Document LKBxvEGOr9Xngrk3QqXMmVkRw

FILE NAME Manville JMA DATE 1977 Mar 16 DOC JMA019 DOCUMENT DESCRIPTION Report - Asbestos Exposures During the Cutting and Machining of Asbestos Cement Pipe Prepared for A Pipe Assoc ASBESTOS EXPOSURES DURING THE CUTTING AND MACHINING ; OF ASBESTOS CEMENT PIPE Prepared for The A Pipe Producers Association 1600 Wilson Boulevard Suite 1308 Arlington Arlington Virginia 22209 Prepared by Wesley M. Noble B.S. Barbara L. Kawahara M.P.H. W. Clark Cooper M.D. Equitable Environmental Health 2180 Milvia Street Berkeley California 94704 Inc. PRODUCED | JM - 83 March 16 1977 ASBESTOS EXPOSURES DURING THE CUTTING AND MACHINING OF ASBESTOS CEMENT PIPE March 16 1977 . Equitable Environmental Health Inc. Berkeley California INTRODUCTION This is a report on the concentrations of airborne asbestos and total dust produced during typical field cutting and machining operations employed in the installation of asbestos cement A pipe The study was carried out by Equitable Environmental Health Inc. under a contract from the A Pipe Producers Association and was specifically designed to obtain quantitative information on the potential exposures of workers in the construction trades The information was needed to predict how A pipe field operations would be affected by alternative health standards for asbestos in the construction industry BACKGROUND Production of asbestos cement pipe began in the United States in 1929. It is used extensively for the transport of water and sewage Current production is estimated at 60 to 65 million linear feet with consumption of approximately 100-140,000 short tons of asbestos per year This accounts for 15 to 20 percent of U.S. asbestos consumption Chrysotile 80 and to a lesser degree crocidolite 20 asbestos are incor- PRODUCED JM " 83 porated in the pipe There are two general categories of C pipe pressure or water pipe and pressure or sewer pipe made in diameters ranging from 4 to 42 inches The former as the name implies must withstand internal hydrostatic pressures and are tested up to 900 pounds per square inch depending on pressure class rating It usually contains about 17 asbestos pressure pipe is designed to withstand external crush loads and usually contains 10 to 12 asbestos plus 10-15 ground scrap pipe fines The cementitious component of the pipe is about 60 cement and 40 silica flour which react to reduce the free lime content below % during the autoclave cure oe(C_ RELEVANT STANDARDS In interpreting data in the report it is useful to review recent current and proposed occupational standards for asbestos It was not until the development of the membrane filter method for direct counting of fibers that occupational standards were based upon fiber concentrations Prior to that total dust counts were the basis for control In 1968 the American Conference of Governmental Industrial Hygienists recommended a weighted average limit of 12 fibers per cubic centimeter based on fibers greater than 5 micrometers in length and alternatively a 2 million particles per cubic foot total particle count limit The fiber limit was adopted by the Department of Labor under the Healey Public Contracts Act in 1969 and was incorporated in OSHA tentative standards in 1971 A reduced standard was announced by OSHA June 7 1972 to be effected in two steds As of July 7 1972 the permissible exposure wa at PRODUCED JM - 83 5 fibers as an hour weighted average TWA with a ceiling of 10 fibers As before only fibers longer than 5 micrometers were counted As of July 1 1976 the permissible TWA was lowered to 2 fibers On October 9 1975 OSHA proposed a still more restrictive occupa- tional standard the new permissible TWA to be 0.5 fibers and the permissible ceiling concentration to be 5 fibers fibers longer than 5 micrometers This standard was to be applicable only to the manufacturing sector with a separate standard to be promulgated later for the construction industry a standard This been more stringent standard has not yet been adopted nor has proposed for the construction industry In the meantime the National Institute for Occupational Safety and Health NIOSH has announced its intent to recommend a further reduction of the occupational standard to a permissible TWA of 0.1 fiber i.e. 100 fibers greater than 5 micrometers per liter of air STUDY DESIGN In its request for a proposal the A Pipe Producers Association requested quantitative exposure to cover both pressure pipe data on the following and pressure pipe field operations . 1 Machining with a manual field lathe 2 Machining with a driven field lathe 3 Cutting with an abrasive disc 4 Power hole cutting 5 Cutting with chisel using hammer and rasp When possible contractors avoid cutting and machining C pipe in the field because of the expense The usual procedure is to have appropriate PRODUCED JM - 83 sizes cut and machined before being taken to the construction sites Because of this it was not feasible to study all operations at the sites where pipe was being installed Instead it was decided to simulate field conditions Arrangements were made to carry out the study on the premises of a manufacturer of C pipe cutting equipment A workman experienced in the use of all the tools performed the individual operations with a helper provided by EEH EEH independently purchased inch diameter sewer pipe Class 2400 and inch diameter pressure pipe Class 150 from a local supply house No engineering control or ventilation was utilized since these are not available in the field approved disposable respirators were worn by operators and EEH personnel during test periods which produced high dust concentrations Each cutting operation when performed in the field is of short duration compared to an hour workday Consequently the ceiling standard which covers short time periods of relatively intense exposure would be more likely to be exceeded than the hour weighted average exposure standard While the number of minutes defined by the ceiling standard has not been uniformly defined in regulations a sampling period of 15 minutes is often used as an effective compromise between catching the peak and obtaining an adequate sample for analysis It was determined in advance that a single cutting or machining opera- tion rarely took as long as 15 minutes For the operations of major interest the average time per operation was from 3 to 6 minutes It was decided therefore that several successive operations would be made during each sampling period The short term sampling period would be approximately 15 PRODUCED minutes unless in the industrial hygienist's judgement a JM - 83 large sample could be obtained in a shorter period In order to assess reproducibility three replicate short or peak breathing zone samples on both the operator and his helper were to be collected for each operation Simultaneously longer integrated personal samples were to be collected on the operator and helper and area samples at a site located approximately 15 feet away and downwind if there were air movement These integrated samples were to be collected over periods of 2 or 3 hours each one to span more than one type of field operation Another area sampler was to be used to collect total dust for gravi- metric analysis This was to be located 5 to 10 feet from the field operation The samples were to be less than one hour in duration to span the three replicate tests for one operation Background samples of 1 to 2 hours each were to be collected before and after each day's work to ascertain the prevailing ambient asbestos concentrations METHODS Air samples were collected on millimeter diameter 0.8 micron pore size Millipore cellulose ester membrane filters in accordance with OSHA and NIOSH recommendations They were all open with the cover of the filter cassette removed samples Personal sampling pumps were operated at flow rates ranging from 1.6 to 2 liters per minute The pumps were calibrated by the soap bubble technique before use Both area and personal breathing samples were taken In the latter the pump was attached to the worker's belt and the filter clipped to his lapel PRODUCED JM - 83 near his face Figure 1 illustrates worker and helper with samplers in place Figure 2 shows the test site with area samplers located near the operation All samples were analyzed by LFE Environmental a laboratory accredited by the American Industrial Hygiene Association following OSHA and NIOSH . methods Briefly the analytic procedure consisted of rendering the filter transparent with a high viscosity solution of membrane filter material in a mixture of diethyl oxalate and dimethyl phthalate The asbestos fibers which lie on the surface of the filter are counted with a phase contrast microscope at 400x magnification The count area was delineated with a Porton graticule Only fibers exceeding 5 micrometers in length were counted The laboratory examined 100 microscopic fields or counted 100 fibers whichever came first Fiber identification depended upon a particle having an aspect ratio of at least 1 and having approximately parallel sides No attempt was made to identify individual fibers mineralogically in view of the known chrysotile and crocidolite content of the material under examination No estimate was made of the number of fibers less than 5 micrometers in length nor the number in the electron microscope range Samples were stored for such studies if they should appear desirablaet some later time It should be emphasized that estimates of fiber concentrations below 5 fibers are subject to increasing lack of precision and that those below 0.5 fibers have a fairly wide margin of error often being based on the observation of relatively few fibers Thus although counts are reported as calculated to two decimal places differences in counts in these ranges should not be overinterpreted PRODUCED JM - 83 ' STUDY OPERATIONS Preliminary Survey On 31 January 1977 Mr. Wesley Noble and Mrs. Barbara Kawahara conducted a preliminary survey to obtain information needed for efficient conduct of the main survey The operation of the field cutting and machining tools was demonstrated Air samplers were taken to determine if a minute sampling period would be adequate Main Survey On February 8 and 9 1977 Mr. Noble Mrs. Kawahara and Mr. Ronald LaSalle returned to the plant to perform the main survey Both days were hazy with the temperature in the 60's and 70's There was virtually no wind in the morning and only light breezes from the west in the afternoons The five cutting and machining operations specified under Study Design were studied plus use of one cutter Wheeler which was introduced for a limited test Descriptions of these operations follow 1 Hand machining with a manual field lathe The lathe Pilot Ratchet Field Lathe Model 12R was attached to the end of an inch pipe supported 2 to 3 feet from the ground Figures 3 and 4 The lathe had two sets of blades one for the actual cut and the other to machine and profile the end The depth of cut could be adjusted manually with screws A ratchet allowed the operator to turn the lathe by pumping a handle The helper adjusted the depth of cut as the lathe rotated about the pipe and would also aid in turning the lathe For sewer pipe one complete cycle took about 8 minutes i.e. 2 minutes to cut and 6 to 7 minate minPRODUCED JM - 83 for set and machining Each short peak sample represented two cycles Cutting pressure pipe took longer 4 minutes for cutting and 8 to 9 minutes for set and profiling Each shortterm sample covered a single cut Power machining with driven field lathe This electricpowered lathe Pilot Powered Field Lathe Model 12P worked on the same principle as the manual lathe Figures 5 and 6 Due to ease of operation a helper was not really necessary Sewer pipe took 1/2 to 1 minute to cut and 4-1 to 5-1 minutes to profile Two cycles were completed for each short peak sample Again cutting pressure pipe took longer 1-1 minutes to cut and 5 to 6 minutes to profile two cycles were used per sample 3 Cutting with abrasive disc This was a gasoline powered abrasive disc saw Stihl with a 10 diameter carbide blade Figure 7 When cutting with the saw the operator held the saw while the helper rolled the pipe along the ground toward or away from him * No machining of the ends was performed with this method of cutting On both sewer and pressure pipe one cut could be made in 30 to 45 seconds Each peak sample included four cuts 4 Power hole cutting The tool used for this Pilot Hole Cutter ' Model 38E is available with either an electric or gasoline engine The mode used in the test was gasoline powered Figure 8 It cut a 4-1 diameter hole with a small center plug The cutter was secured to the pipe with a chain The PRODUCED JM - 83 engine rotated the blade while the operator continuously adjusted the height of the blade The helper aided in equipment set It took about 1 minute to cut a hole in sewer pipe and 1-1 to 2 minutes for pressure pipe Two minutes set time was required between holes Four holes were cut for each peak sample 5 Cutting with hammer chisel and rasp The pipe was cut using a hammer and chisel and the edges then smoothed with a coarse file Figures 9 and 10 The helper rotated the pipe as the operator worked Two cuts of sewer pipe each taking 4 to 6 minutes were made during the short or peak sampling period Cutting the pressure pipe lasted 11 minutes and only one cut was made per sample 4 wa 8) A single test of the Wheeler Chain Cutter Model 2990 was made Although this alternative equipment for cutting pipe in the field was not included in the original protocol its availability and potential useful- ness justified a limited trial It has cutting discs mounted on a chain which is wrapped around pipe Figures 11 and 12 Its action is controlled hydraulically by an operator who could be as far as 10 to 15 feet from the pipe being cut Set and cutting required 2 to 3 minutes This . was tested once on sewer pipe and once on pressure pipe Another cutting device manually operated was given a single test during the preliminary survey This the Pilot Model 4 Pipe Cutter Figure 13 applies a circumferential cutting action from the pressure of rotating sharpened discs The tool is rotated around the pipe and pressure is PRODUCED applied by means of handles The tool can be set up and the cut completed - 83 in 2 to 3 minutes This was tested only once during the preliminary survey E RESULTS Preliminary Survey The data obtained during the preliminary survey are summarized in Table 1. The asbestos concentrations that were recorded indicated that the air sampling procedures yielded reasonable values for the proposed operations They also showed the comparatively high asbestos dust production during the abrasive disc operation a practice not recommended by the A pipe industry unless workers are provided with NIOSH approved respirators The integrated exposure to the operator during an hour's performance of four representative procedures was 4.3 fibers The integrated area sample showed 2.9 fibers and 16.8 mg mof total dust x Main Survey The operator's peak exposures to asbestos during each operation involving sewer pipe and pressure pipe are summarized in Table 2. The conspicuously high concentrations during use of the abrasive disc are apparent Table 3 similarly shows the peak exposures of the helper with the abrasive disc operation again producing high concentrations of airborne| asbestos Table 4 summarizes the integrated exposures of the operator and helper as they performed several operations in sequence Area integrated samples during the same operations are also shown Background levels measured at the beginning and Table 5 presents data on end of each total dust day are included in the table obtained at a distance of 5 to PRODUCED JM - 83 10 feet during each of the cutting and machining operations An 11 unusually high concentration of total dust during the hand lathe operation using sewer pipe was not compatible with the industrial hygienist's impression of total dustiness It was a single determination which cannot be explained Table 6 provides a general summary of the average exposures of operator and helper during the operations and integrated exposures during successive operations both for operator helper and in the area Tables 7A 7B and 7C show the distribution of time for successive operations which were performed during the collection of the integrated samples Representative fibers seen in microscopic examinations of the samples are shown in Figures 14 15 16 and 17 DISCUSSION Background levels As expected the background fiber concentrations which were recorded in the range of 0.01 to 0.02 fibers are near the limit of sensitivity for the volumes of air and the methods employed in this study They represent approximate values which indicate very low concentrations The numbers of fibers found are similar to those found | by EEH in previous studies Short term or peak exposures The most notable finding was the high concentration of airborne asbestos produced by cutting with the abrasive disc The peak personal samples for the operator and helper during this operation ranged from two to six times the current OSHA ceiling standard of 10 fibers and from four to twelve times the proposed ceiling standard of 5 fibers The helper's exposure was higher PRODUCED 12 explained by the fact that the rapidly rotating blade of the saw propelled the dust away from the tool and the operator and often this was directed toward the helper None of the other cutting and machining operations produced peak asbestos fiber concentrations which exceeded the most restrictive currently proposed ceiling concentration i.e. 5 fiber A pipe cutter Wheeler not included in the basic protocol was used for a single operation with sewer pipe and pressure pipe and yielded peak concentrations well below ceiling levels for both operator and helper Integrated personal exposures The integrated personal samples represented the exposures of operator and helper over a period of about half a work day During the first morning of the study sewer pipe was cut and machined using all tools except the abrasive disc The operator's integrated exposure over a period of about three hours was 0.09 fibers and that of the helper was 0.10 fibers It is obvious that such opera- tions could be continued through an hour working day without exceeding the present TWA of 2.0 fibers the proposed TWA of 0.5 fibers or even the stringent NIOSH recommendation of 0.1 fibers When essentially similar operations were carried out on pressure pipe for three hours on the second day the integrated sample for the operator was 0.75 fibers and that of the helper 0.17 fibers While such operations continued through an hour work day would comply with the current standard of 2 fibers modifications in work practices or other controls would be needed to ensure compliance with a standard requiring a TWA below 0.5 fibers When integrated samples were collected covering the periods when abrasive disc cutting was carried out on sewer and pressure pipe PRODUCED JM ~ PRODUCED - addition to chisel and rasp use during the same period the high dust concentrations produced by the abrasive disc led to integrated exposures for a hour period of 3.94 fibers for the operator and 7.07 fibers for the helper An operator carrying out such work for over 4 hours in an hour day would exceed the 2 fibers standard one hour of such activity in a day would exceed the 0.5 fibers proposed standard Similarly the helper would be in excess of the standard with 2-1 hours of such activity per day while slightly over half hour of work would cause him to exceed 0.5 fibers proposed standard All of the foregoing calcula- tions presuppose zero exposure during the remaining work day It is obvious from the foregoing that without modification ventilation or engineering control the abrasive disc cutter produces unacceptable concentrations of airborne asbestos Its use in cutting A pressure or sewer pipe would appear to be in violation of the current OSHA standard 29 CFR 1910.1001 iii which requires that all operated and operated tools which may produce or release asbestos fibers in excess of prescribed exposure limits shall be provided with local exhaust ventila- tion Integrated area samples These represented the possible exposure of a person working about feet from the cutting or machining operation one who might be in a trade different from that of the operator or his helper The fiber counts were in reasonable agreement with those of the personal integrated samples During sewer pipe operations they were extremely low and did not suggest any potential hazard For pressure pipe operations the three value of 0.44 fibers with no abrasive disc operations included was below the current TWA of 2 fibers even if continued for 8 hours It provided little margin of safety for an PRODUCED JM - 83 14 0.5 fiber standard however The area integrated sample during abrasive disc operation 4.90 fibers illustrated again the potential hazard of this operation since workers 15 feet away were subject to concentrations well in excess of the present occupational TWA Total dust concentrations Estimations were made of the concentrations of all airborne dust i.e. asbestos + cement + all other particulates during the various operations Because the composition of the dust was not determined in terms of free silica the potential hazard from the concentrations found cannot be evaluated The present OSHA standard for total dust even if regarded as inert is 15 mIf it contains crystalline silica quartz the permissible TWA is 30 mdivided by the % of silica + 2 For example if there were 10 quartz in the dust the permissible TWA would be 2.5 mReview of Table 5 shows several operations which produce concentrations of total dust which if long continued would be approaching the silica standard if the airborne quartz content were sufficiently high Housekeeping needs During the tests it was observed that considerable amounts of particulate waste and scrap material resulted from the cutting and machining operations Photographs illustrate this well In view of the asbestos content rigorous housekeeping would be necessary with proper storage and disposal of wastes PRODUCED 4 JM PRODUCED 15 CONCLUSIONS The use of the abrasive disc saw on A sewer pipe and pressure pipe produced high concentrations of airborne asbestos fibers The peak con- centrations in the breathing zone of the saw operator and his helper greatly exceeded the current OSHA standard for short or peak exposures Use of this tool without an exhaust ventilation system would appear to be a violation of current standards When this tool is used for an appreciable part of the work cycle it can also result in a weighted average TWA exposure for the work exceeding the current OSHA TWA limit of 2 fibers The exposures of the operator and helper during field cutting and machining operations using the manual lathe power lathe hole cutter and hammer chisel and rasp indicate peak exposures substantially less than the current OSHA ceiling of 10 fibers and the proposed ceiling of - 5 fibers Limited tests of the Pilot and the Wheeler cutting tools indicated that these also produced ceiling concentrations below current and proposed standards It is improbable that field personnel would be exposed throughout a working day to the intensive cutting and machining operations which were set up for the purpose of this study It is believed therefore that current and proposed occupational standards could be met with available equipment provided that the abrasive disc saw was eliminated or otherwise modified to reduce dust production to acceptable levels Until such elimination or modification saw operators and helpers should be required to wear respira- tors approved by NIOSH for protection against dust Good housekeeping and proper waste disposal would be an essential part of industrial hygiene measures needed during the cutting and PRODUCED A pipe JM - 83 16 ACKNOWLEDGEMENTS We wish to express our appreciation to Mr. J. R. Rawlins of the Pilot Manufacturing Company of Torrance California who made arrangements for a satisfactory location to carry out the study and also made appropriate tools available and instructed our staff on their use JM PRODUCED 9 . - B@ - 98 Table 1 Data Obtained in Preliminary Survey of Cutting and Machining Operations on A Sewer Pipe Operation Operation Sampled Abrasive disc Pilot pipe cutter Manual lathe Power lathe Operator integrated Area integrated Total dust Vol | Operator Integrated Total | Sample Duration Sampled No. Min Liters Fibers Air Fibers ML 3 Air mq 3 8 14.9 14.7 5 10 18.6 0.086 6 15 27.9 0.12 7 17 31.6 .05 4 57 113 4.3 2 58 109 2.9 101 58 105 16.8 * A special tool not included in main survey protocol Note Background sample taken for 49 minutes before pipe cutting began contained 0.017 fibers air . PRODUCED JM PRODUCED - PRODUCEDPRODUCED PRODUCED PRODUCED oO Table 2 Operator's Peak Exposures to Asbestos Tool used for Cutting or Machining Manual lathe Power lathe Power hole cutter Abrasive disc Chisel and rasp Wheeler PRODUCED cutt PRODUCED PRODUCED PRODUCED PRODUCED 1 Sample No 223 223 223 585811 357 357 17 36 38 40 233 233 233 C Sewer Pipe 2 Duration Min 3 Vol of Air Sampled Liters 11 21.9 11 21.9 9 17.9 13 25.6 14 27.9 14 27.9 15 21.9 15 29.8 14 27.6 454 8.0 454 9.9 454 8.0 14 27.9 11 21.9 9 17.9 , 4 Fibers per ML of Air 0.22 0.14 0.09 av 0.15 0.12 .06 .06 av 0.08 0.51 0.69 0.11 av 0.44 16.7 40.4 49.3 av 35.5 0.23 0.22 0.44 av..30 5 Sample No. 256 75 76 55 586 586 858 65 68 41 43 45 525 525 525 C Pressure Pipe 6 Duration Min ) 7 Vol of Air Sampled Liters 320 24.2 320 22.3 20 37.2 8 Fibers per ML of Air 0.72 0.64 0.17 av 0.51 275 37.2 0.34 275 31.6 0.09 275 27.9 0.57 : av 0.33 // 33.5 1.47 // 26.0 1.82 18 33.5 1.66 av 1.65 157 13.9 19.8 157 9.9 23.9 157 13.9 17.1 av 20.3 12 23.9 3.71 14 27.9 1.70 10 19.9 0.56 av 1.99 24 14 27.9 .06 70 4 7.4 0.85 Tool used for Cutting or Machining Manual lathe Power lathe Power hole cutter Abrasive disc Chisel and rasp Wheeler pipe cutter PRODUCED JM PRODUCED PRODUCED PRODUCED 83 PRODUCED PRODUCED PRODUCEDPROUCED 1 Sample No. 18 21 22 NAO NAO 10 12 14 16 333 333 39 223 28 33 Table 3 Helper's Peak Exposures To Asbestos A Sewer Pipe 2 Duration Min 3 Vol of Air Sampled Liters 220 23.9 220 23.9 220 19.9 4 Fibers per ML of Air 0.13 0.07 0.20 av 0.13 14 27.9 0.06 15 29.8 0.16 16 31.8 0.05 av 0.09 11 21.9 0.29 = 27.9 0.28 13 25.9 7 0.12 av 0.23 455 8.0 58.2 455 9.9 52.6 455 9.9 81.2 av 64.0 14 27.9 0.06 12 23.9 0.13 10 19.9 0.56 av 0.25 5 Sample No. 73 74 77 384 384 384 260 260 69 246 246 46 48 50 52 A Pressure Pipe 6 Duration Min ) 7 Vol of Air Sampled Liters 16 29.0 12 21.7 20 36.2 8 Fibers per ML of Air 0.55 0.07 0.04 av 0.22 18 32.6 0.55 18 32.6 0.39 14 25.3 0.75 . av 0.56 18 32.6 0.29 14 25.3 0.44 19 34.4 0.41 av 0.38 557 9.9 62.0 557 9.9 62.0 557 13.9 55.2 av 59.7 11 21.9 1.37 14 27.9 0.40 11 21.9 0.94 av 0.90 25 13 25.9 0.06 71 + 5 9.0 0.87 4 Tat o) o Operations Asbestos Levels in Operator Helper Operator Integrated Sample V^ l of Fibers Air per Dura- Sam- ML Sample tion pled of No. Min | Liters Air and Area Integrated Samples and in Helper Integrated Sample _ VOT of Fibers Air per Dura- Sam- ML Sample tion pled of No. Min | Liters Air Background Samples Area Integrated Sample Vol of Fibers Sample No. Air Dura- Sam- tion pled Min | Liters per ML of Air Feb. 8 a.m. Sewer 4 184 366 0.09 3 181 246 0.10 6 184 342 0.04 pipe power lathe hole cutter manual lathe chisel and rasp Feb. 8 p.m. Sewer 31 pipe chisel and rasp abrasive disc 112 221 3.94 25 113 154 7.07 32 115 214 4.90 Pressure pipe abrasive disc chisel and rasp Feb. 9 a.m. Pressure pipe 54 power lathe hole cutter manual lathe 182 248 0.75 99 _ 185 368 0.17 58 194 386 0.44 Background Feb. 8 a.m. | 97 Background 53 83 Feb. 8 p.m. PRODUCED PRODUCED Background 67 89 Feb. 9 JM PRODUCED Background 83 78 =! 130 Feb. 9 83 | 175 0.01 150 0.02 135 0.01 259 0.01 ee) a) Ta Total Dust From Cutting and Machining Operations 1 i : Tool used for Cutting or Machining Sample t- No. Manual lathe 104 A Sewer Pipe 2 Duration Min ) 3 Vol of Air Sampled Liters 37 67.0 Power lathe 102 53 95.9 Power hole cutter 103 42 76.0 Abrasive disc 107 19 34.4 Chisel and rasp 106 39 70.6 4 Total Dust3 mg ) 51.5 5 Sample No. 113 A Pressure Pipe 6 Duration Min ) 7 Vol of Air Sampled Liters 51 95.9 8 Total Dust3 mgm) 8.13 5.74 110 57 107 2.99 1.84 111 50 94.0 0.21 37.5 108 13 23.5 34.0 0.1 109 42 76.0 2.89 * This single value was much greater than would have been expected from the apparent dustiness of the operation - we have no explanation JM - 83 PRODUCED Oo Tat Summary of Data Obtained in Survey of A Pipe Cutting and Machining Operations Type of A Pipe Sewer pipe Tool In Operation Power lathe Hole cutter Operator's Exposure Fibers Air Inte- Peak | grated av.08 Helper's Exposure Fibers Air Inte- Peak } grated av.09 av.44 0.09 av.23 0.10 Manual lathe av av Wheeler cutter 0.06 0.06 Chisel and rasp av.30 J av.25 ) Abrasive disc | av35.5 av64.0 av64.0 Pressure pipe Abrasive disc | av20.3 3.94 av59.7 7.07 Chisel and rasp avl.99 | av.90 Power lathe | av.33 Hole cutter avl.65 Wheeler cutter 0.85 av.56 t 0.75 av.38 0.17 -ct 0.87 Manual lathe av.51 | av.22 Area Integrated Fibers cc Air 0.04 ) 4.90 t 0.44 Total Dust m mg 5.74 1.84 51.5 29.0 0.1 37.5 34.0 2.89 2.99 0.21 0.1 8.13 9 Background > Fibers CC Air 0.1 0.02 0.1 0.1 Fiber Fiber concentrations these Yests rasps are only approximate and indicate only that the background was extremely low JM PRODUCED JM - 83PRODUCE Table 7A Distribution of Time for Successive Operations During Integrated Samples -February 8 A.M.- Operator Integrated Sample Helper Integrated Sample Area Integrated Sample 184 minutes 181 minutes 184 minutes 0.09 fibers 0.10 fibers 0.04 fibers POWER LATHE sewer pipe Average of 3 peak samples * SET HOLE CUTTER SET sewer pipe SET U Average of 3 a peak samples SET MANUAL LATHE SET sewer pipe SET U Average of 3 P peak samples WHEELER E CUTTER sewer S pipe P Single -- Sample CHISEL & RASP sewer pipe Single Sample operator 0.08 cc helper 0.09 cc 52 min PRODUCED JM - 83 PRODUCED operator 0.44 cc helper 0.23 cc 5 42 min Er Er n operator 0.15 cc helper 0.13 cc 5 36 min E + n operator 0.15 cc operator 0.23 cc helper 0.13 cc 7-14 min8+ helper 0.06 0.06 cc 14 min TAL B Distribution of Time for Successive Operations During Integrated Samples -February 8 P.M.- Operator Integrated Sample Helper Integrated Sample Area Integrated Sample 112 minutes 113 minutes 115 minutes 0 3.94 fibers 7.07 fibers 4.90 fibers CHISEL & RASP sewer pipe Average of 2 peak samples ABRASIVE DISC SET SET sewer pipe SET SET U -- -- Average of 3 peak samples ABRASIVE DISC SET pressure pipe SET . SET U P Average of 3 peak samples operator 0.33 cc helper 0.35 cc operator 35.5 cc helper 64.0 cc operator 20.3 cc helper 59.7 cc CHISEL & RASP pressure pipe Average of 3 peak samples operator 1.99 cc : helper 0.90 cc penn 23 min r 17 min 7 21 min 4, 38 min | E 2 ES i i n C JM - 83 PRODUCED Le] Table 7C Distribution of Time for Successive Operations During Integrated Samples -February 9 A.M.- Operator Integrated Sample Helper Integrated Sample Area Integrated Sample 182 minutes 185 minutes 194 minutes 0.75 fibers 0.17 fibers 0.44 fibers POWER LATHE pressure pipe Average of 3 peak samples operator 0.33 cc helper 0.56 cc 58 min JM 83PRODUCE HOLE CUTTER SET pressure pipe ond ia Average of 3 peak samples operator 1.65 cc helper 0.38 cc SW SET SW uy E SET SET E Sa L| DC E}; DC R CUT EX CUT EX CUT EX CUT EX CUTEX CUT EX MANUAL LATHE pressure pipe Average of 3 peak samples operator 0.51 cc helper 0.22 cc single sample operator 0.85 cc helper 0.87 cc 51 min EC 5 5 9 L~ _ _ 4_9__m.in ny) E i i rs _ _ _ __3- a, S- one AMEwees 7a ae eh ta pS ny mee r Piet eh ee De ae me eb Coden ales FIGURE 1. Changing filters on personal samplers oo [ a i .t : 7 Fei ns TL Siete? te teres OS : | : . , A he acme stabendla 9 ele bl ee OMI VTT es erry A a olen oo) FIGURE 2 Conducting a typical test Area sampler ; for fiber concentrations on cart area sampler for total dust on drum PRODUCED JM - 83 nays spina Barf peeteess sa a wr TaD oc daa oatteetamee ; vane EOS get ect i rd de] ee| a a IMuHEr sacl ee ee ee FIGURE 4. Operating manual field lathe ABer Me mat ol Wye Ue aes OVE Wt des FIGURE 5 Powered field lathe FIGURE 6 Operating powered field lathe DUCED JM Sees DUCED Limit 4trr-ry eo Siaoy Pc ae Ste een uoreaL Ot a are + ie PE ee ae Fee aekAaictaT Fe Gs SIT We atten Le FIGURE 7. disc saw Operating abrasive eee ice Se ee Sey coe ee ate aad Tetva ant SOPts ae pedi rns en nd ina Sa STs) ay Fri se aos e ee | FIGURE 8. Power hole cutter 2 Fe. ene ee st re J A 3 rl ernest B atl ny te4 teehee eg Bian sth. fae, ie TTig RAL EF we ORIN ei -S, gt 4 eat A sed is NS FIGURE 9. Cutting pipe with hammer and chisel FIGURE 10. Rasping end of cut pipe FIGURE 11. Operating Wheeler pipe cutter beginning of cut FIGURE 12. Operating Wheeler pipe cutter end of cut oa) moe ey, et tans weooeksiit Bie Ay eS, Kio hes arene, ole Fiat fect Se pes Lee rs rode 4 mE OES TOL aA FIGURE 13. Pilot pipe cutter in operation T Mba My Pom 0 be bret Bi BAeye Y r Tae, 7. ome wae 2 Pika - Sl ane <p MELE tve ali} en ek Ser etl Eye Vane Nyt D vetincw f PAT ae on wit Se AT ea ea A Bad . tert, @ + ad 7 an eee 5 Be dire 2 Ph ie hae oe FIGURE 14 Chrysotile fiber bundle abrasive disc cutting of pressure pipe . ' RRS St eee erie hed FIGURE 15. Chrysotile pressure pipe fiber . power lathe PRODUCED operati PRODUCED PRODUCED 5 - a ane . . teal a4 iid tt | oe . e ee e ee ~ * 4 ._ ~ 4 s . + ge . nn ) wooo ef . . , 4 * 6 Ps . a ~~ nr s 9 ae . e . - a . t N . * . 4 ' FIGURE 16. Chrysotile fiber from area integrated sample pressure pipe aX a 2 3 af Sat hes ae say Wate 4 COA Wank te Ee' aD it In if ry ' FO DeGe oe. By Ooity ts ee ; }. POPS SONA a Re, ae ee 3. Atated Aas ERS x," Sains on aD $mxe 4 ss rye . a! f. ld Vig &): + OT $y" Hg ofa ssAr 9. * r2 1 PT Z a, -~ , SE oy sy.Bly es oe J : ple 6 > @. Aaa) ip tT sty Food FAA. =) ; ? ere! * a a nea oy, ot, a ne y- ; Rh f > A) ; Te y P* E Were , FS ay 3 oe Fy voeh) Moy adh Pa a wHte, Uztt REE~~ apyA?e RC H sehen Spela oe eee eh 1s A ow SUG Pad a ae Sota : ate : > . es TRESS a ee ay ae ea anes IE tow ode fi ; sad . ; wes Bot fi eo" Wit Tee Sy GN nd Vy! we Tt pee! . wm dhe , samples PRODUCED FIGURE 17. Field from helper's integrated types of pipe JM DUST EXPOSURES DURING THE CUTTING AND MACHINING OF ASBESTOS PIPE ADDITIONAL STUDIES Prepared for The A Pipe Producers Association 1600 Wilson Boulevard Suite 1308 Arlington Virginia 22209 Prepared by 1 Equitable Environmental Health Inc. 2020 Milvia Street Berkeley California 94704 December 15 1977 PRODUCED JM - 83 INTRODUCTION On March 16 1977 Equitable Environmental Health Inc. submitted a draft report to the C Pipe Producers Association which provided quantitative data on dust exposures during field operations in which sewer and pressure pipe were subjected to a number of typical field cutting and machining operations A final report on the above was completed in July 1977 and the results have been incorporated in recommendations for work practices in the handling of C pipe On July 12 1977 the Association requested additional studies of dust exposures involving other field operations These also included a quantitative estimation of potential exposures to quartz STUDY DESIGN & OPERATIONAL PLAN Determination of airborne asbestos fiber concentrations Airborne fiber concentrations were determined during the following operations 1 Unloading pressure pipe at work site 2 Laying pressure pipe in trench 3 Cutting operations a Cutting with manual saw pressure pipe b Cutting with snap cutting equipment pressure and sewer pipe c Cutting with abrasive disc wet pressure and sewer pipe 4 Machining operations a Cutting and machining with Doty tool pressure and sewer pipe b Use of tapering tool air duct pipe c Machining differing sizes of pressure pipe 4 8 and 16 with manual lathe PRODUCED JM - 83 5 Hole cutting a Use of drill and rasp 6 Tapping operations pressure and sewer pipe a Dry tap with Mueller J pressure and sewer pipe b Wet tap with Mueller 8-100 pressure and sewer pipe 7 Coupling removal i.e. removing pipe from line 3 Hammer and chisel pressure and sewer pipe It was not possible to set up a cutting operation with a cooled masonry radial arm saw or to remove pipe from a line with a sabre saw Determination of quartz Samples of total and respirable dust integrated over a number of operations were collected and analyzed for quartz METHODS Each operation when performed in the field is of short duration compared to an hour workday Consequently the OSHA ceiling standard intended to cover short periods of relatively intense exposure would be more likely to be exceeded than would be the hour time weighted average TWA standard A sampling period of 15 minutes is regarded as suitable for determining peak or ceiling exposures while at the same time obtaining an adequate sample for analysis Most of the cutting and machining operations took less than 15 minutes some required less than a minute In these cases it was decided to perform the same operation several times during the sampling period The times will be indicated PRODUCED J-M 83 C For each operation except as otherwise indicated three replicate short breathing zone samples were collected for the operator and for his helper Simultaneously longer personal samples were collected on the operator and his helper over a period of two to three hours and covering more than one type of field operation Also integrated area samples were collected at a site approximately 15 feet away and downwind if there was air movement Other area samplers located 1 to 5 feet from the field operations were used to collect total dust and respirable dust by weight Samples used for total dust were changed every 4 hours those for respirable dust every 8 hours Three such samples were used to determine quartz content Background samples were collected before and after each day's operations Air samples were collected on millimeter diameter 0.8 micron pore size Millipore cellulose ester membrane filters in accordance with OSHA and NIOSH recommendations They were all open with the cover of the filter cassette removed samples Personal sampling pumps were operated at flow rates ranging from 1.6 to 2 liters per minute The pumps were calibrated by the soap bubble technique before use Both area and personal breathing samples were taken In the latter the pump was attached to the worker's belt and the filter clipped to his lapel near his face Figure 1 in the July 1977 Report illustrates worker and helper with samplers in place Figure 2 in the same report shows the test site with area samplers located near the operation Asbestos fiber counts were done by an experienced and accredited technician following OSHA and NIOSH methods The same technician was employed who had worked in the earlier C pipe study Briefly the analytic procedure consisted of rendering the filter transparent with a high viscosity solution of membrane filter material in a mixture of diethyl oxalate and dimethyl phthalate The | PRODUCED JM - 83 asbestos fibers which lie on the surface of the filter are counted with a phase contrast microscope at 400x magnification The count area was delineated with a Porton graticule Only fibers exceeding 5 micrometers in length were counted The laboratory examined 100 microscopic fields or counted 100 fibers whichever came first Fiber identification depended upon a particle having an aspect ratio of at least 3 and having approximately parallel sides No attempt was made to identify individual fibers mineralogically in view of the known chryso- tile and crocidolite content of the material under examination Fibers which appeared not to be asbestos were noted when seen No estimate was made of the number of fibers less than 5 micrometers in length nor the number in the electron microscope range Samples were stored for such studies if they should appear desirable at some later time It should be emphasized that estimates of fiber concentrations below 5 fibers are subject to increasing lack of precision and that those below 0.5 fibers have a wide margin of error often being based on the observation of very few fibers For example in a 15 minute sample one fiber observed per 100 fields is equivalent to 0.05-0.07 fibers which is the approximate lower limit of detection for this sampling period Although counts are reported as calculated to two decimal places small differences in counts in these ranges should not be overinterpreted A zero count merely means that the count was too low for any fibers to be seen in 100 fields and is consistent with a very low concentration of airborne fibers Samples for gravimetric dust concentrations were weighed in the laboratory of EEH Quartz analyses were performed by George Clayton Associates Performance of study As in the previous study all of the operations were carried out on the premises of Pilot Mfg Co. a manufacturer of C pipe equip- PRODUCED JM - 83 ment in Torrance California except for unloading and placing in trench which were done on a job site in Alameda County California A workman experienced in the use of the tools performed the individual operations with a helper provided by EEH EEH independently purchased the necessary sewer pipe and pressure pipe for cutting and machining from a local supply house All pipe was 8 inches in diameter unless otherwise specified As before no engineering dust control or local ventilation was utilized except when this was built into the equipment being used as was true for some of the tests using the Doty tool and when wetting was added to the use of the abrasive disc GENERAL DESCRIPTION OF OPERATIONS The except for unloading and laying operationwass carried out during the period October 1-15 1977. Mrs. Barbara Kawahara was the industrial hygienist and she was assisted by Mr. Jerry Flanery of the EEH staff The weather during the period was in general overcast with clearing skies in midmorning Temperatures during the test periods ranged from 16-21 C 60 to 70 F There was relatively little breeze in the mornings with gusty breezes up to 5 or 10 mph in the afternoons Housekeeping In order to minimize contamination of the test area with dust and scrap commercial vacuum cleaner was brought in to maintain a clean work area Unfortunately it was ineffective because of a worn gasket and blew visible dust from its exhaust It was necessary to wet down the area periodi- cally and sweep up loose scraps and dust PRODUCEDPRODUCED . JM PRODUCED DETAILED DESCRIPTION OF OPERATIONS AND SAMPLING TIMES 1 Unloading This was done with a palletized load using a fork Figures 1 & 2 The pipe was arranged on 4 foot pallets 8 per bed plus miscellaneous short lengths and couplings It took approximately 15 minutes to unload a bed truck Up until three or four years ago it had been customary for the pipes to be loaded individually by being rolled down skids To unload a bed truck in this manner took about 2 hours For this operation a single minute personal sample was collected on the fork operator while pressure pipe was being unloaded 2 Laying pipe in trench The operation which was studied involved trenching laying pipe and filling simultaneously Figures 3-5 One worker remained in the trench at the forward end of the pipe The second worker worked both topside and in the trench He attached a clamp to the pipe lubricated the end then got into the trench to help guide it into place for coupling Two 1-1 hour samples were collected by personal samplers placed on the two workers 3a Cutting with manual saw Figure 6 Due to the inability to pro- cure an appropriate bow saw blade a standard hack saw was used with a hardened steel blade The blade was changed before each run Sampling times ranged from 12 to 15 minutes during which time it was possible to cut about half way through the 8 pressure pipe This tool was not used with sewer pipe 3b Cutting with snap cutting equipment For this portion of the study a Wheeler Chain Cutter Model 2990 was used It has cutting discs mounted on a chain which is wrapped around the pipe Figures 7 & 8 The action is controlled hydraulically by an operator who can stand as far as 10 to 15 feet from the pipe being cut The set between cuts took about two minutes Pumping to build up pressure required about 15 seconds Five to 8 cuts were PRODUCED JM PRODUCED made during each sampling period the average ranged from 14 to 16 minutes for sewer pipe and 13 to 16 minutes for pressure pipe 3c Cutting with abrasive disc wet A gasoline abrasive disc saw Stihl with a inch carbide blade was used Figures 9-11 Four 1/4 inch diameter plastic hoses were mounted on the housing of the saw two on a side as shown in Figure 10 in accordance with TAC Ltd. blueprints provided by AACPP These were connected to a manifold to which was attached a hose deliver- ing water at a rate of 2 to 3 gallons per minute A preliminary run was with a saw that proved to be underpowered requiring 18 minutes for two cuts With a more powerful saw 1-1 hp motor a cut could be completed in approximately 1-1 minutes Two to 3 cuts were taken per sample the sampling periods having been reduced to 3 to 6 minutes after an initial test sampling period of 17 minutes had led to overloading of the filter with dust This test was run on pressure pipe only 4a Cutting and machining with Doty tool The Doty tool Figures 12-15 has two operating stations one for cutting and one for machining It has three operating modes dry dry with shroud and wet with shroud The last two modifications were to reduce dust generation and dispersion During tests of the tool in the dry mode with shroud and wet mode with shroud a olastic bag was placed over the blade to reduce dust Figure 13 All cuts were made wet because a diamond blade is used A fine spray of water is directed across the blade during operations About half minute is required for a single cut Machining was done dry with no shroud dry with shroud and wet with shroud Again for the wet mode a fine spray was used Machining took about 1 minute Most of the sampling time involved moving pipe Use of the Doty tool is essentially a one operation a helper being needed only to move large pipes - PRODUCED JM PRODUCED C< Two to four cuts and two to four machine operations were completed per sample cycle Sampling time was reduced from approximately 15 minutes to approximately 10 minutes for the dry mode because it raised visible dust It was observed that on the dry mode with shroud tests visible dust was released during bevelling It is suggested that a gasket or some other seal would be helpful in preventing this Sampling times recorded for the use of the Doty tool wet for pressure pipe were 10 to 11 minutes and for sewer pipe 9 to 15 minutes For use of Doty tool dry with shroud with pressure pipe the sampling times were 13 to 17 minutes and for the sewer pipe 12 to 14 minutes For the use wet with shroud 13 to 18 minute sampling times were employed for pressure pipe 12 to 16 minutes for sewer pipe 4b Use of tapering tool with A air duct pipe Test of the tapering tool Figure 16 was limited to inch / air duct pipe which has a thick- ness of approximately 1/4 inch Its operating principle is similar to that of the manual field lathe Sampling times ranged from 14 to 22 minutes which included one cut and one tapering operation 4c Machining with manual lathe on differing sizes of pipe In order to determine whether or not the size of pipe had a detectable influence on dust production a manual lathing operation was carried out on pressure pipe of inch inch and inch diameter Figures 17 & 18 For the inch pipe there was one cut and one machining for each sample set requiring about 3 minutes cut requiring about 3 minutes second set about 4 minutes and machining about 8 minutes the sampling times for the three replications being 13 to 21 minutes For inch pipe again one cut and one machining was carried out for each sample the set requiring about 3-1 minutes the cut about 2 minutes second set requiring about 2 minutes and machining about 10 minutes The PRODUCED JM - 83 replicate samples ranged from 19 to 21 minutes For the inch pipe there was one partial cut per sample each sample included some machining and some cutting The set required 3 minutes the cutting about 12 minutes the second set about 2 minutes and machining about 20 minutes 5a Hole cutting with drill and rasp For this operation Figures 19-21 inch holes were drilled on the pipe in a circular pattern of about 6 inches in diameter after which the central portion was knocked out with a hammer and the rough edges smoothed with a rasp The operator used the exhaust air from the drill to blow off excess dust Figure 22 Although the practice of blowing asbestos dust is not recommended it was used in this instance to duplicate worst possible work practices or tool performance characteristics The drilling took a long time to complete so that only about 3/4 of the circumference was finished in one sampling period Therefore some samples did not include the hammer and file steps Sampling times for pressure pipe ranged from 16 to 24 minutes for sewer pipe from 17 to 21 minutes 6a Tapping operations with Mueller J tool Figure 23 The Mueller J tool is used for tapping pipes not pressurized the trench top or in the trench In the latter case a hole is dug to expose the pipe but for the test a pipe which had not been installed was employed A manually operated tool was used which cuts a hole and threads it Two inch holes were cut per sampling period Sampling periods for pressure pipe were 14 to 19 minutes 6b Tapping operations with Mueller 100 tool The Mueller 8-100 tool Figure 24 is used for tapping pipes already in line usually those under pressure It has a pressure chamber to keep the water from flowing out during the tests At the recommendation of the local Mueller representative this chamber was filled with water to simulate wet conditions during the tests There were two holes cut per sampling period the sampling times were 14 to 19 minutes PRODUCED JM PRODUCED c 10 7a Removal of coupling with hammer and chisel For pressure pipe a hammer and chisel were used to make a longitudinal trough in the coupling Figure 25 When this had been completed a crowbar was used to separate the coupling For pressure pipe this took about 22 minutes one coupling being removed per sample With sewer pipe the same procedure took about 10 minutes per sample It was soon found that by placing the chisel midline on the coupling one or two sharp hits would split the coupling a procedure which took only 1030 seconds per coupling For sewer pipe 3 to 4 couplings were cut per sample the major portion of the sampling time being during moving pipe and securing it to supports Cc Order of tests Availability of equipment and efficient use of pipe and manpower led to the actual tests being carried out in an order different from that summarized in the foregoing outline The order of testing was as follows Monday October 10 1977 Cutting with snap cutting equipment pressure pipe 3b Cutting with hack saw pressure pipe 3a Machining with manual Machining with manual lathe lathe inch pressure inch pressure pipe pipe 5c 5c Machining with manual lathe inch pressure pipe 5c Hole cutting with drill and rasp pressure pipe 5a Tuesday October 11 1977 Coupling removal hammer and chisel pressure pipe 7a Tap with Mueller J pressure pipe 6a Tap with Mueller 100 pressure pipe 6b Tap with Mueller 100 sewer pipe 6b Tap with Mueller J sewer pipe 6a Use of tapering tool on / air duct 4b Cutting with snap cutting equipment sewer pipe 3b PRODUCED =. JM PRODUCED C 11 Wednesday October 12 1977 Cutting with hack saw sewer pipe 3a Hole cutting with drill and rasp sewer pipe 5a Cutting with abrasive disc wet pressure pipe 3c Removal of coupling with hammer and chisel sewer pipe 7a Thursday October 14 1977 Cutting and machining with Doty tool dry pressure pipe 4a Cutting and machining with Doty tool dry shroud pressure pipe 4a Cutting and machining with Doty tool wet shroud pressure pipe 4a Cutting Cutting and machining with and machining with Doty Doty tool tool dry dry sewer pipe 4a shroud sewer pipe 4a Cutting and machining with Doty tool wet shroud sewer pipe 4a Friday October 15 1977 Cutting Cutting with with abrasive abrasive disc disc wet wet pressure pipe 3c sewer pipe 3c Testing at Bay Area site Unloading pipe at site 1 Laying pipe in trench 2 Integrated term samples were taken as shown in the tables of results RESULTS fe The short or peak exposures during the operations studied are shown in Tables 1-6 Integrated personal samples analyzed for asbestos fiber concentrations are shown in Table 7. Table 8 summarizes integrated area samples which were studied for asbestos fiber concentrations total dust respirable dust and quartz content as shown None of the respirable samples i.e. samples collected with a filter cyclone to remove large respirable PRODUCED PRODUCED PRODUCED PRODUCED 12 ra particles showed a measurable amount of dust sufficient for quartz analysis Table 9 summarizes background levels DISCUSSION a f Background levels as in the previous study were at the limit of sensitivity for the volumes of air and the methods employed Ranging from below the level of detection to 0.07 fibers they indicate low concentrations similar to those found in many earlier studies Short or peak exposures All operations that were studied produced airborne concentrations far below the current short standard of 10 fibers or the proposed short standard of 5 fibers except for some operations using the Doty tool and operations using the abrasive disc saw Some operations using the Doty tool particularly when used dry although below the permissible concentrations for short exposures would if continued over an hour day exceed the permissible time weighted average of 2.0 fibers It is of course unlikely that use would be continuous The abrasive disc saw even when used wet produced unacceptably high concentrations of airborne fibers averages ranging from 10 to 65 fibers It is believed that use of water to cut down dust with this machine could be improved upon Because the hose was attached to the housing and the latter could be rotated with respect to the handle of the saw the water was not invar- iably directed to the cutting area It was observed also that dust was generated within the pipe during the cutting and would exhaust from the ends of the pipe and this could not be reduced by water applied to the outside of the pipe Also although the outside of the pipe was thoroughly wet as the cut proceeded the disc would generate heat and dry an area on either side of the blade It is 13 recommended that water be applied through a fine spray spread over a wide field so that nozzle placement would not be critical We do not feel that the wet- cutting modification employed in our tests was designed to cover all conditions of tool positioning and usage therefore the possibility of effective dust re- duction with a proper method of wetting should not be ruled out The quartz analyses which employed ray diffraction methods which would be used by OSHA and most industrial hygienists showed more than % quartz in - each of the total dust samples that were analyzed specifically 5.7 9.0 and 15.4 The threshold limit value i.e. the permissible weighted average for total containing dust is 30 mg . % quartz + 3 Therefore in the three samples measured the range of TWA's would have been from 1.6 to 2.6 m No concentrations this high were reported in the integrated samples collected during the current studies The high levels reported in the previous survey were peak not integrated samples SUMMARY AND CONCLUSIONS > Summary and Conclusions Determinations were made of airborne asbestos fiber concentrations total dust and respirable dust concentrations and crystalline silica concentrations during a number of field operations used in the cutting machining and installation of asbestos pipe These were designed to supplement studies reported in 1977 which showed that potential asbestos exposures during most operations were well below current occupational health standards but that one tool the abrasive disc saw resulted in unacceptably high concentrations of fibers In addition short term concentrations of total dust suggested that if crystalline silica content was high permissible levels might be exceeded The additional studies included a test of the abrasive disc saw with an attachment for wetting the area being cut tests in which concentrations of crystalline silica were determined as well as tests of several operations not previously studied Specifically the following operations were included 1 unloading of pressure pipe at the work site 2 laying pressure pipe in a trench 3 cutting pressure pipe with a manual saw cutting pressure and sewer pipe with snap cutting equipment cutting pressure and sewer pipe with an abrasive disc wet 4 cutting and machining pressure and sewer pipe with a Doty tool with various modifications wet and dry use of tapering tool on air duct pipe machining differing sizes of pressure pipe 4- 8- and inch with a manual lathe 5 hole cutting pressure and sewer pipe with drill and rasp 6 dry tapping pressure and sewer pipe with a Mueller J tool wet tapping pressure and sewer pipe with a Mueller 100 tool and 7 removing coupling from pressure and sewer pipe with hammer and chisel All operations that were studied produced airborne concentrations of asbestos far below the current short term OSHA standard of 10 fibers >5um in length and none would have exceeded a weighted average of 2 ml or even 0.5 ml if continued for a full working day except for 1 the abrasive disc saw and 2 some operations with the Doty tool when used dry The abrasive disc even when used wet resulted in fiber concentrations ranging from 10 to 65 ml It was concluded that better design of the wetting method was essential The con- centrations observed with the Doty tool dry were below short standards and would have exceeded the time weighted average of 2 ml only in the unlikely event of being used continuously over a full work day Integrated total dust samples contained 5.7 9.0 and 15.4 quartz This meant that permissible weighted averages would have ranged from 1.6 to 2.6 cubic meter The only integrated sample that exceeded the current OSHA standard was that collected during use of the abrasive disc saw These additional studies confirm that asbestos pipe can be cut machined and installed without exceeding current and proposed OSHA standards but that use of proper tools and adherance to recommended work practices are essential 14 Table 1 Airborne Fiber Concentrations During Unloading of Pressure Pipe and Laying Pipe in Trench Operation Unloading pipe Laying pipe Laying pipe Background Duration min 2 2 32 Fibers m 0.03 % 0 0.02 0 bd Below detectable limit y 4 ... Table 2 Airborne Fiber Concentrations During Cutting Operations with Hack Saw Snap Cutting and Use of Abrasive Disc Het A Pressure Pipe Operator Duration min Fibers ml Helper Duration min Fibers ml A Sewer Pipe Operator Duration min Fibers ml Helper Duration min Fibers m Hack saw 15 15 12 Mean Snap cutting 545 14 15 Mean Abrasive disc 17 Wet 6 3 4 Mean 0.06 0 0 0.01 0 0 0.07 0.02 30.4 60.1 25.8 109.1 65.0 552 0.05 552 0.21 552 0.07 0.11 16 0 20 0 20 0 0 1545 30.9 1545 54 1545 46 1545 47.5 49.2 18 0.11 17 0.23 15 0.19 0.18 15 0 15 0.07 16 0.06 0.04 556 95.3 556 19.8 556 11.3 42.1 16 0 655 0.17 15 0.06 0.08 15 0.05 225 0.06 225 0.05 0.05 556 14.4 556 8.4 556 7.8 10.2 Filter overloaded not used in calculating mean J- M PRODUCED 83 PRODUCED 15 Table 3 Airborne Fiber Concentrations During Machining Operations Operation Operation Cutting & Machining with Doty Tool Dry Mean Dry Shroud Mean Wet Shroud Mean A Pressure Pipe Operator Duration min Fibers m Helper Duration min Fibers ml 11 3.75 22 1.62 22 0.32 1.9 16 0.3 588 1.56 588 2.02 1.29 18 0.18 14 0.29 16 0.15 0.21 = 1.37 29 2.15 10 3.18 2.23 17 0.19 13 0.24 14 0.11 0.18 285 0.47 285 0.18 285 0.15 0.27 PRODUCED PRODUCED PRODUCED PRODUCED PRODUCED PRODUCED A Sewer Pipe Operator Duration min Fibers m Helper Duration min Fibers ml 15 1.13 10 8.91 509 1.44 3.83 NO2 0.23 NO2 0.25 NO2 0.20 0.23 14 0.17 12 0.14 16 0.30 0.20 15 0.32 10 0.48 9 0.08 0.29 583 0 583 0.06 583 0.20 0.09 14 0 12 0 15 0.11 0.04 4 16 Table 4 Effect of Size of Pipe Upon Airborne Fiber Concentrations During Machining With Manual Lathe Operation Operation Manual lathe inch pipe Mean inch pipe Mean { inch pipe Mean Operator Duration min Fibers ml 18 OOOO 19 OOOO 20 OOOO OOOO 22 0.04 19 0 21 0.05 0.03 18 0 15 0 19 0.05 0.02 Helper Duration min Fibers ml 18 0 19 0 21 0.05 0.02 222 0.07 20 0.24 21 0.07 0.13 18 0.05 15 0.07 20 0.05 0.06 18 Table 5 Airborne Fiber Concentrations During Use of Tapering Tool with C Air Duct Pipe Tapering tool with air duct pipe Mean Operator Duration min Fibers ml 14 0.28 23 0.13 14 0.14 0.18 Helper Duration min Fibers ml 14 0.06 22 0 15 0 0.02 PRODUCED PRODUC8E3D Table 6 Airborne Fiber Concentrations During Hole Cutting Tapping Operations and Coupling Removal Operation Hole Cutting with Drill and Rasp Mean Pressure Pipe Operator Helper Duration min Fibers ml Duration min Fibers ml Sewer Pipe Operator Helper Duration min Fibers ml Duration min Fibers ml 296 0.18 296 0.14 16 0.33 0.22 287 0.08 287 0.11 17 0 0.06 255 0.28 255 0.17 17 0.23 0.23 21 0.25 17 0.15 18 oO * 0.13 Dry Tap with Mueller J Mean 179 0.06 179 0.09 19 0 0.05 15 0.06 17 0.10 19 0.05 0.07 18 0.07 16 0.12 15 0 0.06 15 0.05 16 0 15 0.05 0.03 Wet Tap with Mueller 100 Mean PRODUCED PRODUCED PJRMOBDUCED Removal PRODUCED and Chisel PRODUCED PRODUCED Mean PRODUCED 19 0.17 228 0 14 0.17 0.11 22 0.29 265 0.30 15 0.32 0.30 * Plus Plus One 1 Glass Fiber 19 0.14 18 0.20 14 0.06 0.13 24 0.11 15 0.12 16 0.06 0.10 14 0.17 18 0 15 0 0.06 12 0.12 12 0.07 9 0 0.06 14 0 16 0 19 i] 0 13 0.12 13 0 9 0.18 0.10 19 c 20 Table 7 Integrated Personal Samples Covering Successive Operations Operation Snap cutting pressure Hack saw pressure Manual field lathe 8 Manual field lathe Manual field lathe Hole drilling 4 16 Coupling hammer and chisel Mueller J pressure Mueller 100 pressure Mueller 100 sewer ueller ueller sewer Tapering tool duct Cutting cutting Cutting hack saw sewer Hole drilling sewer Abrasive disc wet pressure Coupling removal sewer Doty Doty Doty Doty Doty Doty tool tool tool tool tool tool dry dry wet dry dry wet pressure shroud pressure shroud pressure sewer shroud sewer shroud sewer Abrasive disc wet pressure Abrasive disc wet sewer Average Peak Counts Integrated Sample Counts Operator Helper Fibers Fibers ml ml Operator Helper Duration min Fibers Duration ml min Fibers ml 0.02 0.01 0.03 0 0.11 0.13 0 0.02 | 0.02 0.06 } 0.22 0.06 ] \ 0.3 0.05 0.1 0.07 ] 0.11 0.06 0.13 0.0 0.06 0.03 | 0.18 0.02 } 0.04 0.05 J 0.18 0.08 : f 0.23 4.30 0.13 0.79 0.06 0.10 } 1.90 1.29 0.21 3.83 0.23 0.20 2.23 0.18 0.27 0.29 0.09 0.05 i 65.02 42.1 49.15 10.22 250 0.02 250 0.11 228 0.08 229 0.02 275 0.05 279 0.04 , 226 0.06 226 0.02 264 132 0.34 0.05 263 178 0.14 0.03 237 0.35 237 0.26 69 5.84 74 5.80 Motor underpowered only one test tried T PRODUCED JM - 83 21 Table 8 Integrated Area Samples Covering Successive Operations Area Samples Asbestos Fibers Total Dust Operations Snap cutting pressure pipe Hack saw cutting pressure pipe Manual field lathe 8 pressure Manual field lathe Manual field lathe Hole drilling 4 pressure 16 pressure Duration min . Fibers ml Duration min k 251 0.57 252 \ 234 0.04 235 m mg 0.33 0.31 Coupling removal hammer and chisel Dry tap Mueller J pressure Wet tap Mueller 100 pressure Dry tap Mueller 100 sewer Dry tap Mueller J Tapering tool with duct pipe Snap cutting sewer sewerpipe C air pipe + 286 ~~ r 225 0.02 0.02 290 0.34 233 0.00 Hack saw cutting sewer pipe Hole drilling sewer pipe Wet abrasive disc pressure pipe Coupling removal sewer pipe | 272 j } 17 0.08 0.02 272 0.12 191 0.79 Quartz Content }- 11.1 | 5.7 | 22 Table 8 Cont'd Integrated Area Samples Covering Successive Operations Operations Cutting and machining Doty dry pressure Cutting and machining dry shroud pressure Cutting and machining wet shroud pressure Cutting and machining wet shroud pressure Cutting and machining dry sewer Cutting and machining dry shroud sewer Cutting and machining wet shroud pressure Abrasive disc wet pressure pipe Abrasive disc wet pipe sewer Area Samples Asbestos Fibers Total Dust Duration min Fibers m1 Duration min m mg Quartz Content 238 0.03 240 0.20 Not | Deter- * mined 80 3.83 82 1.66 b 15.4 333 Table 9 Airborne Fiber Concentrations Before and After Operations Background Levels Date and Time October 10 1977 am October 10 1977 pm October 11 1977 am October 11 1977 pm October 12 1977 am October 12 1977 pm October 14 1977 am October 14 1977 pm October 15 1977 am October 15 1977 pm Duration min QU QU ON ON UN UN 129 ON UN UN Fibers m1 * 0.02 0.07 0.0 0.01 0 0.002 0 0.01 0 Below detectable limit tine Sor ctae oT a ag meth ities eet, ge aa" Ri > any Sp iS Re . ae Ont ah. : Pe te -, TT me n'y x" Nierein nae Rat irtd tae te f Ss 2 teen ae e : S 4 ae eeake Ud BRENT OR ry C ot SaaL t TLep SAere eeAde wt, lag ae E 3s aoe ees yar > ed p Liens eee 4 ene, A TA etry Naan 3 : =a, va erga : - Ts pa ee hie pane SG eH o Stal ve, a rg RON See aegis SARE > rere te Sees, Sef aie CHE SMA eee PAROS CEES FIGURE 1. Unloading inch pressure pipe at work site Rod ea % TA Saetsetel 7 - , eS ae . a iaedt " Eaed elton SM ge 5 ACLS oats o a4 ie ioS] FIGURE 2. Transporting inch pressure pipe from truck to trench PRODUCEDPRODUCED PRODUCED . PRODUCED - PRODUCED FIGURE 3. Placing pipe at side of trench ee arse ie RIT a AOS igus, erent ee G Reg Soo Sues FIGURE 5. Positioning in trench wut shes Per ay? ry tres! 3 hed te : 3 Rn Os te Vee, ern Py 'OS Tab ae ee * FIGURE 6. Cutting with hack saw y 4 s ee roth es > iE eae, a7.) aay NG Wiel cae os FIGURE 7. Snap cutting tool eee ect we S : |e 72, iba, a, he f c Fae i] v9 Ts. we weTe HF n tae he 3 eS - hy . ae " " wy zs I s. Ly, by eo 5 peal PRODUCED PRODUCED FIGURE 8. Hydraulic control of snap cutting equipment PRODUCED PRODUCED 83 FIGURE 9. Abrasive wet cutting disc saw with hoses for a ent 4 ater REE Eh rT witats e AOL ve ere... * tis Times A eoing: Al eres, Be FIGURE 10. JPMPRROODDUCUECE Abrasive disc saw with hoses for wet cutting PRODUCE PRODUCE PRODUCE PRODUCE S59 pea a aalt gees BRA, tend S) meget * fA . ae Bat aed5: pny = aavsAU, . . el ati a FIGURE 11. Use of abrasive disc saw wet are tera TV ve pat ; Pod 4 for Ua y FIGURE 12. Ooty tool cutting FIGURE 13. Doty tool cutting with bag around blade | | = - qT PRODUCED FIGURE 14. Doty tool machining with shroud PRODUCED PRODUCED FIGURE 15. shroud Doty tool machining dry without 20S xy ws ave b omy * itn wig, Pile Zane Sid kay pa aad 1a FIGURE 16. Tapering A air duct PRODUCED PRODUCED {f FIGURE 17. Use of manual pressure pipe lathe on inch C . FIGURE 18. Use of manual lathe on inch pressure pipe FIGURE 19. Cutting hole with drill he Fe sa)gen 5a Sy Sah ne ded 95 FIGURE 20. Knocking central portion with hammer VE: 62) Ad RR ^' ay aatiOL we wy pa ~ et f fhe ene oat" aes aw FIGURE 21. Smoothing rough edges with rasp why 4 a FIGURE 22. Blowing dust with exhaust FIGURE 23. Use of Mueller J tool cn oe At * a segue Tas ete RE PO i te 24 > bat A oe ENG iw Rk. ye Pr jin a" Se ie io = F, Rae ee . Ne a! 12 as P.Wir FIGURE 24. Mueller 100 tool 7 eis FIGURE 25. Removal of coupling with chisel