Document LJoOeEzzK1ekRnYLNmmnpdOEQ

UNITED STATESUNITED STATES ENVIRONMENTAL PROTECTION AGENCY *REGION 1 ENVIRONMENTAL AGENCY5 POST OFFICEB OSSTQOUN,A RMAE ,0 21S0U9-I3T9E12 100 PROTECTION Drafted Date:24 Sept 2021 Finalized Date: Subj:Inspection Report Clean Water Act - National Pollutant Discharge Elimination System (" NPDES ") Laurel Hill Construction From:Andrew Spejewski, Enforcement Officer Thru: To:File I. Facility Information A. Facility Name:Laurel Hill Construction FT B. Facility Location: 2038 Lunenburg Road Lancaster, MA 01523 C. Facility Contacts: Ron Koivu Harbor Classic Homes rek64@yahoo.com James Rheault, Site Engineer jrheault@whitmanbingham.com D. NPDES ID No (s).: MAR10036S II. Background Information A. Date(s) of inspection: September 17, 2021 B. Weather Conditions: Clear, dry C. US EPA Representative(s): Andrew Spejewski D. State / Local Representative(s): David Koonce, Town of Lancaster Conservation Agent Thomas Christopher, Chair, Town of Lancaster Conservation Commission ED_019088A_00019778-00001 E. Federally Enforceable Requirements Covered During the Inspection: NPDES General Permit for Discharges from Construction Activities (2017 Construction General Permit) F. Previous Enforcement Actions: No federal actions known III. Type and Purpose of Inspection Evaluation of compliance with the 2017 Construction General Permit IV. Facility Description The site is a construction project (originally planned as easidential a development) lying west of Lunenburg Road. The site slopes down to the towards the road, and slightly down to the north along the road, as well as slightly down to the south at the extreme southern end of the site. A road enters from Lunenburg Road about 20 yards from the southern end of the site. The road goes west uphill, then turns north to the northwest end of the site. In the southeast corner (south of the road entrance) are large stockpiles and a large, deep, basin. A permanent basin is planned for the northeast corner of the site, but at the time of the inspection it was not completed. At the time of the inspection, the entire area adjacent to Lunenburg road has been cleared and at least partially graded, as well as the road (and a short width to either side of the road). The road was graded, but still dirt and some gravel (catchbasins were in place). V. Inspection Mr. had contacted the site owner the Mr. Rheault. before the inspection, and arranged to meet at Mr. Spejewski, Mr. Koonce and Mr. Christopher arrived at the site about 11:00 AM. There, they met Mr. Rheault. A. Opening Conference Mr. Spejewski presented his credentials, provided a copy of the Small Business Information Sheet and explained the purpose of the inspection. Mr. Rheault explained that he had just been hired as the engineer for the site. He said that at the moment the only plans for the site were to stabilize everything for the winter. According to Mr. Koonce the site had been a mix of forest and open field before the project. 2 ED_019088A_00019778-00002 B. Records Review Mr. Spejewski asked about a SWPPP for the site. Mr. Rheault said that he did not at the moment have a copy of the existing SWPPP, and that he would be preparing a new one for the site. Mr. Rheault said he would get a copy of the current SWPPP and email it to Mr. Spejewski. [Note: On September 17, Mr. Rheault emailed a stormwater plan to Mr. Spejewski; see copy in the inspection file]. C. Facility Tour The group toured the site. The site entrance, between Lunenburg Road and the site road, has a layer of gravel, with no sediment accumulation. The site road was dirt and some Catin. were in place, with opening at the grade of the road in most cases, and filter gravel each catchbasin. The road had (fairly new - looking) crushed stone checkdams at several place. there was sediment accumulated behind each dam. There was some erosion of the road, into very small gullies; it was not clear whether the erosion pre - dated the checkdams. Along the central part of the road, after it turned to the north, e north side of the road was a slope up away from the road which had en cleared: for 10 to 20 yards. Past the clearing was well - established grass and weeds. The slope had clear signs of erosion with small gullies forming. The road sloped slightly up as it went north to roughly the midpoint of the road, then sloped slightly down to the north from there. Checkdams were in place on the northern slope down, too. A basin was in place east of the road, car the midpoint. The basin was formed of crushed - stone walls, on the downhi //. of the road. Turbid water remained the basin. In the woods below the basin, disturbances in leaves and debris appeared to indicate past flow through the area, but little or no sediment deposits were observed. The road ended at the north in a widened turn - around. The area around the road had been cleared and graded.ished grass was in place up to the edge of the unpaved road. The south edge of the site was next to a pre - existing housing development; the road for the pre - existing development was slightly raised above the level of the site (at least at the western half of the south border). Flow from the south part of the road and nearby areas led around a stockpile to a flat area and then appeared to flow east towards the large basin in the southeast. The large basin in the southeast had a small amount of standing water. It was surrounded by various stockpiles, none stabilized or otherwise protected, and flat areas of bare dirt. 3 ED_019088A_00019778-00003 No signs of overflow from the basin could be seen. The bare dirt walls of the basin did not show significant erosion (possibly indicating a fairly recent installation). North of the site road, next to Lunenburg road, a flow channel had been constructed from the road leading to a moderately large basin. Like the basin to the southwest, it had some standing water, and the bare earth walls appeared fairly new. North of that basin was the outfall from site drainage. Mr. Rheault stated that this was the planned location of the site's permanent stormwater basin. Mr. Rheault said that the excavator had begun construction, but after hitting clay, stopped. Mr. Koonce said that the site had discharged turbid stormwater from this point during a storm in the summer. At the time of the inspection, the concrete outfall led to a small 20 basin formed of crushed stone walls. Outside of the basin was an area with well - established P.grass and two rows of wood - mulch berms D. Closing Conference Mr. Spejewski noted the lack of stabilization over much of the site. Mr. Rheault said that stabilizing the site and re - designing the permanent basin were his only priorities at this point. Mr. Spejewski thanked Mr. Rheault for his time and left the site. Picture List: IMG 2476.JPGeast to Lunenburg road over site entrance IMG 2477.JPGacing south from north of site entrance IMG 2478.JPGFacing north to stockpile, from near site entrance IMG 2479.JPGCatchbasin, on slope east of entrance. IMG 2480.JPGCheckdam on road, up hill from entrance. IMG 2481.JPGFacing northwest along west side of road IMG 2482.JPGCheckdam in central (north - south) part of road IMG 2483.JPGBasin south of central part of road IMG 2484.JPGWoods belo basin south of road IMG 2485.JPGFacing north to end of road IMG 2486.JPGFacing south, drainage at southwest corner of site IMG 2487.JPGSouth edge of site (west end) IMG 2488.JPGacing north over basin at southeast of site IMG 2489.JPGFacing northeast over basin at southeast of site IMG 2490.JPGFacing north over temporary basin in center - east IMG 2491.JPGFacing north of site of permanent basin * END * Unless otherwise noted, this report describes conditions at the facility / property as observed by EPA inspector(s), and / or through records provided to and / or information reported to EPA inspector(s) by facility representatives and as understood by the inspector(s). This report may not capture all operations or activities ongoing at the time of the inspection. This report does not make final determinations on potential areas of 4 ++ ED_019088A_00019778-00004 concern. Nothing in this report affects EPA's authorities under federal statutes and regulations to pursue further investigation or action. DRAFT 50 ED_019088A_00019778-00005