Document LK6RBbreKD6414avME9wnZRrb
The Second Quarter Safety & Housekeeping Inspection for the HCN Complex was conducted by the Inspection Team of George Pappas, Jake Linkey, Roger Mears, and Rick Sharp on April 23, 1985.
Safety
1. Interlock bypass system - have formal procedure that is working.
2. Operations personnel feel they are "safer than ever" now due to High Hazardous Material information being communicated.
3. Three (3) vessels are overdue on AVIP. However, extensions have been granted by the plant manager. Realistic scheduling of tank inspections should prevent most justified delays.
4. Plectrons - operating O.K.
5. Breathing air station east of 25V2-1 and west of 25V1-2 needs a connector.
6. Dismantling crew gone on break and left Acetylene and Oxygen bottles with tioses pressured-up.
7. Emergency generator room has possible asbestos exposed. Check out and if asbestos correct and mark lines.
8. Hoses on top structure (Dept. 25) in rack need inspection. Housekeeping
1. Oil change materials left under 29Z301 - needs a storage place..
2. Area around chlorinator - generally cluttered - needs clean-up.
3. Tarp and extension cord laying on west end of HCN storage.
4. Second floor of Dept. 25 - cluttered with boards and pieces of metal.
5. Runway between 19 Pure and 25 (TBA) badly cluttered.
6. Concrete pad (Dept. 25) - cluttered with individual gloves, gasket material, some paper.
Please respond in writing to Jim McPhail and Doug Barfoot by May 17, 1985.
RVS/ps
R. V. Sharp SC 000288
LAM001485