Document LKR0VzKqL8GJ6X0RvE3nnkdEw
LABORATORY COMMITTEE MEETING July II. 1963
Messrs:
R. W. Higgins T. S. Clousing J. W. Hosbein H. B. Speelman
E. R. Harden R. L. Hosbein J. A. Buettgen
Gentlemen:
The meeting was called to order at 10:30 a. a. on July 11, 1963 in the Aurora Laboratory conference room. The next meeting will be held in the tame place August 1, 1963.
ACTION TAKEN ON REGULAR AGENDA:
1. E13-B TEMPERATURE GRADIENT COMPARATOR
Harbison-Vallcer teat data sent to Mr. Higgins by Mr. Cobaugh has been turned over to Mr. Harden for evaluation. A report will be made to the committee upon completion.
Mr. Higgins vill turn over to Mr. John Holbein photostats of comparator draw ings for transmission to our patent attorneys. One drawing is of the original conception and the other is a drawing of the current comparator now in use at our laboratory.
2. Z32-A DEVELOPMENT OF ''MS" WALLS AND ARCHES
The plastic "MS" nose model is now scheduled for early August erection. Tile, plastic firebrick, castings and steel have been ordered. This model oust be ready for Sales Meeting scheduled for August 13 and 14th.
3. E36-B ABRESIST CEMENT
The cement approved for use with Abreslst is the same formula as that used in DRISEAL with a set of approximately 2% hours.
Because of possible applications of Abreslst to concrete and brick as well as steel Mr. Harden will cooduct tests to determine the reaction of the cement, if any, to this type of construction.
4. E38-A DRTIBC OUT DATA
Final report on this project is now being readied.
5. P3-B SUPER 711 - RESEARCH
\
Nothing new reported except that Johns Manville tested asbestos and were unable to come up with any answers.
The following is the new procedure in product control testing and reporting. Every product manufactured will be tested at least once per (Much. A report will be made monthly on the average of tests in addition to Indicating the "low" and "high" results.
-2-
6. D2-B PYROSCAI
Mo change In this project from previous report.
7. E39-A REFRACTORY HANGER HALL TEMPERATURE STUDY
Final report made and distributed.
8. Dl-B DECRETE - CALCRETE
Mr. Harden reported on the re-run of the Decrete 40 and 50 and It now appears that enough Information Is available for developing a data sheet.
9. E41-A REFRACTORY CASTABLE FACED BLOCK INSULATION FOR DETRICK PANEL CONSTRUCTIOf
Mr. Harden requested, and was granted, an additional 10 days to complete tests and "burns" on several promising materials.
10. E42-A MINERAL WOOL BLOCK INSULATION
Final report made and distributed.
11. E43-A TEST FURNACE - DETRICK-DENNIS-RICE HULLS
Mr. Specimen reported that the L. F. Gas Company will loan tanks for use on this project. We are, however, required to pay for gas used and any regulators, if required.
Mr. Buettgen reported that rental fans are not available in Aurora. Prices were submitted on new fans. A check will be made on used fan prices.
MISCELLANEOUS
Mr. Speelman exhibited samples of block and felt combinations cemented together to form a single unit. Test specimens had been submitted to direct heat (on Griptex Block portion) with favorable results.
Mr. Speelman stated that the primary purpose of the tests was to develop an insulation combination which would give the same, or better, insulation results than all Griptex Block and at the same time provide a substantial price differencial when quoting competitively.
Additional benefits possible, from the combination unit, are lower costs since felts coat less than block.
Contractor will have a single unit application.
Mora effective insulation through felt layer.
Respectfully submitted, M. H. DETRICK COMPANY
JAS:va
Copies to:
Mr. L. Hosbeln Mr. C. F. Pollen Mr. H. Rowley AURORA FILS
J. A. Buettgen RAD Laboratory