I. Facility Information
A. Facility Name:Laurel Hill Construction
FT
B. Facility Location: 2038 Lunenburg Road
Lancaster, MA 01523
C. Facility Contacts: Ron Koivu
Harbor Classic Homes
rek64@yahoo.com
James Rheault, Site Engineer
jrheault@whitmanbingham.com
D. NPDES ID No (s).: MAR10036S
II. Background Information
A. Date(s) of inspection: September 17, 2021
B. Weather Conditions: Clear, dry
C. US EPA Representative(s):
Andrew Spejewski
D. State / Local Representative(s):
David Koonce, Town of Lancaster Conservation Agent
Thomas Christopher, Chair, Town of Lancaster Conservation Commission
ED_019088A_00019778-00001
E. Federally Enforceable Requirements Covered During the Inspection: NPDES
General Permit for Discharges from Construction Activities (2017 Construction
General Permit)
F. Previous Enforcement Actions: No federal actions known
III. Type and Purpose of Inspection
Evaluation of compliance with the 2017 Construction General Permit
IV. Facility Description
The site is a construction project (originally planned as easidential a development) lying
west of Lunenburg Road. The site slopes down to the
towards the road, and slightly
down to the north along the road, as well as slightly down to the south at the extreme
southern end of the site.
A road enters from Lunenburg Road about 20 yards from the southern end of the site.
The road goes west uphill, then turns north to the northwest end of the site.
In the southeast corner (south of the road entrance) are large stockpiles and a large, deep,
basin. A permanent basin is planned for the northeast corner of the site, but at the time
of the inspection it was not completed.
At the time of the inspection, the entire area adjacent to Lunenburg road has been cleared
and at least partially graded, as well as the road (and a short width to either side of the
road). The road was graded, but still dirt and some gravel (catchbasins were in place).
V. Inspection
Mr. had contacted the site owner
the
Mr. Rheault.
before the inspection, and arranged to meet at
Mr. Spejewski, Mr. Koonce and Mr. Christopher arrived at the site about 11:00 AM.
There, they met Mr. Rheault.
A. Opening Conference
Mr. Spejewski presented his credentials, provided a copy of the Small Business
Information Sheet and explained the purpose of the inspection.
Mr. Rheault explained that he had just been hired as the engineer for the site. He said
that at the moment the only plans for the site were to stabilize everything for the winter.
According to Mr. Koonce the site had been a mix of forest and open field before the
project.
2
ED_019088A_00019778-00002
B. Records Review
Mr. Spejewski asked about a SWPPP for the site. Mr. Rheault said that he did not at the
moment have a copy of the existing SWPPP, and that he would be preparing a new one
for the site. Mr. Rheault said he would get a copy of the current SWPPP and email it to
Mr. Spejewski. [Note: On September 17, Mr. Rheault emailed a stormwater plan to Mr.
Spejewski; see copy in the inspection file].
C. Facility Tour
The group toured the site.
The site entrance, between Lunenburg Road and the site road, has a layer of gravel, with
no sediment accumulation.
The site
road was dirt and some Catin. were in place, with opening at the
grade of the road in most cases, and filter gravel each catchbasin.
The road had (fairly new - looking) crushed stone checkdams at several place. there was
sediment accumulated behind each dam. There was some erosion of the road, into very
small gullies; it was not clear whether the erosion pre - dated the checkdams.
Along the central part of the road, after it turned to the north, e north side of the road
was a slope up away from the road which had en cleared: for 10 to 20 yards. Past the
clearing was well - established grass and weeds. The slope had clear signs of erosion with
small gullies forming.
The road sloped slightly up as it went north to roughly the midpoint of the road, then
sloped slightly down to the north from there. Checkdams were in place on the northern
slope down, too.
A basin was in place east of the road, car the midpoint. The basin was formed of
crushed - stone walls, on the downhi //. of the road. Turbid water remained the basin.
In the woods below the basin, disturbances in leaves and debris appeared to indicate past
flow through the area, but little or no sediment deposits were observed.
The road ended at the north in a widened turn - around. The area around the road had been
cleared and graded.ished grass was in place up to the edge of the unpaved road.
The south edge of the site was next to a pre - existing housing development; the road for
the pre - existing development was slightly raised above the level of the site (at least at the
western half of the south border). Flow from the south part of the road and nearby areas
led around a stockpile to a flat area and then appeared to flow east towards the large basin
in the southeast.
The large basin in the southeast had a small amount of standing water. It was surrounded
by various stockpiles, none stabilized or otherwise protected, and flat areas of bare dirt.
3
ED_019088A_00019778-00003
No signs of overflow from the basin could be seen. The bare dirt walls of the basin did
not show significant erosion (possibly indicating a fairly recent installation).
North of the site road, next to Lunenburg road, a flow channel had been constructed from
the road leading to a moderately large basin. Like the basin to the southwest, it had some
standing water, and the bare earth walls appeared fairly new.
North of that basin was the outfall from site drainage. Mr. Rheault stated that this was
the planned location of the site's permanent stormwater basin. Mr. Rheault said that the
excavator had begun construction, but after hitting clay, stopped. Mr. Koonce said that
the site had discharged turbid stormwater from this point during a storm in the summer.
At the time of the inspection, the concrete outfall led to a small 20 basin formed of crushed
stone walls. Outside of the basin was an area with well - established P.grass and two rows of
wood - mulch berms
D. Closing Conference
Mr. Spejewski noted the lack of stabilization over much of the site. Mr. Rheault said that
stabilizing the site and re - designing the permanent basin were his only priorities at this
point. Mr. Spejewski thanked Mr. Rheault for his time and left the site.
Picture List:
IMG 2476.JPGeast to Lunenburg road over site entrance
IMG 2477.JPGacing south from north of site entrance
IMG 2478.JPGFacing north to stockpile, from near site entrance
IMG 2479.JPGCatchbasin, on slope east of entrance.
IMG 2480.JPGCheckdam on road, up hill from entrance.
IMG 2481.JPGFacing northwest along west side of road
IMG 2482.JPGCheckdam in central (north - south) part of road
IMG 2483.JPGBasin south of central part of road
IMG 2484.JPGWoods belo basin south of road
IMG 2485.JPGFacing north to end of road
IMG 2486.JPGFacing south, drainage at southwest corner of site
IMG 2487.JPGSouth edge of site (west end)
IMG 2488.JPGacing north over basin at southeast of site
IMG 2489.JPGFacing northeast over basin at southeast of site
IMG 2490.JPGFacing north over temporary basin in center - east
IMG 2491.JPGFacing north of site of permanent basin
* END *
Unless otherwise noted, this report describes conditions at the facility / property as
observed by EPA inspector(s), and / or through records provided to and / or information
reported to EPA inspector(s) by facility representatives and as understood by the
inspector(s). This report may not capture all operations or activities ongoing at the time
of the inspection. This report does not make final determinations on potential areas of
4 ++
ED_019088A_00019778-00004
concern. Nothing in this report affects EPA's authorities under federal statutes and
regulations to pursue further investigation or action.