Attached are the results of the fiber sampling done on 30 and 31 May.
As you will note, all fiber counts, with one exception, vrere veil below the present TLV of 5 fibers per ml and below or very close to the 1976 TLV of 1 fibers. The exception was the 6th level of the furnace area'where the sample indicated 3.3 fibers per tnl. Apparently, the ' I heat rise and exhaust fans at this level .tend to concentrate fibers
as weli as; visible dust. I suggest evaluation of the problem by further sampling at the 5th level and lower'levels. .In the interla, if anyone is required to spend more than a very brief period of time at the 6th level, a respirator is suggested as a precautionary measure. I The 2.1 fibers at the discharge end of the iil drier indicate that the drier room is an rea where more extensive testing is advisable. I
doubt if there is a problem but further data should be obtained,
I am sending separately, the clips and more sampling heads. Also, Frank'Serafin, our Laboratory Director, is preparing instructions I for constructing a simple apparatus to calibrate your air sampling pumps.
Our thanks again for your hospitality. If we can be of further assistance, please call.
"........
.H.A. Eschonbach HAEimh Enclosures cc; F.A. Eaton
[PLAINTIFF EXHIBIT |
t SCO 5202
DOJWRG 00519
EXHIBIT
z
Kennedy
v\
--\
*
: t Cpa?o^(t of TEir
.
TO OATfc- -
ilB/iU;
' O.M. SCOTT & SONS
MARYSVILLE OHIO
Sample
9
Operation or
Location
SC 1
Turf Builder Bagging
sq 2
Rode Bagging
SC 3 ;
. *,
Furnace Area 1st Floor Stoners
SC 4
. : Furnace Area 6th Level
sc s
'-v'* Furnace Area 4th Level
.
SC 6
, Furnace Area . 2nd Level '
SC 7
Control Room
SC 8 .
. Discharge End of Drier #1
-
Fibers Per Ml (Greater than 5 microns in
length)
.4
*'4 . ' .
2.1 . '
loili
Remarks
Difficulties with bagging
equipment contributed to
dust levels.
.
#1,2,3,41 8 Operating
. ' 8.3
. (1 It . 11
.
1.4 . 1* * II *
1.9 '
0.0 2.1
11 II
f|
' <1
.
O 1111
`
:, !
'V
` ' "r m . , : . : .
.
" ' " ' . . '
SC DENH003042