Document LJwGxnmdZrL3Qw3bkxaayy49g

GeorgiaFfecific intracompany memo to Mr. J. R. Hurd from Ed Sing subject Asbestos Monitoring location location date PLAINTIFF'S EXHIBIT Portland Acme July 16, 1974 Jim, enclosed is an intracompany memo from Mr. Howard Schutte, joint system quality supervisor at the Acme plant. In comparing the self-check program vs. the Industrial Hygienist program, I feel we would be wise to proceed with the self-check program. Niosh in Cincinnati, Ohio offers a training program that would fit our needs completely. Niosh only offers two, two-day courses this year, September 3-5, November 25-27 and no courses through June, 1975. So you can see we do not have much time. Please advise. EDS/om cc: Mr. T. W. Richards - Tigard E. D. S. GtOt SGP 0007705 Buffalo Testing Laboratories INCORPORATED CHEMISTS - METALLURGISTS 902 Kcnmore Ave. BIOLOGISTS - ENGINEERS Buffalo. N. Y. - 14216 Established 1927 Phone: (716) 873-2302 Report No. 66,073 Order No. July 18, 1974 Attn; Mr. Schifferle Georgia-Pacific Corporation Sloomingdale Road Akron, New York 14001 Gentlemen: Following are the results of tests made on the samples which you submitted to us on July 16th, 1974. Ten (10) prepared cellulose niters for asbestos determination were sent to Georqia-Paicific on July 11th, 1974. ihey were labeled A-1 to A-10 respectively " Samples Submitted; Ten (10) filters were submitted on July 16th, 1974 and were identified as follows: Sample No. Time (Total) Flow Rate Object: A-1 A-2 A-3 A-4 A-5 A-6 A-7 A-8 A-9 A-10 230 min. 210 min. 215 min. 240 min. 445 min. 440 min. 250 min. 230 min. 2 liters per minu te 2 liters per minu te 2 liters per minu te 2 liters per minu te 2 liters per minu te 2 liters per minu te 2 liters per minute 2 liters per minute To determine the amount of asbestos fibers over five (5) microns in length per milliliter of air. '' BUFFALO TESTING LABORATORIES INCORPORATED .... THE CUIRT TO WHOM TMCT ARE AftORtSSCO AMO THEIR COMMUNICATION TO ANT OTHERS OR THE USE Of BiircAi n TPCTING LABORATORIES INC etivt ou* >o nm arrrotai. our vetters ano reports arrvt olt to t*c samrie teeteo BUFFALO T"T ............. .. ................. ............... the re.OATS ..0 LETTER, and the hahe Of THE BUFFALO "EVnNc'LABORATOmEsl'HC o* it seal, or ihsighia. are hot to >e used ohde. ant crcuhst.hces >h ao.ertis.ho to the central ru.lic. Limitation of Liability - Oue diligence was used In rendering the professional opinion, but if it should fall In some regard, the amount of liability will be limited to an amount equal to the fee. SGP 0007706 Buffalo Testing Laboratories INCORPORATED Buffalo, N. Y. - 14216 -2- Method of Analyses: Done in accordance with "Tentative Method of Test for Evaluating Airborne Asbestos Dust" October, 1972, U.S. Dept, of H.E.W., Public Health Service. Results: The results obtained by microscopically counting the fibers in randomly selected fields at known are have shown that each of the filters contained: Sample No. A-l A-2 A-3 A-4 A-5 A-6 A-7 A-8 A-9 A-10 Fibers/ml .0000 .0095 .0208 .0068 .0032 .0098 .0083 .0000 .0438 .0095 In the opinion of our laboratory these are too few fibers for good statistics since the concentration normally encountered is industrial hygiene practice is in the vicinity of five (5) fibers per milliliter. WAK/mek Very truly yours, BUFFALO TESTING LABORATORIES, INC. o WAYN# A. KVETKOSKY ,x, 'j lI J' SGP 0007707 July 23, 1974 Mr. C. W. Wheeler, Jr. Platennkcrs Inc. Post Office Bos 10705 Birmingham, Alabama 35202 Dear Mr. Wheeler: . . We axe returning an approved copy of the five-gallon pail art work which incorporates an asbestoB warning clause. We are not signing and returning the art work on the onegallon pail as it is an obsolete design and completely wrong for our use. I suggest that you contact Standard Container to see if you cannot locate the current pail design and modify the art to incorporate the warning in the appropriate place on this smaller pail. Thank you very much. Very truly yours. ELA:nh Enclosure cc: Mr. Robert Spinney Edvard L. Aasen Purchasing Manager Gypsum Division t* fi* '-Ti- SGP 0007708 GeorgiaFfeicific intracompany memo to Mr. R. E. Morse from C. W. Lehnert ^ - location location date Portland Tigard July 19, 1974 cc: P Mr. A. T. Niebergall - Portland Mr. G. S. Nelson - Portland Mr. J. J. Davis - Portland Mr. S. K. Jackson - Portland Mr. G. F. Baitinger - Portland Mr. T. R. Godfrey - Portland Mr. D. C. Corkill - Portland*^"*"^ PRIVILEGED INFORMATIC i HAS BEEN REDACTED FROM THIS DC "UMENT. SEE PRIVILEGE LOG FOR DESCRIPTION OF REDACTED INFORMATION. The products which no longer contain asbestos include the dry powder products at our Acme plant, including our entire texture line. We are also offering a non-asbestos Bedding, Topping, and Triple Duty from Chicago and, to some extent, from Marietta. Our Ready Mix joint compound still does contain asbestos, as well as the dry powder casein products manufactured at Akron and Chicago and Triple Duty manufactured at Marietta, Chicago, and Akron. We are currently in the process of developing other non-asbestos joint compound formulas and will keep you apprised of our progress. CWL'.elz * RECEIVED BV JUL 22 1974 GYPSUtyl DIVISION SGP 0007709 tsi a. GPBW ACME GEO PAC PTLD A t136 AM ED SING ACME FHM JIM HURD 7-29-7A SOBJECI ASBESTOS DUST MONITORING DO NOTHING ON DUST MONITORING UNTIL YOU HEAR FRM ME LATER ON THIS wK. IF U HU BEEN IN TOUCH WITH UNION CARBIDE PLS ADU GA OR END M PBW ACME r SGP 0007710 GeorgiaF&cific intracompany memo to See below from G. E. Wilson subiecl JOINT CEMENT PRODUCT PLANS location location date Portland July 31, To: Messrs. J. D. Rauch, Akron Plant M. A. Palmowski, Chgo D. C. Corkill, Portlan 0. E. Burch, Portland E. B. Hollingsworth, Wilm Del Gyp T. W. Richards, Tigard Lab C. W. Lehnert, Tigard Lab Bill Gettel, Tigard Lab George Fowler, Marietta Plant Ed Aasen, Portland In order to bring everyone up to date with our plans for dry powder mater ial and to get everyone moving in the same direction, I would like to out line our course of action. As soon as possible we will discontinue to manufacture casein based materials at Chicago. We'should not order any more material that is used only in casein based materials. We should use up our present raw materials as much as possible and then transfer the remaining rr" materials and bags to Akron. Concurrent with the discontinuance of casein production, Chicago should get raw materials to begin producing the asbestos free vinyl products that have been developed. They will supply their own market as well as produce mater ial for Akron to supply their market as required. We should expedite the modified casein formula changeover at Akron as rapid ly as possible. When Chicago stops manufacturing the casein based materials, Akron will supply Chicago with their needs for part truckload shipments. If there are any questions regarding the program, please let me know. GEW/mf G.E.W. GP 0? SGP 0007711 Georgia F^cific ^ intracompany memo to See below from G. E. Wilson subiect JOINT CEMENT PRODUCT PLANS location location date t Portland July 31, 1974 To: Messrs. J. D. Rauch, Akron Plant M. A. Palmowski, Chgo D. C. Corkill, Portlan 0. E. Burch, Portland E. B. Hollingsworth, Wilm Del Gyp T. W. Richards, Tigard Lab C. W. Lehnert, Tigard Lab Bill Gettel, Tigard Lab George Fowler, Marietta Plant Ed Aasen, Portland In order to bring everyone up to date with our plans for dry powder mater ial and to get everyone moving in the same direction, I would like to out line our course of action. As soon as possible we will discontinue to manufacture casein based materials at Chicago. We should not order any more material that is used only in casein based materials. We should use up our nresent raw materials as much as possible and then transfer the remaining re-' materials and bags to Akron. Concurrent with the discontinuance of casein production, Chicago should get raw materials to begin producing the asbestos free vinyl products that have been developed. They will supply their own market as well as produce mater ial for Akron to supply their market as required. We should expedite the modified casein formula changeover at Akron as rapid ly as possible. When Chicago stops manufacturing the casein based materials, Akron will supply Chicago with their needs for part truckload shipments. If there are any questions regarding the program, please let me know. GEW/mf G.E.W. of :} SGP 0007712 August 5, 1974 Mr. Forrest Hamilton Chase Bag Company P. 0. Box 10192 Portland, Oregon 97210 Dear Forrest: This is to confirm my telephone conversation with you Thursday, concerning bags prdered for our Marietta, Georgia plant on purchase orders ~ 'nd G-03117. The 50 pound P-1071 Triple Duty Bags are to be supplied without any asbestos warning imprinted on the back of the bag. As explained, asbestos will be used as a raw material in one marketing area and will be taken out of our formula in a different marketing area. In each case it will be the plant's responsibility to apply an appropriate gummed label to indicate the nature of the contents. On order G-08117 we do wish to have the P-2053 Vinyl Topping and P-2052 Vinyl Bedding Bags shippdd to Marietta as originally indicated on this order. In my conversation Friday with Bosco, we increased the quantity of Vinyl Topping Bags on this order from 40,000 to 50,000 and cut back the number of Vinyl Bedding Bags from 20,000 to 10,000. At the completion of Marietta's custom filling operation we intend to send any bags left over to the Chicago plant in the final car of finished goods. Thank you very much. Very truly yours Edward L. Aasen Purchasing Manager Gypsum Division ELA/mb cc: Messrs. R. V. Favero - Marietta M. A. Palmowski - Chicago T. W. Richards - Tigard E. B. Hollingsworth - Wilmington SGP 0007713 12 July 1974 , - -i< A complete negative and plate making service to the lithographic trade Kr. Edward L. Aasin Purchasing Mgr. .Gypsum Division S00 S. W. 5th Avenue Portland, Oregon 97204 Dear Ur. Aasin: Enclosed you will find 2 B/W proofs of each of the Georgia-Pacific Redi-Mix Joint Compound: 1-1 gal. Round (with ears) Standard Cont. EO 1147-2 2-5 gal. Pail Standard Cont. EO 1145-2 Please sign the approval form attached to the back of one of each .of these and send to Mr. Robert Spinney, Standard Container Company, P. 0. Box 336, Homerville, Georgia 31634. s ,'V With best wishes, I am \ r\ }T&ly/v6uxs, lUA^OTjRAVI^G/PLA^EMAffiSRB', INC. Charles W. Wheeler, Jr. CWW/bc C. C. Ur Robert Spinney Affiliated Company -- ALABAMA ENGRAVING COMPANY... Photoengrvln| SGP 0007714 GPBW VILM GP BU AKRON 7-12-74 TO: MR. J.R.HURD - PORTLAND FR: 0. D. RAUCH - AKRON WE HAVE SCHEDULED OUR JOINT SYSTEM PLANT ASBESTOS PERSONAL MONITORING TESTS FOR JULY 15* 1974. THIS WILL MEEU 6 MONTH REQUIREMENT FOR OS HA. CC: MR. H.W* PEELE - WILMINGTON GA OR END GPBW WILM ! GEO PAC PTLD C GP BW AKRON 7-12-74 TO* MR. J.R.HURD - PORTLAND FRt J. D. RAUCH - AKRON WE HAVE SCHEDULED OUR JOINT SYSTEM PLANT ASBESTOS PERSONAL MONITORING TESTS FOR JULY 15# 1974. THIS WILL MEEtf 6 MONTH REQUIREMENT FOR OS HA. CCl MR. H.W. PEELE - WILMINGTON GA OR END GEO PAC PTLD C 1 SGP 0007715 GPBW WILM GP BW AKRON 7-12-74 TO: MR. J.R.HURD - PORTLAND FR: o. D. RAUCH - AKRON WE hAVE SCHEDULED OUR JOINT SYSTEM PLANT ASBESTOS PERSONAL MONITORING TESTS FOR JULY 15# 1974* THIS WILL MEED 6 MONTH REQUIREMENT FOR OS HA. CC: MR* H.W. PEELE - WILMINGTON GA OR END GPBW WILM GEO PAC PTLD C GP BV AKRON 7-12-74 TOt MR. J.R.HURD - PORTLAND FRI J. D. RAUCH - AKRON WE HAVE SCHEDULED OUR JOINT SYSTEM PLANT ASBESTOS PERSONAL MONITORING TESTS FOR JULY 15# 1974* THIS WILL UEEjT6 MONTH REQUIREMENT FOR 05 HA. CC: MR. H.W. PEELE - WILMINGTON GA OR END GEO PAC PTLD C SGP 0007716 Ge'cfgis-Fteciiic intracompany memo -sTo-Y^- io Mr. Ed Sing from Howard Schutte subject Asbestos Monitoring cc: K. W. Brown - Acme location location date Acme Acme July 11, 1974 Ed, here is a comparison of costs for the monitoring of asbestos dust here at Acme. Column one covers the cost of a self-monitoring program and column two lists the costs for outside inspectors (Industrial Hygienist)to check asbestos levels. The costs for the Industrial Hygienist were taken from Jim Hurd's correspondence dated March 19, 1974. Note: Totals for both do not include travel e>penses. Self-Check Program Industrial Hygienist Schooling Equipment * Lab analysis Total Cost $ 200 (1 person) 290 60 $ 550 Initial Cost Lab Analysis $600 200 to 300 $800 or $900 * The equipment consists of a complete dust sampling kit but does not include the microscope which would cost over $3,000. Therefore we sould have to send our samples to be analyzed at-a cost of $15/sample. The $60 "lab analysis" cost is figured in for this purpose. As you know, Ed, the Tigard Lab is working on the elimination of asbestos from all formulas. Presently, however, they are focusing their attention on the limestone using plants. This seems to indicate that we will be using asbestos for at least another year. This means we will need to-monitor asbestos levels at least once more and,who knows, the elimination of asbestos could be a long way off. In conclusion I would like to express rny belief that we would be wise to go ahead on our own and pursue the self-checking program for the following reasons: 1) Elimination of asbestos is still a ways off. 2) The cost of the entire self-check program is less than one visit from a Industrial Hygienist. Remember, if more checks are necessary the cost is doubled, tripled, etc., in the case of calling in outside Hygienists but the self-checking program is a one time, one cost deal except for the relatively small lab analysis cost. 3) We can better control the testing procedures and make sure a fair * test is taken. GP 09 SGP 0007717 Asbestos Monitoring -2- July 11, 1974 4) Even if asbestos is eliminated the sampling equipment can be used for monitoring mica, talc or even gypsum contents in the air. Also we should realize the replacement for asbestos will probably be a potentially dangerous substance also. 5) Other plants may also require periodic testing and we may be able to recover the entire cost and show a profit, too! 6) All schooling and equipment is NIOSH approved and since these are the people we will be working with I feel our results would be more readily accepted if we follow their program. HAS/om H. A. S. SGP 0007718