Document LK61Onwo2QB4N838mRVdOEekQ
iconocoj
Interoffice Communication
To From Date Subject
R. D. Gamblin
C. R. Hiller
May 7, 1981
WEEKLY PRODUCTION REPORT WEEK NO. 17
ABERDEEN - WEEK ENDING 5/5/81
Resin A & BC Plasticizer A & BC Dry Blend Compound A & BC
Safety
Production MM Lbs. - 7 Days - 4/29/81 thru 5/5/81
Last 7 Days
May Month to Date
Year to Date
Apr i 1 Previous Month
5.55 39 .82
92
3.76 .20
.55 .58
108.30
4.73 16.06
17-99
26.27 1.08
3.75 4.35
r
One first aid injury was recorded for the reporting period.
Cumulative Injury Performance
April
Year to Date
First Aid Medical Lost Time
,8 15
12 00
Resin Unit (A & BC Grade)
Production
Forecast MM Lbs., - April - May
Last 7 Days, M Lbs./C.D.
793 Budget
25.0 25.8
Last 7 Days, % of Budget
95
Forecast 4/30
26.5
Current Rate, % of Budget
98
Actual 4/30
26.3
Forecast 5/7
27-5
Vinyl production averaged 793 M pounds per day during the week. The major item affecting production was a major area power outage which occurred 4/30/81 and lasted 16 minutes. A number of reactors had to be killed in the polymerization cycle and one reactor agitator seal failed internally. No VCM releases occurred.
Other production penalties for the week included: long reactor dump times associated with 2 coarse batches, maintenance on 741 gearbox, and replacement of a charge water valve on D-500 reactor.
Compound Unit (Customer Grade)
Production
Forecast MM Lbs. - April - May
Last 7 Days, M Lbs./C.D. Last 7 Days, % of Budget
144 Budget
4.7 4.7
91
Forecast 4/30
4.3
Actual 4/30
4.5
Forecast 5/7
4.6
DTH 000051751
R. D. Gamblin Weekly Production Report - Aberdeen May 7, 1981 Page 2
Compound - (continued)
Line I operated 7 days averaging 65 M pounds per day. Line III operated 7 days averaging 80 M pounds per day. Line III rates were affected by quality control on two Western Electric compounds.
Plasticizer operated 5 days averaging 78 M pounds per day.
Dry Blend Unit
Production
Forecast MM Lbs. - April - May
Last 7 Days, M Lbs./C.D. Last 7 Days, % of Budget
118 Budget
2.2 2.5
141
Forecast 4/30
3-8
Actual 4/30
3-7
Forecast 5/7
4.6
Dry Blend operated 6 days averaging 138 M pounds per day. Production rates were affected by production on a new product RP-100 BW and by 90171 quality problems.
c. 7?. rrt/A
C. R. Mi 1ler Acting Manager
cjt
RDG'S OFFICE TO COPY: HRF, ELK, SKS
ABERDEEN COPIES: CLM, PEM, JRM, JEB, RGG, JEM, RAF, RDJ, TBD, MPB
DTH 000051752