ENGINEERING SPECIFICATION Texas Division
PLAINTIFF'S EXHIBIT
DOYV-2369
OXYGEN 0 to 100 Psig Ambient Temperature
46-760
Revised 9-20-71 Page 1 of 4
1" and Under il"
P-28B P-27B
AS1M A-106, Grade B, extra-strong seamless steel pipe.
asTM A-106, Grade B, standard weight seamless steeli pipe.
2" and Over
P-3B
ASIM A-53 or API-5L, Grade B, Schedule 40, seamless* steel pipe, open hearth or electric furnace steel*'1
Fittings
E = 90 Ell, L = 45 Ell, T = Tee, R = Reducer
I-*" and Under
ELTR-64ft 3000-lb. forged steel socket welding fittings, ASIM A-l8l, Grade II.
C-i4b
3000-lb. forged steel socket welding couplings,
ASIM A-181, Grade II.
u-10
3000-lb. socket welding FS union, moly steel seat, Rockwood Type 603B.
l^" and Over
ELTR-15 Standard weight seamless steel welding fittings, ASIM A-234, Grade WPA or WPB, ASA BI6.9.
Flanges
F-3-RF
150-lb. raised face blind falnge, ASIM A-l8l, Grade I or II, ASA BI6.5.
F-24-RF
150-lb. raised face welding neck flange, ASIM A-l8l, Grade I or II, ASA B16.5, bore to match welding fittings.
Branch Connections BC-l8W
For welded piping, branch lines shall be welded in without reinforcement regardless of size combination. For threaded branch connection, use Thredolet or 3000-lb. full coupling welded to header. For socket welding branch connections, use Sockolet or socket welding coupling welded to header.
Gaskets
G-4 Standard flat ring gasket, l/l6 inch thick asbestos Garlock 900 or equal.
Joint Compound
JC-15
Teflon tape l/2 inch by 3 tail thickness, Scotch Brand 547-
Flange Bolts
B-3 ASIM A-193, Grade B-7, alloy steel bolt studs with ASIM A-194, Grade 2H, heavy hex nuts. (Note: For
temperature range from -50F to +1000F inclusive.)
89*101015
ST0404683
ENGINEERING SPECIFICATION Texas Division
R 46-760 Revised 4-15-69 Page 2 of 4
\
Valves !" and Under
& l" and 2
2" and Over
1^" and Under
V-474 (Gate)
800-11). socket veld, OS/Y, solid wedge gate valve, carbon steel body, 13 chrome alloy steel trim with hard-faced seat rings.
Crane Hancock Jenkins OIC Pacific
3605XU 950W 8800W 1117-W 596-2
RP-C Smith Vogt Worcester
F-57-DE 800SW sw-12111-18 600-EF
V-617 (Gate)
150-lb. flanged, OS/Y, gate valve, carbon steel body, 131 chrome alloy steel trim with hard-faced seats.
Crane Hancock Jenkins OIC
3510XU
950-F-15 8815 1100-w
Pacific RP-C Smith
3150-2 F-158-DE 815
V-51
(Gate)
150-lb. flanged, OS/Y, wedge gate valve, carbon steel body, 13 chrome alloy steel trim.
Chapman Crane Jenkins Lunk OIC
150 47X 1009-C 175132 1502-C
Pacific Powell RP-C Stockhma Walworth
150-1
1503 15013 15-0F-1 5202-F-AA
V-472 (Globe)
600-lb. socket welding, OS/Y, flocontrol type globe valve, carbon steel body, chrome stainless trim.
Hancock
5525W
V-595 (Globe)
600-lb. socket welding, OS/Y, globe valve, carbon steel body, 13 chrome alloy steel trim, with hardfaced seat.
Crane Hancock Jenkins
3652XW 5500-W 8g8ow
OIC RP-C Smith
1717-W F-813E G-80-1
V-36
150-lb. f 'langed, OS/Y, globe valve. carbon steel
(Globe) body, 13 chrome alloy steel trim.
Chapman Crane Jenkins Lunk OIC
153-A 11+3X 1040-C 1755B2 1532-c
Pacific Powell RP-C Stockham WaIvorth
160-1
1531-P 1511D 15-GPF-l 5275-F-AA
21Qi*0f*e99
ST0404684
ENGINEERING SPECIFICATION TexaB Division
T46-760 8-18-67
Page 3 of 4
Valves (Continued)
1" and Under
V-594 (Check)
600-lb. socket welding, horizontal lift, check valve, carbon steel body, 13 chrome alloy steel trim, bolted cap.
Crane Jenkins Pacific
3682X 8c80W 3682-I
RP-C Smith Vogt
F-91-DE C80R SW 6083-90
I5-" and Over
V-46 (Check)
150-lb. flanged, horizontal swing, check valve, carbon steel body, 13 chrome alloy steel trim, bolted cap.
Chapman Crane Jenkins Tiiink
QIC
151-A 1^7X 1025-c 1759B2 1572-C
Pacific Powell RP-C Stockham Walworth
180-1
1561-A 153LD 15-SF-l 53^1-F-aa
Notes:
Every precaution must be taken to keep piping system free of all hydrocarbons (grease, oil, etc.). The following precautions shall be taken:
1. All pipe shall be degreased in pickling vat using a caustic solution as recommended by Dow. Pipe shall then be rinsed thoroughly in clean, hot water. Immediately after cleaning, the pipe ends shall be temporarily capped or plugged to prevent recontaiglnation before final assembly. Each length of pipe shall be marked, using a color code or other means of identification. No pipe or piece of pipe shall be used in the piping system which does not have this identi fication mark.
2. After leaving pickling vat, it shall be the contractor's responsibility to keep the internal and external surfaces of this pipe free of all hydrocarbons or other foreign matter. Open ends must be plugged at the end of each work day.
3. Workmen shall wear clean gloves when handling this pipe.
If. Carbon tetrachloride shall be used as a lubricant on dies in cutting threads. All threads shall be wiped free of lubricant after removing dies.
5. Ends of pipe shall be thoroughly reamed to remove burrs.
6. Cyl-Seal as specified in Engr. Spec. 4-8-855 shall be used as a pipe joint compound. It shall be applied on the male thread only, starting from the second thread from the end of the pipe.
ST0404685
ENGINEERING SPECIFICATION Texas Division
Tl+6-760
8-18-67 Page ^ of 4
i (Continued)
Pipe (Continued)
7. After piping has "been installed and tested, carton tetrachloride shall he circulated through the piping system to insure against any hydrocarbons remaining in the piping. The contractor shall furnish the necessary labor and material to connect up the pump, flush the piping, and drain the system.
Valves:
1. Valves which have been especially processed for oxygen service and sealed by the manufacturer shall be kept sealed until actual instal lation in the line.
2. Valves which have not been especially processed and sealed for oxygen service shall be processed in the field as follows:
a. All valves shall be dismantled and degreased, using perchlorethylene or other suitable solvent. This work shall be done on the job site. Each valve will be inspected by designated Dow personnel before being reassembled.
b. Valve stem packing shall be removed during this operation and replaced with Johns-Manville MX-3681 or equal. Packing shall be free of all hydrocarbons. Spool form or cut ring packing may be used. Valves shall be handled in the same manner as pipe; clean gloves, etc.
c. Ends of valve shall be plugged after reassembly to eliminate possibility of any foreign matter entering valve.
d. Nameplate shall be stamped with the symbol O2 in the presence of inspector upon completion of reassembly. Valves shall he color coded, same as pipe.
Fittings:
1. All fittings shall he degreased and thoroughly cleaned inside and out, using perchlorethylene or other suitable solvent. This work shall be done on the job site immediately prior to installation to insure that all fittings are degreased and clean when installed. Fittings shall he color coded, same as pipe, and shall be handled with clean gloves.