E Yes u No u N/A
9. A final project inspection was or will be conducted with representatives of the sponsor and the contractor present that ensure:
a. Physical completion of project work in conformance with approved plans and specifications (Order 5100.38);
b. Necessary actions to correct punch list items identified during final inspection are complete (Order 5100.38); and
c. Preparation of a record of final inspection and distribution to parties to the contract (Order 5100.38);
E Yes u No u N/A
10. The project was or will be accomplished without material deviations, changes, or modifications from approved plans and specifications, except as approved by the FAA (Order 5100.38).
Z Yes u No u N/A
FAA Form 5100-129 (2/24) SUPERSEDES PREVIOUS EDITION
OST-2025-1200 Page 00818
Sierra Club v. Dept. of Transp. - 3:25-cv-06221
page 2 of 3
SC_EVERSPLIT0014995
11. The construction of all buildings have complied or will comply with the seismic construction requirements of 49 CFR 41.120.
E Yes E No Ej N/A
12. For development projects, sponsor has taken or will take the following close-out actions:
a. Submit to the FAA a final test and quality assurance report summarizing acceptance test results, as applicable (Grant Condition);
b. Complete all environmental requirements as established within the project environmental determination (Oder 5100.38); and
c. Prepare and retain as-built plans (Order 5100.38).
Yes u No u N/A 13. Sponsor has revised or will revise their airport layout plan (ALP) that reflects improvements made
and has submitted or will submit an updated ALP to the FAA no later than 90 days from the period of performance end date. (49 USC 47107 and Order 5100.38).
E Yes E No E N/A
Attach documentation clarifying any above item marked with "No" response.
Sponsor's Certification
I certify, for the project identified herein, responses to the forgoing items are accurate as marked and additional documentation for any item marked "no" is correct and complete.
Executed on this
day of
Name of Sponsor: City of Redding
Name of Sponsor's Authorized Official: Andrew Solsvig
Title of Sponsor's Authorized Official: Airports Manager
Signature of Sponsor's Authorized Official:
Digitally signed by Andrew
Andrew Solsvig Solsvig Date: 2025.04.04 11:48:53 -07'00'
I declare under penalty of perjury that the foregoing is true and correct. I understand that knowingly and willfully providing false information to the federal government is a violation of 18 USC 1001 (False Statements) and could subject me to fines, imprisonment, or both.
FAA Form 5100-129 (2/24) SUPERSEDES PREVIOUS EDITION
OST-2025-1200 Page 00819
Sierra Club v. Dept. of Transp. - 3:25-cv-06221
page 3 of 3
SC_EVERSPLIT0014996
AI U.S. Department of Transportation
`1101 Federal Aviation Administration
OMB CONTROL NUMBER: 2120-0569 EXPIRATION DATE: 12/31/2026
Drug-Free Workplace Airport Improvement Program Sponsor Certification
Sponsor: City of Redding
Airport: Redding Regional (RDD)
Project Number: 3-06-0194-0XX-2025
Description of Work: Runway 16-34 Rehabilitation; Connector Taxiway H, Rwy 16-34 Shoulder and Runway 16-34 Blast Pad Reconstruction; MAGVAR updates; Runway 16-34 High Intensity Light Replacement (HIRL) and Airfield Signage Improvements; Phase 2, Construction.
Application 49 USC 47105(d) authorizes the Secretary to require certification from the sponsor that it will comply with the statutory and administrative requirements in carrying out a project under the Airport Improvement Program (AIP). General requirements on the drug-free workplace within federal grant programs are described in 2 CFR part 182. Sponsors are required to certify they will be, or will continue to provide, a drug-free workplace in accordance with the regulation. The AIP project grant agreement contains specific assurances on the Drug-Free Workplace Act of 1988.
Certification Statements Except for certification statements below marked as not applicable (N/A), this list includes major requirements of the construction project. Selecting "Yes" represents sponsor acknowledgement and confirmation of the certification statement. The term "will" means Sponsor action taken at appropriate time based on the certification statement focus area, but no later than the end of the project period of performance. This list is not comprehensive and does not relieve the sponsor from fully complying with all applicable statutory and administrative standards. The source of the requirement is referenced within parenthesis.
1. A statement has been or will be published prior to commencement of project notifying employees that the unlawful manufacture, distribution, dispensing, possession, or use of a controlled substance is prohibited in the sponsor's workplace, and specifying the actions to be taken against employees for violation of such prohibition (2 CFR 182.205).
El Yes u No u N/A
2. An ongoing drug-free awareness program (2 CFR 182.215) has been or will be established prior to commencement of project to inform employees about:
a. The dangers of drug abuse in the workplace;
b. The sponsor's policy of maintaining a drug-free workplace;
c. Any available drug counseling, rehabilitation, and employee assistance programs; and
d. The penalties that may be imposed upon employees for drug abuse violations occurring in the workplace.
O Yes u No u N/A
FAA Form 5100-130 (2/24) SUPERSEDES PREVIOUS EDITION
OST-2025-1200 Page 00820
Page 1 of 3
Sierra Club v. Dept. of Transp. - 3:25-cv-06221
SC_EVERSPLIT0014997
3. Each employee to be engaged in the performance of the work has been or will be given a copy of the statement required within item 1 above prior to commencement of project (2 CFR 182.210). x Yes u No u N/A
4. Employees have been or will be notified in the statement required by item 1 above that, as a condition employment under the grant (2 CFR 182.205(c)), the employee will: a. Abide by the terms of the statement; and b. Notify the employer in writing of his or her conviction for a violation of a criminal drug statute occurring in the workplace no later than five calendar days after such conviction. 0 Yes u No u N/A
5. The Federal Aviation Administration (FAA) will be notified in writing within 10 calendar days after receiving notice under item 4b above from an employee or otherwise receiving actual notice of such conviction (2 CFR 182.225). Employers of convicted employees must provide notice, including position title of the employee, to the FAA (2 CFR 182.300). ID Yes u No u N/A
6. One of the following actions (2 CFR 182.225(b)) will be taken within 30 calendar days of receiving a notice under item 4b above with respect to any employee who is so convicted: a. Take appropriate personnel action against such an employee, up to and including termination, consistent with the requirements of the Rehabilitation Act of 1973, as amended; and b. Require such employee to participate satisfactorily in drug abuse assistance or rehabilitation programs approved for such purposes by a federal, state, or local health, law enforcement, or other appropriate agency. 11Yes u No u N/A
7. A good faith effort will be made, on a continuous basis, to maintain a drug-free workplace through implementation of items 1 through 6 above (2 CFR 182.200). ID Yes u No u N/A
Site(s) of performance of work (2 CFR 182.230):
Location 1 Name of Location: Redding Regional Airport Address: Redding, California
Location 2 (if applicable) Name of Location: Address:
Location 3 (if applicable) Name of Location: Address:
FAA Form 5100-130 (2/24) SUPERSEDES PREVIOUS EDITION
OST-2025-1200 Page 00821
Sierra Club v. Dept. of Transp. - 3:25-cv-06221
Page 2 of 3
SC_EVERSPLIT0014998
Attach documentation clarifying any above item marked with a "No" response.
Sponsor's Certification
I certify, for the project identified herein, responses to the forgoing items are accurate as marked and additional documentation for any item marked "no" is correct and complete.
Executed on this
day of
Name of Sponsor: City of Redding
Name of Sponsor's Authorized Official: Andrew Solsvig
Title of Sponsor's Authorized Official: Airports Manager
Signature of Sponsor's Authorized Official:
Digitally signed by Andrew
Andrew Solsvig Sdsvig
Date, 2025.04.04 11,4934 -ono'
I declare under penalty of perjury that the foregoing is true and correct. I understand that knowingly and willfully providing false information to the federal government is a violation of 18 USC 1001 (False Statements) and could subject me to fines, imprisonment, or both.
FAA Form 5100-130 (2/24) SUPERSEDES PREVIOUS EDITION
OST-2025-1200 Page 00822
Sierra Club v. Dept. of Transp. - 3:25-cv-06221
Page 3 of 3
SC_EVERSPLIT0014999
AI U.S. Department of Transportation
`1101 Federal Aviation Administration
OMB CONTROL NUMBER: 2120-0569 EXPIRATION DATE: 12/31/2026
Equipment and Construction Contracts Airport Improvement Sponsor Certification
Sponsor: City of Redding
Airport: Redding Regional (RDD)
Project Number: 3-06-0194-0XX-2025
Description of Work: Runway 16-34 Rehabilitation; Connector Taxiway H, Rwy 16-34 Shoulder and Runway 16-34 Blast Pad Reconstruction; MAGVAR updates; Runway 16-34 High Intensity Light Replacement (HIRL) and Airfield Signage Improvements; Phase 2, Constructi
Application 49 USC 47105(d) authorizes the Secretary to require certification from the sponsor that it will comply with the statutory and administrative requirements in carrying out a project under the Airport Improvement Program (AIP). General procurement standards for equipment and construction contracts within Federal grant programs are described in 2 CFR 200.317-200.326. Labor and Civil Rights Standards applicable to the AIP are established by the Department of Labor (www.dol.gov) AIP Grant Assurance C.1--General Federal Requirements identifies all applicable Federal Laws, regulations, executive orders, policies, guidelines and requirements for assistance under the AIP. Sponsors may use state and local procedures provided the procurement conforms to these federal standards.
This certification applies to all equipment and construction projects. Equipment projects may or may not employ laborers and mechanics that qualify the project as a "covered contract" under requirements established by the Department of Labor requirements. Sponsor shall provide appropriate responses to the certification statements that reflect the character of the project regardless of whether the contract is for a construction project or an equipment project.
Certification Statements Except for certification statements below marked as not applicable (N/A), this list includes major requirements of the construction project. Selecting "Yes" represents sponsor acknowledgement and confirmation of the certification statement. The term "will" means Sponsor action taken at appropriate time based on the certification statement focus area, but no later than the end of the project period of performance. This list is not comprehensive and does not relieve the sponsor from fully complying with all applicable statutory and administrative standards. The source of the requirement is referenced within parenthesis.
1. A written code or standard of conduct is or will be in effect prior to commencement of the project that governs the performance of the sponsor's officers, employees, or agents in soliciting, awarding and administering procurement contracts (2 CFR 200.318).
El Yes u No u N/A
FAA Form 5100-131 (2/24) SUPERSEDES PREVIOUS EDITION
OST-2025-1200 Page 00823
Sierra Club v. Dept. of Transp. - 3:25-cv-06221
Page 1 of 4
SC_EVERSPLIT0015000
2. For all contracts, qualified and competent personnel are or will be engaged to perform contract administration, engineering supervision, construction inspection, and testing (Grant Assurance C.17).
El Yes u No u N/A
3. Sponsors that are required to have a Disadvantage Business Enterprise (DBE) program on file with the FAA have included or will include clauses required by Title VI of the Civil Rights Act and 49 CFR Part 26 for Disadvantaged Business Enterprises in all contracts and subcontracts.
El Yes u No u N/A
4. Sponsors required to have a DBE program on file with the FAA have implemented or will implement monitoring and enforcement measures that:
a. Ensure work committed to Disadvantaged Business Enterprises at contract award is actually performed by the named DBEs (49 CFR 26.37(b));
b. Include written certification that the sponsor has reviewed contract records and has monitored work sites for performance by DBE firms (49 CFR 26.37(b)); and
c. Provides for a running tally of payments made to DBE firms and a means for comparing actual attainments (i.e. payments) to original commitments (49 CFR 26.37(c)).
x Yes u No u N/A
5. Sponsor procurement actions using the competitive sealed bid method (2 CFR 200.320(c)). was or will be:
a. Publicly advertised, allowing a sufficient response time to solicit an adequate number of interested contractors or vendors;
b. Prepared to include a complete, adequate and realistic specification that defines the items or services in sufficient detail to allow prospective bidders to respond;
c. Publicly opened at a time and place prescribed in the invitation for bids; and
d. Prepared in a manner that result in a firm fixed price contract award to the lowest responsive and responsible bidder.
N Yes u No u N/A
6. For projects the Sponsor proposes to use the competitive proposal procurement method (2 CFR 200.320(d)), Sponsor has requested or will request FAA approval prior to proceeding with a competitive proposal procurement by submitting to the FAA the following:
a. Written justification that supports use of competitive proposal method in lieu of the preferred sealed bid procurement method;
b. Plan for publicizing and soliciting an adequate number of qualified sources; and
c. Listing of evaluation factors along with relative importance of the factors. u Yes u No E N/A
7. For construction and equipment installation projects, the bid solicitation includes or will include the current federal wage rate schedule(s) for the appropriate type of work classifications (2 CFR Part 200, Appendix II). E Yes No N/A
FAA Form 5100-131 (2/24) SUPERSEDES PREVIOUS EDITION
OST-2025-1200 Page 00824
Page 2 of 4
Sierra Club v. Dept. of Transp. - 3:25-cv-06221
SC_EVERSPLIT0015001
8. Concurrence was or will be obtained from the Federal Aviation Administration (FAA) prior to contract award under any of the following circumstances (Order 5100.38D): a. Only one qualified person/firm submits a responsive bid; b. Award is to be made to other than the lowest responsible bidder; and c. Life cycle costing is a factor in selecting the lowest responsive bidder. x Yes u No u N/A
9. All construction and equipment installation contracts contain or will contain provisions for: a. Access to Records ( 200.336) b. Buy American Preferences (Title 49 U.S.C. 50101) c. Civil Rights - General Provisions and Title VI Assurances( 41 CFR part 60) d. Federal Fair Labor Standards (29 U.S.C. 201, et seq) e. Occupational Safety and Health Act requirements (20 CFR part 1920) f. Seismic Safety -- building construction (49 CFR part 41) g. State Energy Conservation Requirements - as applicable(2 CFR part 200, Appendix II) h. U.S. Trade Restriction (49 CFR part 30) i. Veterans Preference (49 USC 47112(c))
O Yes u No u N/A 10. All construction and equipment installation contracts exceeding $2,000 contain or will contain the
provisions established by: a. Davis-Bacon and Related Acts (29 CFR part 5) b. Copeland "Anti-Kickback" Act (29 CFR parts 3 and 5)
N Yes u No u N/A
11. All construction and equipment installation contracts exceeding $3,000 contain or will contain a contract provision that discourages distracted driving (E.O. 13513).
El Yes u No u N/A
12. All contracts exceeding $10,000 contain or will contain the following provisions as applicable: a. Construction and equipment installation projects - Applicable clauses from 41 CFR Part 60 for compliance with Executive Orders 11246 and 11375 on Equal Employment Opportunity; b. Construction and equipment installation - Contract Clause prohibiting segregated facilities in accordance with 41 CFR part 60-1.8; c. Requirement to maximize use of products containing recovered materials in accordance with 2 CFR 200.322 and 40 CFR part 247; and d. Provisions that address termination for cause and termination for convenience (2 CFR Part 200, Appendix II).
EJ Yes u No u N/A
FAA Form 5100-131 (2/24) SUPERSEDES PREVIOUS EDITION
OST-2025-1200 Page 00825
Page 3 of 4
Sierra Club v. Dept. of Transp. - 3:25-cv-06221
SC_EVERSPLIT0015002
13. All contracts and subcontracts exceeding $25,000: Measures are in place or will be in place (e.g. checking the System for Award Management) that ensure contracts and subcontracts are not awarded to individuals or firms suspended, debarred, or excluded from participating in federally assisted projects (2 CFR parts 180 and 1200).
El Yes u No u N/A 14. Contracts exceeding the simplified acquisition threshold (currently $250,000) include or will include
provisions, as applicable, that address the following: a. Construction and equipment installation contracts - a bid guarantee of 5%, a performance bond of 100%, and a payment bond of 100% (2 CFR 200.325);
b. Construction and equipment installation contracts - requirements of the Contract Work Hours and Safety Standards Act (40 USC 3701-3708, Sections 103 and 107);
c. Restrictions on Lobbying and Influencing (2 CFR part 200, Appendix II);
d. Conditions specifying administrative, contractual and legal remedies for instances where contractor of vendor violate or breach the terms and conditions of the contract (2 CFR 200, Appendix II); and
e. All Contracts - Applicable standards and requirements issued under Section 306 of the Clean Air Act (42 USC 7401-7671q), Section 508 of the Clean Water Act (33 USC 1251-1387, and Executive Order 11738.
Yes u No u N/A
Attach documentation clarifying any above item marked with "No" response.
Sponsor's Certification
I certify, for the project identified herein, responses to the forgoing items are accurate as marked and additional documentation for any item marked "no" is correct and complete.
Executed on this
day of
Name of Sponsor: City of Redding
Name of Sponsor's Authorized Official: Andrew Solsvig
Title of Sponsor's Authorized Official: Airports Manager
Signature of Sponsor's Authorized Official:
Digitally signed by Andrew
Andrew Solsvig sD*aitel25.04.04 11:50,05
-oroa
I declare under penalty of perjury that the foregoing is true and correct. I understand that knowingly and willfully providing false information to the federal government is a violation of 18 USC 1001 (False Statements) and could subject me to fines, imprisonment, or both.
FAA Form 5100-131 (2/24) SUPERSEDES PREVIOUS EDITION
OST-2025-1200 Page 00826
Sierra Club v. Dept. of Transp. - 3:25-cv-06221
Page 4 of 4
SC_EVERSPLIT0015003
AI U.S. Department of Transportation
`1101 Federal Aviation Administration
OMB CONTROL NUMBER: 2120-0569 EXPIRATION DATE: 12/31/2026
Project Plans and Specifications Airport Improvement Program Sponsor Certification
Sponsor: City of Redding
Airport: Redding Regional (RDD)
Project Number: 3-06-0194-0XX-2025
Description of Work: Runway 16-34 Rehabilitation; Connector Taxiway H, Rwy 16-34 Shoulder and Runway 16-34 Blast Pad Reconstruction; MAGVAR updates; Runway 16-34 High Intensity Light Replacement (HIRL) and Airfield Signage Improvements; Phase 2, Constructi
Application 49 USC 47105(d) authorizes the Secretary to require certification from the sponsor that it will comply with the statutory and administrative requirements in carrying out a project under the Airport Improvement Program (AIP). Labor and civil rights standards applicable to AIP are established by the Department of Labor (www.dol.gov/). AIP Grant Assurance C.1--General Federal Requirements identifies applicable federal laws, regulations, executive orders, policies, guidelines and requirements for assistance under AIP. A list of current advisory circulars with specific standards for procurement, design or construction of airports, and installation of equipment and facilities is referenced in standard airport sponsor Grant Assurance 34 contained in the grant agreement.
Certification Statements Except for certification statements below marked as not applicable (N/A), this list includes major requirements of the construction project. Selecting "Yes" represents sponsor acknowledgement and confirmation of the certification statement. The term "will" means Sponsor action taken at appropriate time based on the certification statement focus area, but no later than the end of the project period of performance. This list is not comprehensive and does not relieve the sponsor from fully complying with all applicable statutory and administrative standards. The source of the requirement is referenced within parenthesis.
1. The plans and specifications were or will be prepared in accordance with applicable federal standards and requirements, so that no deviation or modification to standards set forth in the advisory circulars, or FAA-accepted state standard, is necessary other than those explicitly approved by the Federal Aviation Administration (FAA) (14 USC 47105).
ID Yes u No ID N/A
2. Specifications incorporate or will incorporate a clear and accurate description of the technical requirement for the material or product that does not contain limiting or proprietary features that unduly restrict competition (2 CFR 200.319).
Yes u No u N/A
FAA Form 5100-132 (2/24) SUPERSEDES PREVIOUS EDITION
OST-2025-1200 Page 00827
Sierra Club v. Dept. of Transp. - 3:25-cv-06221
Page 1 of 3
SC_EVERSPLIT0015004
3. The development that is included or will be included in the plans is depicted on the current airport layout plan as approved by the FAA (14 USC 47107). O Yes u No u N/A
4. Development and features that are ineligible or unallowable for AIP funding have been or will be omitted from the plans and specifications (FAA Order 5100.38, par. 3-43).
N Yes u No u N/A
5. The specification does not use or will not use "brand name" or equal to convey requirements unless sponsor requests and receives approval from the FAA to use brand name (FAA Order 5100.38, Table U-5). ID Yes u No u N/A
6. The specification does not impose or will not impose geographical preference in their procurement requirements (2 CFR 200.319(b) and FAA Order 5100.38, Table U-5). fp Yes u No u N/A
7. The use of prequalified lists of individuals, firms or products include or will include sufficient qualified sources that ensure open and free competition and that does not preclude potential entities from qualifying during the solicitation period (2 CFR 319(d)). ID Yes u No u N/A
8. Solicitations with bid alternates include or will include explicit information that establish a basis for award of contract that is free of arbitrary decisions by the sponsor (2 CFR 200.319(a)(7)).
N Yes u No u N/A
9. Concurrence was or will be obtained from the FAA if Sponsor incorporates a value engineering clause into the contract (FAA Order 5100.38, par. 3-57). ID Yes u No u N/A
10. The plans and specifications incorporate or will incorporate applicable requirements and recommendations set forth in the federally approved environmental finding (49 USC 47106(c)). ID Yes u No u N/A
11. The design of all buildings comply or will comply with the seismic design requirements of 49 CFR 41.120. (FAA Order 5100.38d, par. 3-92) u Yes u No ID N/A
12. The project specification include or will include process control and acceptance tests required for the project by as per the applicable standard: a. Construction and installation as contained in Advisory Circular (AC) 150/5370-10. Yes u No u N/A
FAA Form 5100-132 (2/24) SUPERSEDES PREVIOUS EDITION
OST-2025-1200 Page 00828
Sierra Club v. Dept. of Transp. - 3:25-cv-06221
Page 2 of 3
SC_EVERSPLIT0015005
b. Snow Removal Equipment as contained in AC 150/5220-20. ID Yes No N/A
c. Aircraft Rescue and Fire Fighting (ARFF) vehicles as contained in AC 150/5220-10. ID Yes u No CI N/A
13. For construction activities within or near aircraft operational areas(AOA): a. The Sponsor has or will prepare a construction safety and phasing plan (CSPP) conforming to Advisory Circular 150/5370-2. b. Compliance with CSPP safety provisions has been or will be incorporated into the plans and specifications as a contractor requirement. c. Sponsor will not initiate work until receiving FAA's concurrence with the CSPP (FAA Order 5100.38, Par. 5-29).
El Yes u No u N/A
14. The project was or will be physically completed without federal participation in costs due to errors and omissions in the plans and specifications that were foreseeable at the time of project design (49 USC 47110(b)(1) and FAA Order 5100.38d, par. 3-100). O Yes u No u N/A
Attach documentation clarifying any above item marked with "No" response.
Sponsor's Certification
I certify, for the project identified herein, responses to the forgoing items are accurate as marked and
additional documentation for any item marked "no" is correct and complete.
Executed on this
day of
Name of Sponsor: City of Redding
Name of Sponsor's Authorized Official: Andrew Solsvig
Title of Sponsor's Authorized Official: Airports Manager
Signature of Sponsor's Authorized Official:
Digitally signed by Andrew
Andrew Solsvig DsaltSev:I..025.04.0411:50:39
-0700'
I declare under penalty of perjury that the foregoing is true and correct. I understand that knowingly and willfully providing false information to the federal government is a violation of 18 USC 1001 (False Statements) and could subject me to fines, imprisonment, or both.
FAA Form 5100-132 (2/24) SUPERSEDES PREVIOUS EDITION
OST-2025-1200 Page 00829
Sierra Club v. Dept. of Transp. - 3:25-cv-06221
Page 3 of 3
SC_EVERSPLIT0015006
AI U.S. Department of Transportation
`1101 Federal Aviation Administration
OMB CONTROL NUMBER: 2120-0569 EXPIRATION DATE: 12/31/2026
Selection of Consultants Airport Improvement Program Sponsor Certification
Sponsor: City of Redding Airport: Redding Regional (RDD) Project Number: 3-06-0194-0XX-2025
Description of Work:
Runway 16-34 Rehabilitation; Connector Taxiway H, Rwy 16-34 Shoulder and Runway 16-34 Blast Pad Reconstruction; MAGVAR updates; Runway 16-34 High Intensity Light Replacement (HIRL) and Airfield Signage Improvements; Phase 2, Constructi
Application 49 USC 47105(d) authorizes the Secretary to require certification from the sponsor that it will comply with the statutory and administrative requirements in carrying out a project under the Airport Improvement Program (AIP). General requirements for selection of consultant services within federal grant programs are described in 2 CFR 200.317-200.326. Sponsors may use other qualifications-based procedures provided they are equivalent to standards of Title 40 chapter 11 and FAA Advisory Circular 150/5100-14, Architectural, Engineering, and Planning Consultant Services for Airport Grant Projects.
Certification Statements Except for certification statements below marked as not applicable (N/A), this list includes major requirements of the construction project. Selecting "Yes" represents sponsor acknowledgement and confirmation of the certification statement. The term "will" means Sponsor action taken at appropriate time based on the certification statement focus area, but no later than the end of the project period of performance. This list is not comprehensive and does not relieve the sponsor from fully complying with all applicable statutory and administrative standards. The source of the requirement is referenced within parenthesis.
1. Sponsor acknowledges their responsibility for the settlement of all contractual and administrative issues arising out of their procurement actions (2 CFR 200.318(k)).
N Yes u No u N/A
2. Sponsor procurement actions ensure or will ensure full and open competition that does not unduly limit competition (2 CFR 200.319).
EJ Yes u No u N/A
3. Sponsor has excluded or will exclude any entity that develops or drafts specifications, requirements, or statements of work associated with the development of a request-forqualifications (RFQ) from competing for the advertised services (2 CFR 200.319).
ID Yes ID No u N/A
FAA Form 5100-134 (2/24) SUPERSEDES PREVIOUS EDITION
OST-2025-1200 Page 00830
Sierra Club v. Dept. of Transp. - 3:25-cv-06221
Page 1 of 3
SC_EVERSPLIT0015007
4. The advertisement describes or will describe specific project statements-of-work that provide clear detail of required services without unduly restricting competition (2 CFR 200.319). El Yes u No u N/A
5. Sponsor has publicized or will publicize a RFQ that: a. Solicits an adequate number of qualified sources (2 CFR 200.320(d)); and b. Identifies all evaluation criteria and relative importance (2 CFR 200.320(d)).
El Yes u No u N/A
6. Sponsor has based or will base selection on qualifications, experience, and disadvantaged business enterprise participation with price not being a selection factor (2 CFR 200.320(d)). El Yes u No O N/A
7. Sponsor has verified or will verify that agreements exceeding $25,000 are not awarded to individuals or firms suspended, debarred or otherwise excluded from participating in federally assisted projects (2 CFR 180.300). El Yes u No u N/A
8. NE services covering multiple projects: Sponsor has agreed to or will agree to: a. Refrain from initiating work covered by this procurement beyond five years from the date of selection (AC 150/5100-14); and b. Retain the right to conduct new procurement actions for projects identified or not identified in the RFQ (AC 150/5100-14).
ID Yes u No u N/A
9. Sponsor has negotiated or will negotiate a fair and reasonable fee with the firm they select as most qualified for the services identified in the RFQ (2 CFR 200.323). ID Yes u No u N/A
10. The Sponsor's contract identifies or will identify costs associated with ineligible work separately from costs associated with eligible work (2 CFR 200.302). El Yes u No u N/A
11. Sponsor has prepared or will prepare a record of negotiations detailing the history of the procurement action, rationale for contract type and basis for contract fees (2 CFR 200.318(i)). ID Yes u No u N/A
12. Sponsor has incorporated or will incorporate mandatory contact provisions in the consultant contract for AIP-assisted work (49 U.S.C. Chapter 471 and 2 CFR part 200 Appendix II)
N Yes u No u N/A
FAA Form 5100-134 (2/24) SUPERSEDES PREVIOUS EDITION
OST-2025-1200 Page 00831
Sierra Club v. Dept. of Transp. - 3:25-cv-06221
Page 2 of 3
SC_EVERSPLIT0015008
13. For contracts that apply a time-and-material payment provision (also known as hourly rates, specific rates of compensation, and labor rates), the Sponsor has established or will establish: a. Justification that there is no other suitable contract method for the services (2 CFR 200.318(j)); b. A ceiling price that the consultant exceeds at their risk (2 CFR 200.318(j)); and c. A high degree of oversight that assures consultant is performing work in an efficient manner with effective cost controls in place 2 CFR 200.318(j)). ID Yes u No u N/A
14. Sponsor is not using or will not use the prohibited cost-plus-percentage-of-cost (CPPC) contract method. (2 CFR 200.323(d)).
El Yes u No u N/A
Attach documentation clarifying any above item marked with "no" response.
Sponsor's Certification
I certify, for the project identified herein, responses to the forgoing items are accurate as marked and additional documentation for any item marked "no" is correct and complete.
I declare under penalty of perjury that the foregoing is true and correct. I understand that knowingly and willfully providing false information to the federal government is a violation of 18 USC 1001 (False Statements) and could subject me to fines, imprisonment, or both.
Executed on this
day of
Name of Sponsor: City of Redding
Name of Sponsor's Authorized Official: Andrew Solsvig
Title of Sponsor's Authorized Official: Airports Manager
Andrew Solsvig Signature of Sponsor's Authorized Official:
I declare under penalty of perjury that the foregoing is true and correct. I understand that knowingly and willfully providing false information to the federal government is a violation of 18 USC 1001 (False Statements) and could subject me to fines, imprisonment, or both.
FAA Form 5100-134 (2/24) SUPERSEDES PREVIOUS EDITION
OST-2025-1200 Page 00832
Sierra Club v. Dept. of Transp. - 3:25-cv-06221
Page 3 of 3
SC_EVERSPLIT0015009
AI U.S. Department of Transportation
`1101 Federal Aviation Administration
OMB CONTROL NUMBER: 2120-0569 EXPIRATION DATE: 12/31/2026
Certification and Disclosure Regarding Potential Conflicts of Interest Airport Improvement Program Sponsor Certification
Sponsor: City of Redding
Airport: Redding Regional (RDD)
Project Number: 3-06-0194-0XX-2025
Description of Work: Runway 16-34 Rehabilitation; Connector Taxiway H, Rwy 16-34 Shoulder and Runway 16-34 Blast Pad Reconstruction; MAGVAR updates; Runway 16-34 High Intensity Light Replacement (HIRL) and Airfield Signage Improvements; Phase 2, Constructi
Application Title 2 CFR 200.112 and 1201.112 address Federal Aviation Administration (FAA) requirements for conflict of interest. As a condition of eligibility under the Airport Improvement Program (AIP), sponsors must comply with FAA policy on conflict of interest. Such a conflict would arise when any of the following have a financial or other interest in the firm selected for award:
a) The employee, officer or agent,
b) Any member of his immediate family,
c) His or her partner, or
d) An organization which employs, or is about to employ, any of the above.
Selecting "Yes" represents sponsor or sub-recipient acknowledgement and confirmation of the certification statement. Selecting "No" represents sponsor or sub-recipient disclosure that it cannot fully comply with the certification statement. If "No" is selected, provide support information explaining the negative response as an attachment to this form. This includes whether the sponsor has established standards for financial interest that are not substantial or unsolicited gifts are of nominal value (2 CFR 200.318(c)). The term "will" means Sponsor action taken at appropriate time based on the certification statement focus area, but no later than the end of the project period of performance.
Certification Statements
1. The sponsor or sub-recipient maintains a written standards of conduct governing conflict of interest and the performance of their employees engaged in the award and administration of contracts (2 CFR 200.318(c)). To the extent permitted by state or local law or regulations, such standards of conduct provide for penalties, sanctions, or other disciplinary actions for violations of such standards by the sponsor's and sub-recipient's officers, employees, or agents, or by contractors or their agents.
El Yes El No
FAA Form 5100-135 (2/24) SUPERSEDES PREVIOUS EDITION
OST-2025-1200 Page 00833
Sierra Club v. Dept. of Transp. - 3:25-cv-06221
Page 1 of 2
SC_EVERSPLIT0015010
2. The sponsor's or sub-recipient's officers, employees or agents have not and will not solicit or accept gratuities, favors or anything of monetary value from contractors, potential contractors, or parties to sub-agreements (2 CFR 200.318(c)).
El Yes u No
3. The sponsor or sub-recipient certifies that is has disclosed and will disclose to the FAA any known potential conflict of interest (2 CFR 1200.112).
x Yes u No
Attach documentation clarifying any above item marked with "no" response.
Sponsor's Certification
I certify, for the project identified herein, responses to the forgoing items are accurate as marked and have the explanation for any item marked "no" is correct and complete.
Executed on this
day of
Name of Sponsor: City of Redding
Name of Sponsor's Authorized Official: Andrew Solsvig
Title of Sponsor's Authorized Official: Airports Manager
Signature of Sponsor's Authorized Official:
Digitally signed by Andrew
Andrew Solsvig DSalts:4025.04.04 1151:42
-0700'
I declare under penalty of perjury that the foregoing is true and correct. I understand that knowingly and willfully providing false information to the federal government is a violation of 18 USC 1001 (False Statements) and could subject me to fines, imprisonment, or both.
FAA Form 5100-135 (2/24) SUPERSEDES PREVIOUS EDITION
OST-2025-1200 Page 00834
Sierra Club v. Dept. of Transp. - 3:25-cv-06221
Page 2 of 2
SC_EVERSPLIT0015011